ACCIONA-FREYFIL-JEC

G/F Jardine Building, JM Compound,

Faraday St. corner Pres. Osmena Highway, Makati City 1234, Philippines

WORK INSPECTION REQUEST

To: Emmanuel De Villa From: Ignacio Lo


Construction Manager, Putatan WTP 2 Constructio
Maynilad Water Services, Inc. Acciona-Fr

Thru: Franz Albert Francisco Requested by: Tobias Kra


Construction Manager Designation: Frey-Fil Pro
ARUP Date: September

Hydrotesting Excavation

Air / Joint Leak Test Sand Bedding

Infiltration / Exfiltration Test Backfilling

Holiday Test Field Density Test

Concrete Pouring Rebar Inspection

Materials Testing Rebar Scanning

Joint Survey Material Sampling

Pipe Laying Plant Inspection

Location: Category:

Date of Activity: Time of Activity:

Refer to Attached: Drawing No. _________________ Keyplan (See Atta


Submittals No. ________________ Test Report No.

Work description:

Inspector Remarks/ Comments:


CONTRACTOR:

Architectural

Proceed Hold
Structural

Civil
Resident Engineer
MEPF

EHS

Noted By:
QAQC
MWSI Constru
ECTION REQUEST
[ Reference Number ]

Ignacio Lobo
Construction Manager,Consortium
Acciona-FreyFil-JEC

Tobias Krause
Frey-Fil Project Manager
September 21, 2016

Final Punchlist

Pre-final Punchlist

Final Inspection

Sub Base

Base Course

Plant Inspection

Testing & Commisioning

Others/ Specify: See description

Keyplan (See Attach)


Test Report No.
Resubmit

Project Manager

MWSI Construction Manager