Professional Documents
Culture Documents
Population Projection
Population projections are carried out to select
the population projection method and the number
of appropriate facilities until the end of the
planning period. In this planning, the suitable
population projection method is linear method with
correlation factor 0.958998 and standard deviation
3523.9529.
CONCLUSION
Based on the technical and non technical
aspects, the selected alternatives are the 1st
Treatment Alternative, they are bar screen,
Notes: tranquilizer, pre-chlorination, pre-sedimentation,
*) Standard Quality Class I of Raw Water, PP RI No.82 Year rapid sand filter, disinfection, neutralization,
2001 reservoir and sludge drying beds. The tranquilizer
**) Standard Quality of Drinking Water, Permenkes No.492
Year 2010
tank is selected first before the pre-sedimentation
1) Exceed the Standard Quality Class I of Raw Water, PP RI tank aims to decrease the flow turbulence so that
No.82 Year 2001 the flow into the pre-sedimentation tank becomes
2) Exceed of Standard Quality of Drink Water, Permenkes the laminar flow. Pre sedimentation tank is planned
No.492 Year 2010
to be in WTP location to facilitate operational and
maintenance.
Table 3. Processing efficiency
REFERENCES
Government Regulation Number .492 Year 2010
on "Water Quality Requirements".
JICA, "Design Criteria for Waterwork Facilities",
JICA, Japan, 1978.
PP RI No.82 of 2001 on "Water Quality
Management and Water Pollution Control".
Master Plan for Drinking Water of Tasikmalaya
DESIGN CONCEPTS City, 2013.
Selection of Drinking Water Treatment Units
Alternative selection of drinking water
treatment units can be determined using the JICA
Prediction Model. Based on JICA Prediction
Model, the alternative processing unit that can be
used to process raw water is shown in Table 4.
Based on the three treatment alternatives that can
be used, one of the best alternative that meets
technical and non technical aspects, such as high
efficiency, flexibility to receive high loading rate,