ast October, the U.S. Occupa- safety capacities, rigging, handling, fore saving time or money.

L tional Safety and Health Ad-


ministration (OSHA) issued a
new standard to regulate the
use of crane-suspended personnel
work platforms. Historically, these
and other factors receive attention
in OSHAs new rule. The rule also
dictates the operating setup of the
lifting crane and the working envi-
ronment surrounding it.
Load line safety factor
is doubled
Load lines must be able to sup-
port seven times the maximum in-
platforms have not been well con- tended load, twice the existing safe-
trolled and about 63 serious acci- Standard clears up confusion ty factor of 3.5. Doubling the safety
dents and 15 deaths have resulted Previously, employers and OSHA factor is very simple. Just use the
annually. OSHA says that comply- disagreed about how to interpret load chart of the crane and cut the
ing with the new standard, regulations for personnel platforms. lift capacity in half. Using the stan-
29CFR1926.550(g), should prevent Employers complained that OSHA dard safety factor of 3.5 times the
future accidents. regulations were ambiguous but al- intended load for load lines and
The standards preamble states lowed the use of personnel plat- downgrading the crane capacity to
that: f o rm s. OSHA maintained that the half its rated capacity (for the plat-
The use of a crane or derrick to standards were not ambiguous and form and its total intended load),
hoist employees on a personnel that 29CFR1926.550(b)(2), which doubles the safety factor. The safety
platform is prohibited, except when banned riding the hook, prohibit- factor increases without modifying
the erection, use, and dismantling ed platforms altogether. the crane or load line.
by conventional means of reaching Now theres no argumentsus- Nonrotational rope is often used
the worksite, such as a personnel pended platforms are legally per- with cranes. It reduces the tendency
hoist, ladder, stairway, aerial lift, el- mitted. Howe ve r, this final rule of the load line to twist, which it
evating work platform or scaffold, 29CFR1926.550(g)does not sometimes does while lifting de-
would be more hazardous, or is not change the original, and still exist- spite a swivel in the hook or block
possible because of structural de- ing, restriction of subsection assembly. OSHA now requires that
sign or worksite conditions. .550(b)(2): workers may not ride a nonrotational ropes have a safety
These platforms have been called bare hook or ride a load of material. factor of 10 as compared with 7 for
man-cages, man-baskets, work That action is still prohibited. other ropes.
p l a t f o rm s, and other labels that Using personnel platforms is
may not match the OSHA title of sometimes the fastest way to reach Crane must use anti-two
personnel platforms. But the rule a work site. Howe ve r, the preamble blocking equipment
applies to all like devices that are to the new standard clearly says that Reliable anti-two blocking equip-
lifted and suspended by cranes. The hoisting workers in man-cages, al- ment is available now, and such a
design, construction, testing, and though allowed, should only be device must be installed on all
maintenance of these platforms are done as a last resort. And only after booms. Se ve ral fatalities have been
now closely regulated. Load line the employer has placed safety be- caused by the lack of anti-two block
equipment.
Operate the crane in a slow, con-
Step 1. Apply first clip one base trolled, cautious manner. It must be
width from dead end of wire top. set up uniformly level to within 1%,
Place the U-bolt over the dead located on firm footing, with outrig-
end, resting the live end in the gers fully extended. These re s t ri c-
clip saddle. Tighten nuts evenly to tions are simply good crane safety
recommended torque.
practices. When platforms are sta-
tionary, dog or lock the load and
boom hoist drum and swing brakes.
Step 2. Apply the second clip Live booms of the free fall type are
nearest the loop as possible. prohibited because they are so dan-
Again, place the U-bolt over the gerous. Ensure that the operator of
dead end. Turn the nuts firmly, variable-angle boom rigs can see a
but do not tighten. boom angle indicator from the cab.
Before any lifting, extension booms
must show the boom length or the
load radius must be measured.
Step 3. Apply all other clips Personnel platform design
spaced evenly between the first is specified
two. Apply tension and tighten all
nuts to recommended torque. The platform may be designed by
After each lift, recheck nut a qualified engineer or by a
torque. nonengineer with structural design
e x p e ri e n c e. Welding must be per-
formed by a welder who need not be
certified, but must be familiar with
weld grades, types, and materials
specified.
Do not stagger clips. Dont allow access gates, includ-
ing sliding and folding types, to
swing out during hoisting. Equip
them with a restraining device to
p re vent accidental opening. All sur-
faces must be smooth so they dont
harm workers.
The platform must have a stan-
Dont place U-bolt of clips on live dard guardrail system (typically 42
end of rope. inches high) with a toe board. The
sides must be closed off from the toe
board to the mid-rail with 12-inch (or
less) wire mesh and a grab rail encir-
cling the inside. Although not spec-
ified, the grab rail should be 30 to 34
inches high like a stair handrail.
There must be room to stand up-
right in the platform. Overhead pro-
tection is only required if theres a
The clip will transfer the load to danger from falling objects. Keep in
the dead end of the rope. mind, though, that theres almost al-
ways something above a platform.
Of course, workers also must wear
hardhats.

Platform must hold its


own weight and 5 times
intended load
The platform must be capable of
supporting its own weight and five SAFETY CHECKLIST FOR
times the intended load. A plate or
CRANE-SUSPENDED PERSONNEL PLATFORMS
permanent marking must show t
he weight of the platform and its
PRE-LIFT MEETING
rated load capacity or maximum in- Boom angle indicator.
tended load. Dont exceed this load. This lift is the only way to do the job. Extension boom marked for length.
Tools can be hoisted on the plat-
Rules and checklist handed out
form with workers, but they must be to the following people at this meeting:
Anti-two blocking device installed
secured and evenly distributed dur- on boom.
ing lifts. The platform shouldnt be Operator Outriggers fully extended, cribbed up.
used to lift tools, equipment, or ma- Signal person Crane off the ground. If on the
terials when not hoisting personnel. wheels, then de-rate.
Workers to be lifted
Rigging hardware must support Supervisor Site layout
5 times the intended load
Site ready for crane.
The suspension system must be
BEFORE THE LIFT Distances from crane to loads
designed to reduce the risk of the measured.
platform tipping while occupied. Workbasket design
When a wire rope bridle is used, Designed by qualified engineer or
each leg must be connected to a experienced, qualified person. TEST LIFT
master line (D-ring) or shackle with Basket can support its own weight Inspected by competent person.
the load evenly distributed. Dont and 5 times its intended load.
use the bridle for any other purpose. Lift to actual site with total load
Access gate is equipped so that (no people).
All rigging hardware must be able to door wont swing out.
support five times the maximum in- Hoist rope has no kinks.
All surfaces are smooth.
tended load. If nonrotational rope is
Multiple part lines not wrapped
used, increase the safety factor to Standard guardrail inside, with toe around one another.
10. Hooks must be able to close and board.
lock, and wire rope eyes must have a Primary attachment is centered.
Hand rail/grab rail inside to hold onto.
thimble in the end. Load line taut and lines reeved properly.
Sides closed off, floor to guardrail,
with -inch or less wire mesh.
1
2

Load-test lifts ensure safety


Room to stand up in basket. DURING THE PERSONNEL LIFT
Test load all platforms before
each use with the full anticipated lift Overhead protection from falling
objects. Body parts inside cage (except
weight. Sandbags make good hu- signal person as required).
man-weight substitutes. Tools or Label on basket of baskets weight.
Tie off to load block/ball.
equipmentbut not peoplecan
be hoisted during the load test. The Platform must be tied off when in the air.
full weight must be hoisted from Rigging
Workers in direct sight of crane
where workers enter the platform operator (radios can substitute).
Rigged so it wont tip when lifted.
and lifted to each work area. The
Crane operator in cab at all times.
lift-position load test must be done Legs of wire rope bridle connected
to master link (D-ring). Other lifts or picks not made while
each time the crane is moved, or
platform in the air.
when its returned to the same loca- All hardware can support 5 times
intended weight (except when non
tion, or when the route is different. rotational rope is used, then its
Stop the operation in bad weather
or adverse conditions.
If the operator determines that 10 times).
changes in the lift route wont affect No travel with people, except with
Hooks capable of opening and closing. portal, locomotive, or tower cranes, and:
the lift, then no further testing is
necessary. Before the actual lift, with Wire rope eyes have thimbles. No other safer way to do the job.
workers aboard, hoist the platform
Restricted to track or runway.
several inches and inspect it.
Crane
After repairing and modifying de- Boom at lift radius.
fects, test load the rig to 125% ca- Load line can support 7 times Boom parallel to travel.
pacity for 5 minutes. A competent intended load.
person must inspect it, perhaps Test lift made.
Load chart examined for maximum
during the lift-position load-test pick. Cut chart numbers in half. Tire pressure checked.
procedure. Also, dont make the lift No live booms. Crane de-rated.
if:
The hoist rope has kinks in it. platform while being hoisted, land- if traveling. Outriggers may be par-
Multiple part lines are twisted ed, or moved. They must remain in tially retracted if this is done.
around one another. the direct sight of and in communi-
The primary attachment is not cation with the crane operator or Hold pre-lift meetings
centered over the load. signal person. A radio can be used if Before making lifts, the operator,
The load line is slack and not a signal person is placed in danger signal person, workers to be lifted,
properly seated on drums or might create a danger. The crane and the person responsible for the
and sheaves. operator must remain in the cab at lift should meet. This group should
all times while the platform is occu- meet again at each job or new loca-
These flaws must be corrected. A pied and the engine is running. tion and when new workers are as-
competent person must then again Dont make lifts with other load signed to the work. At the pre-lift
inspect the platform to ensure no lines while the platform is suspend- meeting, discuss the following: em-
other problems exist with the com- ed or occupied. ployee rules, the workers role in the
ponents or structure. Then the lift safety success of the lift, and the line
can proceed. Traveling with a suspended of authority in case the lift must be
platform is limited called off.
Workers and platform should Hoisting personnel and traveling
be tied off with a crane are prohibited except Safety comes first
If the platform is not landed, then for portal, tower, or locomotive OSHA standard 29CFR1926.550(g)
it must be securely tied off unless ty- c ra n e s, or where the employer is requires a lot of time and paper-
ing off creates a safety hazard. Use able to show that theres no safer work. Its not feasible to try to re-
tag lines unless they, too, create a way to work. member all the procedures without
hazard. Travel is only permitted to the checklists of some sort. The check-
Workers can be tied off to the low- work site if the crane is restricted to list also should be on file to prove
er load block, overhaul ball, or to a a fixed track or runway. Travel is lim- thoroughness if a problem arises.
s t ru c t u ral member of the platform ited to the load radius of the boom These tasks are trivial, though,
with a lanyard and safety belt. Tying used during the lift, and the boom when you consider that the yearly
off is not required over water but must be parallel to the direction of number of injuries and deaths will
wearing a flotation jacket is. OSHA t ra vel. Make a complete trial run, be reduced by the new regulations.
already requires jackets for con- without workers to test the tra ve l The present fatality count is statisti-
struction work over water. route. The full-lift test can be made cally high considering the small
Since lightning, heavy rain, and at this time too, but, again, not with number of workers who are hoisted
high winds adversely affect worker workers suspended. In other words, in personnel platforms. Also, many
safety and crane stability, hoisting the crane is not to walk all over the platform/crane accidents are not re-
must be stopped during such job with workers on the platform. ported. The real number of acci-
weather. Check tire pressures on rubber- dents may well be higher than those
Workers, except the signal person, tired mounts. A 50% lift capacity re- noted by OSHA.
must keep all body parts inside the duction is made for on the rubber,

PUBLICATION#C890560
Copyright 1989, The Aberdeen Group