You are on page 1of 28

PRESTRESSED CONCRETE

CORRUGATED SHEET PILES


Content
Introduction . .............................................. 3
Advantage of Corrugated Type . .............................................. 4
Specification . .............................................. 6
Durability . .............................................. 10
Production Procedure . .............................................. 11
Quality Control . .............................................. 12
Driving Procedure . .............................................. 13
Driving Configuration . .............................................. 14
Application . .............................................. 15
List of Experiences . .............................................. 24
Principal Company . .............................................. 26


Introduction
PT. KOMPONINDO BETONJAYA (KOBE)
participates in the development of the nation by utilizing domestic resources, combined
with advanced technology from other countries. Good cooperation has been established
between a national group of companies and professional Japanese company in the field
of prestressed concrete. Its presence also strengthens various aspects of the national
development of Indonesia with high precision concrete products. Quality checks to
maintain the quality are continuously conducted.

Extensive research and constant monitoring of products guarantee quality control. With
the availability of experience and knowledge, PT. KOMPONINDO BETONJAYA has for many
years constantly conducted business in the field of concrete, and enjoys the confidence
of many users.

Prestressed concrete is mainly used as structure members. The demand has constantly
increased and has rapidly developed since 1955; in 1965, it even obtained the recognition
from Japanese Industrial standard committee (JIS). The large demand shows that PT.
KOMPONINDO BETONJAYA is recognized as having reliable quality.
The requirement for sheet piles has increased to the extent that in 1983 a seminar was
held to maintain quality control.

KOBEs research results have been approved by JIS in 1988 and results in KOBE giving
priority to the requirements of user. Various decisions on load capacity standards have
been taken in line with the need of the user. These decisions have been officially recognized
by JIS in September 1, 1988. PT. KOMPONINDO BETONJAYA is expanding the use of PC
Sheet piles extensively as possible, in order that developments can run smoothly. Various
facilities and conveniences are granted for the satisfaction of the user, and we are always
prepared to assist and provide guidelines and directives in technical aspects, design and
installation.


Advantage of Corrugated Type
Prestressed Concrete Sheet Piles (PC Sheet Piles) can be used for port
structures, river revetment, sewerage, earth retaining walls and many
other uses and were developed as a substitute for steel sheet piles.

Because of their corrugated cross section, PC Sheet Piles have better


capabilities and are cheaper than conventional steel sheet piles. In
particular, corrugated sheet piles perform at their best when being driven
in; they can be placed with greater accuracy.

PC sheet Piles are already being used by many user and their excellent
performance has been highly appreciated. These piles will satisfy all your
demands.
PC Corrugated sheet Piles were tested
by the Japanese Industrial Standard
Committee and were formally given JIS
approval under revised standard JIS-
A-5326 on September 1, 1988 by the
Japanese Minister of International Trade
and Industry. Some of the advantages
of PC Corrugated Sheet Piles are :

1. High Strength and high quality


PC. Corrugated Sheet Piles are
manufactured using the highest
production techniques in plants
where quality control is strictly enforced.

2. High performance and economics


High strength materials are used. At the same time, the use of a
corrugated cross section makes them mechanically efficient while
reducing weight. This allows PC Corrugated Sheet Piles to be produced
very economically.

3. Sheet piles have no front or back making handling easier


Since a PC Corrugated Sheet Pile has no front or back, they can be
used in various applications. No special instructions are needed for
carrying, temporarily placing or lifting. This makes handling easy and
reduces placement errors.


4. Large Sheet piles can be manufactured
Large or long Sheet Piles can be manufactured from prestressed
concrete (PC) without problems.

5. Completely Free from rust and corrosion; makes them usable


even in marine structures.
Since the piles are prestressed, there is no cracking. Also, they can
be used for ocean structures in accordance with Standard Concrete
Specifications (FY 1986) - especially severe corrosive environments.

6. Excellent workability
Sheet piles can withstand a high
tensile force, allowing them to be
pulled out after driving; and are suited
to mechanical construction work
involving many kinds of machines, even
vibrohammer, because they are made of
prestressed concrete.

7. High driving accuracy


Because of the corrugated cross
section of the sheet piles, resisting
planes are large in the lateral direction
and normal direction so that there
is less tilting or overturning.

8. Small displacement (deflection) at the head of sheet piles


Even in case of self standing sheet pile retaining walls, the displacement
at the head portions is smaller than for other types, because the
moment of inertia is larger since the cross section is a wave form.
This makes higher retaining walls possible.


Specification
Prestressed Concrete Sheet Piles

Top End Middle Section


Top End Middle Section Cross Section
Type (m)
H t i j e a b c d h f
W-325 1000 325 110 125 200 430 109 169 338 63 215 100 0.132

W-350 1000 350 120 150 200 404 117 161 322 76 230 100 0.147

W-400 1000 400 120 200 200 370 130 148 296 93 280 100 0.160

W-450 1000 450 120 250 200 322 155 123 246 117 330 100 0.184

W-500 1000 500 120 300 200 336 140 138 276 110 380 100 0.182

W-600 1000 600 120 400 200 306 150 128 256 125 480 100 0.208


Corrugated Type (1000mm width)
JIS A 5354 - 1993

11.4

13.3

15.6

17.0

20.1

23.4

26.9

30.7

35.2

40.4

50.6

59.6

Cross Section

Height Cross Sect. Distance from Neutral Axis Moment Section Modulus
of Inertia
Type
H A Y I Z
(cm) (cm2) Yu (cm) YL (cm) (cm ) 4
Zu (cm )3
ZL (cm4)
W-325 1000 32.5 1315 16.25 16.25 134261 8262 8262

W-350 1000 35.0 1468 17.50 17.50 169432 9682 9682

W-400 1000 40.0 1598 20.00 20.00 248685 12434 12434

W-450 1000 45.0 1835 22.50 22.50 353354 15705 15705

W-500 1000 50.0 1818 25.00 25.00 462362 18494 18494

W-600 1000 60.0 2078 30.00 30.00 765907 25530 25530


Weight Table
Length Weigth Length Weigth
Type Type
m t m t
8.0 2.65 11.0 5.06
9.0 2.98 12.0 5.52
10.0 3.31 13.0 5.97
W-325 1000 11.0 3.64 W-450 1000 14.0 6.43
12.0 3.97 15.0 6.89
13.0 4.30 16.0 7.35
14.0 4.63 17.0 7.81
9.0 3.32 13.0 5.92
10.0 3.69 14.0 6.38
11.0 4.05 15.0 6.83
12.0 4.42 16.0 7.29
W-350 1000 W-500 1000
13.0 4.79 17.0 7.74
14.0 5.15 18.0 8.20
15.0 5.52 19.0 8.65
20.0 9.11
10.0 4.01 15.0 7.81
11.0 4.41 16.0 8.33
12.0 4.81 17.0 8.84
W-400 1000 13.0 5.21 W-600 1000 18.0 9.36
14.0 5.61 19.0 9.88
15.0 6.01 20.0 10.40
16.0 6.41 21.0 10.92



Durability
The Prestressed Concrete Sheet Pile has the following features and advantages :
a. Because it is manufactured in a well organized and controlled factory, high strength
concrete ( bk = 725 kg/cm2) and uniform quality of concrete can be obtained.
b. Because the high strength concrete is strongly protected against penetration of
oxygen (02) and Chloride (CI), durability against corrosion is very high under severe
soil and water conditions.
c. Introducing compressive stress into concrete by using PC Strand gives large bending
durability and therefore crack control can be easily maintained and subsequently
large resistant moment can be obtained in spite of small dimensions.
d. The danger of sudden dropping of its safety factor is very small even in case of
emergency.
e. The good appearance of the sheet pile (e.g. harmonizing to nature) can be maintained
as permanent structure.

Especially, PC Corrugated Type Sheet Pile has a bigger moment of inertia which results in
smaller deformation. So, the height of the structure can be bigger and the warp of the
sheet pile can be smaller.

10
Production Procedures

Preparation Process Rebar Bending

Rebar Caging PC Strand Stressing

Rebar Assembling Placing Concrete

Steam Curing Finishing Goods


11
Quality Control
Kobe PC Sheet Pile shall be produced in accodance to JIS A 5354 - 1993

RAW MATERIAL
Raw material KOBE PC Sheet Pile shall generally be as follows:

Type Code / Standards Description


a. Cement SNI 15 - 2049 Ordinary Portland Cement Type 1
b. Aggregates JIS A 5308 Aggregates fo ready mixed concrete.
For coarse aggregate max size 20 mm
c. Chemical Admixture ASTM C 494 Standard Specification for Chemical
Admixture for Concrete, Calcium Chloride
free
d. Prestressing Steel JIS G 3536/ASTM A 416 Uncoated Stress Relieved Steel Wire &
Strand for prestressed Concrete SWPR 7B
12.7 mm,
15.2 mm
e. Reinforcing Steel SNI 07 - 2052 Steel Bars for Concrete Reinforcement
TP 25 and TS 40
f. Water BS 3148 Water for making Concrete Shall not contain
any detrimental amount of oils, acids, salts,
etc.

Compressive Strength Test of Concrete


Compressive strength test will be done for all daily production work at the age of 1 day
(before stress introduction) 7 days and 28 days accordingly.

Characteristic cube strength in accordance with Indonesian National Standard SNI 03-
1974 should be 725 kg/ cm2 (K 725) or equivalent with minimum cylinder strength (fck)
of 600 kg/ cm2.

12
Driving Procedure
of PC CORRUGATED SHEET PILE

13
Driving Configuration
of PC CORRUGATED SHEET PILE

1. Crawler Crane
2. Vibro Hammer
3. Chuck/Holder
4. Generator
5. Control Panel
6. Water Jet
7. Diversion Device
8. Water Tank
9. Guide Beam/Frame
10. Support Frame
11. Guide Roller
12. Lever Block
14. High Pressure Pipe
15. Jet Nozzle
16. High Pressure Rubber Hose

14
Application
Embankment

Culvert

Road

Port Structure Level

15
Construction
I. Embankment

Sungai Karang Mumus, Samarinda,


Kalimantan Timur

Rusunami Green Parkview


Jakarta Barat

Sungai Kayan, Tanjung Selor, Bulungan


Kalimantan Timur

Phu My 2-1 on Power Plant


Vietnam

16
Delta Silikon 5
Lippo Cikarang

Sungai Siak
Pekanbaru

Executive Paradise, Cipete


Jakarta Selatan

Bendung Elysium
Lippo Cikarang

17
II. Channel

Muara Tawar Combine Cycle Plant


Bekasi Jawa Barat

Medan Food Control - 6


Sumatera Utara

Cluster Gold Coast & Garden House


Bukit Golf Mediterania, PIK, Jakarta

Bukit Golf Mediterania


Pantai Indah Kapuk, Jakarta

18
III. Culvert

Plaza Senayan STP VII, Jakarta


(Sewage Treatment Plant)

19
IV. Port Structure

Fishing Port
Muara Baru, Jakarta

Dermaga Penajam
Kalimantan Timur

PLTGU Muara Tawar


Bekasi, Jawa Barat

Pasar Baru
Balikpapan, Kalimantan Timur

20
V. Sea Wall

Break Water, Muara Angke


Jakarta

Sea View Apartment


Balikpapan

Balikpapan Center
Balikpapan, Kalimantan Timur

Barau, Pontianak
Kalimantan Barat

21
VI. Road

Rest Area Km 32
Tol Cikampek

Tol BSD - Serpong


Tangerang, Jawa Barat

Tol Tanjung Barat


Jakarta

22
VII. Basement

Grand Soho, Slipi, Jakarta Barat

Wisma Central Asia, Slipi, Jakarta Barat

Askrindo Building, Jakarta

23
List of Experience
LENGTH/ TOTAL
YEAR PROJECT NAME OWNER CONTRACTOR TYPE
M PCS TON
PORT STRUCTURE/SEA WALL
Dermaga Ferry PT.Caltex Perawang Pekanbaru Caltex Hutama Karya W.325 B 16 140 741
2000
Sea Wall Pasar Baru, Balikpapan Pemda Kaliraya Sari W.350 B 12 152 673
2001 Sea Wall Pasar Baru, Balikpapan Phase-2 Pemda Kaliraya Sari W.350 B 12 160 708
2002 Galangan Kapal Balikpapan Galangan B.U. Galangan Balikpapan Utama W.600 A 17 117 1,034
2003 Trubaindo Port, Melak, Kalimantan Timur Trubaindo Swi Jetty Nusantara W.450 B 17 520 4,066
Armabar Tanjung Priok, Jakarta TNI AL Hutama Karya. Wil. II W.600 A 18 139 1,301
2004
Nusantara Multi Purpose Terminal Port, Jakarta Pelindo Rinkai Construction W.450 B 16 509 3,746
2006 Reklamasi Sisi Ancol Barat, Jakarta Jaya Ancol Jaya Beton W.450 B 16 405 2,981
Turap Dermaga Pontianak Pemda Mitra Konstruksi Kalbar W.325 B 8 267 707
2008 Dermaga Pulau Panjang, Kep. Seribu Pemda Jaya Konstruksi W.325 B 10 430 1,423
Galangan Kapal Pontianak Steadfast Marine Steadfast Marine W.325 A 12 380 1,509
Sarana Bidang Sumber Daya Air, Pontianak Pemda Gunakarya - Damai JO W.325 A 8 1,017 2,693
2009 Break Water Muara Angke, Jkt Pemda Jaya Konstruksi MP W.600 A 20 102 1,061
Fishing Port, Muara Baru Kalimantan Direjen Perikanan/TOA - PP. JO W.600 B 23 292 3,492
Turap di Kab. Sintang, Kalimantan Barat Pemda Antariksa Inti W.325 A 10 182 602
2010 Dermaga Pontianak Pemda Betang Kalimantan Barat W.450 B 16 163 1,200
Pengaman Pantai Jl. RE Martadinata Pemda Bangun Makmur Utama W.450 B 17 90 704
2011 Jalan & Pelabuhan Batubara Kal-Sel Pelindo Hutama Karya W.350 B 13 750 3,598
Pengendalian Banjir Kota Sintang Pemda Marga Mulia W.325 A 13 162 697
Barau, Pontianak Pemda Siman Eranesia Ardesplan W.325 A 13 590 2,539
2012
Sukadana, Kab. Kayong Utara Pemda Siman Eranesia Ardesplan W.325 A 13 185 796
Dermaga KBS Cilegon Krakatau Steel Adhi Karya W.500 A 11 250 1,479
ROAD
Underway Tanah Abang Phase IV, Jkt Pemda DKI Jaya Konstruksi W.450 B 12 41 226
Jalan Tembus Iswahyudi, Balikpapan Pemda Kaliraya Sari W.325 B 12 54 214
2000 Jalan Tembus Iswahyudi, Balikpapan Pemda Kaliraya Sari W.325 B 10 40 132
Jalan Tembus Iswahyudi, Balikpapan Pemda Kaliraya Sari W.325 B 8 9 24
Jalan Tembus Iswahyudi, Balikpapan Pemda Kaliraya Sari W.325 B 7 16 37
Raya Bogor & Tg. Barat Fly Over, Jakarta Pemda DKI Jakarta Wijaya Karya W.325 A 6 35 70
Raya Bogor & Tg. Barat Fly Over, Jakarta Pemda DKI Jakarta Wijaya Karya W.325 A 7 50 116
2003
Raya Bogor & Tg. Barat Fly Over, Jakarta Pemda DKI Jakarta Wijaya Karya W.325 A 10 67 222
Raya Bogor & Tg. Barat Fly Over, Jakarta Pemda DKI Jakarta Wijaya Karya W.325 A 12 35 139
Rehabilitasi Jl. Yos Sudarso, Pekanbaru Pemda Kalber Konstruk W.325 A 6 209 415
2003 Rehabilitasi Jl. Yos Sudarso, Pekanbaru Pemda Kalber Konstruk W.325 A 7 142 329
Rehabilitasi Jl. Yos Sudarso, Pekanbaru Pemda Kalber Konstruk W.325 A 8 67 177
Jembatan Sungai Wain Pemda Cipta Karsa W.325 A 10 30 99
2004
Jembatan Sungai Wain Pemda Cipta Karsa W.325 A 6 14 28
2005 Suprapto & Pramuka FO, Jakarta Pemda DKI Jakarta Hutama Karya Wil. II DKI W.325 A 10 300 993
Flyover Arif Rahman Hakim, Depok PU Waskita Karya W.325 A 9 81 241
2006
Flyover Arif Rahman Hakim, Depok PU Waskita Karya W.325 A 7 78 181
2008 Tol Sedyatmo, Jakarta Jasa Marga Pembangunan Perumahan W.325 A 12 1,300 5,164
2009 Tol BSD, Serpong Jasa Marga Kumala Wandira Danarta W.450 A 13 115 686
Pintu Tol Lenteng Agung, Jakarta Jasa Marga Kumala Wandira Danarta W.400 A 13 43 168
2011
Tol Cinere Jagorawi Jasa Marga Waskita Karya W.450 B 13 32 177
2012 Rest Area Tol Cikampek KM. 32 Lippo Cikarang Lippo Cikarang W.450 A 14 26 163
BASEMENT
Menara Jamsostek, Jakarta Jamsostek Total Bangun Persada W.600 B 17 573 5,065
Pasaraya Sultan Agung, Jakarta Tata Diantara Total Bangun Persada W.450 B 14 73 470
1996
Gedung Kesenian TIM, Jakarta Pemda Pembangunan Perumahan W.600 B 14 298 2,169
Gedung Kesenian TIM, Jakarta Pemda Pembangunan Perumahan W.600 B 17 30 265
Octagon Office Building, Jakarta Octagon Sumicon Utama W.450 B 12 265 1,463
Bidakara Bank Indonesia, Jakarta Bank Indonesia PP-Taisei W.450 B 12 37 204
1997
Bidakara Bank Indonesia, Jakarta Bank Indonesia PP-Taisei W.600 B 14 88 641
Askrindo Office Building, Jakarta Askrindo Pembangunan Perumahan W.450 B 12 258 1,424
2005 Grand Soho Slipi, Jakarta Grand Soho Multi Pondasi Utama W.600 B 15 147 1,147
24
LENGTH/ TOTAL
YEAR PROJECT NAME OWNER CONTRACTOR TYPE
M PCS TON
EMBANKMENT
Rehabilitasi Sungai Kayan, Tanjung Palas, Kaltim Pemda Beringin W.450 A 14 1,250 8,050
Sungai Karang Mumus X, Samarinda Pemda Hutama Karya Wil. V W.325 A 13 62 267
Kolam Ebony, Pantai Indah Kapuk, Jakarta Agung Sedayu Multi Artha Pratama W.325 A 6 200 397
Pengaman Tebing S.Siak di depan kantor DPRD Siak Pemda Inti Cahaya Riau W.350 A 15 41 227
2006 Pengaman Tebing S.Siak di depan kantor DPRD Siak Pemda Inti Cahaya Riau W.325 B 15 120 596
Pem. Turap Beton Desa Paluh Kec. Menpura Pemda Bumi Siak Makmur W.325 A 8 100 265
Turap Danau Moon Lake, Cikarang Lippo Cikarang Lippo Cikarang W.325 A 10 180 596
Rehab. Turap Kanal Banjir Kel. Meranti Pemda Hutama Karya Cab. Riau W.325 B 24 1,040 2,754
Turap Sungai Kandilo Tanah Grogot Pemda Trillion Glory International W.350 A 54 750 4,785
Turap Jembatan Siak Sri Indrapura, Riau Pemda Hutama Karya Cab. Riau W.325 B 8 35 93
2007 Turap Jembatan Siak Menuju Kantor Bupati, Siak Pemda Hutama Karya Cab. Riau W.325 A 15 1,500 7,448
Banjir Kanal Timur Paket 22, Jakarta Pemda Waskita Karya W.325 A 12 3,000 11,916
Rehabilitasi Sungai Kayan, Tanjung Selor, Kalimantan Pemda Beringin W.350 A 14 1,050 5,424
2008
Banjir Kanal Timur Paket 22, Tahap II, Jakarta Pemda Waskita Karya W.325 A 12 852 3,384
Normalisasi Kali Mookervart Hulu 3 Jakarta Barat Pemda Adhi Karya W.325 B 12 1,650 6,554
Sarana Bidang Sumber Daya Air, Pontianak Pemda Gunakarya - Damai JO W.325 A 8 1,017 2,693
2009
Normalisasi Kali Mookervart Hulu 1 Jakarta Barat Pemda Pembangunan Perumahan W.325 B 12 3,180 12,631
Break Water Muara Angke, Jkt Pemda Jaya Konstruksi MP W.600 A 20 102 915
Sarana Bidang Sumber Daya Air, Pontianak Pemda Pemda/Gunakarya - Damai JO W.325 A 8 195 516
Turap di Kab. Sintang, Kalimantan Barat Pemda Antariksa Inti W.325 A 10 182 602
Tanjung Palas Bulungan, Kaltim Pemda Beringin W.450 A 14 396 2,550
2010
Dermaga Pontianak Pemda Betang Kalimantan Barat W.450 A 16 163 1,200
Pompa Duri, Jakarta Pemda Waskita Karya. PT Wil. Tengah W.450 B 17 253 1,978
Kalimantan Pemda Agrabudi Gas Utama W.325 A 15 130 645
Jalan & Pelabuhan Batubara Kal-Sel Pemda Hutama Karya. W.350 B 12 750 3,321
Kawasan Industri Lippo Cikarang Lippo Cikarang Lippo Cikarang W.600 A 15 118 920
2011
Pengendalian Banjir Kota Sintang Pemda Wirata Daya Muktitama W.325 A 13 172 740
CWP 1 Kara Pulau Sambu W.500 B 20 400 3,640
Pengendalian Banjir Kota Sintang Pemda Marga Mulia W.325 A 10 162 536
Barau, Pontianak Pemda Siman Eranesia Ardesplan W.325 B 14 405 1,877
Sukadana, Kab. Kayong Utara Pemda Siman Eranesia Ardesplan W.325 A 9 185 551
Kalimalang Jakarta Timur Pemda Putra Kreasi Multibuana W.325 A 7 120 278
Delta Silicon 3-5-6, Lippo Cikarang Lippo Cikarang Lippo Cikarang W.600 B 20 167 1,737
2012
Normalisasi Kali Dadap Tangerang Pemda Sac Nusantara - Nindya Karya W.325 B 12 890 3,535
JO
Penahan Tanah Sungai Siak Pemda Pembangunan Perumahan W.350 B 14 300 1,550
Cab. IX
WWTP 3 Lippo Cikarang Lippo Cikarang Trilogi Suryawisesa W.350 B 15 171 946
CULVERT
2000 Jakarta Fishing Port, Muara Baru Dirjen. Perikanan Waskita-Daito JO. W.325 A 12 32 127
2001 Plaza Senayan STP V, Jakarta Senayan Square Kajima Indonesia W.450 B 12 68 375
2004 Pump House Power Plant, Cilacap Cengda Satyamitra Surya Perkasa W.600 A 16 147 1,223
2004 Pump House Power Plant, Cilacap Cengda Satyamitra Surya Perkasa W.325 A 7 338 783
2006 Senayan Square Cinema Jakarta Senayan Square Kajima Indonesia W.450 B 13 84 502
2007 Senayan Square STP 7 Jakarta Senayan Square Kajima Indonesia W.450 B 13 84 502
2011 Senayan Square Appartement Tower C&D Senayan Square Kajima Indonesia W.450 B 13 84 502
CHANNEL
2000 Phu My 1 Thermal Power Plan, Vietnam Mitsubishi H. I PS.Corporation W.450 B 20 120 1,104
2001 Phu My 2 - 1 Add on Thermal Power Plan, Hazama PS.Corporation W.350 B 13 444 2,130
Vietnam
2001 Phu My 2 - 1 Add on Thermal Power Plan, Hazama PS.Corporation W.350 B 15 412 2,280
Vietnam
2006 Klambu Kudu Paket 5 Semarang Pemda Hutama Karya. PT Wilayah V W.325 A 6 272 540
2007 Cluster Garden House & Gold Coast, Jakarta Agung Sedayau Mitra Artha Pratama W.325 A 6 3,939 7,823
2011 Bendung Ellycium Lippo Cikarang Lippo Cikarang Harmoni Jaya Sejahtera W.350 B 13 54 259
2011 Bendung Ellycium Lippo Cikarang Lippo Cikarang Harmoni Jaya Sejahtera W.600 A 17 12 106

25
Principal Company

Project : Sanbonmatsu-line, Road Maintenance


Client : Kagawa Prefecture, Nagao Civil Office
Height : 6.5 m
Driving : Jet Cutter + Vibro Hammer
Soil Type : Silt Sand
N value : 0-40
Type of Sheet Pile : SW-275, L = 15.5 m + Tie Road

Project : Kagawa Sakaide Marugame Bicycle Road


Client : Kagawa Prefecture, Nagao Civil Office
Height : 7 m
Driving : Jet Cutter + Vibro Hammer
Soil Type : Sand
N value : 20
Type of Sheet Pile : SW-600 B, L = 11 m + Tie Road

26
Project : Ohda-pond Road Retaining Wall
Client : Kagawa Prefecture, Nagao Civil Office
Height : 5.3 m
Driving : Jet Cutter + Vibro Hammer
Soil Type : Sand
N value : 4 - 20
Type of Sheet Pile : SW-275, L = 10 m + Tie Road

Jakarta Office: Head Office:


Graha Iskandarsyah 1st Floor Harumi Center Building 3F, 2-5-24, Harumi, Chuo-ku,
Jl. Iskandarsyah Raya No. 66C Tokyo 104-8215
Jakarta Selatan

Telephone : 62 - 21 - 720 7519 Telephone : 81 - 3 - 6385 9111


Facsimile : 62 - 21 - 720 4771 Facsimile : 81 - 3 - 3536 6927
http://www.psmic.co.jp
27
Office
Jl. Raya Cikarang Cibarusah No. 99, Sukaresmi - Cikarang Selatan, Bekasi 17550 - Indonesia
Phone : (62-21) 897 5558 (Hunting) Fax. : (62-21) 8990 6762
E-mail : marketing@kobe-concrete.com
Factory
Jl. Raya Cikarang Cibarusah No. 99, Sukaresmi - Cikarang Selatan, Bekasi 17550 - Indonesia
Phone : (62-21) 8990 6813 (Hunting) Fax. : (62-21) 8990 6683
website : www.kobe-concrete.com

You might also like