You are on page 1of 3

JHA for PIPE WORK

Hazards analysis and precautions


ACTIVITY BASED RISK ASSESSMENT FOR PIPE WORK
Maurel& Prom Ref.: GR-HSE-FRM-011
HSE Forms Rev.: 0 of 30/12/2014

Job Safety Analysis Page 1 of 7


Facility: Mnazi Bay MB3 Date: 09-01-2015 Pages: 7
Leader: LUO Participants :LUO,SUN,LIN,ZHANG,LU,KANG
Description of work: Pipe work at MB3
Target Completion
Initial risk Residual risk Action by:
# Task Hazards / Risks / Scenario Action taken to limit danger date date
S P E S P E
-Prior to any activity on work site, set
up wind direction indicator and
watchman.
-Check all safety means are available on
site.
-Fire or explosion
-Set trash bins at worksite.
-Traffic accident.
-Provide banks man to guide the vehicle Supervisor,
Mobilization -Collision between vehicles.
when poor access or reverse driving. Safety Supervisor,
1 (machinery equipment) -Collision with pedestrians 4 3 T 4 1 A
-Organize circulation .segregate vehicle driver
-Damages to M&P
vehicles and pedestrians activities when
installations
reasonably possible.
-Falling of goods during
-Put barricades to protect critical
transportation.
installations (well head)
-Driver to check and make sure all
goods are loaded and secured properly
Post relevant safety signs.
Poor Weather - Rain - Site Supervisor to instruct all men to Site Supervisor,
2 3 2 T 3 1 A
Condition - Personal injury stop work and take shelter. Safety Supervisor.

-Driver has to ensure the materials


stacking properly onto the trailer / on
the ground.
-Falling object
Lifting Crew,
Materials loading and -Injury to workers, body
3 3 3 T -Only competent person to rig the 3 1 A Driver.
unloading on trailer injuries, fractures, sprains
materials & equipment. Safety Supervisor