MAZCOPR Engineering Services (Pvt.

) Limited
Pakistan.
PK-MZE-16-S005
SITE INSPECTION REPORT

Site Inspection Report

Tender Stage

Plant/Area: 132/11.5 kV (AIS) Grid Station (Including Allied Transmission Line)


DHA (Shuhuda) Town, Phase- IX, Lahore
Client DHA
EPC Contractor SIEMENS
Civil & ETC Contractor MAZCORP Engineering Services (Pvt.) Limited
Checklist Completed By: Muhammad Faizan
(Sr. Engineer Civil)
Checklist Completed By Mian Muhammad Khurram
(Manager Civil)
Date: 11-12-2016

Page | 1 |
Rev 0
MAZCOPR Engineering Services (Pvt.) Limited
Pakistan.
PK-MZE-16-S005
SITE INSPECTION REPORT

Site Location:
The site is located at DHA Phase IX (9) beside Lahore Bedian road near Harpalke Minor Canal & Ring road, La-
hore. The coordinate of site is 31.446256, 74.446534 as per google map. The site is approximately 14km from
SIEMENS Lahore office.

Page | 2 |
Rev 0
MAZCOPR Engineering Services (Pvt.) Limited
Pakistan.
PK-MZE-16-S005
SITE INSPECTION REPORT
Questions Status Comments/Clarifications
N/A = Not Applicable
Y = Answer Yes and/or comments
N = Answer No and/or comments

Site Check List


1.1 Do you have detailed description of the Y Please see site location plan
location with map and photographs?
1.2 Did you carry out an accurate inspection Y It is a green field project. The soil strata is
of the ground, to the extent that you are similar with general strata of Lahore
sure of having considered all elements
for proposing the best technical solution
at competitive price?
1.3 Does the Customers Specifications as- N It is Contractor Responsibility
sume the responsibility for the indicated
geographical conditions?
1.4 If yes, are they consistent with your vis- N/A
ual inspection of the ground?
1.5 If not, did you assess them to the extent N/A
necessary to avoid unforeseen ground
features, at least by a light penetrome-
ter?
1.6 Is the Site Leveled N More than 1m filling may require in
most of the area of site from road level
1.7 Is the Site Still Covered With Top Soil? Y
1.8 Is Cutting or Filling Required on site? Y Filling required
1.9 Have you checked the ground water Y 300Ft below Natural Surface Level (NSL)
level?
1.10 Is there an existing access to the site Y Site is near to Bedian Road & situated on
and is it in good conditions? main road of society.

1.11 Is the distance from existing main road Distance from ring road to site is approxi-
to the site known? mately 5km
1.12 Is the site embankment/levelling re- N
quired?
1.13 Does a water supply system exist? N Bore shall be required for this purpose.

1.14 Is the local practice known and consid- Y


ered?

1.15. Have you checked existing underground N/A


installations and obstacles?

1.16 Have you considered the availability Y Sand & Crush is available at Lawrencepur
and distance for concrete, rein- & Margala respectively, which is 350km
forcement, building materials? away from Site.
Cement, Steel & other material are availa-
ble in Lahore (10km to 20km away from
Site)
1.17 Is there any demolishing works Re- N
quired?

Page | 3 |
Rev 0
MAZCOPR Engineering Services (Pvt.) Limited
Pakistan.
PK-MZE-16-S005
SITE INSPECTION REPORT
Questions Status Comments/Clarifications
N/A = Not Applicable
Y = Answer Yes and/or comments
N = Answer No and/or comments

Local Costs of Area

2.1 Did you investigate the main local costs Y


such as manpower, aggregates, ce-
ment, reinforcing steel, fuel, local
transport, hiring of equipment, custom
duties, etc.?
2.2 Are there any import/export re- N
strictions for civil works materials?

Climatic Conditions
3.1 Did you consider the effects of the cli- Y
matic conditions? Summer is hot & Winter is cold
3.2 Are min/max day or night temperatures Y
to be considered?
3.3 Have you considered seasonal adverse Y
weather conditions such rain, frost etc.?

Accommodation/Camps
4.1 Did you evaluate the cost of accommo- Y
dation including hotels, camps, local
condition, restrictions, safety, transpor-
tation, consumables, meals, etc?
4.2 Did you evaluate the cost of offices and, Y Site Storage Container & Office container
if requested, for Customer and Engi- will be required
neer?
4.3 What requires to be delivered from N/A
home base because not available or to
expensive at site?
Demolishing Work
5.1 No. and dimension of foundation N
5.2 No. dimension and kind of other struc- N
ture

General Observation:
Site is leveled and most of the area is more than 1m deep from main road level. Huge quantity of
borrow backfill shall be required.
The foundation size shall not be more differ than the WAPDA standard size foundation
The quantity of concrete may be increased at least 1.25 times to quantities mentioned in BoQ

Page | 4 |
Rev 0
MAZCOPR Engineering Services (Pvt.) Limited
Pakistan.
PK-MZE-16-S005
SITE INSPECTION REPORT

Grid Station Gate

Site Area

Page | 5 |
Rev 0
MAZCOPR Engineering Services (Pvt.) Limited
Pakistan.
PK-MZE-16-S005
SITE INSPECTION REPORT

Site Area

Page | 6 |
Rev 0