You are on page 1of 21

4/6/2017 APEXProjectTimeCostsFullDetails

APEX>Projects>FullSummary
GeneratingCSV180,623of180,623TimeTaken=00h00m05s
From22/06/2015MonTo30/04/2017Sunforsyril.francisco:PaulSyrilD.FranciscoForANYProject

MatchSummary x A
ExportCSV
Date StaffName StaffID ProjectNo. ProjectName Stage Task Description PN(hr) PO(hr) AN(hr) AO(hr) TotalHrs
20150625Thu PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Basic TaskLogresearchonapartmentdesign 0.58 0.00 0.00 0.00 0.58
ACTIVITIES Research floorplan
20150625Thu PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Basic TaskLogRESEARCHONEXISTING 1.33 0.00 0.00 0.00 1.33
ACTIVITIES Research APARTMENTPROJECTFLOORPLAN
20150625Thu PaulSyrilD.Francisco 00JOG002 COMPANY Conceptual Drafting TaskLogConceptualplanofapartment 3.33 0.67 0.00 0.00 4.00
ACTIVITIES building
20150625Thu PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Basic researchonapartmentbuildingfloor 1.67 0.00 0.00 0.00 1.67
ACTIVITIES Research plans
20150626Fri PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Drafting TaskLogschemefloorplanon 10.25 0.25 0.00 0.00 10.50
ACTIVITIES apartmentdesignB.A.L.Ecompetition
20150629Mon PaulSyrilD.Francisco COM2015001 GOODYEAR Schematics Drafting TaskLogupdatecolumnsizeand 2.92 2.67 0.00 0.00 5.59
ARVO section
20150629Mon PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Drafting TaskLogupdateB.A.L.ECOMPETITION 5.92 0.00 0.00 0.00 5.92
ACTIVITIES apartment/dormitoryfloorplans
20150629Mon PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Drafting TaskLogupdateB.A.L.ECOMPETITION 5.92 0.00 0.00 0.00 5.92
ACTIVITIES apartment/dormitoryfloorplans
20150629Mon PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Drafting TaskLogupdateB.A.L.ECOMPETITION 5.92 0.00 0.00 0.00 5.92
ACTIVITIES apartment/dormitoryfloorplans
20150630Tue PaulSyrilD.Francisco COM2015001 GOODYEAR Schematics Drafting TaskLogupdatesectiondrawing 0.33 0.00 0.00 0.00 0.33
ARVO
20150630Tue PaulSyrilD.Francisco COM2015001 GOODYEAR Schematics Drafting TaskLogupdatesectiondetails 1.67 0.00 0.00 0.00 1.67
ARVO
20150630Tue PaulSyrilD.Francisco COM2015001 GOODYEAR Design Drafting TaskLogplottingofleftsideelevation 0.08 0.00 0.00 0.00 0.08
ARVO Development
20150630Tue PaulSyrilD.Francisco COM2015001 GOODYEAR Design Drafting TaskLogPLOTTINGOFELEVATIONS 0.00 0.00 0.00 0.00 0.00
ARVO Development
20150630Tue PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Drafting TaskLogrevisionofapartment/ 2.75 0.00 0.00 0.00 2.75
ACTIVITIES dormitoryfloorplan
20150701Wed PaulSyrilD.Francisco COM2015001 GOODYEAR Schematics Drafting TASKLOGupdaterearelevation 8.42 0.00 0.00 0.00 8.42
ARVO
20150702Thu PaulSyrilD.Francisco COM2015001 GOODYEAR Schematics Drafting TaskLogupdaterearelevation 1.08 0.00 0.00 0.00 1.08
ARVO
20150702Thu PaulSyrilD.Francisco COM2015001 GOODYEAR Schematics Drafting TaskLogcrosssection3detailupdate 8.83 0.17 0.00 0.00 9.00
ARVO rearelevationandcrosssection2
20150703Fri PaulSyrilD.Francisco COM2015001 GOODYEAR Schematics Drafting TaskLoglongitudinalsection4 0.08 0.00 0.00 0.00 0.08
ARVO
20150703Fri PaulSyrilD.Francisco COM2015001 GOODYEAR Schematics Drafting TaskLoglongitudinalsection4ground 3.75 0.00 0.00 0.00 3.75
ARVO floor
20150703Fri PaulSyrilD.Francisco COM2015001 GOODYEAR Schematics Drafting TASKLOGupdateLONGITUDINAL 5.17 0.75 0.00 0.00 5.92
ARVO SECTION2/CINEMASECTION
20150706Mon PaulSyrilD.Francisco COM2015001 GOODYEAR Schematics Drafting TaskLogupdateLONGITUDINAL 5.17 0.00 0.00 0.00 5.17
ARVO SECTION2ANDCINEMASECTION
20150706Mon PaulSyrilD.Francisco COM2015001 GOODYEAR Schematics Drafting TaskLogARVOACAREATABULATION 1.25 1.17 0.00 0.00 2.42
ARVO
20150707Tue PaulSyrilD.Francisco COM2015001 GOODYEAR Schematics Drafting TaskLogupdatecinemasectiondetail 9.75 2.00 0.00 0.00 11.75
ARVO longitudinalsection2baysection4
20150708Wed PaulSyrilD.Francisco COM2015001 GOODYEAR Schematics Drafting TaskLogupdatebaysection4 10.00 0.08 0.00 0.00 10.08
ARVO SECTIONS&ELEVATION
20150709Thu PaulSyrilD.Francisco COM2015001 GOODYEAR Schematics Drafting TaskLogupdatesections&elevations 0.00 0.00 0.00 0.00 0.00
ARVO
20150709Thu PaulSyrilD.Francisco COM2015001 GOODYEAR Schematics Drafting TaskLogUPDATEGROUNDFLOOR 8.67 1.83 0.00 0.00 10.50
ARVO PLAN
20150710Fri PaulSyrilD.Francisco COM2015001 GOODYEAR Schematics Drafting TaskLogUPDATESECTIONAREA 2.92 0.00 0.00 0.00 2.92
ARVO COLOROFTENANTMIXUSAGEAND
AC'DAREA
20150710Fri PaulSyrilD.Francisco COM2015001 GOODYEAR Schematics Drafting TaskLogBAYSECTION5&BAY 6.58 1.25 0.00 0.00 7.83
ARVO SECTION6
20150713Mon PaulSyrilD.Francisco COM2015001 GOODYEAR Schematics Drafting TaskLogBAYSECTION8 6.33 0.00 0.00 0.00 6.33
ARVO
20150713Mon PaulSyrilD.Francisco COM2015001 GOODYEAR Schematics Drafting TaskLogUPDATEBAYSECTION456& 3.08 0.33 0.00 0.00 3.41
ARVO 8
20150714Tue PaulSyrilD.Francisco COM2015001 GOODYEAR Schematics Drafting TaskLogupdatebaysection 8.08 0.00 0.00 0.00 8.08
ARVO
20150714Tue PaulSyrilD.Francisco COM2015001 GOODYEAR Schematics Drafting TaskLogPLOTTINGOFBAYSECTIONS 0.00 0.00 0.00 0.00 0.00
ARVO
20150714Tue PaulSyrilD.Francisco COM2015001 GOODYEAR Schematics Drafting TaskLogDOUBLEWALLSSECOND 0.00 1.42 0.00 0.00 1.42
ARVO FLOORPLAN
20150715Wed PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogsecondfloordetail(railings 6.92 0.00 0.00 0.00 6.92
ARVO Documents doublewallsdoors&windows)
20150715Wed PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogDOORSCHEDULE 8.75 0.00 0.00 0.00 8.75
ARVO Documents
20150715Wed PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogADMINOFFICESPACE 2.42 0.00 0.00 0.00 2.42
ARVO Documents PLANNING
20150715Wed PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogUPDATERCPGROUND 1.08 1.92 0.00 0.00 3.00
ARVO Documents FLOOR&SECONDFLOOR
20150716Thu PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogUPDATERCPGROUND& 5.50 0.00 0.00 0.00 5.50
ARVO Documents SECONDFLOORPLAN
20150716Thu PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogUPDATEDOORSCHEDULE 0.00 0.00 0.00 0.00 0.00
ARVO Documents
20150716Thu PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogUPDATEBAYSECTION47 1.42 0.00 0.00 0.00 1.42
ARVO Documents
20150718Sat PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogSTAIRDETAILS 6.67 0.00 0.00 0.00 6.67
ARVO Documents
20150720Mon PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogupdatestairdetail 9.83 1.17 0.00 0.00 11.00
ARVO Documents
20150720Mon PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogELEVATORDETAILS 0.00 0.00 0.00 0.00 0.00
ARVO Documents
20150720Mon PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogFLOORPLANTAGS 6.25 2.58 0.00 0.00 8.83
ARVO Documents

http://www.jogassociates.com/cgibin/projects/rpg2.cgi?fdet2=1 1/21
4/6/2017 APEXProjectTimeCostsFullDetails
20150721Tue PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogupdatefloorplantags 4.92 0.00 0.00 0.00 4.92
ARVO Documents
20150721Tue PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogrevisionsonbaysections 9.92 0.17 0.00 0.00 10.09
ARVO Documents
20150722Wed PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogrevisionofbaysection7 0.00 0.00 0.00 0.00 0.00
ARVO Documents
20150722Wed PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogUPDATEFLOORPLANTAGS 7.42 0.42 0.00 0.00 7.84
ARVO Documents (GROUNDFLOOR&SECONDFLOOR)
DRAFTINGOFROOFDECKPLANTAG
&UPDATEDOORSCHEDULE
20150723Thu PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogescalatordetails 4.67 0.00 0.00 0.00 4.67
ARVO Documents
20150723Thu PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogUPDATEANDPLOTFLOOR 8.50 2.50 0.00 0.00 11.00
ARVO Documents PLANTAGS
20150723Thu PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogROOFDECKLOUVER 3.50 2.50 0.00 0.00 6.00
ARVO Documents WINDOW
20150724Fri PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogupdatewindowschedule 3.00 0.00 0.00 0.00 3.00
ARVO Documents
20150724Fri PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogUPDATEFLOORPLANTAGS 6.08 0.00 0.00 0.00 6.08
ARVO Documents
20150724Fri PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogupdatedoorschedule 3.33 0.00 0.00 0.00 3.33
ARVO Documents
20150724Fri PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogFLOORTAGSTRANSFERTO 0.58 0.00 0.00 0.00 0.58
ARVO Documents PLOTFILE
20150725Sat PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogPLOTTINGOFSTAIRDETAIL 0.00 2.17 0.00 0.00 2.17
ARVO Documents ANDESCALATORDETAIL
20150725Sat PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogwindowscheduleupdate& 3.00 0.00 0.00 0.00 3.00
ARVO Documents transfertoplotfileclerestoryand
adminsecurityoffice
20150727Mon PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogdoorscheduleplot 10.17 0.50 0.00 0.00 10.67
ARVO Documents
20150727Mon PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogUPDATEFLOORPLANTAGS 5.92 0.00 0.00 0.00 5.92
ARVO Documents (ROOFDECK)
20150727Mon PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogUPDATEWINDOWSCHEDULE 0.00 0.00 0.00 0.00 0.00
ARVO Documents
20150728Tue PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogupdatebillboarddetail 9.50 0.00 0.00 0.00 9.50
ARVO Documents
20150728Tue PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogCOLUMNDETAIL 0.00 0.00 0.00 0.00 0.00
ARVO Documents
20150728Tue PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogUPDATEPLOTFILE 0.00 0.00 0.00 0.00 0.00
ARVO Documents
20150728Tue PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogUPDATEDOOR&WINDOW 0.00 1.33 0.00 0.00 1.33
ARVO Documents SCHED
20150729Wed PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogupdatedoor&window 0.00 0.00 0.00 0.00 0.00
ARVO Documents schedule
20150729Wed PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogUPDATESTAIRDETAIL 0.00 0.00 0.00 0.00 0.00
ARVO Documents
20150730Thu PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogupdatedoor&window 3.00 0.00 0.00 0.00 3.00
ARVO Documents schedule/floorplantags
20150731Fri PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogUPDATEFLOORPLANTAGS 1.25 0.00 0.00 0.00 1.25
ARVO Documents
20150731Fri PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogupdateplotfile 1.58 0.00 0.00 0.00 1.58
ARVO Documents
20150731Fri PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogupdateplotfile 7.58 0.00 0.00 0.00 7.58
ARVO Documents
20150731Fri PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Filing TaskLogSORTINGOFDESIGN 2.00 0.00 0.00 0.00 2.00
ARVO Documents DEVELOPMENTPACKAGE
20150803Mon PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogupdatebillboarddetail 5.17 0.00 0.00 0.00 5.17
ARVO Documents
20150803Mon PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogupdatebillboarddetails 3.83 0.50 0.00 0.00 4.33
ARVO Documents
20150804Tue PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogplottingofbillboarddetails 1.33 0.00 0.00 0.00 1.33
ARVO Documents
20150804Tue PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogplottingofbillboarddetails 1.33 0.00 0.00 0.00 1.33
ARVO Documents
20150804Tue PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogCOLUMNDETAILS 0.25 0.00 0.00 0.00 0.25
ARVO Documents
20150804Tue PaulSyrilD.Francisco COM2015001 GOODYEAR Contract Drafting TaskLogUPDATEBILLBOARDDETAIL 1.33 0.00 0.00 0.00 1.33
ARVO Documents 13
20150804Tue PaulSyrilD.Francisco REC2014001 CLARK Contract ProjectCo TaskLogcommentsonplumbing& 4.58 0.50 0.00 0.00 5.08
WATERWORLD Documents ordination sanitaryplans
20150805Wed PaulSyrilD.Francisco REC2014001 CLARK Contract Production TASKLOGUPDATECOMMENTSON 2.42 0.00 0.00 0.00 2.42
WATERWORLD Documents PLUMBING/SANITARYPLANFROM
PDFFINALDRAWING
20150805Wed PaulSyrilD.Francisco REC2014001 CLARK Contract Production TaskLogUPDATECOMMENTSON 0.92 0.00 0.00 0.00 0.92
WATERWORLD Documents PLUMBING/SANITARY/FIREPRO.
FROMPDFFINALDRAWING
20150805Wed PaulSyrilD.Francisco REC2014001 CLARK Contract Production TaskLogcommentsforarchitectural 3.00 0.00 0.00 0.00 3.00
WATERWORLD Documents plans
20150805Wed PaulSyrilD.Francisco REC2014001 CLARK Design Production TaskLogPLOTTINGOFPLUMBING/ 1.83 0.00 0.00 0.00 1.83
WATERWORLD Development SANITARYPLANSANDFIREPRO.
PLANS
20150805Wed PaulSyrilD.Francisco REC2014001 CLARK Design Production TaskLoggeneralcommentsfor 1.75 0.00 0.00 0.00 1.75
WATERWORLD Development sanitary/plumbingplans
20150805Wed PaulSyrilD.Francisco REC2014001 CLARK Design Production TaskLogcommentsonsanitaryplans 0.00 0.92 0.00 0.00 0.92
WATERWORLD Development andfireproplanspersheet
20150806Thu PaulSyrilD.Francisco REC2014001 CLARK Design Production TaskLogcommentsonsanitaryplans 2.58 0.00 0.00 0.00 2.58
WATERWORLD Development sheetW1toW10
20150806Thu PaulSyrilD.Francisco REC2014001 CLARK Design Production TaskLogcommentsonsanitaryplan 0.83 0.00 0.00 0.00 0.83
WATERWORLD Development sheetP1toP5
20150806Thu PaulSyrilD.Francisco REC2014001 CLARK Design Production TaskLogcommentssanitaryplansheet 4.42 0.00 0.00 0.00 4.42
WATERWORLD Development P6toP17
20150806Thu PaulSyrilD.Francisco REC2014001 CLARK Design Production TaskLogcommentsFIREPROTECTION 0.67 0.67 0.00 0.00 1.34
WATERWORLD Development SYSTEMSHEETF1TOF5
20150807Fri PaulSyrilD.Francisco REC2014001 CLARK Design Production TaskLogcommentsFIREPROTECTION 2.83 0.00 0.00 0.00 2.83
WATERWORLD Development SYSTEMSHEETF6TOF10
20150807Fri PaulSyrilD.Francisco REC2014001 CLARK Design Drafting TaskLogfinalcommentsforsanitary 0.00 0.00 0.00 0.00 0.00
WATERWORLD Development plansandfireprotectionsystemper
sheet
20150807Fri PaulSyrilD.Francisco REC2014001 CLARK Design Production TaskLogupdatefinalcommentsfor 5.08 0.67 0.00 0.00 5.75
WATERWORLD Development sanitaryplansandfireprotection
systempersheet

http://www.jogassociates.com/cgibin/projects/rpg2.cgi?fdet2=1 2/21
4/6/2017 APEXProjectTimeCostsFullDetails
20150810Mon PaulSyrilD.Francisco INS2015004 LDSIBA Schematics Production updateproposedareasquarefootage 1.75 0.00 0.00 0.00 1.75
ZAMBALES
20150810Mon PaulSyrilD.Francisco INS2015005 LDS Schematics Drafting REVISIONMALAYBALAY3RD 1.92 0.50 0.00 0.00 2.42
MALAYBALAY ADDITIONFLOORPLAN
BUKIDNON
20150810Mon PaulSyrilD.Francisco INS2015006 LDS Schematics Drafting REVISIONINPROPOSEDADDITION 0.75 2.00 0.00 0.00 2.75
BALINGASAG FLOORPLAN
MIS.ORIENTAL
20150810Mon PaulSyrilD.Francisco COM2014003 ROBINSONS Contract Production GROOVESPACINGDIMENSIONS 0.75 0.00 0.00 0.00 0.75
TAGUM Documents
20150810Mon PaulSyrilD.Francisco REC2014001 CLARK Design Production TASKLOGupdatecommentsin 3.25 0.00 0.00 0.00 3.25
WATERWORLD Development sanitaryandfireprosystem
20150811Tue PaulSyrilD.Francisco INS2015005 LDS Schematics Drafting reviseELEVATION 2.00 0.00 0.00 0.00 2.00
MALAYBALAY
BUKIDNON
20150811Tue PaulSyrilD.Francisco INS2015005 LDS Schematics Production updatefloorplanareatabulationof 3.42 0.00 0.00 0.00 3.42
MALAYBALAY existingandproposedaddition
BUKIDNON building
20150811Tue PaulSyrilD.Francisco INS2015005 LDS Schematics Drafting updaterevisioninfloorplan 3.50 0.00 0.00 0.00 3.50
MALAYBALAY
BUKIDNON
20150811Tue PaulSyrilD.Francisco INS2015006 LDS Schematics Drafting UPDATEHATCHELEVATION 0.00 2.83 0.00 0.00 2.83
BALINGASAG REVISIONSAREATABULATION
MIS.ORIENTAL
20150812Wed PaulSyrilD.Francisco INS2015005 LDS Schematics Production TaskLogPLOTTINGOFWORKING 0.00 2.25 0.00 0.00 2.25
MALAYBALAY DRAWING
BUKIDNON
20150812Wed PaulSyrilD.Francisco INS2015005 LDS Schematics Production TaskLogREVISIONONBUDGETARY 0.00 1.58 0.00 0.00 1.58
MALAYBALAY EST.OFFICEFILE
BUKIDNON
20150812Wed PaulSyrilD.Francisco INS2015005 LDS Schematics Production updatebudgetaryestimates 2.67 0.00 0.00 0.00 2.67
MALAYBALAY
BUKIDNON
20150812Wed PaulSyrilD.Francisco INS2015006 LDS Schematics Production updatearea/costestimate 2.50 0.00 0.00 0.00 2.50
BALINGASAG
MIS.ORIENTAL
20150812Wed PaulSyrilD.Francisco INS2015006 LDS Schematics Production updateestimate 3.75 0.00 0.00 0.00 3.75
BALINGASAG
MIS.ORIENTAL
20150813Thu PaulSyrilD.Francisco PD2014001 PRACTICE Conceptual Drafting schematicplanofLDSDIANAY 4.25 0.00 0.00 0.00 4.25
DEVELOPMENT
20150813Thu PaulSyrilD.Francisco INS2015005 LDS Schematics Production TaskLogCROSSCHECKOFEST 1.17 0.00 0.00 0.00 1.17
MALAYBALAY
BUKIDNON
20150813Thu PaulSyrilD.Francisco COM2014003 ROBINSONS Contract Production updateRCPfourthfloorcinema 0.92 0.00 0.00 0.00 0.92
TAGUM Documents
20150813Thu PaulSyrilD.Francisco COM2014003 ROBINSONS Contract Drafting updatercpofCINEMAfourthfloor 2.25 0.00 0.00 0.00 2.25
TAGUM Documents
20150814Fri PaulSyrilD.Francisco INC2015007 LDSDIANAY Schematics Production TaskLogUpdateschematicplanarea 1.75 0.00 0.00 0.00 1.75
tabulationplotting
20150814Fri PaulSyrilD.Francisco INC2015007 LDSDIANAY Schematics Production TaskLogupdateschematicplan 0.00 0.00 0.00 0.00 0.00
20150814Fri PaulSyrilD.Francisco INC2015007 LDSDIANAY Schematics Drafting TaskLogreviseadditionalparkingand 3.75 0.92 0.00 0.00 4.67
basketballcourtlayout
20150817Mon PaulSyrilD.Francisco INS2015003 LDS Schematics Drafting updatesection 0.09 2.33 0.00 0.00 2.42
SANCHEZ
MIRA
20150817Mon PaulSyrilD.Francisco INS2015003 LDS Design Production UPDATEAREATABULATION&EST. 3.08 0.00 0.00 0.00 3.08
SANCHEZ Development
MIRA
20150817Mon PaulSyrilD.Francisco INS2015003 LDS Contract Production updateareatabulation&budgetary 3.25 0.00 0.00 0.00 3.25
SANCHEZ Documents est.
MIRA
20150817Mon PaulSyrilD.Francisco INC2015007 LDSDIANAY Schematics Production TASKLOGverifylotbearing 3.08 0.00 0.00 0.00 3.08
20150818Tue PaulSyrilD.Francisco INS2015003 LDS Contract Drafting TaskLogupdatecross&longsection 3.17 0.00 0.00 0.00 3.17
SANCHEZ Documents
MIRA
20150818Tue PaulSyrilD.Francisco INS2015003 LDS Contract Production TaskLogrevision:budgetaryestof 2.33 0.17 0.00 0.00 2.50
SANCHEZ Documents pumphousetoiletsdp
MIRA
20150818Tue PaulSyrilD.Francisco INC2015007 LDSDIANAY Schematics Drafting TaskLogREVISION:SCHEMATICPLAN 1.42 0.00 0.00 0.00 1.42
20150818Tue PaulSyrilD.Francisco INC2015007 LDSDIANAY Schematics Production TaskLogPOWERPOINT 2.58 0.67 0.00 0.00 3.25
PRESENTATION
20150819Wed PaulSyrilD.Francisco INC2015007 LDSDIANAY Schematics Production TaskLogupdatepowerpoint 9.75 0.42 0.00 0.00 10.17
presentationandschematicplan
20150819Wed PaulSyrilD.Francisco INC2015007 LDSDIANAY Schematics Drafting TASKLOGupdateschematicplan 4.25 0.00 0.00 0.00 4.25
20150820Thu PaulSyrilD.Francisco INS2015003 LDS Contract Production TaskLogcheckingoffloorplantobe 2.33 0.00 0.00 0.00 2.33
SANCHEZ Documents plot
MIRA
20150820Thu PaulSyrilD.Francisco INS2015003 LDS Contract Production TaskLogPLOTTINGOF 1.67 0.75 0.00 0.00 2.42
SANCHEZ Documents ARCHITECTURALCIVILWORKS
MIRA MECHANICALELECTRICAL
20150820Thu PaulSyrilD.Francisco INC2015007 LDSDIANAY Schematics Production TaskLogplottingofupdated 7.25 0.00 0.00 0.00 7.25
schematicplan
20150820Thu PaulSyrilD.Francisco INC2015007 LDSDIANAY Schematics Production TaskLogUPDATEPOWERPOINT 5.50 0.00 0.00 0.00 5.50
PRESENTATION
20150824Mon PaulSyrilD.Francisco INS2015001 LDSMASINLOC Construction Production packagingconstructionplan 0.16 4.42 0.00 0.00 4.58
AndPermits (blueprint)
20150824Mon PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogupdateprogressofthe 2.92 0.00 0.00 0.00 2.92
SANCHEZ project
MIRA
20150824Mon PaulSyrilD.Francisco INS2015003 LDS Contract Production TaskLogupdatecrosssection 3.25 0.00 0.00 0.00 3.25
SANCHEZ Documents
MIRA
20150824Mon PaulSyrilD.Francisco INC2015007 LDSDIANAY Schematics Production TaskLogupdateprogressofproject 3.17 0.00 0.00 0.00 3.17
20150825Tue PaulSyrilD.Francisco INS2015003 LDS Design Drafting TaskLogupdatecrosssection 1.17 0.00 0.00 0.00 1.17
SANCHEZ Development
MIRA
20150825Tue PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogupdateprogressofproject 0.50 0.00 0.00 0.00 0.50
SANCHEZ
MIRA
20150825Tue PaulSyrilD.Francisco MXD2013006 TORRESUR Miscellaneous Production UPDATEUPPERGROUNDANDSIXTH 2.66 0.84 0.00 0.00 3.50
FLOORRCP(TRANSFERFIRE
SPRINKLERTORCPAND
DIMENSIONING)

http://www.jogassociates.com/cgibin/projects/rpg2.cgi?fdet2=1 3/21
4/6/2017 APEXProjectTimeCostsFullDetails
20150825Tue PaulSyrilD.Francisco COM2014003 ROBINSONS Construction Production updatetoilet2A2B2Cdetailsecond 2.17 0.00 0.00 0.00 2.17
TAGUM AndPermits floor
20150825Tue PaulSyrilD.Francisco COM2014003 ROBINSONS Construction Production updatecinemaauditoriumdetailplans 3.50 0.00 0.00 0.00 3.50
TAGUM AndPermits andseatingcapacity(interior)
20150826Wed PaulSyrilD.Francisco INS2015001 LDSMASINLOC Miscellaneous Production TaskLogcompileconstructionset 4.00 1.67 0.00 0.00 5.67
(caddfile)
20150826Wed PaulSyrilD.Francisco INS2015001 LDSMASINLOC Construction Production TaskLogUPDATEPERIMETERFENCE 1.33 0.50 0.00 0.00 1.83
AndPermits LAYOUT
20150826Wed PaulSyrilD.Francisco INS2015001 LDSMASINLOC Construction Production COMPILECONSTRUCTIONSETCADD 4.17 0.00 0.00 0.00 4.17
AndPermits FILE
20150827Thu PaulSyrilD.Francisco INS2015001 LDSMASINLOC Construction Production TaskLogupdateconstructionset 1.58 0.00 0.00 0.00 1.58
AndPermits compilation
20150827Thu PaulSyrilD.Francisco INS2015001 LDSMASINLOC Construction Production TaskLogPREPARESCADDFILEAND 1.42 0.00 0.00 0.00 1.42
AndPermits PDFFILEBURNING
20150827Thu PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production UPDATEDOORSCHEDULE/DETAIL 1.50 0.00 0.00 0.00 1.50
SANCHEZ
MIRA
20150827Thu PaulSyrilD.Francisco INS2015003 LDS Design Production TaskLogupdaterevisionofdoor/ 3.92 0.00 0.00 0.00 3.92
SANCHEZ Development windowscheduleandtags
MIRA
20150827Thu PaulSyrilD.Francisco INS2015003 LDS Design Production updatefloortilelayout 1.08 0.92 0.00 0.00 2.00
SANCHEZ Development
MIRA
20150828Fri PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogupdatedrawingstandard 0.00 0.00 0.00 0.00 0.00
SANCHEZ (architectural)
MIRA
20150828Fri PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogupdatedrawingstandard 6.50 0.00 0.00 0.00 6.50
SANCHEZ (architectural)
MIRA
20150828Fri PaulSyrilD.Francisco INS2015003 LDS Design Production TaskLogUPDATEPULPITDETAILS 0.92 0.00 0.00 0.00 0.92
SANCHEZ Development
MIRA
20150828Fri PaulSyrilD.Francisco INS2015003 LDS Design Production TaskLogUPDATESPIREDETAILS 0.00 0.00 0.00 0.00 0.00
SANCHEZ Development
MIRA
20150828Fri PaulSyrilD.Francisco INS2015003 LDS Design Production TaskLogUPDATECEILINGSECTION@ 2.25 0.00 0.00 0.00 2.25
SANCHEZ Development CHAPEL
MIRA
20150901Tue PaulSyrilD.Francisco INS2015003 LDS Design Production TaskLogupdateceilingsectiondetails 2.92 0.00 0.00 0.00 2.92
SANCHEZ Development ofchapel
MIRA
20150901Tue PaulSyrilD.Francisco INS2015003 LDS Design Production TaskLogUPDATERCP(ACOUSTIC 1.74 0.68 0.00 0.00 2.42
SANCHEZ Development TILE)
MIRA
20150901Tue PaulSyrilD.Francisco INS2015003 LDS Design Production TaskLogUPDATECABINETDETAIL& 4.17 0.00 0.00 0.00 4.17
SANCHEZ Development SECTION
MIRA
20150901Tue PaulSyrilD.Francisco INS2015003 LDS Design Production TaskLogUPDATEBISHOPWALL 0.67 0.00 0.00 0.00 0.67
SANCHEZ Development ELEVATION&FURNITUREDETAILS
MIRA
20150902Wed PaulSyrilD.Francisco INS2015003 LDS Design Production TaskLogupdatercpacoustictile 2.50 0.00 0.00 0.00 2.50
SANCHEZ Development
MIRA
20150902Wed PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogupdatereferencetagplan 1.75 0.00 0.00 0.00 1.75
SANCHEZ
MIRA
20150902Wed PaulSyrilD.Francisco INS2015003 LDS Schematics Production TASKLOGUPDATEARCHITECTURAL 0.42 1.00 0.00 0.00 1.42
SANCHEZ STANDARDDRAWINGS
MIRA
20150902Wed PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogUPDATEARCHITECTURAL 2.33 0.00 0.00 0.00 2.33
SANCHEZ STANDARDDRAWINGS
MIRA
20150902Wed PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogUPDATEROOFPLAN 2.50 1.00 0.00 0.00 3.50
SANCHEZ
MIRA
20150903Thu PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogupdatedrawingstandards 4.92 0.00 0.00 0.00 4.92
SANCHEZ (titleblocklogo)
MIRA
20150903Thu PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogupdatearchitecturaldrawing 2.41 0.59 0.00 0.00 3.00
SANCHEZ standard(Miscellaneousdetails/plans)
MIRA
20150903Thu PaulSyrilD.Francisco INS2015003 LDS Schematics Production TASKLOGUPDATERCPCHAPEL 0.17 0.42 0.00 0.00 0.59
SANCHEZ (OPTION3&4)
MIRA
20150917Thu PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogupdateprojectprogress 3.58 0.00 0.00 0.00 3.58
SANCHEZ
MIRA
20150917Thu PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogupdateRCP(OPTION3)AND 2.25 0.17 0.00 0.00 2.42
SANCHEZ DETAILPLAN
MIRA
20150917Thu PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogUPDATECOLUMNWALL 3.67 0.00 0.00 0.00 3.67
SANCHEZ SETTINGOUTPLANANDCEILING
MIRA FRAMING&GRIDSUPPORTPLAN
20150918Fri PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogUPDATESTANDARD 0.92 0.00 0.00 0.00 0.92
SANCHEZ DRAWINGS(ELECTRICAL)
MIRA
20150918Fri PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogREVISEPERIMETERFENCE 2.58 0.00 0.00 0.00 2.58
SANCHEZ PROFILE
MIRA
20150918Fri PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogupdateperimeterfenceprofile 3.00 0.00 0.00 0.00 3.00
SANCHEZ
MIRA
20150918Fri PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogUPDATEELEVATION(COURT 1.17 0.00 0.00 0.00 1.17
SANCHEZ FENCEAREALIGHTINGLIGHTPOST)
MIRA
20150919Sat PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogupdateelevation(fencecourt 6.67 0.00 0.00 0.00 6.67
SANCHEZ lightpostarealightramps
MIRA door/windowtags)
20150921Mon PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogUPDATEELEVATIONS/ 2.08 0.00 0.00 0.00 2.08
SANCHEZ SECTIONS
MIRA
20150921Mon PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogREVISION:PERIMETER 2.42 0.00 0.00 0.00 2.42
SANCHEZ FENCEPROFILE
MIRA
20150921Mon PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogupdaterevision:perimeter 5.00 0.00 0.00 0.00 5.00
SANCHEZ fenceprofile

http://www.jogassociates.com/cgibin/projects/rpg2.cgi?fdet2=1 4/21
4/6/2017 APEXProjectTimeCostsFullDetails
MIRA
20150921Mon PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogupdatefenceelevations 0.33 0.25 0.00 0.00 0.58
SANCHEZ
MIRA
20150922Tue PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Production TaskLogBLOWUPDETAILWAITING 1.83 0.25 0.00 0.00 2.08
DEVELOPMENT AREA
20150922Tue PaulSyrilD.Francisco INS2015003 LDS Schematics Drafting TaskLogFENCEPERIMETERPROFILE 3.92 0.00 0.00 0.00 3.92
SANCHEZ REVISION
MIRA
20150922Tue PaulSyrilD.Francisco OFC2014003 HLURBOFFICE Miscellaneous Production TaskLogHLURBBLOWUPPLAN/ELEV 2.50 0.00 0.00 0.00 2.50
RCPFLOORPATTERN:CHIEFOF
STAFFOFFICE
20150922Tue PaulSyrilD.Francisco OFC2014003 HLURBOFFICE Miscellaneous Production TaskLogBLOWUPDETAILCEO 1.50 0.00 0.00 0.00 1.50
TOILET
20150923Wed PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogupdateelevationdetail 4.67 0.00 0.00 0.00 4.67
SANCHEZ
MIRA
20150923Wed PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogupdateperimeterfencedetail 4.83 0.17 0.00 0.00 5.00
SANCHEZ
MIRA
20150924Thu PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogUPDATEARCHITECTURAL 0.00 3.92 0.00 0.00 3.92
SANCHEZ WORKINGDRAWINGS
MIRA
20150924Thu PaulSyrilD.Francisco INS2015003 LDS Schematics Drafting TaskLogUPDATEDRAWING 1.25 0.00 0.00 0.00 1.25
SANCHEZ STANDARDANDPAPERSIZEOF
MIRA MECHANICALELECTRICALAND
SANITARYPLANSFORDESIGN
DEVELOPMENTANDCONSTRUCTION
PLAN
20150924Thu PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogOVERLAYSITE 3.83 0.67 0.00 0.00 4.50
SANCHEZ DEVELOPMENTPLANOF
MIRA ARCHITECTURALELECTRICALAND
SANITARY
20150924Thu PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogOVERLAYSITE 3.83 0.67 0.00 0.00 4.50
SANCHEZ DEVELOPMENTPLANOF
MIRA ARCHITECTURALELECTRICALAND
SANITARY
20150928Mon PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogSORTINGOFFILESFOR 1.08 0.00 0.00 0.00 1.08
SANCHEZ CONTRACTDOCUMENT
MIRA
20150928Mon PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogUPDATESTRUCTURAL 8.67 0.58 0.00 0.00 9.25
SANCHEZ ELECTRICALTELECOMDRAWING
MIRA STANDARDFORC.D.
20150929Tue PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogupdatesanitarydrawing 2.58 0.00 0.00 0.00 2.58
SANCHEZ standardforC.D.
MIRA
20150929Tue PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogUPDATERCP 0.00 0.00 0.00 0.00 0.00
SANCHEZ ARCHITECTURALDRAWING
MIRA STANDARDANDLAYOUT(A1)
20150929Tue PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogUPDATERCP 2.75 0.00 0.00 0.00 2.75
SANCHEZ ARCHITECTURALDRAWING
MIRA STANDARDANDLAYOUT(A1)
20150929Tue PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogUPDATERIGHT/LEFT 3.25 0.00 0.00 0.00 3.25
SANCHEZ ELEVATION
MIRA
20150929Tue PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogUPDATECEILINGDETAIL 1.58 0.33 0.00 0.00 1.91
SANCHEZ
MIRA
20150930Wed PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogUPDATECROSS/LONG 3.83 0.00 0.00 0.00 3.83
SANCHEZ SECTION
MIRA
20150930Wed PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogUPDATEDRAWING 4.33 0.00 0.00 0.00 4.33
SANCHEZ STANDARDOFPUMPHOUSE
MIRA
20150930Wed PaulSyrilD.Francisco INS2015003 LDS Schematics Drafting TaskLogBAPTISMALFONTDETAIL 2.08 0.33 0.00 0.00 2.41
SANCHEZ WITHSUMPPITSECTION
MIRA
20151001Thu PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogUPDATESUMPPITDETAILIN 5.17 0.00 0.00 0.00 5.17
SANCHEZ FONTDETAILSECTION
MIRA
20151001Thu PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogUPDATESUMPPITDETAILIN 5.17 0.00 0.00 0.00 5.17
SANCHEZ FONTDETAILSECTION
MIRA
20151001Thu PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogPLOTTINGOFTELECOM 1.50 0.00 0.00 0.00 1.50
SANCHEZ DRAWINGS
MIRA
20151001Thu PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogPLOTTINGOF 0.00 0.00 0.00 0.00 0.00
SANCHEZ ARCHITECTURALDRAWINGS
MIRA
20151001Thu PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogPLOTTINGOF 3.58 0.42 0.00 0.00 4.00
SANCHEZ ARCHITECTURALDRAWINGS
MIRA
20151002Fri PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogupdateceilingsectiondetail 3.00 0.00 0.00 0.00 3.00
SANCHEZ ofMULTIPURPOSESECTIONLONG
MIRA SECTION
20151002Fri PaulSyrilD.Francisco INS2015003 LDS Schematics Drafting TaskLogUPDATEROSTRUMDETAIL 7.58 0.00 0.00 0.00 7.58
SANCHEZ SECTIONPLOTTINGOF
MIRA ARCHITECTURALMISCELLANEOUS
DETAILS
20151005Mon PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogUPDATEARCHITECTURAL 5.92 0.42 0.00 0.00 6.34
SANCHEZ CIVIL&STRUCTURALDRAWING
MIRA STANDARDS
20151005Mon PaulSyrilD.Francisco INS2015003 LDS Schematics Production TaskLogUPDATEARCHITECTURAL 3.58 0.42 0.00 0.00 4.00
SANCHEZ DRAWINGSTANDARDSFOR
MIRA CONTRACTDOCUMENT
20151006Tue PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogUPDATEARCHITECTURAL 5.17 0.00 0.00 0.00 5.17
SANCHEZ SETSFORFINALDRAWINGS
MIRA
20151006Tue PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogUPDATEARCHITECTURAL 3.67 0.00 0.00 0.00 3.67
SANCHEZ SETS(MISCELLANEOUSDETAILS)
MIRA FORFINALDRAWINGS
20151006Tue PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogMINUTESOFMEETING 1.42 0.08 0.00 0.00 1.50
SANCHEZ
MIRA
20151007Wed PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogMINUTESOFMEETING 2.42 0.00 0.00 0.00 2.42
SANCHEZ
MIRA

http://www.jogassociates.com/cgibin/projects/rpg2.cgi?fdet2=1 5/21
4/6/2017 APEXProjectTimeCostsFullDetails
20151007Wed PaulSyrilD.Francisco INS2015003 LDS Contract Production TaskLogupdatefacadedetailelevation 0.83 0.00 0.00 0.00 0.83
SANCHEZ Documents
MIRA
20151007Wed PaulSyrilD.Francisco INS2015003 LDS Contract Production TaskLogUPDATEWALLTAGSETTING 0.92 0.00 0.00 0.00 0.92
SANCHEZ Documents OUTPLAN
MIRA
20151007Wed PaulSyrilD.Francisco INS2015003 LDS Contract Production TaskLogUPDATEFLOORPLANWALL 3.00 0.00 0.00 0.00 3.00
SANCHEZ Documents TAG
MIRA
20151007Wed PaulSyrilD.Francisco INS2015003 LDS Design Drafting TaskLogUPDATEINTERIORWALL 2.33 0.00 0.00 0.00 2.33
SANCHEZ Development ELEVATIONOFSERVINGAREA
MIRA
20151008Thu PaulSyrilD.Francisco INS2015003 LDS Contract Production TaskLogupdatemiscellaneousdetails 2.00 0.08 0.00 0.00 2.08
SANCHEZ Documents
MIRA
20151008Thu PaulSyrilD.Francisco INS2015003 LDS Design Drafting TaskLogREVISEDRCPACOUSTIC 2.42 0.00 0.00 0.00 2.42
SANCHEZ Development TILEANDSECTIONDETAIL
MIRA
20151008Thu PaulSyrilD.Francisco INS2015003 LDS Contract Production TaskLogupdatechapelsection 1.83 0.00 0.00 0.00 1.83
SANCHEZ Documents acoustictile
MIRA
20151008Thu PaulSyrilD.Francisco INS2015003 LDS Design Drafting TaskLogINTERIORWALLELEVATION 2.92 0.00 0.00 0.00 2.92
SANCHEZ Development OFTECH.ROOM
MIRA
20151008Thu PaulSyrilD.Francisco INS2015003 LDS Design Production TaskLogUPDATEFURNITURELAYOUT 0.33 0.25 0.00 0.00 0.58
SANCHEZ Development PLAN
MIRA
20151009Fri PaulSyrilD.Francisco T001 APEX Miscellaneous Meeting APEX:GENERALASSEMBLY 2.50 0.00 0.00 0.00 2.50
20151009Fri PaulSyrilD.Francisco INS2015003 LDS Contract Production TaskLogupdatemiscellaneousdetail 5.08 0.00 0.00 0.00 5.08
SANCHEZ Documents drawingstandards
MIRA
20151009Fri PaulSyrilD.Francisco INS2015003 LDS Design Production TaskLogTOILETWALLELEVATION 4.75 1.17 0.00 0.00 5.92
SANCHEZ Development
MIRA
20151012Mon PaulSyrilD.Francisco INS2015003 LDS Contract Drafting TaskLogCANOPYDETAIL 2.58 0.00 0.00 0.00 2.58
SANCHEZ Documents
MIRA
20151012Mon PaulSyrilD.Francisco INS2015003 LDS Contract Production TaskLogMISCELLANEOUSDETAILS 1.75 0.00 0.00 0.00 1.75
SANCHEZ Documents
MIRA
20151012Mon PaulSyrilD.Francisco INS2015003 LDS Contract Production TaskLogROSTRUMDETAIL&FUTURE 5.33 0.17 0.00 0.00 5.50
SANCHEZ Documents WALLDETAIL
MIRA
20151013Tue PaulSyrilD.Francisco INS2015003 LDS Contract Production TaskLogMISCELLANEOUSDETAILS 4.17 0.00 0.00 0.00 4.17
SANCHEZ Documents
MIRA
20151013Tue PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogUPDATETITLEBLOCK 3.33 0.00 0.00 0.00 3.33
SANCHEZ (ARCHITECTURALWORKING
MIRA DRAWINGS)
20151013Tue PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogPLOTTINGOF 2.00 0.00 0.00 0.00 2.00
SANCHEZ MISCELLANEOUSDETAIL
MIRA
20151014Wed PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogplottingofengineering 1.33 0.00 0.00 0.00 1.33
SANCHEZ workingdrawings
MIRA
20151014Wed PaulSyrilD.Francisco INS2015003 LDS Contract Production TaskLogRCPREVISION 1.58 0.00 0.00 0.00 1.58
SANCHEZ Documents
MIRA
20151014Wed PaulSyrilD.Francisco INS2015003 LDS Contract Production TaskLogCEILINGDETAILATCHAPEL 6.08 0.00 0.00 0.00 6.08
SANCHEZ Documents REVISION/RCP
MIRA
20151014Wed PaulSyrilD.Francisco INS2015003 LDS Contract Production TaskLogUPDATEFLOORPLAN 0.51 0.57 0.00 0.00 1.08
SANCHEZ Documents
MIRA
20151015Thu PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogPLOTTINGOFWORKING 4.17 0.00 0.00 0.00 4.17
SANCHEZ DRAWINGS
MIRA
20151015Thu PaulSyrilD.Francisco INS2015003 LDS Contract Production TaskLogFONTDETAIL 3.33 0.67 0.00 0.00 4.00
SANCHEZ Documents
MIRA
20151015Thu PaulSyrilD.Francisco INS2015003 LDS Contract Production TaskLogREFLECTEDCEILINGPLAN 2.00 0.25 0.00 0.00 2.25
SANCHEZ Documents SPEAKERLAYOUT
MIRA
20151015Thu PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogPROJECTMANUAL 0.00 3.25 0.00 0.00 3.25
SANCHEZ
MIRA
20151016Fri PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogPROJECTMANUAL 3.33 0.42 0.00 0.00 3.75
SANCHEZ
MIRA
20151016Fri PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogFORPERMITPLANS 2.75 0.00 0.00 0.00 2.75
SANCHEZ
MIRA
20151016Fri PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogTECHSPECS 3.42 0.25 0.00 0.00 3.67
SANCHEZ
MIRA
20151019Mon PaulSyrilD.Francisco MXD2015001 RAYMUNDKHO Schematics Production TaskLogCHECKINGOFFLOORPLAN 3.17 0.00 0.00 0.00 3.17
DIMENSIONANDSPECSFOR
ELEVATION
20151019Mon PaulSyrilD.Francisco MXD2015001 RAYMUNDKHO Conceptual Production TaskLogRIGHTANDLEFTELEVATION 4.58 0.00 0.00 0.00 4.58
20151019Mon PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Basic TaskLogRESEARCHREINFORCING 0.58 0.00 0.00 0.00 0.58
SANCHEZ Research STEELBAR(ESTIMATES)
MIRA
20151019Mon PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogSUMMARYREPORTOF 1.17 0.75 0.00 0.00 1.92
SANCHEZ CONTRACTORSTHATPARTICIPATE
MIRA ANDDECLINEONPREBIDMEETING
20151020Tue PaulSyrilD.Francisco MXD2015001 RAYMUNDKHO Schematics Drafting TaskLogCROSSSECTION1 0.92 0.00 0.00 0.00 0.92
20151020Tue PaulSyrilD.Francisco INS2015003 LDS Biddings Production TaskLogSORTINGOFBLUEPRINT 3.17 0.00 0.00 0.00 3.17
SANCHEZ FORBIDDERS
MIRA
20151020Tue PaulSyrilD.Francisco INS2015003 LDS Biddings Filing TaskLogBLUEPRINTANDTECH 5.08 0.75 0.00 0.00 5.83
SANCHEZ SPECS
MIRA
20151021Wed PaulSyrilD.Francisco MXD2015001 RAYMUNDKHO Schematics Drafting TaskLogCROSSSECTION 2.17 0.00 0.00 0.00 2.17
20151021Wed PaulSyrilD.Francisco MXD2015001 RAYMUNDKHO Schematics Drafting TaskLogCROSSSECTION2 1.83 0.00 0.00 0.00 1.83
20151021Wed PaulSyrilD.Francisco MXD2015001 RAYMUNDKHO Schematics Drafting TaskLogupdatecrosssection2 4.75 0.00 0.00 0.00 4.75
20151021Wed PaulSyrilD.Francisco MXD2015001 RAYMUNDKHO Schematics Drafting TaskLogRCPBASEMENT 0.75 0.25 0.00 0.00 1.00

http://www.jogassociates.com/cgibin/projects/rpg2.cgi?fdet2=1 6/21
4/6/2017 APEXProjectTimeCostsFullDetails
20151022Thu PaulSyrilD.Francisco PD2014001 PRACTICE Conceptual Drafting TaskLogSCHEMATICPLANGROUND 3.92 0.08 0.00 0.00 4.00
DEVELOPMENT PASEO7
20151022Thu PaulSyrilD.Francisco MXD2015001 RAYMUNDKHO Schematics Drafting TaskLogUPDATEBASEMENTRCP 1.66 0.09 0.00 0.00 1.75
20151022Thu PaulSyrilD.Francisco MXD2015001 RAYMUNDKHO Schematics Drafting TaskLogGROUNDRCP 3.92 0.00 0.00 0.00 3.92
20151023Fri PaulSyrilD.Francisco PD2014001 PRACTICE Conceptual Drafting TaskLogSCHEMATICPLANBYRON 5.08 0.00 0.00 0.00 5.08
DEVELOPMENT SYPAMPANGA
20151023Fri PaulSyrilD.Francisco MXD2015001 RAYMUNDKHO Schematics Drafting TaskLogUPDATECROSSSECTION1& 4.42 0.58 0.00 0.00 5.00
2
20151026Mon PaulSyrilD.Francisco MXD2015001 RAYMUNDKHO Design Drafting TaskLogGROUNDRCP 3.00 0.00 0.00 0.00 3.00
Development
20151026Mon PaulSyrilD.Francisco MXD2015001 RAYMUNDKHO Design Drafting TaskLogRCPMEZZANINESECOND& 6.50 0.17 0.00 0.00 6.67
Development THIRD
20151026Mon PaulSyrilD.Francisco COM2014003 ROBINSONS Miscellaneous Drafting TaskLogBUILTINCOLUMNDETAILS 0.00 2.25 0.00 0.00 2.25
TAGUM ANDADDITIONALLANDSCAPING
20151027Tue PaulSyrilD.Francisco COM2013002 GREENFIELD Schematics Drafting TaskLogSCHEME1&2GREENFIELD 5.33 1.75 0.00 0.00 7.08
BLOCK7 PASEO7
20151027Tue PaulSyrilD.Francisco COM2014003 ROBINSONS Construction Drafting TaskLogADDITIONALLANDSCAPING 1.08 7.34 0.00 0.00 8.42
TAGUM AndPermits DETAILINMAINENTRYELEVATION/
SECTION/BLOWUPPLAN
20151027Tue PaulSyrilD.Francisco COM2014003 ROBINSONS Construction Drafting TaskLogADDITIONALLANDSCAPING 3.09 2.16 0.00 0.00 5.25
TAGUM AndPermits DETAILINMAINENTRY
20151028Wed PaulSyrilD.Francisco PD2014001 PRACTICE Conceptual Drafting TaskLogSUYSINGSCHEMATICPLAN 3.42 2.00 0.00 0.00 5.42
DEVELOPMENT
20151028Wed PaulSyrilD.Francisco MXD2015001 RAYMUNDKHO Design Production TaskLogUPDATERCP/ELEVATION 3.83 0.00 0.00 0.00 3.83
Development
20151028Wed PaulSyrilD.Francisco MXD002 ByronSy Conceptual Basic TaskLogRESEARCHCONCEPTUAL 2.08 0.00 0.00 0.00 2.08
Anchor&Theme Research IMAGESOFMIXEDUSED
COMMERCIALDEVELOPMENT
20151028Wed PaulSyrilD.Francisco MXD002 ByronSy Conceptual Basic TaskLogRESEARCHCONCEPTMALL 0.17 0.00 0.00 0.00 0.17
Anchor&Theme Research DESIGN
20151029Thu PaulSyrilD.Francisco FSWH2015001 SUYSING Schematics Drafting TaskLogSUYSINGBLOCKINGPLAN 9.50 2.25 0.00 0.00 11.75
WAREHOUSE ANDRESEARCH
20151030Fri PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogSCHEME3 7.50 2.25 0.00 0.00 9.75
Anchor&Theme
20151030Fri PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogSCHEME3 7.50 2.25 0.00 0.00 9.75
Anchor&Theme
20151030Fri PaulSyrilD.Francisco FSWH2015001 SUYSING Schematics Drafting TaskLogBOCKINGPLANSAND 9.67 2.25 0.00 0.00 11.92
WAREHOUSE CONCEPTIMAGES
20151102Mon PaulSyrilD.Francisco MXD002 ByronSy Conceptual Production TaskLogCONCEPTUALIMAGES/ 0.50 1.50 0.00 0.00 2.00
Anchor&Theme PLANS
20151102Mon PaulSyrilD.Francisco FSWH2015001 SUYSING Conceptual Production TaskLogSCHEMATICPLANAND 9.00 0.92 0.00 0.00 9.92
WAREHOUSE CONCEPTUALIMAGESINTERIOR
20151103Tue PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogSCHEME2PARKINGLAYOUT 4.25 0.00 0.00 0.00 4.25
Anchor&Theme
20151103Tue PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogUPDATESCHEME2MIXED 5.25 0.25 0.00 0.00 5.50
Anchor&Theme USEDCOMMERCIALBUILDING
20151104Wed PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogSCHEME2SECTION1 4.25 0.00 0.00 0.00 4.25
Anchor&Theme
20151104Wed PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogSHEME2SECTION2 1.83 0.00 0.00 0.00 1.83
Anchor&Theme
20151104Wed PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogSCHEME1FLOORPLAN 3.42 0.33 0.00 0.00 3.75
Anchor&Theme REVISION
20151105Thu PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TASKLOGSCHEME1GROUNDFLOOR 4.25 0.00 0.00 0.00 4.25
Anchor&Theme PLAN
20151105Thu PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogREVISIONSCHEME2 5.25 0.42 0.00 0.00 5.67
Anchor&Theme SECONDFLOORPLANANDPARKING
20151106Fri PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogMASTERDEVELOPMENT 9.83 0.00 0.00 0.00 9.83
Anchor&Theme CONCEPT/SCHEME
20151109Mon PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogSCHEMEANDCONCEPTOF 10.33 0.33 0.00 0.00 10.66
Anchor&Theme MASTERDEVELOPMENTPLAN
20151110Tue PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogSCHEMEMASTERPLAN/ 10.08 1.33 0.00 0.00 11.41
Anchor&Theme CONCEPT
20151110Tue PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogSCHEME1PLANREVISION 0.58 3.58 0.00 0.00 4.16
Anchor&Theme 1.5HEC.
20151111Wed PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogSCHEME1REVISIONFLOOR 10.50 0.42 0.00 0.00 10.92
Anchor&Theme PLAN
20151112Thu PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogUPDATESCHEME1REVISION 4.00 0.00 0.00 0.00 4.00
Anchor&Theme FLOORPLAN
20151112Thu PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogMASTERDEVELOPMENT 6.17 0.58 0.00 0.00 6.75
Anchor&Theme PLAN40HEC.
20151113Fri PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogFLOORPLANCOMMERCIAL 9.50 0.42 0.00 0.00 9.92
Anchor&Theme BLOCK9(IKEACONCEPT)
20151114Sat PaulSyrilD.Francisco MXD002 ByronSy Conceptual Production TaskLogMASTERPLANSCHEMEFOR 6.25 0.00 0.00 0.00 6.25
Anchor&Theme HIGHSTREET
20151116Mon PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogUPDATEMASTER 9.83 0.08 0.00 0.00 9.91
Anchor&Theme DEVELOPMENTSCHEMEPLAN(HIGH
STREET&CROSSING)
20151117Tue PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogMASTERDEVELOPMENT 5.50 0.75 0.00 0.00 6.25
Anchor&Theme PLANPROMENADEHIGHSTREET
CROSSING
20151117Tue PaulSyrilD.Francisco MXD002 ByronSy Conceptual Production TaskLogCONCEPTBOARDLAYOUT 4.00 1.00 0.00 0.00 5.00
Anchor&Theme
20151117Tue PaulSyrilD.Francisco FSWH2015001 SUYSING Schematics Drafting TaskLogREVISEDSCHEMATICPLAN 0.00 0.92 0.00 0.00 0.92
WAREHOUSE
20151118Wed PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogANCHORBUILDINGSCHEME 7.08 0.00 0.00 0.00 7.08
Anchor&Theme
20151120Fri PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogANCHORBUILDING 4.58 0.00 0.00 0.00 4.58
Anchor&Theme CONCEPTSCHEMEFLOORPLAN
20151120Fri PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogANCHORBUILDINGSCHEME 5.25 0.33 0.00 0.00 5.58
Anchor&Theme 1GROUND&SECONDFLOORPLAN
20151120Fri PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TASKLOGANCHORBUILDING 0.33 4.00 0.00 0.00 4.33
Anchor&Theme SCHEME2GROUND&SECOND
FLOORPLAN
20151121Sat PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogANCHORBUILDINGAND 4.08 0.00 0.00 0.00 4.08
Anchor&Theme PROMENADEFLOORPLAN
20151121Sat PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogANCHORBUILDINGSCHEME 2.83 2.08 0.00 0.00 4.91
Anchor&Theme 2ROOFDECK
20151123Mon PaulSyrilD.Francisco FSWH2015001 SUYSING Schematics Drafting TaskLogSCHEMEPLANREVISION 4.08 0.00 0.00 0.00 4.08
WAREHOUSE
20151123Mon PaulSyrilD.Francisco FSWH2015001 SUYSING Schematics Drafting TaskLogUPDATESCHEMEPLAN 5.08 3.75 0.00 0.00 8.83
WAREHOUSE REVISION

http://www.jogassociates.com/cgibin/projects/rpg2.cgi?fdet2=1 7/21
4/6/2017 APEXProjectTimeCostsFullDetails
20151124Tue PaulSyrilD.Francisco SUP2014001 NEW Miscellaneous Discussion NEWSUPPLIERS:COMPOSITEPANEL 1.00 0.00 0.00 0.00 1.00
SUPPLIERS
20151124Tue PaulSyrilD.Francisco MXD002 ByronSy Conceptual Production TASKLOGPRESENTATIONBOARD 2.50 9.58 0.00 0.00 12.08
Anchor&Theme
20151124Tue PaulSyrilD.Francisco FSWH2015001 SUYSING Schematics Drafting TaskLogREVISIONSCHEMATICPLAN 2.42 0.33 0.00 0.00 2.75
WAREHOUSE
20151124Tue PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Drafting TaskLogBYRONSYPAMPANGA(1.50 3.58 0.00 0.00 0.00 3.58
ACTIVITIES HECTARES)SCHEMEPLANREVISIONS
20151125Wed PaulSyrilD.Francisco MXD002 ByronSy Conceptual Production TaskLogBOARDPRESENTATIONAND 4.08 0.00 0.00 0.00 4.08
Anchor&Theme CONCEPTDIAGRAMOFANCHOR
BUILDING
20151125Wed PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TASKLOGUPDATECONCEPT 4.83 7.83 0.00 0.00 12.66
Anchor&Theme DIAGRAMOFANCHORBUILDING
20151126Thu PaulSyrilD.Francisco MXD002 ByronSy Conceptual Design TaskLogPRESENTATIONBOARD 6.25 0.00 0.00 0.00 6.25
Anchor&Theme
20151126Thu PaulSyrilD.Francisco MXD002 ByronSy Conceptual Production TaskLogEFFICIENCYRATIOOF3 3.92 0.42 0.00 0.00 4.34
Anchor&Theme SCHEMATICPLAN
20151127Fri PaulSyrilD.Francisco MXD002 ByronSy Conceptual Design TaskLogPOWERPOINT 9.67 0.67 0.00 0.00 10.34
Anchor&Theme PRESENTATION
20151127Fri PaulSyrilD.Francisco MXD002 ByronSy Conceptual Submission TaskLogINFINITYPLACE 0.00 1.17 0.00 0.00 1.17
Anchor&Theme COMPETITIONPRESENTATIONFILING
20151201Tue PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Production TaskLogFORPERMITPLANSKAISER 3.83 0.00 0.00 0.00 3.83
DEVELOPMENT SY
20151201Tue PaulSyrilD.Francisco INS2015001 LDSMASINLOC Construction Meeting TASKLOGMEETINGREGARDING 0.92 0.00 0.00 0.00 0.92
AndPermits REPLACEMENTOFFENCE
20151201Tue PaulSyrilD.Francisco INS2015001 LDSMASINLOC Construction Production TASKLOGQUERIESFORCONSULTANT 4.75 0.25 0.00 0.00 5.00
AndPermits REGARDINGCOLLAPSEFENCEAND
STRUCTURAL
20151202Wed PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Production TaskLogRESEARCHKAISERSY 2.08 0.00 0.00 0.00 2.08
DEVELOPMENT FORPERMITSTRUCTURAL
WORKINGDRAWINGS
20151202Wed PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Production TaskLogKAISERSYUPDATE 6.75 0.00 0.00 0.00 6.75
DEVELOPMENT STRUCTURALDRAWINGSFOR
PERMIT
20151202Wed PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Production TaskLogKAISERSYELECTRICAL& 0.67 2.33 0.00 0.00 3.00
DEVELOPMENT PLUMBINGPLANSFORPERMITS
20151202Wed PaulSyrilD.Francisco INS2015001 LDSMASINLOC Construction Production TaskLogFILINGOFINVESTIGATION 0.00 0.17 0.00 0.00 0.17
AndPermits REPORTS/FINDINGS&
RECOMMEDATIONOFDESIGN
20151202Wed PaulSyrilD.Francisco INS2015003 LDS Biddings Production TaskLogBIDRECOMMENDATION& 0.00 1.75 0.00 0.00 1.75
SANCHEZ EVALUATION
MIRA
20151202Wed PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogSCHEME4 0.00 0.58 0.00 0.00 0.58
Anchor&Theme
20151203Thu PaulSyrilD.Francisco INS2015003 LDS Biddings Production TaskLogBIDRECOMMENDATIONAND 3.08 0.00 0.00 0.00 3.08
SANCHEZ EVALUATION
MIRA
20151203Thu PaulSyrilD.Francisco MXD002 ByronSy Conceptual Production TASKLOGSCHEME4OPTION1&2 6.42 2.00 0.00 0.00 8.42
Anchor&Theme
20151204Fri PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogUPDATESCHEME4PARKING 10.00 2.17 0.00 0.00 12.17
Anchor&Theme
20151205Sat PaulSyrilD.Francisco INS2015003 LDS Biddings Production TaskLogBIDRECOMMENDATION 0.00 1.00 0.00 0.00 1.00
SANCHEZ
MIRA
20151205Sat PaulSyrilD.Francisco RES2014001 SYRESIDENCE Construction Production TaskLogBLUEPRINTANDTECH 0.00 2.17 0.00 0.00 2.17
LVQC AndPermits SPECSFILINGFORPERMIT
20151207Mon PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Filing TaskLogARRANGING&ORGANIZE 1.67 0.00 0.00 0.00 1.67
DEVELOPMENT PROJECTFOLDERSINFINITYPLACE
(COMPETITION)BYRONSY
SCHEMATICSTAGESUYSING
WAREHOUSE
20151207Mon PaulSyrilD.Francisco MXD002 ByronSy Schematics Drafting TaskLogREVISEDSCHEMATICPLAN 2.17 0.25 0.00 0.00 2.42
Anchor&Theme
20151207Mon PaulSyrilD.Francisco FSWH2015001 SUYSING Schematics Production TaskLogREVISEDSCHEMATICPLAN 2.75 0.00 0.00 0.00 2.75
WAREHOUSE RESEARCHANDLAYOUT
20151207Mon PaulSyrilD.Francisco FSWH2015001 SUYSING Schematics Production TaskLogUPDATEREVISED 2.58 0.00 0.00 0.00 2.58
WAREHOUSE SCHEMATICPLAN
20151207Mon PaulSyrilD.Francisco RES2014001 SYRESIDENCE Miscellaneous Filing TaskLogBLUEPRINTFILINGFOR 0.33 0.00 0.00 0.00 0.33
LVQC PERMIT
20151208Tue PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogSCHEMATICPLANREVISION 0.92 2.75 0.00 0.00 3.67
Anchor&Theme
20151208Tue PaulSyrilD.Francisco FSWH2015001 SUYSING Schematics Drafting TaskLogUPDATESCHEMATICPLAN 3.92 0.00 0.00 0.00 3.92
WAREHOUSE
20151208Tue PaulSyrilD.Francisco FSWH2015001 SUYSING Schematics Drafting TaskLogUPDATESCHEMATICPLAN 4.58 0.00 0.00 0.00 4.58
WAREHOUSE
20151209Wed PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogUPDATESCHEMATICPLAN 9.50 0.75 0.00 0.00 10.25
Anchor&Theme
20151210Thu PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogUPDATEAREAOFSPACES 3.33 0.84 0.00 0.00 4.17
Anchor&Theme OFSCHEMATICPLAN
20151210Thu PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogSCHEMATICPLAN3ASPER 6.17 1.42 0.00 0.00 7.59
Anchor&Theme OWNER
20151211Fri PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogUPDATESCHEME2OPTION 3.00 0.00 0.00 0.00 3.00
Anchor&Theme 2
20151211Fri PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogSCHEMATICPLAN4 6.92 1.08 0.00 0.00 8.00
Anchor&Theme
20151211Fri PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogSCHEMATICPLAN4 0.00 3.08 0.00 0.00 3.08
Anchor&Theme
20151214Mon PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogSCHEME2OPTION2B 4.00 0.00 0.00 0.00 4.00
Anchor&Theme
20151214Mon PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogUPDATESCHEME2OPTION 6.25 0.42 0.00 0.00 6.67
Anchor&Theme 2B
20151215Tue PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogUPDATESCHEMATICPLANS 2.42 1.58 0.00 0.00 4.00
Anchor&Theme FORMEETING
20151215Tue PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogSCHEME3REVISIONSFOR 7.08 1.75 0.00 0.00 8.83
Anchor&Theme MEETING
20151216Wed PaulSyrilD.Francisco MXD002 ByronSy Schematics Drafting TaskLogREVISIONSCHEME3C 5.00 0.67 0.00 0.00 5.67
Anchor&Theme
20151216Wed PaulSyrilD.Francisco RES2014001 SYRESIDENCE Miscellaneous Production TaskLogUPDATEARCHITECTURAL 5.00 0.00 0.00 0.00 5.00
LVQC PLANSFORPERMIT&CDBURNING
(COPY)
20151217Thu PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogUPDATESCHEME3C 5.58 0.00 0.00 0.00 5.58
Anchor&Theme
20151217Thu PaulSyrilD.Francisco MXD002 ByronSy Schematics Production TaskLogAREATABSCHEME3CAND 5.17 0.58 0.00 0.00 5.75

http://www.jogassociates.com/cgibin/projects/rpg2.cgi?fdet2=1 8/21
4/6/2017 APEXProjectTimeCostsFullDetails
Anchor&Theme UPDATEFLOORPLAN
20151218Fri PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogSCHEME3REVISION&AREA 10.08 0.42 0.00 0.00 10.50
Anchor&Theme TAB
20151221Mon PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogUPDATESCHEME3CFLOOR 10.17 1.58 0.00 0.00 11.75
Anchor&Theme PLAN
20151222Tue PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogSCHEME3UPDATEAREA 0.00 0.00 0.00 0.00 0.00
Anchor&Theme TAB
20151223Wed PaulSyrilD.Francisco INS2015003 LDS Construction Submission TaskLogREVIEWINGANDSORTINGOF 1.83 0.00 0.00 0.00 1.83
SANCHEZ AndPermits CONSTRUCTIONPLAN&TARPAULIN
MIRA
20151223Wed PaulSyrilD.Francisco MXD002 ByronSy Conceptual Submission TaskLogSCHEMATICPERSPECTIVE 8.92 0.92 0.00 0.00 9.84
Anchor&Theme FOROWNERREVIEWANDAPPROVAL
20160104Mon PaulSyrilD.Francisco INS2015003 LDS Construction ProjectCo TaskLogFOLLOWUPCONTRACTOR 4.75 0.00 0.00 0.00 4.75
SANCHEZ AndPermits ordination REGARDINGFORBLUEPRINTANDCD
MIRA PICKUPANDTARPAULINDESIGN
APPROVALANDUPDATEONPRE
CONSTRUCTIONMEETING
20160104Mon PaulSyrilD.Francisco INS2015003 LDS Construction ProjectCo TaskLogTaskLogFOLLOWUP 4.75 0.17 0.00 0.00 4.92
SANCHEZ AndPermits ordination CONTRACTORREGARDINGFOR
MIRA BLUEPRINTANDCDPICKUPAND
TARPAULINDESIGNAPPROVALAND
UPDATEONPRECONSTRUCTION
MEETING
20160105Tue PaulSyrilD.Francisco MXD002 ByronSy Conceptual Production TaskLogUPDATEAREATAB 4.00 0.00 0.00 0.00 4.00
Anchor&Theme
20160105Tue PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TaskLogSCHEME3REVISIONS 5.50 0.42 0.00 0.00 5.92
Anchor&Theme
20160106Wed PaulSyrilD.Francisco MXD002 ByronSy Conceptual Drafting TASKLOGUPDATEREVISED 9.50 1.67 0.00 0.00 11.17
Anchor&Theme SCHEMATICPLAN
20160107Thu PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogREVISEOPTION2 10.00 0.17 0.00 0.00 10.17
Development SCHEMATICPLAN
20160108Fri PaulSyrilD.Francisco MXD003 ByronSy Design Drafting 4.00 0.00 0.00 0.00 4.00
Development
20160108Fri PaulSyrilD.Francisco COM2014010 GEEGEMALL/ Design Drafting UPDATEFOURTHFLOORPLANBASE 5.50 1.00 0.00 0.00 6.50
ERICLIM Development ONASBUILTPLAN
20160111Mon PaulSyrilD.Francisco INS2015001 LDSMASINLOC Construction Production TASKLOGFOLLOWUPSTRUCTURAL 1.50 0.00 0.00 0.00 1.50
AndPermits FORSTEELDECKCONNECTIONS
20160111Mon PaulSyrilD.Francisco MXD003 ByronSy Schematics Drafting TaskLogREVISEDSCHEMATICPLAN 0.00 0.00 0.00 0.00 0.00
20160111Mon PaulSyrilD.Francisco MXD003 ByronSy Schematics Drafting TaskLogREVISEDSCHEMATICPLAN 4.00 2.25 0.00 0.00 6.25
20160111Mon PaulSyrilD.Francisco RES2013009 JOHNNYTAN Construction Production TASKLOGFOLLOWUPDRAWINGS 4.00 0.00 0.00 0.00 4.00
AndPermits (INTERIORGLASSDOORS)FOR
MEETING
20160113Wed PaulSyrilD.Francisco MXD2015001 RAYMUNDKHO Design Drafting TaskLogFLOORPLANSWALL 0.50 3.00 0.00 0.00 3.50
Development FINISHESTAGS
20160113Wed PaulSyrilD.Francisco MXD003 ByronSy Schematics Production TaskLogUPDATEAREATABOF 9.00 0.00 0.00 0.00 9.00
SCHEMATICPLANS
20160114Thu PaulSyrilD.Francisco MXD2015001 RAYMUNDKHO Design Production TaskLogWALLFINISHES(WALL 4.67 0.17 0.00 0.00 4.84
Development TAGS)
20160114Thu PaulSyrilD.Francisco MXD003 ByronSy Schematics Production TaskLogUPDATEAREATABULATION 5.50 0.00 0.00 0.00 5.50
20160115Fri PaulSyrilD.Francisco MXD2015001 RAYMUNDKHO Design Production TaskLogUPDATEARCHITECTURAL 4.50 0.00 0.00 0.00 4.50
Development FINISHES
20160115Fri PaulSyrilD.Francisco MXD2015001 RAYMUNDKHO Design Production TaskLogUPDATEARCHITECTURAL 4.50 0.00 0.00 0.00 4.50
Development FINISHES
20160115Fri PaulSyrilD.Francisco MXD003 ByronSy Schematics Drafting TaskLogUPDATESTAIRS 0.50 4.33 0.00 0.00 4.83
20160118Mon PaulSyrilD.Francisco T001 APEX Miscellaneous Meeting APEX:DAVAORETAIL 1.00 0.00 0.00 0.00 1.00
20160118Mon PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Meeting TASKLOGMeeting(Ayala)Interim 2.75 0.00 0.00 0.00 2.75
DEVELOPMENT RetailDevelopmentinDavaoMinutes
ofmeeting
20160118Mon PaulSyrilD.Francisco MXD003 ByronSy Schematics Drafting TaskLogUPDATEPLANSASPER 5.17 2.66 0.00 0.00 7.83
OWNERAPPROVEDLAYOUTWITH
COMMENTS
20160118Mon PaulSyrilD.Francisco MXD003 ByronSy Design Production TaskLogPLANNINGSUMMARYOF 1.58 0.33 0.00 0.00 1.91
Development DESIGNDEVELOPMENTSTAGE
20160119Tue PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Filing UPDATEARCHITECTURALPERMIT 0.08 2.25 0.00 0.00 2.33
DEVELOPMENT PLANSFOROFFICEARCHIVE(KAISER
SY)
20160119Tue PaulSyrilD.Francisco MXD003 ByronSy Design Production TaskLogDDPLANNINGSUMMARY 9.58 0.00 0.00 0.00 9.58
Development UPDATEAREATABANDFLOOR
PLANS
20160120Wed PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Filing TaskLogUPDATEARCHITECTURAL 4.58 0.00 0.00 0.00 4.58
DEVELOPMENT PERMITPLANSFOROFFICEARCHIVE
(KAISERSY)
20160120Wed PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogSITEDEVELOPMENTPLAN& 4.92 5.50 0.00 0.00 10.42
Development FLOORPLANS(COMMONTOILETS)
20160121Thu PaulSyrilD.Francisco MXD003 ByronSy Design Production TaskLogUPDATEFLOORPLANS& 9.50 3.33 0.00 0.00 12.83
Development AREATAB
20160122Fri PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogGROUNDFLOORPLANAND 10.25 1.75 0.00 0.00 12.00
Development UPDATEAREATAB
20160125Mon PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogUPDATEGROUNDSECOND& 10.00 0.75 0.00 0.00 10.75
Development ROOFDECKFLOORPLANGRID
COLUMNATIONTOILETLAYOUTFOR
OFFICE(FRONT)
20160127Wed PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogUPDATEDOORSALL 10.50 0.83 0.00 0.00 11.33
Development FLOORPLANSSECTIONLINES
LONGITUDINALSECTION
20160128Thu PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogUPDATELONGSECTION 10.50 0.00 0.00 0.00 10.50
Development UPDATEALLFLOORPLANBASEDON
PERSPECTIVE
20160129Fri PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogUPDATEFLOORPLANS 10.50 0.00 0.00 0.00 10.50
Development BASEDONPERSPECTIVESECTION&
BOREHOLELOCATION
20160201Mon PaulSyrilD.Francisco MXD2015001 RAYMUNDKHO Design Drafting TASKLOGDOORSCHEDULE&DOOR 1.00 3.92 0.00 0.00 4.92
Development TAGSALLPLANS
20160201Mon PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogUPDATEPLANBASEON 8.50 0.00 0.00 0.00 8.50
Development REVISEDPERSPECTIVEWALL
GRAPHICSANDSTEELGRILLDESIGN
FORKIOSKANDATM
20160202Tue PaulSyrilD.Francisco MXD2015001 RAYMUNDKHO Design Drafting TaskLogUPDATEDOORSCHEDULE 4.42 0.33 0.00 0.00 4.75
Development ANDTAGS
20160202Tue PaulSyrilD.Francisco MXD2015001 RAYMUNDKHO Design Drafting TaskLogWINDOWSCHEDULE&TAGS 5.08 3.00 0.00 0.00 8.08
Development ANDUPDATEDOORSCHED&TAGS
20160203Wed PaulSyrilD.Francisco MXD2015001 RAYMUNDKHO Design Drafting TaskLogUPDATEWINDOWSCHEDULE 9.83 0.00 0.00 0.00 9.83
Development REFLECTCOLUMNFROM

http://www.jogassociates.com/cgibin/projects/rpg2.cgi?fdet2=1 9/21
4/6/2017 APEXProjectTimeCostsFullDetails
STRUCTURALUPDATEFRONT
ELEVATION
20160204Thu PaulSyrilD.Francisco MXD2015001 RAYMUNDKHO Contract Drafting TaskLogFIREEXITSTAIRDETAILS 7.50 0.42 0.00 0.00 7.92
Documents
20160204Thu PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Meeting TaskLogMEETINGPAROLACAINTA 2.00 2.00 0.00 0.00 4.00
ACTIVITIES METRORIZALDOCTORS
20160205Fri PaulSyrilD.Francisco MXD2015001 RAYMUNDKHO Contract Drafting TaskLogUPDATESECTIONS 6.67 0.00 0.00 0.00 6.67
Documents
20160205Fri PaulSyrilD.Francisco MXD003 ByronSy Design Production TaskLogPLANNINGSUMMARY 0.68 1.01 0.00 0.00 1.69
Development
20160205Fri PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Meeting TaskLogMINUTESOFMEETING 1.17 0.00 0.00 0.00 1.17
ACTIVITIES HOSPITALPROJECTINCAINTA&
REQUESTFORPROPOSAL
20160205Fri PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Meeting TaskLogMEETINGPENSHOPPE 2.00 0.00 0.00 0.00 2.00
ACTIVITIES CENTER/WAREHOUSEINGOLDEN
ABC
20160205Fri PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Meeting TaskLogMINUTESOFMEETING 0.34 0.67 0.00 0.00 1.01
ACTIVITIES PENSHOPPEDISTRIBUTION/
WAREHOUSE
20160206Sat PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogPERSPECTIVEFOR 5.50 0.00 0.00 0.00 5.50
Development ARCHITECTGANREVISIONFRONT
ELEVATION&LEFTELEVATION
20160209Tue PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogUPDATEFRONTANDLEFT 10.00 1.33 0.00 0.00 11.33
Development ELEVATION
20160210Wed PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogUPDATEFRONTELEVATION 10.50 0.17 0.00 0.00 10.67
Development ANDGROUNDFLOORPLANBASEON
REVISEDPERSPECTIVE
20160211Thu PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogLEFTELEVATIONUPDATE 10.00 1.25 0.00 0.00 11.25
Development GROUNDFLOORPLANANDSECOND
FLOORPLAN
20160212Fri PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogUPDATEELEVATIONAND 10.17 1.33 0.00 0.00 11.50
Development LONGSECTION1LONGSECTION2
ROOFDECKPLAN
20160215Mon PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogLONGSECTION2&SECOND 10.00 0.25 0.00 0.00 10.25
Development FLOORPLAN(OFFICELAYOUT
FRONT)
20160216Tue PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogUPDATEGROUNDFLOOR 10.00 1.50 0.00 0.00 11.50
Development PLANFLOORELEVATIONRAMPS
DRIVEWAYSELEVATION&SECTION
STUDY(ELEVETEDLEVELFROM
INTERIOR)
20160217Wed PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogREVISEDGROUNDFLOOR 10.50 1.25 0.00 0.00 11.75
Development PLANFLOORELEVATION&SITE
DEV'TPLAN
20160218Thu PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogREVISEDGROUNDTOROOF 10.50 2.00 0.00 0.00 12.50
Development DECKFLOORPLANANDINTERIM
PARKINGUPDATESTAIRS
20160219Fri PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogUPDATESTAIRSINPLANS 10.50 0.17 0.00 0.00 10.67
Development
20160222Mon PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogUPDATEGROUNDFLOOR 9.50 0.50 0.00 0.00 10.00
Development PLANSECONDELEVATIONAND
ELEVATIONBASEDONAPPROVED
LAYOUTOFTHEANCHORUNITS
SECTION
20160223Tue PaulSyrilD.Francisco MXD003 ByronSy Miscellaneous Meeting TASKLOGMeetingwithEngr.Harry 0.92 0.00 0.00 0.00 0.92
ContrerasandEngr.CesarNavarro.CM
20160223Tue PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TASKLOGUPDATELONGSECTION 8.50 2.92 0.00 0.00 11.42
Development GRIDELEVATION&GRIDFLOORPLAN
20160224Wed PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogLONGSECTIONANDCROSS 10.00 2.50 0.00 0.00 12.50
Development SECTION1UPDATELEFTANDFRON
ELEVGROUNDFLOOR
20160225Thu PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogUPDATESECTIONELEVATION 7.00 0.00 0.00 0.00 7.00
Development ANDPLANS
20160226Fri PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogUPDATESPECSOF 9.33 4.58 0.00 0.00 13.91
Development ELEVATIONANDSECTIONREVISION
20160227Sat PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogREVISEDFLOORPLAN 4.50 0.00 0.00 0.00 4.50
Development ELEVATIONSECTIONCOLUMNGRID
LINEANDFLOORELEVATIONGRID
20160229Mon PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogUPDATEFLOORPLAN 9.50 0.67 0.00 0.00 10.17
Development SECTIONELEVATIONFORCHECK
PRINTFOROUTSOURCINGAND
APPROVALTOTHEOWNER
20160301Tue PaulSyrilD.Francisco MXD003 ByronSy Design Production TaskLogPLANNINGSUMMARY 10.00 0.67 0.00 0.00 10.67
Development MISCELLANEOUSDETAILS
REFERENCE
20160302Wed PaulSyrilD.Francisco INS2015001 LDSMASINLOC Miscellaneous Filing TaskLogFILLINGOFCONSTRUCTION 2.33 0.00 0.00 0.00 2.33
PLANSBIDDINGPLANS&TECH
SPECSFOROFFICECOPY
20160302Wed PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogRIBBONDETAILS 7.17 1.50 0.00 0.00 8.67
Development
20160303Thu PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogREVISIONOF 9.50 2.33 0.00 0.00 11.83
Development ARCHITECTURALPLANSBASEDON
NEWCOLUMNARGRIDDETAILFOR
APPROVALPREDESIGNMEETING
20160304Fri PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogREVISEPLANSSECTIONS 10.00 3.33 0.00 0.00 13.33
Development ELEVATIONS
20160307Mon PaulSyrilD.Francisco MXD003 ByronSy Design Design TaskLogOFFICELAYOUT(SECOND 9.50 2.17 0.00 0.00 11.67
Development FLOOR)ELEVATIONREVISIONON
PLANS
20160308Tue PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogREVISEDFLOORPLANS 10.00 1.67 0.00 0.00 11.67
Development
20160309Wed PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TASKLOGREVISEDADMINOFFICE 9.00 3.50 0.00 0.00 12.50
Development LAYOUTOFGROUNDFLOOR
WAREHOUSEREVISEDSTAIRS
TRANSPARENTROOFATROOFPLAN
20160310Thu PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogUPDATEELEVATIONSECTION 9.50 3.58 0.00 0.00 13.08
Development CANOPYGRIDLINES
20160311Fri PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TASKLOGUPDATEELEVATIONS 7.67 0.00 0.00 0.00 7.67
Development FLOORPLANSSECTIONS
20160312Sat PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TASKLOGREVISIONONPLANS( 0.00 7.58 0.00 0.00 7.58
Development WAREHOUSE)UPDATEPLANSFOR
OUTSOURCING
20160314Mon PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogUPDATESECTIONAND 8.92 0.92 0.00 0.00 9.84
Development ELEVATIONSFLOORPLANSFORRCP
20160314Mon PaulSyrilD.Francisco MXD003 ByronSy Design Production TaskLogPREDESIGNMEETING 0.58 0.00 0.00 0.00 0.58
Development (MINUTESOFMEETING)

http://www.jogassociates.com/cgibin/projects/rpg2.cgi?fdet2=1 10/21
4/6/2017 APEXProjectTimeCostsFullDetails
20160315Tue PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogREVISIONONWAREHOUSE 9.75 0.33 0.00 0.00 10.08
Development LAYOUTSECTIONSGROUNDFLOOR
PLANSECONDFLOORPLAN&ROOF
DECKPLAN
20160316Wed PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TASKLOGUPDATEELEVATIONSAND 9.50 0.17 0.00 0.00 9.67
Development SECTION
20160317Thu PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TASKLOGUPDATESECTION 9.50 0.50 0.00 0.00 10.00
Development ELEVATIONINCLINEDCONVEYORFOR
MERCHANDISEANDRIBBONDETAILS
20160318Fri PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TASKLOGUPDATEPLANSSECTIONS 9.50 1.25 0.00 0.00 10.75
Development &ELEVATIONANSWEREDQUERIES
REGARDINGOUTSOURCING
20160321Mon PaulSyrilD.Francisco MXD003 ByronSy Design Design TaskLogUPDATELEFTELEVATION& 9.83 0.00 0.00 0.00 9.83
Development SECONDFLOORPLANSTPLOCATION
BACKLITACRYLICWALLDETAIL
20160322Tue PaulSyrilD.Francisco INS2015001 LDSMASINLOC Construction Production TaskLogCHECKINGOFDOOR 2.50 0.42 0.00 0.00 2.92
AndPermits SCHEDULEDOORJAMBFOR
APPROVAL
20160322Tue PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogINCLINEDCONVEYOR 7.00 0.58 0.00 0.00 7.58
Development DETAILS
20160323Wed PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogBILLBOARDDETAIL&SLIDE 10.25 0.17 0.00 0.00 10.42
Development FORMERCHANDISEREVISION
20160328Mon PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogPLOTFILEFLOORPLANS 10.00 0.42 0.00 0.00 10.42
Development MISCELLANEOUSDETAILSFOR
OUTSOURCINGREFERENCE
20160329Tue PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TASKLOGUPDATEGRIDLINEPLAN 9.50 0.83 0.00 0.00 10.33
Development ORIENTATIONTEXTORIENTATIONON
PLANSTITLEBLOCK
20160330Wed PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogREVISEDPLAN&ELEVATION 10.50 0.50 0.00 0.00 11.00
Development OFGENSET&TVR(HORIZONTAL
LOUVER)
20160331Thu PaulSyrilD.Francisco MXD003 ByronSy Miscellaneous Production TaskLogCOMMENTEDONFLOOR 10.25 0.08 0.00 0.00 10.33
PLANSFROMOUTSOURCING(FOR
REVSIONS)
20160401Fri PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TASKLOGTVRGENSETDETAIL& 9.50 1.08 0.00 0.00 10.58
Development CANOPYCOLUMNDETAIL
20160404Mon PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogREVISEDTVRGENSETROOM 10.50 3.33 0.00 0.00 13.83
Development DETAILSCANOPYDETAILS(JEEPNEY
TERMINALFRONTENTRYWALKWAY)
20160405Tue PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogREVISEDCANOPYDETAILS 10.25 1.08 0.00 0.00 11.33
Development TVRGENSETROOMDETAILSGRID
LINES
20160406Wed PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogREVISEDTVRGENSET 10.25 0.92 0.00 0.00 11.17
Development SECTION&CANOPY4
20160407Thu PaulSyrilD.Francisco MXD003 ByronSy Design Drafting REVISEDCANOPY4WALKWAY 9.50 3.83 0.00 0.00 13.33
Development CANOPYTERMINALCANOPY&STP
HOLDINGTANKDETAILS
20160408Fri PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogUPDATESTPHOLDINGTANK 10.25 1.25 0.00 0.00 11.50
Development DETAILCANOPY1DETAILS
20160411Mon PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogCANOPY236DETAILSWITH 10.25 0.58 0.00 0.00 10.83
Development PLAN&RCP
20160412Tue PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogREVISEDTVR&GENSET 10.25 1.25 0.00 0.00 11.50
Development ROOMDETAILS(5METERCEILING
HEIGHTREQUIREMENT)
20160413Wed PaulSyrilD.Francisco MXD003 ByronSy Design Drafting TaskLogREVISEDSTAIR2ONPLANS 10.00 2.08 0.00 0.00 12.08
Development STOREFRONTDETAILSWALL
PROTRUSIONONPLANS
20160414Thu PaulSyrilD.Francisco MXD003 ByronSy Design Production TASKLOGUPDATEDSTAIRS(FIRE 9.25 0.58 0.00 0.00 9.83
Development EXITSTAIR)COORDINATEWITH
OUTSOURCING(AIMS)MEETINGWITH
TIMS(PMOFOWNER)FOLLOWUP
CONSULTANTREGARDINGPERMIT
PLANS
20160415Fri PaulSyrilD.Francisco MXD003 ByronSy Design Production TASKLOGPERMITPLANS(FORPLOT) 9.50 4.67 0.00 0.00 14.17
Development DOOR&WINDOWSCHEDULE/TAGS
REVISIONSECTIONFLOORPLAN
ELEVATION
20160416Sat PaulSyrilD.Francisco MXD003 ByronSy Design Production TaskLogENGINEERINGPERMIT 10.25 4.17 0.00 0.00 14.42
Development PLANSARCHITECTURALPERMIT
PLANSDRAFTING(PLANSELEVATION
SECTIONRCPDOORS&WINDOWS
SCHEDULE)
20160418Mon PaulSyrilD.Francisco MXD003 ByronSy Design Production PERMITPLANSFORPLOT 9.50 3.50 0.00 0.00 13.00
Development ARCHITECTURAL&STRUCTURAL
20160419Tue PaulSyrilD.Francisco MXD003 ByronSy Contract Production TaskLogSORTINGOFPERMITPLANS 10.50 1.67 0.00 0.00 12.17
Documents TECHNICALSPECIFICATIONS
CHECKPRINT(FACADEDETAILS)
UPDATECANOPYDETAILS(BEAM)
20160420Wed PaulSyrilD.Francisco MXD003 ByronSy Contract Production TaskLogCHECKPRINTCANOPY 10.00 1.17 0.00 0.00 11.17
Documents FACADEELEVATIONPLOTTINGFOR
OWNERSCOPY(GROUNDFLOOR
PLANBLOWUPPLANFORTENANT
VICINITYLOCATIONMAP)AND
PERMITPLANS&TECHSPECSFILING
20160421Thu PaulSyrilD.Francisco MXD003 ByronSy Contract Production TaskLogFORDELIVERYTOOWNER 10.25 0.67 0.00 0.00 10.92
Documents (SORTINGOFPERMITPLANSTECH
SPECSPERMITFORMS)CHECKPRINT
(CROSSSECTIONSDOORSCHEDULE
WINDOWSCHEDULERCPFLOOR
PLAN)
20160422Fri PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogCROSSSECTION&LONG 10.33 0.00 0.00 0.00 10.33
Documents SECTION(CLEARHEIGHTPROPOSAL
FOR2NDFLOORWAREHOUSE)
TRUSSCOLUMNCONNECTIONFOR
STRUCTURAL
20160422Fri PaulSyrilD.Francisco INS2016001 LDSTIGAON Schematics Drafting TaskLogASBUILTPLAN(LEFT& 0.00 2.50 0.00 0.00 2.50
RIGHTSIDEELEVATION)
20160425Mon PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogCHECKPRINTDOOR& 5.92 0.00 0.00 0.00 5.92
Documents WINDOWTAGSLONG&CROSS
SECTION
20160425Mon PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogCANOPYDETAILSREVISION 3.58 0.42 0.00 0.00 4.00
Documents &CHECKPRINT
20160426Tue PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogCANOPYCHECKPRINT& 6.75 0.00 0.00 0.00 6.75
Documents REVISION
20160426Tue PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogWAREHOUSECEILING 2.50 1.00 0.00 0.00 3.50
Documents HEIGHTFORAPPROVAL(CROSS/
LONGSECTION&PLAN)CONNECTION
DETAILOFTRUSSCOLUMN&SLAB

http://www.jogassociates.com/cgibin/projects/rpg2.cgi?fdet2=1 11/21
4/6/2017 APEXProjectTimeCostsFullDetails
FORVERIFICATION(STRUCTURAL
DETAIL)CANOPYDETAIL(REVISED
PROFILE)
20160427Wed PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TASKLOGJEEPNEYTERMINAL& 9.25 0.25 0.00 0.00 9.50
Documents WALKWAYCANOPYREVISEDDETAIL
REVISEDSTAIRONPLAN
20160428Thu PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogSTAIRDETAILSCHECKPRINT 3.25 0.00 0.00 0.00 3.25
Documents
20160428Thu PaulSyrilD.Francisco MXD003 ByronSy Contract Production TaskLogUPDATEDAREATAB 5.75 0.00 0.00 0.00 5.75
Documents
20160428Thu PaulSyrilD.Francisco MXD003 ByronSy Contract Production TaskLogFACADEDETAILBAY 1.42 0.17 0.00 0.00 1.59
Documents SECTIONDOORSCHEDULEWINDOW
SCHEDULECHECKINGFROM
OUTSOURCING
20160429Fri PaulSyrilD.Francisco MXD003 ByronSy Contract Production TaskLogCHECKINGWALLFINISH 0.33 0.00 0.00 0.00 0.33
Documents (WALLTAGS)
20160429Fri PaulSyrilD.Francisco INS2016001 LDSTIGAON Schematics Drafting TaskLogFRONTELEVATION 2.84 1.08 0.00 0.00 3.92
20160429Fri PaulSyrilD.Francisco RES2013009 JOHNNYTAN Construction Drafting TASKLOGPORCHCANOPYDETAIL 6.33 0.00 0.00 0.00 6.33
AndPermits (ADDITIONALDETAIL)
20160502Mon PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogCHECKING(UPDATED 4.67 0.00 0.00 0.00 4.67
Documents DRAWINGSASPERLATESTCHECK
PRINTFROMOUTSOURCING)
20160502Mon PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogCHECKINGUPDATEDFILE 0.58 0.00 0.00 0.00 0.58
Documents FROMOUTSOURCINGASPERLATEST
CHECKPRINT
20160502Mon PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogUPDATEDSTAIRSONPLAN& 1.33 0.67 0.00 0.00 2.00
Documents CANOPYONPLAN
20160502Mon PaulSyrilD.Francisco RES2013009 JOHNNYTAN Construction Drafting TaskLogUPDATEPORCHCANOPY 2.92 0.00 0.00 0.00 2.92
AndPermits ADDITIONALDETAIL
20160503Tue PaulSyrilD.Francisco INS2015003 LDS Construction Production TaskLogCONSTRUCTIONBULLETIN 4.92 0.00 0.00 0.00 4.92
SANCHEZ AndPermits (FENCECYCLONETOCHB)
MIRA
20160503Tue PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogREVISEDGUTTERSIZEOF 2.25 0.00 0.00 0.00 2.25
Documents CANOPY5(ASPERSANITARY)
20160503Tue PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogCHECKINGRAMPDETAIL 1.17 0.00 0.00 0.00 1.17
Documents FROMOUTSOURCING
20160503Tue PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogPYLONDETAIL(CHECKING 1.33 0.92 0.00 0.00 2.25
Documents FROMOUTSOURCING)REVISIONON
SECTION&PLANREGARDING
WAREHOUSECEILINGHEIGHT
APPROVEDBYOWNER
20160504Wed PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogREVISIONONSECTION& 9.25 0.00 0.00 0.00 9.25
Documents PLANSREGARDINGAPPROVED
WAREHOUSEHEIGHTBYOWNER
20160504Wed PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogSITEDEVELOPMENTPLAN 0.00 1.42 0.00 0.00 1.42
Documents
20160505Thu PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogREVISEDCROSSSECTIONS 5.42 0.00 0.00 0.00 5.42
Documents
20160505Thu PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogREVISEDCROSSSECTION3 4.42 4.00 0.00 0.00 8.42
Documents &4LONGSECTIONFLOORPLANS
SITEDEVTPLAN&PLOTTINGOF
FLOORPLANSELEVATIONSSECTIONS
COVERPAGEFORMEETING
20160506Fri PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogFORMEETING&FOR 3.75 0.00 0.00 0.00 3.75
Documents STRUCTURAL(PLANSSECTIONS
ELEVATION)
20160510Tue PaulSyrilD.Francisco INS2015001 LDSMASINLOC Construction Drafting TaskLogCONVENIENCEOUTLET 5.17 0.00 0.00 0.00 5.17
AndPermits ADDITION
20160510Tue PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogWALLTAGSFORCHECKING 1.33 0.00 0.00 0.00 1.33
Documents
20160510Tue PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogUPDATEELEVATIONS 1.75 0.00 0.00 0.00 1.75
Documents
20160510Tue PaulSyrilD.Francisco MXD003 ByronSy Contract Production TaskLogPLOTTINGARCHITECTURAL 1.83 0.58 0.00 0.00 2.41
Documents DRAWINGSLAYOUT
20160511Wed PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogSIGNAGEDETAIL& 8.42 0.00 0.00 0.00 8.42
Documents COMMENTEDPLANSFORREVISIONS
20160511Wed PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TASKLOGREVISEDLEFTSIDE 1.08 2.25 0.00 0.00 3.33
Documents ELEVATION(ADJUSTEDWAREHOUSE
HEIGHT)
20160512Thu PaulSyrilD.Francisco MXD003 ByronSy Contract Production TaskLogLISTOFARCHITECTURAL 0.25 0.00 0.00 0.00 0.25
Documents DRAWINGS
20160512Thu PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogREVISEDRIGHT&REAR 2.75 0.00 0.00 0.00 2.75
Documents ELEVATION(ADJUSTEDWAREHOUSE
HEIGHT)
20160512Thu PaulSyrilD.Francisco MXD003 ByronSy Contract Production TaskLogFLOORPLANS&FLOOR 4.83 0.00 0.00 0.00 4.83
Documents PATTERNPLANSFORCHECKPRINT
20160512Thu PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TASKLOGUPDATEFLOORPLAN 1.67 4.66 0.00 0.00 6.33
Documents REGARDINGREVISEDWALLFLOOR
FINISHESFORBIDPLANS
20160513Fri PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TASKLOGREVISEDANDPLOTTINGOF 9.50 1.58 0.00 0.00 11.08
Documents ARCHITECTURALBIDPLANS
20160516Mon PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TASKLOGBIDPLANSFACADE 9.25 5.75 0.00 0.00 15.00
Documents DETAILFLOORPATTERNSECTIONS
20160517Tue PaulSyrilD.Francisco MXD003 ByronSy Biddings Drafting TaskLogREVISED&PLOTTINGOF 10.25 3.50 0.00 0.00 13.75
ARCHITECTURALBIDPLANS
20160518Wed PaulSyrilD.Francisco MXD003 ByronSy Biddings Production TaskLogCOMPILATIONOFBIDPLANS 6.33 0.00 0.00 0.00 6.33
(EFILES)&REVISEDCOMMONTOILET
20160518Wed PaulSyrilD.Francisco MXD003 ByronSy Biddings Production TaskLogBIDBULLETIN#1 2.33 0.00 0.00 0.00 2.33
STRUCTURAL
20160518Wed PaulSyrilD.Francisco MXD003 ByronSy Biddings Drafting TaskLogUPDATERCPLAYOUT 0.83 0.33 0.00 0.00 1.16
COMMONTOILETDETAIL
20160519Thu PaulSyrilD.Francisco MXD003 ByronSy Biddings Drafting TaskLogREVISEDCOMMONTOILET@ 0.00 0.00 0.00 0.00 0.00
GROUNDFLOOR
20160519Thu PaulSyrilD.Francisco MXD003 ByronSy Biddings Drafting TaskLogSTRUCTURALBIDBULLETIN 6.08 0.00 0.00 0.00 6.08
1
20160519Thu PaulSyrilD.Francisco MXD003 ByronSy Biddings Production TaskLogSORTINGOFBIDBULETIN1 1.00 0.25 0.00 0.00 1.25
STRUCTURALBIDPLANS&SPECS
DIGEST
20160520Fri PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogCOLUMNCLADDINGDETAIL 5.00 0.00 0.00 0.00 5.00
Documents FILINGOFPERMITDOCUMENTSTOBE
DELIVEREDTOOWNER
20160520Fri PaulSyrilD.Francisco MXD003 ByronSy Biddings Drafting TaskLogCOMMONAREACOLUMN 3.83 0.17 0.00 0.00 4.00
DETAIL
20160520Fri PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TASKLOGTUBULARACCENTDETAIL 0.67 0.17 0.00 0.00 0.84

http://www.jogassociates.com/cgibin/projects/rpg2.cgi?fdet2=1 12/21
4/6/2017 APEXProjectTimeCostsFullDetails
Documents FORSTRUCTURAL
20160523Mon PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogTUBULARSTEELGRILLES 4.50 0.00 0.00 0.00 4.50
Documents ACCENTWITHBUILTUPACRYLIC
20160523Mon PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogUPDATESLABANDBEAMON 3.50 0.00 0.00 0.00 3.50
Documents SECTIONBASEDONLATEST
STRUCTURALSCHEDULEOFSLAB
ANDBEAM
20160523Mon PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TASKLOGREVISEDCOLUMN 1.50 2.17 0.00 0.00 3.67
Documents CLADDINGDETAIIL
20160524Tue PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogREVISEDCOLUMN 1.42 0.00 0.00 0.00 1.42
Documents CLADDINGDETAILSANDPLOTTING
20160524Tue PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogCHECKBAYSECTION9 7.50 0.00 0.00 0.00 7.50
Documents FORMOUTSOURCINGBASEDON
PROJECTIONLINEINPLANSAND
REFLECTEDCOLUMNFROM
STRUCTURAL
20160524Tue PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogRCPREVISION 1.00 0.17 0.00 0.00 1.17
Documents
20160525Wed PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogUPDATECEILINGHEIGHT 4.42 0.16 0.00 0.00 4.58
Documents LEVELFORRCP
20160525Wed PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogBEAMDEPTHLEGENDON 5.08 0.83 0.00 0.00 5.91
Documents SECONDFLOORFRAMINGUPDATE
COLUMNONPLANS
20160526Thu PaulSyrilD.Francisco MXD003 ByronSy Biddings Drafting TaskLogCOMPILATIONOFBIDPLANS 10.00 0.67 0.00 0.00 10.67
FOROUTSOURCING&REVISED
CEILINGHEIGHTOFGROUNDTO
SECONDFLOORREVISEDRCP
CEILINGHEIGHTBIDQUERYFROM
BIDDER
20160527Fri PaulSyrilD.Francisco MXD003 ByronSy Biddings Production TaskLogBIDQUERYFOR 9.67 1.50 0.00 0.00 11.17
STRUCTURALSLOPESTUDYFOR
UPDATEDGROUNDFLOORAND
PARKINGLEVELUPDATEDRCP
DETAILSWITHLIGHTINGFIXTURE
FORELECTRICAL(COMMENTEDON
PLAN)CHECKINGOFFIREEXITSTAIR
1FROMOUTSOURCING&REVISION.
20160530Mon PaulSyrilD.Francisco MXD003 ByronSy Biddings Production TaskLogUPDATEDARCHITECTURAL 3.67 0.00 0.00 0.00 3.67
PLAN/RCPANDDETAILSWITH
LIGHTINGFIXTURETOCONSIDERTO
BESENDTOELECTRICAL
CONSULTANT
20160530Mon PaulSyrilD.Francisco MXD003 ByronSy Biddings Drafting TaskLogFIREEXITDETAIL1&2 6.50 0.75 0.00 0.00 7.25
CHECKINGANDREVISIONCOMMON
AREACOLUMNDETAIL
20160531Tue PaulSyrilD.Francisco MXD003 ByronSy Biddings Production TaskLogSTRUCTURALBIDBULLETIN 6.83 0.00 0.00 0.00 6.83
#2(LETTER&DOCUMENTS)
20160531Tue PaulSyrilD.Francisco MXD003 ByronSy Biddings Drafting TASKLOGREVISECROSSSECTION1 2.67 0.50 0.00 0.00 3.17
(ADJUSTEDCEILINGHEIGHT)FOR
OUTSOURCINGREFERENCE
20160601Wed PaulSyrilD.Francisco MXD003 ByronSy Biddings Drafting TaskLogREVISEDLONGSECTION1 10.25 2.25 0.00 0.00 12.50
FRONTELEVATIONCROSSSECTION1
(ADJUSTEDHEIGHT)SLOPESTUDY
FORAPPROVALADJUSTEDPLAN
REGARDINGADJUSTEDFLOORLEVEL
/CEILINGHEIGHT
20160602Thu PaulSyrilD.Francisco MXD003 ByronSy Biddings Drafting TaskLogREVISIONSFORRCP 9.50 0.92 0.00 0.00 10.42
(CEILINGHEIGHT)REVISIONON
STAIRSDUETOADJUSTEDHEIGHTOF
CEILINGREVSIONONPLAN(STAIR
PLAN)
20160602Thu PaulSyrilD.Francisco MXD003 ByronSy Biddings Drafting TaskLogSITEDEVELOPMENT 0.00 1.17 0.00 0.00 1.17
REVISION
20160603Fri PaulSyrilD.Francisco MXD003 ByronSy Biddings Drafting TaskLogPLOTTINGOFREVISED 10.25 0.50 0.00 0.00 10.75
FLOORPLANCHECKING&REVISION
ONELEVATIONSTOREFRONTRAMP
DETAIL&DELIVERYTRUCKDETAIL
20160607Tue PaulSyrilD.Francisco MXD003 ByronSy Biddings Production TaskLogSTRUCTURALBIDBULLETIN 4.83 0.00 0.00 0.00 4.83
#4&COMPILATIONOFBID
BULLETINSWITHDOCSTOBESEND
TONEWPM
20160607Tue PaulSyrilD.Francisco MXD003 ByronSy Biddings Production TaskLogCHECKINGOFREVISED 5.08 0.42 0.00 0.00 5.50
SECTIONSFROMOUTSOURCING(AIM
ARCHITECTS)SLIDEFOR
MERCHANDISETVR/GENSETDETAIL
20160608Wed PaulSyrilD.Francisco MXD003 ByronSy Biddings Production TaskLogADDITIONALTICKETBOOTH 9.50 1.75 0.00 0.00 11.25
PLOTTINGOFSECTIONDOOR
SCHEDULERIBBONDETAILSCANOPY
DETAILS(REVISIONS)
20160609Thu PaulSyrilD.Francisco MXD003 ByronSy Biddings Drafting TaskLogCHECKING&REVISIONS 10.00 1.08 0.00 0.00 11.08
STAIRDETAILSFACADEDETAILSBAY
SECTIONS
20160610Fri PaulSyrilD.Francisco MXD003 ByronSy Biddings Production TaskLogBIDBULLETIN 10.00 0.50 0.00 0.00 10.50
ARCHITECTURAL01PLOTTINGOF
REVISEDARCHITECTURALBAY
SECTIONSREVISION
20160613Mon PaulSyrilD.Francisco MXD003 ByronSy Biddings Production TaskLogCHECKING&REVISIONOF 10.00 0.00 0.00 0.00 10.00
WINDOWSCHEDCURBCUTOUT
DETAILSFIREEXITSTAIRDETAIL2
SECTION(WALLMOUNTEDRAILING)
20160614Tue PaulSyrilD.Francisco MXD003 ByronSy Biddings Drafting TaskLogCHECKING&REVISIONS 10.00 0.00 0.00 0.00 10.00
SIGNAGE(BUILDINGID)DETAILS
WINDOWSCHEDULE&DOOR
SCHEDULE
20160615Wed PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogBIDABSTRACT& 6.17 0.08 0.00 0.00 6.25
SANCHEZ RECOMMENDATIONSUMMARY
MIRA INVITATION&CONFIRMATION
COMPILATION
20160615Wed PaulSyrilD.Francisco MXD003 ByronSy Biddings Production TaskLogREVISIONSONOFFICE& 3.58 0.00 0.00 0.00 3.58
TOILETDETAILS
20160616Thu PaulSyrilD.Francisco MXD003 ByronSy Biddings Drafting TaskLogUPDATEBEAMSSIZESON 10.00 0.08 0.00 0.00 10.08
SECTIONS&BAYSECTIONS
20160617Fri PaulSyrilD.Francisco MXD003 ByronSy Biddings Production TaskLogCHECKINGOFTOILET& 10.00 0.67 0.00 0.00 10.67
OFFICEDETAIL(FROMAIM
ARCHITECT)PLOTTINGOF
MECHANICALELECTRICALSANITARY
&FIREPROTECTIONFORADVANCE
COPY
20160620Mon PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogPROJECTCONCERNSTHAT 10.00 0.08 0.00 0.00 10.08

http://www.jogassociates.com/cgibin/projects/rpg2.cgi?fdet2=1 13/21
4/6/2017 APEXProjectTimeCostsFullDetails
SANCHEZ NEEDSTOBEADDRESSED.
MIRA
20160621Tue PaulSyrilD.Francisco MXD003 ByronSy Biddings Production TASKLOGBIDBULLETIN 9.50 0.83 0.00 0.00 10.33
STRUCTURAL06&BIDBULLETIN
ARHITECTURAL01
20160622Wed PaulSyrilD.Francisco INS2015003 LDS Construction ProjectCo TASKLOGSHOPSDRAWINGFOR 9.50 2.83 0.00 0.00 12.33
SANCHEZ AndPermits ordination APPROVALCOORDINATINGFOR
MIRA MONTHLYCOORDINATIONMEETING
ANDPROJECTTURNOVER
20160623Thu PaulSyrilD.Francisco INS2015003 LDS Construction Meeting TASKLOGPREPARATIONFORTHE 5.83 0.25 0.00 0.00 6.08
SANCHEZ AndPermits MEETINGBIDSUMMARY/ABSTRACT
MIRA TOBEDELIVERTOSIRVICSON
20160623Thu PaulSyrilD.Francisco INS2015003 LDS Construction Meeting TASKLOGPREPARATIONFORTHE 5.83 0.25 0.00 0.00 6.08
SANCHEZ AndPermits MEETINGBIDSUMMARY/ABSTRACT
MIRA TOBEDELIVERTOSIRVICSON
20160623Thu PaulSyrilD.Francisco MXD003 ByronSy Biddings Drafting TaskLogPROPOSEDSECONDFLOOR 3.50 0.00 0.00 0.00 3.50
TOTALAREA1700.00SQM
REQUIREMENT
20160623Thu PaulSyrilD.Francisco MXD003 ByronSy Biddings Drafting TaskLogPROPOSEDSECONDFLOOR 3.50 0.00 0.00 0.00 3.50
TOTALAREA1700.00SQM
REQUIREMENT
20160627Mon PaulSyrilD.Francisco INS2015003 LDS Construction Production TaskLogDRAIN&VALVEBOXDETAIL 8.50 0.75 0.00 0.00 9.25
SANCHEZ AndPermits FORREFERENCEFORAPPROVALOF
MIRA SHOPSDRAWINGSOFUNITIZED
PANELBOARDFORELECTRICAL
REVISEDSANCHEZMIRA&MASINLOC
CONCERNS
20160627Mon PaulSyrilD.Francisco MXD003 ByronSy Biddings Drafting TaskLogPERIMETERLIGHTINGFOR 2.00 0.00 0.00 0.00 2.00
ELECTRICAL
20160628Tue PaulSyrilD.Francisco MXD003 ByronSy Biddings Drafting TaskLogCOLUMNADDITION 1.50 1.92 0.00 0.00 3.42
20160628Tue PaulSyrilD.Francisco INS2016003 LDSNARRA Schematics Production TaskLogCONTRACTDOCSPLANNING 4.67 0.00 0.00 0.00 4.67
SUMMARY
20160629Wed PaulSyrilD.Francisco INS2016003 LDSNARRA Design Drafting TaskLogFLOORPLANSECTION 10.00 2.75 0.00 0.00 12.75
Development ELEVATION
20160630Thu PaulSyrilD.Francisco INS2016003 LDSNARRA Design Drafting TaskLogROOFPLANFLOORPLAN 10.00 3.33 0.00 0.00 13.33
Development SECTIONELEVATIONRCP(UPDATED)
20160701Fri PaulSyrilD.Francisco INS2016002 LDSBICUTAN Contract Meeting LDSBICUTAN:DESIGNMEETING 1.00 0.00 0.00 0.00 1.00
Documents
20160701Fri PaulSyrilD.Francisco INS2016003 LDSNARRA Design Drafting TaskLogARCHITECTURALDRAWINGS 10.00 1.00 0.00 0.00 11.00
Development PREDESIGNMEETINGBUDGETARY
COSTESTIMATECOORDINATIONWITH
CONSULTANTS
20160702Sat PaulSyrilD.Francisco INS2016003 LDSNARRA Design Drafting TaskLogBUDGETARYCOSTESTIMATE 9.00 0.83 0.00 0.00 9.83
Development MEETINGWITHCIVILSITE
DEVELOPMENTLOCATIONOF
EXISTINGWATERLINESEPTICTANK&
SERVICEENTRYOFELECTRICAL
20160704Mon PaulSyrilD.Francisco INS2016003 LDSNARRA Design Production TaskLogUPDATEBUDGETARYCOST 10.00 2.58 0.00 0.00 12.58
Development ESTIMATEREVISEDROOFPLAN
ELEVATION&SECTIONS
20160705Tue PaulSyrilD.Francisco INS2016003 LDSNARRA Design Drafting TaskLogUPDATEBUDGETARYCOST 10.00 0.50 0.00 0.00 10.50
Development ESTIMATESECTIONS
20160707Thu PaulSyrilD.Francisco INS2016002 LDSBICUTAN Design Drafting TaskLogCEILINGFRAMINGPLAN 10.00 1.58 0.00 0.00 11.58
Development TOILETDETAILS/LDSNARRA
ADDITIONALSECTION&PLOTTING
20160708Fri PaulSyrilD.Francisco MXD003 ByronSy Biddings Drafting TaskLogUPDATEFLOORELEVATION 3.50 0.00 0.00 0.00 3.50
ONSTRUCTURALPLANSPLOTOF
UPDATEDSTRUCTURALPLANS
20160708Fri PaulSyrilD.Francisco INS2016003 LDSNARRA Design Drafting TaskLogUPDATEDDESIGN 6.50 0.58 0.00 0.00 7.08
Development DEVELOPMENTPLANS&PLOTTING
20160711Mon PaulSyrilD.Francisco INS2016001 LDSTIGAON Design Drafting TaskLogTOILETDETAILS 4.50 4.00 0.00 0.00 8.50
Development
20160711Mon PaulSyrilD.Francisco INS2016003 LDSNARRA Design Drafting TaskLogREFLECTEDCEILINGPLAN 5.00 2.50 0.00 0.00 7.50
Development REVISIONSUPDATEDPLANSFOR
MEPFWALLSECTIONDETAIL
20160712Tue PaulSyrilD.Francisco INS2016003 LDSNARRA Design Drafting TaskLogWALLSECTION&VENT 10.00 2.50 0.00 0.00 12.50
Development GRILLEDETAILBUTTRESSDETAIL
FOYERDETAILFURNITURELAYOUT
20160713Wed PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogTOILETDETAILWALL 9.50 2.67 0.00 0.00 12.17
Documents SECTION&VENTGRILLDETAIL
SPECSBUTTRESSDETAILSPECS
FURNITURELAYOUTCEILING
SECTION
20160714Thu PaulSyrilD.Francisco INS2016001 LDSTIGAON Contract Drafting TASKLOGPOWERPOINTFORFINAL 0.50 6.92 0.00 0.00 7.42
Documents DESIGNPRESENTATION
20160714Thu PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogCEILINGFRAMINGDETAIL 10.00 0.50 0.00 0.00 10.50
Documents CHAIRGUARDDETAILSTORAGE/
TECHROOMDETAILENLARGEREAR
WALLPLAN&ELEVATION
20160715Fri PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogADVANCEARCHITECTURAL 5.50 1.00 0.00 0.00 6.50
Documents COPYFOROWNER
20160718Mon PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogDOOR&WINDOWSCHEDULE 10.50 1.75 0.00 0.00 12.25
Documents &ELEVATION/DETAILSFLOORPLAN
REFERENCETAGS
20160719Tue PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogDOORS&WINDOWS 10.00 4.00 0.00 0.00 14.00
Documents SCHEDULEREVISIONTABULATIONOF
REUSE&NEW(DOORS&WINDOWS
LIGHTINGFIREEXITSIGNAGE
SPEAKEREXHAUST/CEILINGFAN)
CHAIRGUARDBASETILE&
WAINSCOTON(LIBRARYFOYER
OFFICE&HIGHCOUNCIL)
20160720Wed PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogPLOTTINGOFDRAWINGS 10.00 1.08 0.00 0.00 11.08
Documents FORPRESENTATIONFOYER1DETAIL
FEATUREWALLINFOYER1&2
HALLWAYELEVATION
20160721Thu PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogFINALDESIGN 10.00 2.75 0.00 0.00 12.75
Documents PRESENTATION
20160722Fri PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogFINALDESIGN 10.00 0.08 0.00 0.00 10.08
Documents PRESENTATIONREVISEDROOF
HEIGHTONFOYERSECTION&
ELEVATION
20160725Mon PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogREVISEDFLOORPLAN/ 10.00 2.50 0.00 0.00 12.50
Documents SCHEMATIC
20160726Tue PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogREVISEDRCPSITE 10.00 1.50 0.00 0.00 11.50
Documents DEVELOPMENT2OPTIONSCHEMATIC
PLAN

http://www.jogassociates.com/cgibin/projects/rpg2.cgi?fdet2=1 14/21
4/6/2017 APEXProjectTimeCostsFullDetails
20160727Wed PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogREVISEDRCPFOYER1&2 8.67 0.00 0.00 0.00 8.67
Documents
20160727Wed PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogFAMILYHISTORYDETAILS 1.25 0.25 0.00 0.00 1.50
Documents
20160728Thu PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogREVISEDOPTION2FLOOR 2.17 0.00 0.00 0.00 2.17
Documents PLAN
20160728Thu PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogREVISEDSCHEMATICPLAN 4.50 0.00 0.00 0.00 4.50
Documents
20160728Thu PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogREVISEDRCP 3.50 0.50 0.00 0.00 4.00
Documents
20160728Thu PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogREVISEDFURNITURE 0.00 2.50 0.00 0.00 2.50
Documents LAYOUT
20160729Fri PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogAIRCONLAYOUTPULPIT 10.00 0.83 0.00 0.00 10.83
Documents PANELDETAILDISTRICTCLERK&
PRESDETAILREVISION
20160801Mon PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogUPDATEREVISED 5.42 0.00 0.00 0.00 5.42
Documents SCHEMATICPLANFORAPPROVAL
20160801Mon PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogREVISEDSCHEMATICPLAN 2.00 0.00 0.00 0.00 2.00
Documents AREATAB
20160801Mon PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogCOMMENTEDREVISED 2.42 1.17 0.00 0.00 3.59
Documents PLANSFORCONSULTANTREVISED
RCP&SDP
20160802Tue PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogRCPCALLOUTS 9.00 2.50 0.00 0.00 11.50
Documents SPECIFICATIONSREVISEDLIGHTING
LAYOUTFLOORTILELAYOUTCEILING
FRAMINGPLAN
20160803Wed PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogREVISEDREFERENCETAG 10.00 2.50 0.00 0.00 12.50
Documents PLANDOORSCHEDULEWINDOW
SCHEDULEDOORTAGSWINDOW
TAGS
20160804Thu PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogDOORSANDWINDOW 10.00 3.50 0.00 0.00 13.50
Documents SCHEDULEELEVATIONSANDDETAILS
FAMILYHISTORYPLAN&ELEV
DETAILWALL&COLUMNSETTING
OUTPLANDETAILEDREFLECTED
CEILINGPLAN
20160805Fri PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogMISCELLANEOUSDETAILS 10.50 0.50 0.00 0.00 11.00
Documents PULPITDETAILSHALLWAY
ELEVATIONFAMILYHISTORY&YW
OPENINGHDCPTOILETDETAIL
20160808Mon PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogMISCELLANEOUSDETAILS 10.00 2.00 0.00 0.00 12.00
Documents HIGHCOUNCILROOMDETAIL
ENLARGEREARWALLELEVATION
CEILINGSECTIONHALLWAY
ELEVATION
20160809Tue PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogUPDATEELEVATIONS& 10.00 2.00 0.00 0.00 12.00
Documents SECTIONSPLOTTINGFORMEETING
20160810Wed PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogUPDATEELEVATION& 10.00 3.17 0.00 0.00 13.17
Documents SECTIONSROOFDETAILSOVERFLOW
WALLELEVATIONCOMMENTEDPLAN
FORELECTRICALPLANS
20160811Thu PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogMISCELLANEOUSDETAILS 10.00 0.17 0.00 0.00 10.17
Documents OVERFLOWDETAILFLOORPLAN
LEGENDSSACRAMENTTABLEDETAIL
20160812Fri PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogMISCDETAILSREARRANGE 10.00 0.50 0.00 0.00 10.50
Documents SHEETNUMBERSSITEDEVELOPMENT
REMOVALPLANS
20160815Mon PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogMISC.DETAILSPLOTFILES 10.50 0.50 0.00 0.00 11.00
Documents DRYWALLDETAILSTEACHINGAREA
DETAILS
20160816Tue PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogMISCDETAILSPLOTTINGOF 10.00 2.25 0.00 0.00 12.25
Documents ADVANCECOPYDRAWINGSET(
ARCHITECTURALSANITARY
STRUCTURALELECTRICAL
MECHANICAL)
20160817Wed PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogCELINGSECTIONUPDATE 10.50 0.00 0.00 0.00 10.50
Documents BUDGETARYESTIMATESUBMITTAL
OFBIDPLANSADVANCECOPY
20160818Thu PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Production TaskLogBUDGETARYESTIMATE 10.00 0.58 0.00 0.00 10.58
Documents UPDATEVENTPIPESLEEVEDETAIL
20160822Mon PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogREVISEDRCPREVISEDWALL 10.00 0.58 0.00 0.00 10.58
Documents SETTINGOUTPLANRESEARCHON
PIPEVENTTHRUWALLDETAILSOF
PIPEVENTTHRUWALL
20160823Tue PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogMISCDETAILSPLOTFILES 10.00 0.00 0.00 0.00 10.00
Documents
20160824Wed PaulSyrilD.Francisco INS2016001 LDSTIGAON Biddings Drafting TASKLOGDOWNSPOUTCOLUMN 2.00 1.50 0.00 0.00 3.50
CLADDINGDETAIL
20160824Wed PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogARCHITECTURALPLOT 7.50 0.00 0.00 0.00 7.50
Documents FILESREVISEDRCPENDWALL
SECTION
20160825Thu PaulSyrilD.Francisco INS2016001 LDSTIGAON Biddings Production TaskLogBIDBULLETIN 1.00 0.00 0.00 0.00 1.00
ARCHITECTURALNO.1
20160830Tue PaulSyrilD.Francisco INS2015003 LDS Construction Drafting TaskLogWALKWAYREDUCEONPLAN 6.00 1.50 0.00 0.00 7.50
SANCHEZ AndPermits BUZZERLOCATIONTYPICAL
MIRA COUNTERPOINTFASCIADETAIL
20160830Tue PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Production TaskLogSUMMARYOFCOMMENTS& 4.50 0.00 0.00 0.00 4.50
Documents REVISIONSLISTOFPROJECTTEAM
20160831Wed PaulSyrilD.Francisco INS2015003 LDS Construction Drafting TaskLogPLASTEREDWALLFENCE 6.00 0.17 0.00 0.00 6.17
SANCHEZ AndPermits FINNISHINTERIORVCLIPGROOVES
MIRA DETAILBUZZERLOCATIONWALKWAY
WIDTHWITHSECTIONCOUNTERTOP
FASCIADETAIL
20160831Wed PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogFINALPLANFORMEETING 4.50 0.00 0.00 0.00 4.50
Documents SITEPLANOVERLAY
(ARCHITECTURAL&ENGINEERING)
20160901Thu PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogFOLLOWUPENGINEERING 10.00 1.50 0.00 0.00 11.50
Documents PLANSFORBIDDING(STRUCTURAL
ELECTRICAL&SANITARY)PLAN
OVERLAYADJUSTEDPLANSBASEON
OWNER'SCOMMENT
20160902Fri PaulSyrilD.Francisco INS2016002 LDSBICUTAN Biddings Production TaskLogBIDSUMMARY 4.92 0.17 0.00 0.00 5.09
20160902Fri PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogUPDATEMECHANICAL 5.00 0.00 0.00 0.00 5.00
Documents DETAILSCOMMENTEDELECTRICAL
PLANREGARDING4ACCU
20160905Mon PaulSyrilD.Francisco INS2016002 LDSBICUTAN Biddings Production TaskLogBIDSUMMARY 10.00 0.08 0.00 0.00 10.08
20160906Tue PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Drafting TaskLogUPDATECOLUMNSIZEON 10.50 1.00 0.00 0.00 11.50

http://www.jogassociates.com/cgibin/projects/rpg2.cgi?fdet2=1 15/21
4/6/2017 APEXProjectTimeCostsFullDetails
Documents PLANASPERSTRUCTURALPLAN
20160907Wed PaulSyrilD.Francisco INS2016002 LDSBICUTAN Biddings Production TaskLogBIDRECOMMENDATION& 10.00 0.25 0.00 0.00 10.25
EVALUATION
20160907Wed PaulSyrilD.Francisco INS2016003 LDSNARRA Contract Production TaskLogSUMMARYOFREMARKS& 2.17 0.00 0.00 0.00 2.17
Documents COMMENTSCOMPLIED(STRUCTURAL
PLANS)
20160908Thu PaulSyrilD.Francisco INS2016003 LDSNARRA Biddings Production TaskLogPREPARATIONOFBID 10.00 1.00 0.00 0.00 11.00
PLANSFORBLUEPRINT
20160909Fri PaulSyrilD.Francisco INS2016003 LDSNARRA Biddings Production TaskLogFOLLOWUPBIDDERSFOR 5.92 0.00 0.00 0.00 5.92
THEIRCONFIRMATIONTOBID
20160909Fri PaulSyrilD.Francisco INS2016003 LDSNARRA Biddings Production TaskLogPROJECTAGENDAFORPRE 4.00 0.00 0.00 0.00 4.00
BIDMEETING
20160913Tue PaulSyrilD.Francisco INS2016002 LDSBICUTAN Biddings Production TaskLogBIDRECOMMENDATION& 5.00 0.33 0.00 0.00 5.33
EVALUATION
20160913Tue PaulSyrilD.Francisco INS2016003 LDSNARRA Biddings Meeting TaskLogPREPARATIONOFBIDPLANS 5.42 0.00 0.00 0.00 5.42
ANDPRESENTATIONFORPREBID
CONFERENCEMEETING
20160914Wed PaulSyrilD.Francisco INS2016002 LDSBICUTAN Biddings Production TaskLogBIDRECOMMENDATION& 10.50 0.25 0.00 0.00 10.75
EVALUATION
20160915Thu PaulSyrilD.Francisco INS2016002 LDSBICUTAN Biddings Production TaskLogBIDRECOMMENDATION& 7.33 0.00 0.00 0.00 7.33
EVALUATION
20160915Thu PaulSyrilD.Francisco INS2016003 LDSNARRA Biddings Production TaskLogPROJECTMANUALFOR 2.58 1.83 0.00 0.00 4.41
BIDDERS
20160916Fri PaulSyrilD.Francisco INS2015003 LDS Construction Drafting TaskLogPUMPHOUSEGENSET 2.08 0.00 0.00 0.00 2.08
SANCHEZ AndPermits CABINET
MIRA
20160916Fri PaulSyrilD.Francisco INS2016003 LDSNARRA Biddings Drafting TaskLogBIDBULLETIN#1 7.75 0.00 0.00 0.00 7.75
20160919Mon PaulSyrilD.Francisco INS2016002 LDSBICUTAN Biddings Production TaskLogBIDEVALUATIONUPDATEBID 8.17 0.00 0.00 0.00 8.17
SUMMARY
20160919Mon PaulSyrilD.Francisco INS2016003 LDSNARRA Biddings Production TaskLogBIDDERSCONFIRMATION 1.33 0.25 0.00 0.00 1.58
REPORT
20160920Tue PaulSyrilD.Francisco INS2016003 LDSNARRA Biddings ProjectCo TaskLogRESEARCHONPERMIT 10.50 0.00 0.00 0.00 10.50
ordination REQUIREMENTS
20160921Wed PaulSyrilD.Francisco INS2016002 LDSBICUTAN Biddings Production TaskLogCHECKING/COMPARISONOF 10.50 0.17 0.00 0.00 10.67
COSTESTIMATEFROMINHOUSETO
BIDDERS
20160922Thu PaulSyrilD.Francisco INS2016002 LDSBICUTAN Biddings Submission TaskLogBIDEVALUATIONAND 10.50 1.25 0.00 0.00 11.75
RECOMMENDATION&BIDSUMMARY
(UPDATEWITHINHOUSEESTIMATE)
20160922Thu PaulSyrilD.Francisco INS2016003 LDSNARRA Biddings Drafting TaskLogBIDBULLETIN#2 0.00 1.50 0.00 0.00 1.50
20160923Fri PaulSyrilD.Francisco INS2016003 LDSNARRA Biddings Drafting TaskLogBIDBULLETIN02 6.08 0.00 0.00 0.00 6.08
20160923Fri PaulSyrilD.Francisco INS2016003 LDSNARRA Biddings Drafting TaskLogBUDGETARYESTIMATE 4.25 0.83 0.00 0.00 5.08
20160926Mon PaulSyrilD.Francisco INS2016002 LDSBICUTAN Biddings Production TaskLogREVISEDBIDSUMMARY(IN 9.83 0.67 0.00 0.00 10.50
HOUSEESTIMATE)
20160927Tue PaulSyrilD.Francisco INS2016002 LDSBICUTAN Biddings Drafting TaskLogUPDATEBIDSUMMARY& 9.83 4.75 0.00 0.00 14.58
EVALUATION
20160928Wed PaulSyrilD.Francisco INS2016002 LDSBICUTAN Biddings Drafting TaskLogFINALIZEBIDEVALUATION& 10.25 1.50 0.00 0.00 11.75
RECOMMENDATION(TABLEADDITIVE
&DEDUCTIVE)
20160929Thu PaulSyrilD.Francisco INS2016002 LDSBICUTAN Biddings Production TaskLogCOMPARISONBETWEEN 10.00 5.42 0.00 0.00 15.42
TECHMASTERCONTRACTORANDIN
HOUSEESTIMATESUMMARY
20160930Fri PaulSyrilD.Francisco INS2016002 LDSBICUTAN Biddings Production TaskLogCHECKINGOFBID 10.25 0.00 0.00 0.00 10.25
EVALUATION(BIDDERS&TECH
MASTER)
20161003Mon PaulSyrilD.Francisco INS2016003 LDSNARRA Biddings Drafting TaskLogBIDBULLETIN3 10.00 1.00 0.00 0.00 11.00
20161004Tue PaulSyrilD.Francisco INS2016003 LDSNARRA Biddings Drafting TaskLogUPDATEFONTDETAIL 10.17 1.00 0.00 0.00 11.17
20161005Wed PaulSyrilD.Francisco INS2016003 LDSNARRA Biddings Drafting TaskLogTEMPORARYFURNISHINGS 10.50 0.25 0.00 0.00 10.75
ANDEQUIPMENTWAREHOUSEPLANS
ELEVATION&SECTIONS
20161006Thu PaulSyrilD.Francisco INS2016003 LDSNARRA Biddings Drafting TaskLogUPDATEPLANSREGARDING 10.17 0.17 0.00 0.00 10.34
BIDBULLETINSFORCONSTRUCTION
PLANS
20161007Fri PaulSyrilD.Francisco INS2016003 LDSNARRA Biddings Production TaskLogBIDBULLETIN04 5.67 0.00 0.00 0.00 5.67
20161007Fri PaulSyrilD.Francisco INS2016003 LDSNARRA Biddings Drafting TaskLogUPDATEPLANSREGARDING 3.58 0.00 0.00 0.00 3.58
BIDBULLETINSFORCONSTRUCTION
PLAN
20161010Mon PaulSyrilD.Francisco INS2016003 LDSNARRA Biddings Production TaskLogUPDATEARCHITECTURAL 10.50 0.08 0.00 0.00 10.58
PLANSREGARDINGBIDBULLETIN
FORCONSTRUCTIONPLAN
20161011Tue PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Production TaskLogUPDATEANDPLOTTINGOF 5.25 0.00 0.00 0.00 5.25
AndPermits ARCHITECTURALCONSTRUCTION
PLANS
20161011Tue PaulSyrilD.Francisco INS2016003 LDSNARRA Biddings Production TaskLogBIDEVALUATION& 1.50 0.00 0.00 0.00 1.50
RECOMMENDATION
20161012Wed PaulSyrilD.Francisco INS2016003 LDSNARRA Biddings Production TaskLogPERMITREQUIREMENTS 10.50 0.08 0.00 0.00 10.58
(BARANGAYCLEARANCE
LOCATIONALCLEARANCE&
BUILDINGPERMIT)
20161013Thu PaulSyrilD.Francisco INS2015003 LDS Construction Submission TaskLogCONSTRUCTIONBULLETIN# 10.50 1.67 0.00 0.00 12.17
SANCHEZ AndPermits 4andCONSTRUCTIONBULLETIN05
MIRA
20161014Fri PaulSyrilD.Francisco INS2016003 LDSNARRA Biddings Production TaskLogUPDATEBIDEVALUATION& 10.00 0.25 0.00 0.00 10.25
RECOMMENDATION
20161017Mon PaulSyrilD.Francisco INS2016003 LDSNARRA Biddings Production TaskLogSITEDEVELOPMENTPLAN 10.50 0.17 0.00 0.00 10.67
WITHPHOTOSFORPRESENTATION
20161019Wed PaulSyrilD.Francisco INS2016003 LDSNARRA Biddings Submission TaskLogBIDSUMMARY(FINALIZE 10.50 0.25 0.00 0.00 10.75
FORSUBMISSION)
20161020Thu PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Drafting TaskLogREVISEDMISCELLANEOUS 10.50 0.42 0.00 0.00 10.92
AndPermits FORCONSTRUCTIONPLANS
20161021Fri PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogLDSANTIPOLOEXISTING 6.50 0.50 0.00 0.00 7.00
DEVELOPMENT FLOORPLAN
20161021Fri PaulSyrilD.Francisco INS2016003 LDSNARRA Biddings Production TaskLogUPDATEBIDEVALUATION& 4.00 0.00 0.00 0.00 4.00
RECOMMENDATION
20161024Mon PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogLDSANTIPOLO2OPTIONS 10.50 1.50 0.00 0.00 12.00
DEVELOPMENT FLOORPLANLOTPLAN
20161025Tue PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Production LDSANTIPOLO3OPTIONSCHEMATIC 9.50 1.00 0.00 0.00 10.50
DEVELOPMENT PLAN
LDSMASINLOCCONSTRUCTION
BULLETINFORSUBMISSION
20161025Tue PaulSyrilD.Francisco INS2015001 LDSMASINLOC Construction Drafting TaskLogCONSTRUCTIONBULLETIN 0.00 2.00 0.00 0.00 2.00
AndPermits FORSUBMISSION
20161026Wed PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogLDSANTIPOLOUPDATE 4.00 0.00 0.00 0.00 4.00

http://www.jogassociates.com/cgibin/projects/rpg2.cgi?fdet2=1 16/21
4/6/2017 APEXProjectTimeCostsFullDetails
DEVELOPMENT SCHEMATICPLANSITE
DEVELOPMENTPLANAREASFOR
PROPOSAL
20161026Wed PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Production TaskLogVICINITYMAP&SITE 6.50 0.33 0.00 0.00 6.83
AndPermits DEVELOPMENTPLANFOR
LOCATIONALCLEARANCE
REQUIREMENTS
20161027Thu PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Production TaskLogSECURINGOFALLPERMIT 10.50 0.33 0.00 0.00 10.83
AndPermits REQUIREMENTS
20161028Fri PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogREVISEDSCHEMATICPLAN 10.00 0.17 0.00 0.00 10.17
DEVELOPMENT
20161102Wed PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogSCHEMATICPLANOPTION3 10.50 0.25 0.00 0.00 10.75
DEVELOPMENT
20161103Thu PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogREVISEDSCHEMATICPLAN 6.50 0.08 0.00 0.00 6.58
DEVELOPMENT
20161103Thu PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Production TaskLogFILLUPOFPERMITFORMS 4.00 0.00 0.00 0.00 4.00
AndPermits ANDCOMPILATION
20161104Fri PaulSyrilD.Francisco INS2016003 LDSNARRA Construction ProjectCo TaskLogCOORDINATEWITH 10.50 0.67 0.00 0.00 11.17
AndPermits ordination BUILDINGOFFICIALREGARDING
APPLICATIONOFBUILDINGPERMIT
20161107Mon PaulSyrilD.Francisco INS2015003 LDS Construction Production TaskLogREVIEWINGANDREPORT 6.50 0.00 0.00 0.00 6.50
SANCHEZ AndPermits OFCONTRACTORANDPROJECT
MIRA INSPECTORREPORTREGARDING
TYPHOONLAWIN
20161107Mon PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Drafting TaskLogCOORDINATEWITH 4.00 0.00 0.00 0.00 4.00
AndPermits BUILDINGOFFICIALREGARDING
PERMITFEEANDCONFIRMATIONOF
BUILDINGPERMITFORM
20161108Tue PaulSyrilD.Francisco INS2015003 LDS Construction Production TaskLogREPORTONTYPHOONLAWIN 10.50 0.25 0.00 0.00 10.75
SANCHEZ AndPermits &KARENREGARDINGTIME
MIRA EXTENSION
20161109Wed PaulSyrilD.Francisco INS2015003 LDS Construction Production TaskLogREPORTFORCHANGE 6.50 0.25 0.00 0.00 6.75
SANCHEZ AndPermits ORDERTIMEEXTENSION
MIRA
20161109Wed PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Production TaskLogCOORDINATIONWITH 4.00 0.00 0.00 0.00 4.00
AndPermits BUILDINGOFFICIALSFORPERMIT
20161110Thu PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Production TaskLogLDSANTIPOLOADD 10.00 0.08 0.00 0.00 10.08
DEVELOPMENT SCHEMATICFORAPPROVAL&
BUDGETARYESTIMATE
20161111Fri PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Submission TaskLogLDSANTIPOLOADD 4.00 0.00 0.00 0.00 4.00
DEVELOPMENT BUDGETARYESTIMATE/REVISED
SCHEMATICPLANFORAPPROVAL
20161114Mon PaulSyrilD.Francisco INS2015003 LDS Construction Submission TaskLogCONSTRUCTIONBULLETIN 2.58 0.17 0.00 0.00 2.75
SANCHEZ AndPermits REGARDINGTIMEEXTENSION
MIRA
20161114Mon PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Production TaskLogSITEPHOTOSFOR 6.00 0.00 0.00 0.00 6.00
AndPermits LOCATIONALCLEARANCE
20161116Wed PaulSyrilD.Francisco INS2015003 LDS Construction Production TaskLogEXHAUSTVENTDETAIL& 6.50 0.00 0.00 0.00 6.50
SANCHEZ AndPermits LAYOUT
MIRA
20161116Wed PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Production TaskLogCOMPILINGOFBARANGAY 4.00 0.00 0.00 0.00 4.00
AndPermits CLEARANCELOCATIONAL
CLEARANCE&BUILDINGPERMIT
REQUIREMENT
20161117Thu PaulSyrilD.Francisco INS2015003 LDS Construction Drafting TaskLogREVISEDEXHAUSTDETAIL& 4.00 0.00 0.00 0.00 4.00
SANCHEZ AndPermits LAYOUT
MIRA
20161117Thu PaulSyrilD.Francisco INS2016003 LDSNARRA Construction ProjectCo TaskLogCOORDINATION&CHECKING 6.50 0.08 0.00 0.00 6.58
AndPermits ordination OFREQUIREMENTSOFBARANGAY
CLEARANCEBUILDINGPERMIT&
LOCATIONAL
20161118Fri PaulSyrilD.Francisco INS2015003 LDS Construction Production TASKLOGREVISIONOFEXHAUST 2.00 1.00 0.00 0.00 3.00
SANCHEZ AndPermits DETAILCOVERANDHANGER
MIRA REVISEDTIMEEVALUATION
(TYPHOONLAWIN)
20161118Fri PaulSyrilD.Francisco INS2016003 LDSNARRA Construction ProjectCo TaskLogCOORDINATIONWITH 4.00 0.00 0.00 0.00 4.00
AndPermits ordination MUNICIPALOFFICALSREGARDING
ADDITIONALREQUIREMENTSTAX
DECLARATION&CLEARANCE
COMPILINGOFREQUIREMENTS
20161118Fri PaulSyrilD.Francisco INS2016004 LDSANTIPOLO Schematics Submission TaskLogPRELIMINARYCOST 3.50 0.00 0.00 0.00 3.50
ESTIMATESCHEMATICPLAN&SCOPE
OFWORKS
20161121Mon PaulSyrilD.Francisco INS2015003 LDS Construction Submission TaskLogREVISEDTIMEEXTENSION& 3.50 0.00 0.00 0.00 3.50
SANCHEZ AndPermits UPDATEDSCHEMATICPLAN
MIRA
20161121Mon PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Production TaskLogPREPARINGOF 1.50 0.50 0.00 0.00 2.00
AndPermits REQUIREMENTSFORPERMIT
20161121Mon PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Site TRAVELFROMMANILATOPALAWAN 4.50 0.00 0.00 0.00 4.50
AndPermits Support
20161122Tue PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Submission APPLICATION&PROCESSINGOF 9.83 0.50 0.00 0.00 10.33
AndPermits PERMIT
20161123Wed PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Production SECURING&FILINGOFAPPROVED 9.50 2.50 0.00 0.00 12.00
AndPermits BUILDINGPERMIT&TRAVELFROM
PUERTOPRINCESAPALAWANTO
MANILA
20161124Thu PaulSyrilD.Francisco INS2015003 LDS PunchListing Submission TaskLogSUBSTANTIALCOMPLETION 3.67 0.00 0.00 0.00 3.67
SANCHEZ CERTIFICATESUBMISSIONTO
MIRA PROJECTINSPECTOR
20161124Thu PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Production TaskLogREPORTINPROCESSINGOF 2.67 0.00 0.00 0.00 2.67
AndPermits PERMIT
20161124Thu PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Drafting TaskLogREVISIONFOR 4.08 0.08 0.00 0.00 4.16
AndPermits CONSTRUCTIONPLAN
20161125Fri PaulSyrilD.Francisco INS2015003 LDS HandOver Production TaskLogPUNCHLISTSUMMARY 1.50 0.00 0.00 0.00 1.50
SANCHEZ
MIRA
20161125Fri PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Drafting TaskLogREVISIONSFOR 8.17 0.00 0.00 0.00 8.17
AndPermits CONSTRUCTIONPLAN
20161128Mon PaulSyrilD.Francisco INS2015003 LDS PunchListing Production TaskLogSUMMARYOFPUNCHLIST 10.50 0.17 0.00 0.00 10.67
SANCHEZ COORDINATEDWITHLANDSCAPER
MIRA
20161129Tue PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Production TaskLogROBBORACAYLOTPLAN 10.50 0.17 0.00 0.00 10.67
DEVELOPMENT MUNICIPALORDINANCERESEARCH
ANDSTUDY
20161201Thu PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Basic TaskLogROBINSONSBORACAY 2.00 0.00 0.00 0.00 2.00
DEVELOPMENT Research COORDINATIONWITHENGINEERING
OFFICE(MUNICIPALOFMALAY

http://www.jogassociates.com/cgibin/projects/rpg2.cgi?fdet2=1 17/21
4/6/2017 APEXProjectTimeCostsFullDetails
BORACAY)REGARDINGBUILDING
RESTRICTIONSANDRESEARCHFOR
ENVIRONMENTGUIDELINES/
REQUIREMENTFORNEWBUILDING
20161201Thu PaulSyrilD.Francisco INS2015003 LDS PunchListing Submission TaskLogSUBMISSIONOFPUNCHLIST 2.00 0.00 0.00 0.00 2.00
SANCHEZ EVALUATIONFORPROJECT
MIRA INSPECTOR
20161201Thu PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Drafting TaskLogUPDATECONSTRUCTION 6.50 0.17 0.00 0.00 6.67
AndPermits PLAN&PROPOSEDDRAINAGE
LAYOUTFORSANITARY
20161202Fri PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous ProjectCo TaskLogROBINSONSBORACAY 4.00 0.00 0.00 0.00 4.00
DEVELOPMENT ordination RESEARCHONCOMMERCIAL1
REQUIREMENTSFIREWALL
RESTRICTIONSDENRRESTRICTIONS
FORBORACAYCONSTANTFOLLOW
UPONORDINANCESFROM
MUNICIPALITYOFMALAYAKLAN
(BORACAY)
20161202Fri PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Drafting TaskLogUPDATECONSTRUCTION 6.50 0.00 0.00 0.00 6.50
AndPermits PLAN
20161205Mon PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous ProjectCo TaskLogROBBORACAYCONSTANT 1.00 0.00 0.00 0.00 1.00
DEVELOPMENT ordination FOLLOWUPOFBUILDING
RESTRICTION/ORDINANCE
20161205Mon PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Drafting TaskLogUPDATECONSTRUCTION 9.50 0.00 0.00 0.00 9.50
AndPermits PLANARCHITECTURAL&MEPFS
20161206Tue PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Production TaskLogROBBORACAYREVIEWAND 4.00 0.00 0.00 0.00 4.00
DEVELOPMENT HIGHLIGHTINGOFORDINANCETHAT
APPLICABLETOTHEPROJECT
RESEARCHONDPWHRESTRICTIONS
FORSIGNAGE/PYLON
20161206Tue PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Production TaskLogCHECKING&PLOTTINGOF 6.50 0.00 0.00 0.00 6.50
AndPermits CONSTRUCTIONPLANSFORCHECK
PRINT
20161207Wed PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous ProjectCo TaskLogROBTOWNVILLEBACOLOD 10.50 0.00 0.00 0.00 10.50
DEVELOPMENT ordination RESEARCHONORDINANCE
(BUILDINGRESTRICTIONS
COORDINATEWITHBUILDING
OFFICIALREGARDINGBUILDING
RESTRICTIONSRESEARCHON
COMMERCIALREQUIREMENTS
(BUILDINGCODE)
20161208Thu PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogROBINSONRBUILDERS 10.50 0.50 0.00 0.00 11.00
DEVELOPMENT BACOLODSCHEMATICPLANOPTION
1
20161209Fri PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogRBUILDERSBACOLOD 10.50 0.00 0.00 0.00 10.50
DEVELOPMENT UPDATESCHEMATICPLANOPTION1
BLOCKINGSOFPLAN
20161212Mon PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogRBUILDERSBACOLOD 10.50 0.00 0.00 0.00 10.50
DEVELOPMENT SCHEMATICPLANOPTION2
20161213Tue PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogRBUILDERSBACOLOD 10.50 0.50 0.00 0.00 11.00
DEVELOPMENT REVISEDSCHEMATICPLANOPTION1
WITHSITEPHOTES/MAP&AREATAB
20161214Wed PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogRBUILDERSBACOLOD 3.08 0.00 0.00 0.00 3.08
DEVELOPMENT UPDATESCHEMATICPLAN&AREA
SUMMARYFORSUBMISSION
20161214Wed PaulSyrilD.Francisco INS2015003 LDS HandOver Production TaskLogCHECKING(COMMENTING) 7.33 0.17 0.00 0.00 7.50
SANCHEZ OFCHANGESONCONSTRUCTION
MIRA PLANTOASBUILTPLAN
20161215Thu PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogRBUILDERSOPTION2 6.50 0.42 0.00 0.00 6.92
DEVELOPMENT SCHEMATICPLAN
20161215Thu PaulSyrilD.Francisco INS2015003 LDS HandOver Production TaskLogCHECKINGOFASBUILT 4.00 0.00 0.00 0.00 4.00
SANCHEZ PRIORTOCONSTRUCTIONPLAN
MIRA PROPOSEDTRAFFICPAINT
20161216Fri PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogROBBORACAYSCHEMATIC 10.50 0.58 0.00 0.00 11.08
DEVELOPMENT SECTION
20161219Mon PaulSyrilD.Francisco INS2015003 LDS HandOver Submission TASKLOGLANDSCAPEMANUALSITE 9.50 0.08 0.00 0.00 9.58
SANCHEZ PHOTOS
MIRA
20161220Tue PaulSyrilD.Francisco INS2015003 LDS HandOver Submission TaskLogUPDATELANDSCAPE 4.00 0.00 0.00 0.00 4.00
SANCHEZ MANUALBASEONASBUILTPLAN
MIRA
20161220Tue PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogCHECKINGOFCHANGESON 6.50 0.00 0.00 0.00 6.50
SANCHEZ CONSTRUCTIONPLANTOASBUILT
MIRA PLAN
20161221Wed PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogCHECKINGANDCOMMENTS 10.50 0.00 0.00 0.00 10.50
SANCHEZ ONCHANGESINCONSTRUCTION
MIRA PLANTOASBUILTPLAN
20161222Thu PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogROBBORACAYPLOTTING 2.00 0.00 0.00 0.00 2.00
DEVELOPMENT OFOPTION2PLANANDSTUDY
SECTION
20161222Thu PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Production TaskLogROBMAGNOLIAEXPANSION 1.00 0.00 0.00 0.00 1.00
DEVELOPMENT ERASINGOFPTRONTRACING
20161222Thu PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Filing TaskLogCHECKING/REVIEWOF 4.00 0.00 0.00 0.00 4.00
SANCHEZ CLOSEOUTDOCUMENTS
MIRA
20161222Thu PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Production TaskLogPLOTTINGOF 3.50 0.00 0.00 0.00 3.50
AndPermits ARCHITECTURALCONSTRUCTION
PLANSFORCHECKPRINT
20161227Tue PaulSyrilD.Francisco INS2015003 LDS HandOver Production TaskLogQARASSESSMENT 10.50 0.08 0.00 0.00 10.58
SANCHEZ CHECKING/COMMENTING
MIRA
20161228Wed PaulSyrilD.Francisco INS2015003 LDS HandOver Production TaskLogQUALITYASSESSMENT 6.00 0.00 0.00 0.00 6.00
SANCHEZ CONSTRUCTIONCHECKLIST
MIRA
20161228Wed PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Drafting TaskLogUPDATECONSTRUCTION 4.50 0.00 0.00 0.00 4.50
AndPermits PLANS7PLOTTINGFORCHECKPRINT
20170103Tue PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Production TaskLogLDSMALLIGSITE 6.00 0.00 0.00 0.00 6.00
DEVELOPMENT RESEARCH&AREATABOF
SCHEMATICPLAN
20170103Tue PaulSyrilD.Francisco INS2015003 LDS HandOver Production TaskLogQUALITYASSESSMENT 4.50 0.08 0.00 0.00 4.58
SANCHEZ CONSTRUCTIONCHECKLISTMEPS
MIRA
20170104Wed PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Production TaskLogLDSMALLIGPROPOSEDNO. 4.00 0.00 0.00 0.00 4.00
DEVELOPMENT OFSITEVISITSAREAHATCH/LEGEND
20170104Wed PaulSyrilD.Francisco INS2015003 LDS HandOver Production TaskLogQARCHECKLIST 6.50 0.25 0.00 0.00 6.75
SANCHEZ ELECTRICALSANITARY/PLUMBING
MIRA SOUND
20170105Thu PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Production TaskLogJOGSTANDARD 10.50 0.08 0.00 0.00 10.58

http://www.jogassociates.com/cgibin/projects/rpg2.cgi?fdet2=1 18/21
4/6/2017 APEXProjectTimeCostsFullDetails
ACTIVITIES CONSOLIDATIONOFDOORSAND
WINDOWSFORRESIDENTIALAND
COMMERCIAL
20170106Fri PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Production TaskLogJOGSTANDARDS 10.08 0.42 0.00 0.00 10.50
ACTIVITIES CONSOLIDATIONOFDOORS&
WINDOWSFORRESIDENTIALAND
COMMERCIAL
20170109Mon PaulSyrilD.Francisco COM2014002 ROBINSONS Schematics Drafting TaskLogROBINSONSBACOLOD 10.50 0.75 0.00 0.00 11.25
REGALADO OPTION3WITHCOLUMNATIONSTUDY
20170110Tue PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Production TaskLogRBUILDERSBACOLOD 10.25 1.00 0.00 0.00 11.25
DEVELOPMENT SCHEMATICPLANCOLUMNATION
FORREVIEW
20170111Wed PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Submission TaskLogCONSTRUCTIONBULLETIN 1.50 0.00 0.00 0.00 1.50
SANCHEZ REGARDINGPROJECTINSPECTOR
MIRA TIMEEXTENSION
20170111Wed PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogPROJECTINSPECTORTIME 6.50 0.25 0.00 0.00 6.75
SANCHEZ EXTENSIONEVALUATION
MIRA
20170111Wed PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Production TaskLogCONSOLIDATIONOFDOORS 4.00 0.00 0.00 0.00 4.00
ACTIVITIES &WINDOWSFORJOGSTANDARDS
20170112Thu PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogCHANGEORDEROF 10.50 1.33 0.00 0.00 11.83
SANCHEZ PROJECTINSPECTORTIME
MIRA EXTENSION(LDSSANCHEZMIRA&
MASINLOC)
20170113Fri PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogRBUILDERSBACOLOD 4.50 0.00 0.00 0.00 4.50
DEVELOPMENT ROOFING
20170113Fri PaulSyrilD.Francisco INS2015001 LDSMASINLOC Miscellaneous Production TaskLogCHANGEORDEROF 2.00 0.00 0.00 0.00 2.00
PROJECTINSPECTIONTIME
EXTENSION
20170113Fri PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Drafting TaskLogPLOTTINGOF 4.00 0.00 0.00 0.00 4.00
AndPermits CONSTRUCTIONPLANS
20170116Mon PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogRBUILDERSBACOLOD 7.25 0.33 0.00 0.00 7.58
DEVELOPMENT SCHEMATICSECTION
20170116Mon PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Production TaskLogCHECKING&PREPARINGOF 3.17 0.00 0.00 0.00 3.17
AndPermits CONSTRUCTIONPLANSFOR
BLUEPRINT
20170117Tue PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogRBUILDERSROOFPLAN& 3.50 0.08 0.00 0.00 3.58
DEVELOPMENT CROSS/LONGSECTION
20170117Tue PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Production TaskLogCONSTRUCTIONPLANS& 6.00 0.00 0.00 0.00 6.00
AndPermits PROJECTMANUALFORCDBURN
20170118Wed PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Production TaskLogPREPARATIONSOF 6.00 0.00 0.00 0.00 6.00
AndPermits CONSTRUCTIONPLANSBLUEPRINT
FORCONTRACTORDOCUMENTSFOR
PRECONSTRUCTIONMEETING
20170118Wed PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Production TASKLOGDOORSTANDARDIZATION 3.50 0.08 0.00 0.00 3.58
ACTIVITIES
20170119Thu PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogRBUILDERSBACOLOD 2.50 0.00 0.00 0.00 2.50
DEVELOPMENT UPDATEROOFPLAN&CROSS
SECTION
20170119Thu PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Production TaskLogCHANGEORDERTIME 2.00 0.00 0.00 0.00 2.00
AndPermits EXTENSION
20170119Thu PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Production TaskLogUPDATEDOOR 6.00 0.00 0.00 0.00 6.00
ACTIVITIES STANDARDIZATIONCOMMERCIAL
20170120Fri PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogLDSPASIGSCHEMATIC 10.50 0.08 0.00 0.00 10.58
DEVELOPMENT PLAN
20170123Mon PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogLDSPASIGSCHEMATICPLAN 10.50 0.17 0.00 0.00 10.67
DEVELOPMENT 3OPTIONS
20170124Tue PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogLDSPASIG:SCHEMEFLOOR 10.50 0.17 0.00 0.00 10.67
DEVELOPMENT PLAN
20170125Wed PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogLDSPASIGUPDATESITE 4.08 0.08 0.00 0.00 4.16
DEVELOPMENT DEVELOPMENTPLAN(PARKING/
LANDSCAPING)
20170125Wed PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Production TaskLogCOMMERCIALCOSTPER 6.33 0.00 0.00 0.00 6.33
ACTIVITIES SQM(REFERENCE:WILCON
EXPANSIONCKSLAGUNAMANATY
MIXEDUSED)
20170126Thu PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogLDSPASIGUPDATESDP 10.50 0.08 0.00 0.00 10.58
DEVELOPMENT
20170127Fri PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Drafting TaskLogJOGSTANDARDELEVATOR 10.50 0.00 0.00 0.00 10.50
ACTIVITIES DETAILS
20170130Mon PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Drafting TaskLogELEVATORDETAILJOG 10.50 0.83 0.00 0.00 11.33
ACTIVITIES STANDARD
20170131Tue PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Drafting TaskLogJOGSTNADARDUPDATE 10.50 0.08 0.00 0.00 10.58
ACTIVITIES ELEVATORDETAILS
20170201Wed PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Drafting TaskLogJOGSTANDARDUPDATE 10.50 0.17 0.00 0.00 10.67
ACTIVITIES ELEVATORDETAIL&MACHINEROOM
DETAILS
20170202Thu PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Drafting TaskLogJOGSTANDARDELEVATOR 10.50 0.08 0.00 0.00 10.58
ACTIVITIES DETAILS(MACHINEROOM)&STAIR
DETAILS
20170203Fri PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Drafting TaskLogJOGSTANDARDUPDATE 10.50 0.00 0.00 0.00 10.50
ACTIVITIES ELEVATORDETAIL(20X30)
20170206Mon PaulSyrilD.Francisco INS2015001 LDSMASINLOC Miscellaneous Production TaskLogADJUSTEDCONSULTANT 4.00 0.08 0.00 0.00 4.08
FEEPROJECTINSPECTORTIME
EXTENSIONWITHLETTER
20170206Mon PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production TaskLogADJUSTEDCONSTRUCTION 2.00 0.00 0.00 0.00 2.00
SANCHEZ FEEPROJECTINSPECTORTIME
MIRA EXTENSIONWITHLETTER
20170206Mon PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Drafting TaskLogJOGSTANDARDUPDATE 4.00 0.00 0.00 0.00 4.00
ACTIVITIES ANDPLOTTINGOFELEVATORDETAIL
FORFINALCHECKING
20170207Tue PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogRTBORACAYSCHEME4A& 5.00 0.00 0.00 0.00 5.00
DEVELOPMENT 4BAREASUMMARY
20170207Tue PaulSyrilD.Francisco INS2015001 LDSMASINLOC Miscellaneous Submission TaskLogTIMEEXTENSIONLETTER 0.50 0.00 0.00 0.00 0.50
FORPROJ.INSPECTORUPDATEAND
EMAIL
20170207Tue PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Submission TaskLogTIMEEXTENSIONLETTER 0.50 0.00 0.00 0.00 0.50
SANCHEZ FORPROJ.INSPECTORUPDATEAND
MIRA EMAIL
20170207Tue PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Drafting TaskLogJOGSTANDARDFIREEXIT 4.50 0.00 0.00 0.00 4.50
ACTIVITIES STAIRDETAILS
20170208Wed PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting RTBORACAYUPDATEAREA 4.50 0.00 0.00 0.00 4.50
DEVELOPMENT SUMMARY
20170208Wed PaulSyrilD.Francisco INS2015003 LDS Miscellaneous Production SANCHEZMIRA&MASINLOC 1.00 0.00 0.00 0.00 1.00
SANCHEZ ADJUSTEDCONSULTANTFEE

http://www.jogassociates.com/cgibin/projects/rpg2.cgi?fdet2=1 19/21
4/6/2017 APEXProjectTimeCostsFullDetails
MIRA
20170208Wed PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Drafting JOGSTANDARDSTAIRDETAILS 3.00 0.00 0.00 0.00 3.00
ACTIVITIES
20170209Thu PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TASKLOGRTBORACAYSCHEME4B 7.08 0.00 0.00 0.00 7.08
DEVELOPMENT SECTION
20170210Fri PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogRTBORACAYSCHEME4B 8.33 0.00 0.00 0.00 8.33
DEVELOPMENT SECTION
20170213Mon PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogRTBORACAYSECTION 3.00 0.00 0.00 0.00 3.00
DEVELOPMENT SCHEME5A
20170213Mon PaulSyrilD.Francisco INS2016001 LDSTIGAON Construction Production TaskLogQUERYONDRIVEWAYSLAB 2.50 0.00 0.00 0.00 2.50
AndPermits &GRADEBEAMFORCIVIL
20170213Mon PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Production TaskLogCHANGEORDER 3.00 0.00 0.00 0.00 3.00
AndPermits CONSTRUCTIONTIMEEXTENSION
20170214Tue PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogRTBORACAYSCHEME4B1 8.50 0.08 0.00 0.00 8.58
DEVELOPMENT SECTION
20170214Tue PaulSyrilD.Francisco INS2016001 LDSTIGAON Construction Production TaskLogCHANGEORDERTIME 2.00 0.00 0.00 0.00 2.00
AndPermits EXTENSION
20170215Wed PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Drafting TaskLogFESTAIRDETAILSUPDATE 8.17 0.00 0.00 0.00 8.17
ACTIVITIES STANDARD
20170216Thu PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Production TaskLogCHANGEORDER 1.00 0.00 0.00 0.00 1.00
AndPermits CONSTRUCTIONTIMEEXTENSION
FORCONTRACTOR
20170216Thu PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Drafting TaskLogFESTAIRSDETAIL 9.50 0.08 0.00 0.00 9.58
ACTIVITIES STANDARD
20170220Mon PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting RTBORACAYSCHEME5A 9.50 0.08 0.00 0.00 9.58
DEVELOPMENT
20170221Tue PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogUPDATEJOGSTANDARDFE 10.50 0.08 0.00 0.00 10.58
DEVELOPMENT STAIR
20170223Thu PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Drafting TaskLogMAINSTAIRDETAIL 10.50 0.08 0.00 0.00 10.58
ACTIVITIES
20170227Mon PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Production TaskLogREVIEWINGOFMONTHLY 1.25 0.00 0.00 0.00 1.25
AndPermits PROGRESSREPORT/BACKTRACKOF
SOILTESTREPORTPRIORTO
ACTUALFOOTING
20170227Mon PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Drafting TaskLogMAINSTAIRDETAILUPDATE 7.25 0.00 0.00 0.00 7.25
ACTIVITIES FORCHECKING
20170228Tue PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Production TaskLogREVIEWINGOFRFI&FYIFOR 10.50 NaN.00 0.00 0.00 0.00
AndPermits STRUCTURAL
20170228Tue PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Drafting TaskLogMAINSTAIRDETAIL 0.00 0.00 0.00 0.00 0.00
ACTIVITIES REVISEDRAILINGANDUPDATEWITH
ZOCALO
20170301Wed PaulSyrilD.Francisco 00JOG002 COMPANY Miscellaneous Drafting TaskLogUPDATESPECSPLAN& 8.75 0.00 0.00 0.00 8.75
ACTIVITIES ELEVATIONOFMAINSTAIR
20170302Thu PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogRTBORACAYSCHEME6 8.50 0.00 0.00 0.00 8.50
DEVELOPMENT
20170302Thu PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Production TaskLogMANDATYGSQUAREAS 1.00 1.83 0.00 0.00 2.83
DEVELOPMENT BUILTPLANCD
20170303Fri PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogRTBORACAYUPDATE 8.33 0.00 0.00 0.00 8.33
DEVELOPMENT SCHEME6APLANANDSLOPE
20170303Fri PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Production TaskLogDISCUSSIONREGARDINGRFI 1.00 0.00 0.00 0.00 1.00
AndPermits (EXCAVATIONANDINCLINEDROOF
BEAM)
20170309Thu PaulSyrilD.Francisco INS2016002 LDSBICUTAN Construction Drafting TaskLogCONSTRUCTIONBULLETIN1 9.50 0.42 0.00 0.00 9.92
AndPermits ROOMELEVATION&MODIFIED
WINDOWCHECKINGANDUPDATE
CONSTRUCTIONPLANS
20170310Fri PaulSyrilD.Francisco INS2016002 LDSBICUTAN Construction Production TaskLogCONSTRUCTIONPLANS 6.92 0.00 0.00 0.00 6.92
AndPermits
20170313Mon PaulSyrilD.Francisco INS2016002 LDSBICUTAN Construction Drafting TaskLogREASEARCHAIRCON 8.83 0.00 0.00 0.00 8.83
AndPermits LAYOUT/TYPEFORAPPROVAL
COORDINATIONWITHCONTRACTOR
REGARDINGPROPOSEDAIRCON
20170314Tue PaulSyrilD.Francisco INS2016002 LDSBICUTAN Construction Drafting TaskLogFLOORPLANCHECKINGOF 10.50 0.00 0.00 0.00 10.50
AndPermits WINDOWANDWACUASPER
EXISTINGREFLECTACTUAL
REFLECTAIRCONONELEVATION
BLOWUPDETAILOFJALOUSIE
WINDOWCOSTINGOF2OPTIONACU
(WIDOWTYPEANDSPLITTYPE)
20170315Wed PaulSyrilD.Francisco INS2016002 LDSBICUTAN Construction Drafting TaskLogCONSTRUCTIONBULLETIN 9.83 0.00 0.00 0.00 9.83
AndPermits AIRCONANDJALOUSIE
MODIFICATIONDETAIL
20170316Thu PaulSyrilD.Francisco INS2016002 LDSBICUTAN Construction Drafting TaskLogCB1ACUUNIT&WINDOW 9.58 0.83 0.00 0.00 10.41
AndPermits MODIFICATION&CHANGEORDER
FORM
20170317Fri PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Drafting TaskLogOVERLAYOFTRUSSIN 9.08 0.00 0.00 0.00 9.08
AndPermits SECTION
20170320Mon PaulSyrilD.Francisco INS2016002 LDSBICUTAN Construction Production TaskLogCHANGEORDERTIME 8.25 0.00 0.00 0.00 8.25
AndPermits EXTENSIONEVALUATION
CHRONOLOGICALEVENTOFISSUING
OFPERMIT
20170321Tue PaulSyrilD.Francisco PD2014001 PRACTICE Schematics Drafting TaskLogLDSSIPOCOTFLOORPLAN 6.17 0.00 0.00 0.00 6.17
DEVELOPMENT SCHEMATICPLANFORAPPROVALIN
TITLEBLOCKFORMATFOROWNER
APPROVAL
20170321Tue PaulSyrilD.Francisco INS2016002 LDSBICUTAN Construction Submission TaskLogCHANGEORDER& 4.00 0.00 0.00 0.00 4.00
AndPermits CONSTRUCTIONBULLETINFOR
SUBMISSIONTOOWNER
20170322Wed PaulSyrilD.Francisco PD2014001 PRACTICE Miscellaneous Drafting TaskLogRTBORACAYFIREEXIT 2.25 0.00 0.00 0.00 2.25
DEVELOPMENT LOCATION/STUDY&UPDATEAREA
SUMMARY
20170322Wed PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Site TaskLogCOORDINATIONREGARDING 5.25 0.00 0.00 0.00 5.25
AndPermits Support SCOPEOFWORKS&SUBMISSIONOF
CHANGEORDERTIMEEXTENSION
FORMONTHLYMEETINGTODAY
20170323Thu PaulSyrilD.Francisco INS2016002 LDSBICUTAN Construction Production TaskLogDECOR&ISTEELBAR 7.17 0.00 0.00 0.00 7.17
AndPermits CHARTCONSOLIDATION&CHECKING
FORDELIVERTOOWNERWITH
CHANGEORDER1
20170324Fri PaulSyrilD.Francisco INS2016002 LDSBICUTAN Construction Drafting TaskLogUPDATECONSTRUCTION 5.17 0.00 0.00 0.00 5.17
AndPermits BULLETINWACUSIZEASPER
OWNERPURCHASE
20170324Fri PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Drafting TaskLogROOFSLOPINGFOR 2.42 0.00 0.00 0.00 2.42
AndPermits CONTRACTORACTUALPHOTOSAND
REFERENCEPLANFROMOWNER
20170327Mon PaulSyrilD.Francisco MXD003 ByronSy Contract Drafting TaskLogPLANELEVATION& 0.00 0.00 0.00 0.00 0.00

http://www.jogassociates.com/cgibin/projects/rpg2.cgi?fdet2=1 20/21
4/6/2017 APEXProjectTimeCostsFullDetails
Documents BAYSECTIONFORFINS
20170327Mon PaulSyrilD.Francisco MXD003 ByronSy Construction Drafting TaskLogPLANSELEVATION& 2.83 0.00 0.00 0.00 2.83
AndPermits SECTIONFORFINS
20170327Mon PaulSyrilD.Francisco INS2016001 LDSTIGAON Construction Production TaskLogREPORTREGARDINGWPR 1.58 0.00 0.00 0.00 1.58
AndPermits UPDATEKEYPLANWITHPHOTOS/
ACTIVITIESDONE
20170327Mon PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Drafting TaskLogDRIVEWAYSECTIONFOR 4.00 0.00 0.00 0.00 4.00
AndPermits APPROVAL
20170328Tue PaulSyrilD.Francisco MXD003 ByronSy Construction Drafting TaskLogPLANSELEVATIONSECTION 9.92 1.00 0.00 0.00 10.92
AndPermits FORFINSDETAIL&plotting
20170329Wed PaulSyrilD.Francisco MXD003 ByronSy Construction Drafting TaskLogPLOTTINGOFFINSDETAIL 3.33 0.00 0.00 0.00 3.33
AndPermits FORCHECKING&SUBMISSION
20170329Wed PaulSyrilD.Francisco INS2016004 LDSANTIPOLO Schematics Production TaskLogTRAFFICSTUDY& 5.00 0.00 0.00 0.00 5.00
FEASIBILITYSTUDYPRELIMINARY
CHECKLISTSUBMITTAL
20170330Thu PaulSyrilD.Francisco INS2016004 LDSANTIPOLO Schematics Production TaskLogPRELIMINARYSUBMITTAL 5.50 0.00 0.00 0.00 5.50
TRAFFICSTUDY&FEASIBILITY
STUDY
20170330Thu PaulSyrilD.Francisco INS2016004 LDSANTIPOLO Schematics Production TaskLogSITEVISITCHECKLIST 3.83 0.08 0.00 0.00 3.91
20170331Fri PaulSyrilD.Francisco INS2016002 LDSBICUTAN Construction Drafting TaskLogCHANGEORDERDAY1OF 3.08 0.00 0.00 0.00 3.08
AndPermits CONSTRUCTION
20170331Fri PaulSyrilD.Francisco INS2016002 LDSBICUTAN Construction Drafting TaskLogCONSTRUCTIONTIME 5.42 0.00 0.00 0.00 5.42
AndPermits EXTENSIONEVALUATIONupdate
changeorder
20170403Mon PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Drafting TaskLogPREPARINGOFDOCUMENTS 1.17 0.00 0.00 0.00 1.17
AndPermits &REVIEWINGOFRSB(STRUCTURAL
PLAN)FORGEOTESTINGWITNESS
20170403Mon PaulSyrilD.Francisco INS2016003 LDSNARRA Construction ProjectCo TASKLOGWITNESSFORRSBTESTING 2.92 0.00 0.00 0.00 2.92
AndPermits ordination WITHCONTRACTORATGEOTESTING
INCORPORATEDMAKATICITY
20170403Mon PaulSyrilD.Francisco INS2016004 LDSANTIPOLO Schematics Production TaskLogPREPARINGOFPLANS& 2.00 0.00 0.00 0.00 2.00
DOCUMENTSFORTOMORROWSITE
VISIT
20170404Tue PaulSyrilD.Francisco MXD003 ByronSy Construction Drafting TaskLogREFLECTPLANS 4.83 0.00 0.00 0.00 4.83
AndPermits BAYSECTIONANDLEFTELEVATION
20170404Tue PaulSyrilD.Francisco MXD003 ByronSy Construction Drafting TaskLogADJUSTEDCCHANNEL 2.67 0.17 0.00 0.00 2.84
AndPermits
20170404Tue PaulSyrilD.Francisco INS2016003 LDSNARRA Construction Production TaskLogREPORTONGEOTESTINGOF 2.17 0.00 0.00 0.00 2.17
AndPermits REBARS
20170405Wed PaulSyrilD.Francisco MXD003 ByronSy Construction Drafting TaskLogFRONTANDLEFT 5.00 0.00 0.00 0.00 5.00
AndPermits ELEVATIONSWATCHCOLOR
20170405Wed PaulSyrilD.Francisco MXD003 ByronSy Construction Drafting TaskLogUPDATEELEVATIONCOLOR 3.58 0.00 0.00 0.00 3.58
AndPermits SWATCHFORCHECKING
20170406Thu PaulSyrilD.Francisco INS2016002 LDSBICUTAN Construction Production TaskLogPREPARATIONOF 0.92 0.00 0.00 0.00 0.92
AndPermits DOCUMENTSFORMEETINGWITH
OWNER
20170406Thu PaulSyrilD.Francisco INS2016003 LDSNARRA Miscellaneous Production TaskLogNARRAMALLIGANTIPOLO 8.25 0.92 0.00 0.00 9.17
PASIGRBUILDERSPROJECT
BACKGROUND
Total[813] 4,138.23 NaN.00 0.00 0.00 4,614.52

ExportCSV Top

http://www.jogassociates.com/cgibin/projects/rpg2.cgi?fdet2=1 21/21

You might also like