You are on page 1of 14

2ndAUTHORSHIPSUPERVISIONREPORT

PANFOODLONGANPROJECT
Date:April14th2017

(ReferenceNo.:7107001)
















Preparedby Checkedby Approvedby
STRUCTURALTEAMLEADER STRUCTURALMANAGER CIVIL&STRUCTURAL
ENGINEERINGDIRECTOR
Signature: Signature: Signature:






Name:LuongNgocHung Name:NguyenTuongHai Name:NguyenMinhTung

Date:.... Date:.... Date:....


2ndAuthorshipSupervisiononApril14th2017 Page1/14
FortheClient ForArchetype
(ManagingDirector)





(Signature) (Signature)



(Name) (Name)



(Date) (Date)

2ndAuthorshipSupervisiononApril14th2017 Page2/14
TABLEOFCONTENTS

1 Introduction ........................................................................................................... 4
2 Categoryaudited ...................................................................................................... 4
3 Categorynotbeaudited .............................................................................................. 4
4 Commentonnoncomplianceitems ................................................................................. 4
5 Recommendation&conclusion .................................................................................... 14

2ndAuthorshipSupervisiononApril14th2017 Page3/14
1 Introduction
On morning April 14th, Archetype team arrived to PAN Food Long An project site, for 2nd
authorshipsupervision,undertheContract01/HTK/PFM/2016.
Attendance:Mr.NguyenTuongHaiC&SDepartmentManager
Mr.LuongNgocHungC&SEngineer.
There is no team member from Pan Food available at site and Archetype team made the
AuthorshipSupervisorindependently.

2 Categoryaudited
Thereare2categorieswhichhavebeenauditedasfollowing:
Designcompliance;
Safetyobservation
For:
Productionbuilding
RMWH
Parking
Office
Watertank&Utilities
02guardhouse
Fence

3 Categorynotbeaudited
Thereare3categorieswhichhavenotbeenauditedasbelow:
Constructionmanagement;
Safetymanagement;
Progress

4 Commentonnoncomplianceitems

Item Photo Comment
Groundbeamnoneedto
anchorageinthewholeofdrop
panel.
1.Main
Production

2ndAuthorshipSupervisiononApril14th2017 Page4/14
Item Photo Comment
Somemainbeamreinforcement
arebentduetotruck
transportation.


2.Main
Production

2ndAuthorshipSupervisiononApril14th2017 Page5/14
Item Photo Comment
Groundbeam@Gr.1(fromGr.E
toF):Topadditionalbarlengthis
about1.15m,notenoughL/4as
perdesign.


3.Main
Production


Thereisnogapatexpansion
joint(@Gr.6)

4.Main
Production

2ndAuthorshipSupervisiononApril14th2017 Page6/14
Item Photo Comment
Therearesomemoreboltholes
atonesideofmaincolumn
base.

5.RawMaterial
Warehouse


Sandfilledintobeamswhichare
casted1stparttounderneathof
theslab.Itisneedtobemade
surethatsandwillbetakeout
properlybefore2ndpartof
concretetobepoured.
6.Utility

2ndAuthorshipSupervisiononApril14th2017 Page7/14
Item Photo Comment
Rebarsmayharmpeopleatsite
withnowarningtape.


7.Utility
Safety

2ndAuthorshipSupervisiononApril14th2017 Page8/14
Item Photo Comment
Beamrebarsarenotstraightat
all,somebentup/down.

8.Utility


Columnrebarsarebentattop
faceofbeam/slab.

9.Office

2ndAuthorshipSupervisiononApril14th2017 Page9/14
Item Photo Comment
Cantileverbeamismainsupport
foroutsidebeam,butrebarsof
itarebentatthemiddleofside
beam.

10.Office

MainRebarwasnoteinstalled
properlycausedtopconcrete
coverwillbehigherthanthe
design.

11.Office

2ndAuthorshipSupervisiononApril14th2017 Page10/14
Item Photo Comment
Concretecovernotfollowed
design:Someofslabrebars
seemclosetoformwork,some
aremuchfar.

12.Office

2ndAuthorshipSupervisiononApril14th2017 Page11/14
Item Photo Comment
Rebarsatcornerbeamsarebent
withbigradius,stirrupsare
placeddiagonally.

13.Office

Oneanchorboltisnotstraight.

14.Parking

2ndAuthorshipSupervisiononApril14th2017 Page12/14
Item Photo Comment
Somefoundationshasrebarsfor
pedestal,somenotnot
followeddesign.

Basedondesign,topofpedestal
is0.05mhigherthantopof
foundation.

15.Parking

2ndAuthorshipSupervisiononApril14th2017 Page13/14
Item Photo Comment
Rebarisrusted.

16.Fence

5 Recommendation&conclusion
Safetymanagement:itshouldbecontrolledandconsolidatedstrictly.
Abovespotcheckneedtobecheckedasitwillaffectthestructure.
Qualitycheck:itmustbeenhancedandmanagedseriouslyplusprofessionally.

Endofreport.

2ndAuthorshipSupervisiononApril14th2017 Page14/14