Sub Total Am
& ENGINEERING (Pvt) Ltd.
ORY NEHLA VILLAGE SUNDER LAHORE.
QUANTITIES AND COST
ne Foundations)
184.64 104,518
5,173.90 366,099
11,947.00 5,581,573
115.26 8,890,731
QUANTITY SHEET
Measurements
Sr. # Description Unit No's
L B
A) Structural Excavation in Common Material.
QUANTITY SHEET
Measurements
Sr. # Description Unit No's
L B
2 MF-2 C.M 1 37.489 8.526
QUANTITY SHEET
Measurements
Sr. # Description Unit No's
L B
4 MF-4 C.M 1 5.725 3.425
QUANTITY SHEET
Measurements
Sr. # Description Unit No's
L B
6 MF-6 Kgs 1 274.7
QUANTITY SHEET
Measurements
Sr. # Description Unit No's
L B
FABCON DESIGN & ENGINEERING (Pvt) Ltd.
COSNTRUCTION OF PYRAMID STEEL STRUCTURES NEHLA VILLAGE SUND
QUANTITY SHEET
Measurements
Sr. # Description Unit No's
L B
FABCON DESIGN & ENGINEERING (Pvt) Ltd.
COSNTRUCTION OF PYRAMID STEEL STRUCTURES NEHLA VILLAGE SUND
QUANTITY SHEET
Measurements
Sr. # Description Unit No's
L B
FABCON DESIGN & ENGINEERING (Pvt) Ltd.
COSNTRUCTION OF PYRAMID STEEL STRUCTURES NEHLA VILLAGE SUND
QUANTITY SHEET
Measurements
Sr. # Description Unit No's
L B
#REF! X 0.4536
NG (Pvt) Ltd.
HLA VILLAGE SUNDER LAHORE.
easurements
Qty Remarks
H
0.6 42.31
0.6 191.78
0.6 49.47
0.6 12.18
0.6 3.15
0.6 3.15
0.6 3.15
0.6 3.15
0.6 3.15
0.6 19.72
0.6 19.72
0.6 19.72
0.6 24.00
0.6 24.00
0.6 8.22
0.6 3.00
0.6 59.37
0.6 59.37
0.6 4.54
0.6 4.54
0.6 4.20
0.6 4.20
566.07 Cu.M
19,993.63 Cft
0.075 5.29
NG (Pvt) Ltd.
HLA VILLAGE SUNDER LAHORE.
easurements
Qty Remarks
H
0.075 23.97
0.075 6.18
0.075 1.52
0.075 0.39
0.075 0.39
0.075 0.39
0.075 0.39
0.075 0.39
0.075 2.46
0.075 2.46
0.075 2.46
0.075 3.00
0.075 3.00
0.075 1.03
0.075 0.38
0.075 7.42
0.075 7.42
0.075 0.57
0.075 0.57
0.075 0.53
0.075 0.53
70.76 Cu.M
2,499.20 Cft
0.508 34.88
0.508 160.62
0.508 40.85
NG (Pvt) Ltd.
HLA VILLAGE SUNDER LAHORE.
easurements
Qty Remarks
H
0.508 9.96
0.508 2.48
0.508 2.48
0.508 2.48
0.508 2.48
0.508 2.48
0.508 15.99
0.508 15.99
0.508 15.99
0.508 19.48
0.508 19.48
0.508 6.40
0.508 2.37
0.508 49.41
0.508 49.41
0.508 3.61
0.508 3.61
0.508 3.35
0.508 3.35
467.19 Cu.M
16,501.31 Cft
7,003.194 7,003.19
21,456.510 21,456.51
8,459.376 8,459.38
774.837 774.84
274.749 274.75
NG (Pvt) Ltd.
HLA VILLAGE SUNDER LAHORE.
easurements
Qty Remarks
H
274.749 274.75
274.749 274.75
274.749 274.75
274.749 274.75
4,111.975 4,111.98
4,111.975 4,111.98
4,111.975 4,111.98
5,993.159 5,993.16
5,993.159 5,993.16
2,860.192 2,860.19
208.141 208.14
4,624.886 4,624.89
4,624.886 4,624.89
378.079 378.08
378.079 378.08
336.070 336.07
336.070 336.07
77,136.31 Kgs
NG (Pvt) Ltd.
HLA VILLAGE SUNDER LAHORE.
easurements
Qty Remarks
H
NG (Pvt) Ltd.
HLA VILLAGE SUNDER LAHORE.
easurements
Qty Remarks
H
NG (Pvt) Ltd.
HLA VILLAGE SUNDER LAHORE.
easurements
Qty Remarks
H
NG (Pvt) Ltd.
HLA VILLAGE SUNDER LAHORE.
easurements
Qty Remarks
H
#REF!
#REF! Cft
a #REF! Lbs
b -
c=a+b #REF! Lbs
= #REF! Kgs
#REF! P%Kg 117.06 #REF!
CONSTRUCTION OF PYRAMID STEEL STRUCTURE (Pvt.) Ltd.
Binding Wire 13 kg
D STEEL STRUCTURE (Pvt.) Ltd.
NG SCHEDULE
C. Total Length
Length(m) (m) Weight-kg/mtr T. Weight (kg)
TOTAL 6,584.12
Wastage 05% 329.21
Sub Total Weight in kgs 6,913.32
Binding Wire 13 kg per ton as per cpwd specification 89.87
Net Total Weight in kgs 7,003.19
CONSTRUCTION OF PYRAMID STEEL STRUCTURE (Pvt.) Ltd.
1 Main Shed
Binding Wire 13 kg
D STEEL STRUCTURE (Pvt.) Ltd.
NG SCHEDULE
C. Total Length
Weight-kg/mtr T. Weight (kg)
Length(m) (m)
TOTAL 20,172.53
Wastage 05% 1,008.63
Sub Total Weight in kgs 21,181.15
Binding Wire 13 kg per ton as per cpwd specification 275.36
Net Total Weight in kgs 21,456.51
CONSTRUCTION OF PYRAMID STEEL STRUCTURE (Pvt.) Ltd.
Binding Wire 13 kg
D STEEL STRUCTURE (Pvt.) Ltd.
NG SCHEDULE
C. Total Length
Length(m) (m) Weight-kg/mtr T. Weight (kg)
TOTAL 7,953.16
Wastage 05% 397.66
Sub Total Weight in kgs 8,350.82
Binding Wire 13 kg per ton as per cpwd specification 108.56
Net Total Weight in kgs 8,459.38
CONSTRUCTION OF PYRAMID STEEL STRUCTURE (Pvt.) Ltd.
Binding Wire 13 kg
D STEEL STRUCTURE (Pvt.) Ltd.
NG SCHEDULE
C. Total Length
Length(m) (m) Weight-kg/mtr T. Weight (kg)
TOTAL 728.47
Wastage 05% 36.42
Sub Total Weight in kgs 764.89
Binding Wire 13 kg per ton as per cpwd specification 9.94
Net Total Weight in kgs 774.84
CONSTRUCTION OF PYRAMID STEEL STRUCTURE (Pvt.) Ltd.
Binding Wire 13 kg
D STEEL STRUCTURE (Pvt.) Ltd.
NG SCHEDULE
C. Total Length
Length(m) (m) Weight-kg/mtr T. Weight (kg)
TOTAL 1,291.54
Wastage 05% 64.58
Sub Total Weight in kgs 1,356.11
Binding Wire 13 kg per ton as per cpwd specification 17.63
Net Total Weight in kgs 1,373.74
CONSTRUCTION OF PYRAMID STEEL STRUCTURE (Pvt.) Ltd.
Binding Wire 13 kg
D STEEL STRUCTURE (Pvt.) Ltd.
NG SCHEDULE
C. Total Length
Length(m) (m) Weight-kg/mtr T. Weight (kg)
TOTAL 11,597.73
Wastage 05% 579.89
Sub Total Weight in kgs 12,177.62
Binding Wire 13 kg per ton as per cpwd specification 158.31
Net Total Weight in kgs 12,335.93
CONSTRUCTION OF PYRAMID STEEL STRUCTURE (Pvt.) Ltd.
Binding Wire 13 kg
D STEEL STRUCTURE (Pvt.) Ltd.
NG SCHEDULE
C. Total Length
Length(m) (m) Weight-kg/mtr T. Weight (kg)
TOTAL 11,269.04
Wastage 05% 563.45
Sub Total Weight in kgs 11,832.50
Binding Wire 13 kg per ton as per cpwd specification 153.82
Net Total Weight in kgs 11,986.32
CONSTRUCTION OF PYRAMID STEEL STRUCTURE (Pvt.) Ltd.
Binding Wire 13 kg
D STEEL STRUCTURE (Pvt.) Ltd.
NG SCHEDULE
C. Total Length
Length(m) (m) Weight-kg/mtr T. Weight (kg)
TOTAL 2,689.04
Wastage 05% 134.45
Sub Total Weight in kgs 2,823.49
Binding Wire 13 kg per ton as per cpwd specification 36.71
Net Total Weight in kgs 2,860.19
CONSTRUCTION OF PYRAMID STEEL STRUCTURE (Pvt.) Ltd.
Binding Wire 13 kg
D STEEL STRUCTURE (Pvt.) Ltd.
NG SCHEDULE
C. Total Length
Length(m) (m) Weight-kg/mtr T. Weight (kg)
TOTAL 195.69
Wastage 05% 9.78
Sub Total Weight in kgs 205.47
Binding Wire 13 kg per ton as per cpwd specification 2.67
Net Total Weight in kgs 208.14
CONSTRUCTION OF PYRAMID STEEL STRUCTURE (Pvt.) Ltd.
Binding Wire 13 kg
D STEEL STRUCTURE (Pvt.) Ltd.
NG SCHEDULE
C. Total Length
Length(m) (m) Weight-kg/mtr T. Weight (kg)
TOTAL 8,696.25
Wastage 05% 434.81
Sub Total Weight in kgs 9,131.07
Binding Wire 13 kg per ton as per cpwd specification 118.70
Net Total Weight in kgs 9,249.77
CONSTRUCTION OF PYRAMID STEEL STRUCTURE (Pvt.) Ltd.
Binding Wire 13 kg
D STEEL STRUCTURE (Pvt.) Ltd.
NG SCHEDULE
C. Total Length
Length(m) (m) Weight-kg/mtr T. Weight (kg)
TOTAL 710.91
Wastage 05% 35.55
Sub Total Weight in kgs 746.45
Binding Wire 13 kg per ton as per cpwd specification 9.70
Net Total Weight in kgs 756.16
CONSTRUCTION OF PYRAMID STEEL STRUCTURE (Pvt.) Ltd.
Binding Wire 13 kg
D STEEL STRUCTURE (Pvt.) Ltd.
NG SCHEDULE
C. Total Length
Length(m) (m) Weight-kg/mtr T. Weight (kg)
TOTAL 631.92
Wastage 05% 31.60
Sub Total Weight in kgs 663.51
Binding Wire 13 kg per ton as per cpwd specification 8.63
Net Total Weight in kgs 672.14