You are on page 1of 50

FABCON DESIGN & ENGINEERING (Pvt) Ltd.

COSNTRUCTION OF NEW FACTORY NEHLA VILLAGE SUNDE


ABSTRACT OF QUANTITIES AND COST
(Machine Foundations)

Sr. # Description Unit Qty

1 Structural Excavation in Common Material. C.M 566.07

2 Plain Cement Concrete P.C.C (1:4:8). C.M 70.76

Reinforcement Cement Concrete R.C.C (1:1.5:3)


3 C.M 467.19
in Column Footings.

4 Steel Reinforcement. G-60 Kgs 77,136.31

Sub Total Am
& ENGINEERING (Pvt) Ltd.
ORY NEHLA VILLAGE SUNDER LAHORE.
QUANTITIES AND COST
ne Foundations)

Rate Amount Remarks

184.64 104,518

5,173.90 366,099

11,947.00 5,581,573

115.26 8,890,731

Sub Total Amount in Rs. 14,942,921


FABCON DESIGN & ENGINEERING (Pvt) Ltd.
COSNTRUCTION OF PYRAMID STEEL STRUCTURES NEHLA VILLAGE SUND

QUANTITY SHEET
Measurements
Sr. # Description Unit No's
L B
A) Structural Excavation in Common Material.

1 MF-1 C.M 1 21.500 3.280

2 MF-2 C.M 1 37.489 8.526

3 MF-3 C.M 1 23.705 3.478

4 MF-4 C.M 1 5.800 3.500

5 MF-5 C.M 1 3.500 1.500

6 MF-6 C.M 1 3.500 1.500

7 MF-7 C.M 1 3.500 1.500

8 MF-8 C.M 1 3.500 1.500

9 MF-9 C.M 1 3.500 1.500

10 MF-10 C.M 1 16.430 2.000

11 MF-11 C.M 1 16.430 2.000

12 MF-12 C.M 1 16.430 2.000

13 MF-13 C.M 1 20.000 2.000

14 MF-14 C.M 1 20.000 2.000

15 MF-15 C.M 1 13.700 1.000

16 MF-16 C.M 1 2.500 2.000

17 MF-17 C.M 1 16.440 6.019

18 MF-18 C.M 1 16.440 6.019

19 MF-19 C.M 1 4.200 1.800

20 MF-20 C.M 1 4.200 1.800

21 MF-21 C.M 1 3.500 2.000

22 MF-22 C.M 1 3.500 2.000

Sub Total Qty in Cu.M


A
Sub Total Qty in Cft

C) Plain Cement Concrete (P.C.C, 1:4:8).

1 MF-1 C.M 1 21.500 3.280


FABCON DESIGN & ENGINEERING (Pvt) Ltd.
COSNTRUCTION OF PYRAMID STEEL STRUCTURES NEHLA VILLAGE SUND

QUANTITY SHEET
Measurements
Sr. # Description Unit No's
L B
2 MF-2 C.M 1 37.489 8.526

3 MF-3 C.M 1 23.705 3.478

4 MF-4 C.M 1 5.800 3.500

5 MF-5 C.M 1 3.500 1.500

6 MF-6 C.M 1 3.500 1.500

7 MF-7 C.M 1 3.500 1.500

8 MF-8 C.M 1 3.500 1.500

9 MF-9 C.M 1 3.500 1.500

10 MF-10 C.M 1 16.430 2.000

11 MF-11 C.M 1 16.430 2.000

12 MF-12 C.M 1 16.430 2.000

13 MF-13 C.M 1 20.000 2.000

14 MF-14 C.M 1 20.000 2.000

15 MF-15 C.M 1 13.700 1.000

16 MF-16 C.M 1 2.500 2.000

17 MF-17 C.M 1 16.440 6.019

18 MF-18 C.M 1 16.440 6.019

19 MF-19 C.M 1 4.200 1.800

20 MF-20 C.M 1 4.200 1.800

21 MF-21 C.M 1 3.500 2.000

22 MF-22 C.M 1 3.500 2.000

Sub Total Qty in Cu.M


C
Sub Total Qty in Cft

D) Reinforcement Cement Concrete (R.C.C, 1:1.5:3).

1 MF-1 C.M 1 21.425 3.205

2 MF-2 C.M 1 37.414 8.451

3 MF-3 C.M 1 23.630 3.403


FABCON DESIGN & ENGINEERING (Pvt) Ltd.
COSNTRUCTION OF PYRAMID STEEL STRUCTURES NEHLA VILLAGE SUND

QUANTITY SHEET
Measurements
Sr. # Description Unit No's
L B
4 MF-4 C.M 1 5.725 3.425

5 MF-5 C.M 1 3.425 1.425

6 MF-6 C.M 1 3.425 1.425

7 MF-7 C.M 1 3.425 1.425

8 MF-8 C.M 1 3.425 1.425

9 MF-9 C.M 1 3.425 1.425

10 MF-10 C.M 1 16.355 1.925

11 MF-11 C.M 1 16.355 1.925

12 MF-12 C.M 1 16.355 1.925

13 MF-13 C.M 1 19.925 1.925

14 MF-14 C.M 1 19.925 1.925

15 MF-15 C.M 1 13.625 0.925

16 MF-16 C.M 1 2.425 1.925

17 MF-17 C.M 1 16.365 5.944

18 MF-18 C.M 1 16.365 5.944

19 MF-19 C.M 1 4.125 1.725

20 MF-20 C.M 1 4.125 1.725

21 MF-21 C.M 1 3.425 1.925

22 MF-22 C.M 1 3.425 1.925

Sub Total Qty in Cu.M


D)
Sub Total Qty in Cft

E) Reinforcement Steel Grade-60.

1 MF-1 Kgs 1 7,003.1

2 MF-2 Kgs 1 21,456.51

3 MF-3 Kgs 1 8,459.3

4 MF-4 Kgs 1 774.8

5 MF-5 Kgs 1 274.7


FABCON DESIGN & ENGINEERING (Pvt) Ltd.
COSNTRUCTION OF PYRAMID STEEL STRUCTURES NEHLA VILLAGE SUND

QUANTITY SHEET
Measurements
Sr. # Description Unit No's
L B
6 MF-6 Kgs 1 274.7

7 MF-7 Kgs 1 274.7

8 MF-8 Kgs 1 274.7

9 MF-9 Kgs 1 274.7

10 MF-10 Kgs 1 4,111.9

11 MF-11 Kgs 1 4,111.9

12 MF-12 Kgs 1 4,111.9

13 MF-13 Kgs 1 5,993.1

14 MF-14 Kgs 1 5,993.1

15 MF-15 Kgs 1 2,860.1

16 MF-16 Kgs 1 208.1

17 MF-17 Kgs 1 4,624.8

18 MF-18 Kgs 1 4,624.8

19 MF-19 Kgs 1 378.0

20 MF-20 Kgs 1 378.0

21 MF-21 Kgs 1 336.0

22 MF-22 Kgs 1 336.0

E) Sub Total Qty in Kgs


FABCON DESIGN & ENGINEERING (Pvt) Ltd.
COSNTRUCTION OF PYRAMID STEEL STRUCTURES NEHLA VILLAGE SUND

QUANTITY SHEET
Measurements
Sr. # Description Unit No's
L B
FABCON DESIGN & ENGINEERING (Pvt) Ltd.
COSNTRUCTION OF PYRAMID STEEL STRUCTURES NEHLA VILLAGE SUND

QUANTITY SHEET
Measurements
Sr. # Description Unit No's
L B
FABCON DESIGN & ENGINEERING (Pvt) Ltd.
COSNTRUCTION OF PYRAMID STEEL STRUCTURES NEHLA VILLAGE SUND

QUANTITY SHEET
Measurements
Sr. # Description Unit No's
L B
FABCON DESIGN & ENGINEERING (Pvt) Ltd.
COSNTRUCTION OF PYRAMID STEEL STRUCTURES NEHLA VILLAGE SUND

QUANTITY SHEET
Measurements
Sr. # Description Unit No's
L B

Total R.C.C #REF!

Steel Reinforcement G-60


Deformed Bars:-

Qty as per item No. 6a, 6b @ 6.75 Lbs/Cft

#REF! X 0.4536
NG (Pvt) Ltd.
HLA VILLAGE SUNDER LAHORE.

easurements
Qty Remarks
H

0.6 42.31

0.6 191.78

0.6 49.47

0.6 12.18

0.6 3.15

0.6 3.15

0.6 3.15

0.6 3.15

0.6 3.15

0.6 19.72

0.6 19.72

0.6 19.72

0.6 24.00

0.6 24.00

0.6 8.22

0.6 3.00

0.6 59.37

0.6 59.37

0.6 4.54

0.6 4.54

0.6 4.20

0.6 4.20

566.07 Cu.M

19,993.63 Cft

0.075 5.29
NG (Pvt) Ltd.
HLA VILLAGE SUNDER LAHORE.

easurements
Qty Remarks
H
0.075 23.97

0.075 6.18

0.075 1.52

0.075 0.39

0.075 0.39

0.075 0.39

0.075 0.39

0.075 0.39

0.075 2.46

0.075 2.46

0.075 2.46

0.075 3.00

0.075 3.00

0.075 1.03

0.075 0.38

0.075 7.42

0.075 7.42

0.075 0.57

0.075 0.57

0.075 0.53

0.075 0.53

70.76 Cu.M

2,499.20 Cft

0.508 34.88

0.508 160.62

0.508 40.85
NG (Pvt) Ltd.
HLA VILLAGE SUNDER LAHORE.

easurements
Qty Remarks
H
0.508 9.96

0.508 2.48

0.508 2.48

0.508 2.48

0.508 2.48

0.508 2.48

0.508 15.99

0.508 15.99

0.508 15.99

0.508 19.48

0.508 19.48

0.508 6.40

0.508 2.37

0.508 49.41

0.508 49.41

0.508 3.61

0.508 3.61

0.508 3.35

0.508 3.35

467.19 Cu.M

16,501.31 Cft

7,003.194 7,003.19

21,456.510 21,456.51

8,459.376 8,459.38

774.837 774.84

274.749 274.75
NG (Pvt) Ltd.
HLA VILLAGE SUNDER LAHORE.

easurements
Qty Remarks
H
274.749 274.75

274.749 274.75

274.749 274.75

274.749 274.75

4,111.975 4,111.98

4,111.975 4,111.98

4,111.975 4,111.98

5,993.159 5,993.16

5,993.159 5,993.16

2,860.192 2,860.19

208.141 208.14

4,624.886 4,624.89

4,624.886 4,624.89

378.079 378.08

378.079 378.08

336.070 336.07

336.070 336.07

77,136.31 Kgs
NG (Pvt) Ltd.
HLA VILLAGE SUNDER LAHORE.

easurements
Qty Remarks
H
NG (Pvt) Ltd.
HLA VILLAGE SUNDER LAHORE.

easurements
Qty Remarks
H
NG (Pvt) Ltd.
HLA VILLAGE SUNDER LAHORE.

easurements
Qty Remarks
H
NG (Pvt) Ltd.
HLA VILLAGE SUNDER LAHORE.

easurements
Qty Remarks
H

#REF!

#REF! Cft
a #REF! Lbs
b -
c=a+b #REF! Lbs
= #REF! Kgs
#REF! P%Kg 117.06 #REF!
CONSTRUCTION OF PYRAMID STEEL STRUCTURE (Pvt.) Ltd.

BAR BENDING SCHEDULE

Dia Spacing Length


S/No. Description (mm) (mm) Nos (m) Hook Lap
1 Main Shed

Main Bars Top # 04 150 1 x 144.3 = 144 21.50 2 x 0.40 = 0.80

Distr. Bars Top # 04 150 1 x 22.87 = 22.87 3.28 2 x 0.40 = 0.80

Main Bars Bottom # 04 150 1 x 144.3 = 144 21.50 2 x 0.40 = 0.80

Distr. Bars Bottom # 04 150 1 x 22.87 = 22.87 3.28 2 x 0.40 = 0.80

Binding Wire 13 kg
D STEEL STRUCTURE (Pvt.) Ltd.

NG SCHEDULE

C. Total Length
Length(m) (m) Weight-kg/mtr T. Weight (kg)

22.30 3218.63 0.994 3,199.32

4.08 93.30 0.994 92.74

22.30 3218.63 0.994 3,199.32

4.08 93.30 0.994 92.74

TOTAL 6,584.12
Wastage 05% 329.21
Sub Total Weight in kgs 6,913.32
Binding Wire 13 kg per ton as per cpwd specification 89.87
Net Total Weight in kgs 7,003.19
CONSTRUCTION OF PYRAMID STEEL STRUCTURE (Pvt.) Ltd.

BAR BENDING SCHEDULE

Dia Spacing Length


S/No. Description Nos Hook Lap
(mm) (mm) (m)

1 Main Shed

Main Bars Top # 04 150 1 x 250.9 = 251 37.49 2 x 0.40 = 0.80

Distr. Bars Top # 04 150 1 x 57.84 = 57.84 8.53 2 x 0.40 = 0.80

Main Bars Bottom # 04 150 1 x 250.9 = 251 37.49 2 x 0.40 = 0.80

Distr. Bars Bottom # 04 150 1 x 57.84 = 57.84 8.53 2 x 0.40 = 0.80

Binding Wire 13 kg
D STEEL STRUCTURE (Pvt.) Ltd.

NG SCHEDULE

C. Total Length
Weight-kg/mtr T. Weight (kg)
Length(m) (m)

38.29 9607.73 0.994 9,550.08

9.33 539.42 0.994 536.18

38.29 9607.73 0.994 9,550.08

9.33 539.42 0.994 536.18

TOTAL 20,172.53
Wastage 05% 1,008.63
Sub Total Weight in kgs 21,181.15
Binding Wire 13 kg per ton as per cpwd specification 275.36
Net Total Weight in kgs 21,456.51
CONSTRUCTION OF PYRAMID STEEL STRUCTURE (Pvt.) Ltd.

BAR BENDING SCHEDULE

Dia Spacing Length


S/No. Description (mm) (mm) Nos (m) Hook Lap
1 Main Shed

Main Bars Top # 04 150 1 x 159 = 159 23.71 2 x 0.40 = 0.80

Distr. Bars Top # 04 150 1 x 24.19 = 24.19 3.48 2 x 0.40 = 0.80

Main Bars Bottom # 04 150 1 x 159 = 159 23.71 2 x 0.40 = 0.80

Distr. Bars Bottom # 04 150 1 x 24.19 = 24.19 3.48 2 x 0.40 = 0.80

Binding Wire 13 kg
D STEEL STRUCTURE (Pvt.) Ltd.

NG SCHEDULE

C. Total Length
Length(m) (m) Weight-kg/mtr T. Weight (kg)

24.51 3897.11 0.99 3,873.73

4.28 103.47 0.99 102.85

24.51 3897.11 0.99 3,873.73

4.28 103.47 0.99 102.85

TOTAL 7,953.16
Wastage 05% 397.66
Sub Total Weight in kgs 8,350.82
Binding Wire 13 kg per ton as per cpwd specification 108.56
Net Total Weight in kgs 8,459.38
CONSTRUCTION OF PYRAMID STEEL STRUCTURE (Pvt.) Ltd.

BAR BENDING SCHEDULE

Dia Spacing Length


S/No. Description (mm) (mm) Nos (m) Hook Lap
1 Main Shed

Main Bars Top # 04 150 1 x 39.67 = 39.67 5.80 2 x 0.40 = 0.80

Distr. Bars Top # 04 150 1 x 24.33 = 24.33 3.50 2 x 0.40 = 0.80

Main Bars Bottom # 04 150 1 x 39.67 = 39.67 5.80 2 x 0.40 = 0.80

Distr. Bars Bottom # 04 150 1 x 24.33 = 24.33 3.50 2 x 0.40 = 0.80

Binding Wire 13 kg
D STEEL STRUCTURE (Pvt.) Ltd.

NG SCHEDULE

C. Total Length
Length(m) (m) Weight-kg/mtr T. Weight (kg)

6.60 261.80 0.99 260.23

4.30 104.63 0.99 104.01

6.60 261.80 0.99 260.23

4.30 104.63 0.99 104.01

TOTAL 728.47
Wastage 05% 36.42
Sub Total Weight in kgs 764.89
Binding Wire 13 kg per ton as per cpwd specification 9.94
Net Total Weight in kgs 774.84
CONSTRUCTION OF PYRAMID STEEL STRUCTURE (Pvt.) Ltd.

BAR BENDING SCHEDULE

Dia Spacing Length


S/No. Description (mm) (mm) Nos (m) Hook Lap
1 Main Shed

Main Bars Top # 04 150 5 x 24.33 = 122 3.50 2 x 0.40 = 0.80

Distr. Bars Top # 04 150 5 x 11 = 55 1.50 2 x 0.40 = 0.80

Main Bars Bottom # 04 150 5 x 24.33 = 122 3.50 2 x 0.40 = 0.80

Distr. Bars Bottom # 04 150 5 x 11 = 55 1.50 2 x 0.40 = 0.80

Binding Wire 13 kg
D STEEL STRUCTURE (Pvt.) Ltd.

NG SCHEDULE

C. Total Length
Length(m) (m) Weight-kg/mtr T. Weight (kg)

4.30 523.17 0.99 520.03

2.30 126.50 0.99 125.74

4.30 523.17 0.99 520.03

2.30 126.50 0.99 125.74

TOTAL 1,291.54
Wastage 05% 64.58
Sub Total Weight in kgs 1,356.11
Binding Wire 13 kg per ton as per cpwd specification 17.63
Net Total Weight in kgs 1,373.74
CONSTRUCTION OF PYRAMID STEEL STRUCTURE (Pvt.) Ltd.

BAR BENDING SCHEDULE

Dia Spacing Length


S/No. Description (mm) (mm) Nos (m) Hook Lap
1 Main Shed

Main Bars Top # 04 150 3 x 110.5 = 331.6 16.43 2 x 0.40 = 0.80

Distr. Bars Top # 04 150 3 x 14.33 = 43 2.00 2 x 0.40 = 0.80

Main Bars Bottom # 04 150 3 x 110.5 = 331.6 16.43 2 x 0.40 = 0.80

Distr. Bars Bottom # 04 150 3 x 14.33 = 43 2.00 2 x 0.40 = 0.80

Binding Wire 13 kg
D STEEL STRUCTURE (Pvt.) Ltd.

NG SCHEDULE

C. Total Length
Length(m) (m) Weight-kg/mtr T. Weight (kg)

17.23 5713.47 0.99 5,679.19

2.80 120.40 0.99 119.68

17.23 5713.47 0.99 5,679.19

2.80 120.40 0.99 119.68

TOTAL 11,597.73
Wastage 05% 579.89
Sub Total Weight in kgs 12,177.62
Binding Wire 13 kg per ton as per cpwd specification 158.31
Net Total Weight in kgs 12,335.93
CONSTRUCTION OF PYRAMID STEEL STRUCTURE (Pvt.) Ltd.

BAR BENDING SCHEDULE

Dia Spacing Length


S/No. Description (mm) (mm) Nos (m) Hook Lap
1 Main Shed

Main Bars Top # 04 150 2 x 134.3 = 269 20.00 2 x 0.40 = 0.80

Distr. Bars Top # 04 150 2 x 14.33 = 28.67 2.00 2 x 0.40 = 0.80

Main Bars Bottom # 04 150 2 x 134.3 = 269 20.00 2 x 0.40 = 0.80

Distr. Bars Bottom # 04 150 2 x 14.33 = 28.67 2.00 2 x 0.40 = 0.80

Binding Wire 13 kg
D STEEL STRUCTURE (Pvt.) Ltd.

NG SCHEDULE

C. Total Length
Length(m) (m) Weight-kg/mtr T. Weight (kg)

20.80 5588.27 0.99 5,554.74

2.80 80.27 0.99 79.79

20.80 5588.27 0.99 5,554.74

2.80 80.27 0.99 79.79

TOTAL 11,269.04
Wastage 05% 563.45
Sub Total Weight in kgs 11,832.50
Binding Wire 13 kg per ton as per cpwd specification 153.82
Net Total Weight in kgs 11,986.32
CONSTRUCTION OF PYRAMID STEEL STRUCTURE (Pvt.) Ltd.

BAR BENDING SCHEDULE

Dia Spacing Length


S/No. Description (mm) (mm) Nos (m) Hook Lap
1 Main Shed

Main Bars Top # 04 150 1 x 92.33 = 92.33 13.70 2 x 0.40 = 0.80

Distr. Bars Top # 04 150 1 x 7.667 = 7.667 1.00 2 x 0.40 = 0.80

Main Bars Bottom # 04 150 1 x 92.33 = 92.33 13.70 2 x 0.40 = 0.80

Distr. Bars Bottom # 04 150 1 x 7.667 = 7.667 1.00 2 x 0.40 = 0.80

Binding Wire 13 kg
D STEEL STRUCTURE (Pvt.) Ltd.

NG SCHEDULE

C. Total Length
Length(m) (m) Weight-kg/mtr T. Weight (kg)

14.50 1338.83 0.99 1,330.80

1.80 13.80 0.99 13.72

14.50 1338.83 0.99 1,330.80

1.80 13.80 0.99 13.72

TOTAL 2,689.04
Wastage 05% 134.45
Sub Total Weight in kgs 2,823.49
Binding Wire 13 kg per ton as per cpwd specification 36.71
Net Total Weight in kgs 2,860.19
CONSTRUCTION OF PYRAMID STEEL STRUCTURE (Pvt.) Ltd.

BAR BENDING SCHEDULE

Dia Spacing Length


S/No. Description (mm) (mm) Nos (m) Hook Lap
1 Main Shed

Main Bars Top # 04 150 1 x 17.67 = 17.67 2.50 2 x 0.40 = 0.80

Distr. Bars Top # 04 150 1 x 14.33 = 14.33 2.00 2 x 0.40 = 0.80

Main Bars Bottom # 04 150 1 x 17.67 = 17.67 2.50 2 x 0.40 = 0.80

Distr. Bars Bottom # 04 150 1 x 14.33 = 14.33 2.00 2 x 0.40 = 0.80

Binding Wire 13 kg
D STEEL STRUCTURE (Pvt.) Ltd.

NG SCHEDULE

C. Total Length
Length(m) (m) Weight-kg/mtr T. Weight (kg)

3.30 58.30 0.99 57.95

2.80 40.13 0.99 39.89

3.30 58.30 0.99 57.95

2.80 40.13 0.99 39.89

TOTAL 195.69
Wastage 05% 9.78
Sub Total Weight in kgs 205.47
Binding Wire 13 kg per ton as per cpwd specification 2.67
Net Total Weight in kgs 208.14
CONSTRUCTION OF PYRAMID STEEL STRUCTURE (Pvt.) Ltd.

BAR BENDING SCHEDULE

Dia Spacing Length


S/No. Description (mm) (mm) Nos (m) Hook Lap
1 Main Shed

Main Bars Top # 04 150 2 x 110.6 = 221.2 16.44 2 x 0.40 = 0.80

Distr. Bars Top # 04 150 2 x 41.13 = 82.25 6.02 2 x 0.40 = 0.80

Main Bars Bottom # 04 150 2 x 110.6 = 221.2 16.44 2 x 0.40 = 0.80

Distr. Bars Bottom # 04 150 2 x 41.13 = 82.25 6.02 2 x 0.40 = 0.80

Binding Wire 13 kg
D STEEL STRUCTURE (Pvt.) Ltd.

NG SCHEDULE

C. Total Length
Length(m) (m) Weight-kg/mtr T. Weight (kg)

17.24 3813.49 0.99 3,790.61

6.82 560.89 0.99 557.52

17.24 3813.49 0.99 3,790.61

6.82 560.89 0.99 557.52

TOTAL 8,696.25
Wastage 05% 434.81
Sub Total Weight in kgs 9,131.07
Binding Wire 13 kg per ton as per cpwd specification 118.70
Net Total Weight in kgs 9,249.77
CONSTRUCTION OF PYRAMID STEEL STRUCTURE (Pvt.) Ltd.

BAR BENDING SCHEDULE

Dia Spacing Length


S/No. Description (mm) (mm) Nos (m) Hook Lap
1 Main Shed

Main Bars Top # 04 150 2 x 29 = 58 4.20 2 x 0.40 = 0.80

Distr. Bars Top # 04 150 2 x 13 = 26 1.80 2 x 0.40 = 0.80

Main Bars Bottom # 04 150 2 x 29 = 58 4.20 2 x 0.40 = 0.80

Distr. Bars Bottom # 04 150 2 x 13 = 26 1.80 2 x 0.40 = 0.80

Binding Wire 13 kg
D STEEL STRUCTURE (Pvt.) Ltd.

NG SCHEDULE

C. Total Length
Length(m) (m) Weight-kg/mtr T. Weight (kg)

5.00 290.00 0.99 288.26

2.60 67.60 0.99 67.19

5.00 290.00 0.99 288.26

2.60 67.60 0.99 67.19

TOTAL 710.91
Wastage 05% 35.55
Sub Total Weight in kgs 746.45
Binding Wire 13 kg per ton as per cpwd specification 9.70
Net Total Weight in kgs 756.16
CONSTRUCTION OF PYRAMID STEEL STRUCTURE (Pvt.) Ltd.

BAR BENDING SCHEDULE

Dia Spacing Length


S/No. Description (mm) (mm) Nos (m) Hook Lap
1 Main Shed

Main Bars Top # 04 150 2 x 24.33 = 48.67 4.20 2 x 0.40 = 0.80

Distr. Bars Top # 04 150 2 x 14.33 = 28.67 1.80 2 x 0.40 = 0.80

Main Bars Bottom # 04 150 2 x 24.33 = 48.67 4.20 2 x 0.40 = 0.80

Distr. Bars Bottom # 04 150 2 x 14.33 = 28.67 1.80 2 x 0.40 = 0.80

Binding Wire 13 kg
D STEEL STRUCTURE (Pvt.) Ltd.

NG SCHEDULE

C. Total Length
Length(m) (m) Weight-kg/mtr T. Weight (kg)

5.00 243.33 0.99 241.87

2.60 74.53 0.99 74.09

5.00 243.33 0.99 241.87

2.60 74.53 0.99 74.09

TOTAL 631.92
Wastage 05% 31.60
Sub Total Weight in kgs 663.51
Binding Wire 13 kg per ton as per cpwd specification 8.63
Net Total Weight in kgs 672.14