JFE ENGINEERING CORPORATION

Kandy City Waste Water Management Project, Package 1

Daily Check List for Concrete Pump Car

This Check List must be maintained and kept at the worksite by the Site
Engineer/Foreman for inspection by Safety Department

PUMP CAR No: Name of the Operator:


Checked By - Name: Designation: Site Engineer/
Foreman
Date Checked - From: To:

# Mo Tu We Th Fr Sa Su
Check Item
n e d u i t n
1 Mechanical Condition of Pump Car
2 Ground Condition
3 Out Riggers and Rigger Pads
4 Electricity Cables & Telecom Cables above
the site
5 Pressure Hoses and Joint Clips/nuts and
bolts
6 Extending arms and joints
7 PPE
8 No third party at the site

Signature:
Safety Officers Comments:-

Name :
Signature

Action By Date Signature