You are on page 1of 92

DATE

1/6/2014
1/7/2014
1/8/2014
1/9/2014
1/10/2014
1/11/2014
1/12/2014
1/13/2014
1/14/2014
1/15/2014
1/16/2014
1/17/2014
1/18/2014
1/19/2014
1/20/2014
1/21/2014
1/22/2014
1/23/2014
1/24/2014
1/25/2014
1/26/2014
1/27/2014
1/28/2014
1/29/2014
1/30/2014
1/31/2014

2/1/2014
2/7/2014
2/8/2014
2/9/2014
2/10/2014

2/11/2014

2/12/2014

2/13/2014

2/14/2014

2/15/2014
2/16/2014

2/17/2014

2/18/2014

2/19/2014
2/20/2014

2/21/2014

2/22/2014

2/23/2014

2/24/2014

2/25/2014
2/26/2014

2/27/2014

2/28/2014
Projects
First Day
WIFI CAM
WIFI CAM
WIFI CAM
WIFI CAM
WIFI CAM
Sunday
LEAVE
Makarsankranti
Makarsankranti
WIFI CAM
WIFI CAM
WIFI CAM
Sunday
WIFI CAM
AWTI Camera/ Omnivision EVM
AWTI Camera/ Omnivision EVM
AWTI Camera(Existing Version)// Omnivision EVM
AWTI Camera(New Version)
WIFI CAM , AWTI Camera(New Version)
Republic Day
Omnivision EVM
AWTI Camera(Existing Version)/ Omnivision EVM
AWTI Camera(Existing Version)/ Omnivision EVM
AWTI Camera(Existing Version)/ Omnivision EVM
AWTI Camera(Existing Version)/ Omnivision EVM

Holiday
AWTI Camera(Existing Version)/ Omnivision EVM
AWTI Camera(Existing Version)/ Omnivision EVM
Awti Camera
Awti Can Extender
Awti Can Extender
Awti Camera
AWTI Camera(New Version)
AWTI Camera(New Version)
Lunch
Awti Can Extender
Awti Can Extender
Lunch
Awti Can Extender
TCS (2)

Holiday
Holiday

TCS(2)

TCS (2)

TCS (2)
TCS (2)

TCS (2)

TCS (2)

Sunday

TCS (2)

TCS (2)
TCS (2)

TCS (2)

TCS (2)
TASK
Intro and Project Specification
Detailed Discussion and study on the specification
Technical Study and Feasibility Study on the specification
Selection of the Low Cost SOC which can support WIFI and CAM
Interaction with the different vendors on SOC ,SENSOR and WIFI modu
Selection of the Low Cost WIFI CAM
Holiday
LEAVE
Holiday
Holiday
Selection of the Low Cost Image Sensor along with client interaction
Waiting for the inputs from Dhaval for vendor details
Omnivision datasheet (waiting )
Holiday
Interaction with the Omnivision and Liteon vendors
Study of the Schematic and Problem with the Existing board(Debuggin
Study of the Schematic and Problem with the Existing board(Debuggin
Existing board taking videos and marking the EDGE noise. Interaction
Making changes in the Existing Board and Preparing the BOM
Making changes in the Existing Board and Preparing the BOM, Interact
HOLIDAY
Existing board taking videos and marking the EDGE noise. Interaction
Studying the registers from the datasheets which can be helpful
Studying the registers from the datasheets which can be helpful
Studying the registers from the datasheets and applying it on the EVM
Studying the registers from the datasheets and applying it on the EVM

Saturday

Changing the Register settings , Recording the Videos for Omnivision T


Sunday (Holiday)
Call with Omnivision team for the noise issues
Studying the Datasheet for the New Project and Preparing the Bill Of M
Meeting with Dhaval and Vishal on the new project
Changing the Register settings for Sharpness and to remove the edge
Reviewing the Schematic and Board file provided by the Client
Reviewing the Schematic and Board file provided by the Client

Studying the Datasheet for the New Project and Preparing the Bill Of M
Studying the Datasheet Of Different Components for the New Project,
Lunch
Preparing first level Bill Of Materials of the Project
To understand the Requirement, Concept , Study the Old Schematic
Lunch and Tea

Designing the Schematic of Power Supply Section with Studying the D


Lunch and Tea
Designing the Power Supply Section of the Project

Creating footprints for the components ADG5433,ADS8568,DAC8871,H


Designing the Schematic of Power Supply Section with Studying the D
Lunch and Tea
Taking KT from Dhavnish for the Project Details and System Flow
Preparing the Power Budget for the Device

Changing the Power Supply Section and Designing with +17.5 and -17
ADC, DAC, SHA and analog switch circuit implementation
Designing the Project Schematic
Lunch and Tea
Reviewing the Schematic and Symbols pin by pin
Updating the Schematic according to the review and discussion with D
Lunch and Tea

Updating the Power Supply Section after discussion with Dhvanish


Cross Verifying all the symbols and pins with datasheets
Lunch
Meeting with Samir
Reviewing the ADC and DAC circuit and doing the needful changes
Studying the Datasheets of Sample and Hold, 2 Input Nand Gate, 4 Bit

Studying the Datasheets of Sample and Hold, 2 Input Nand Gate, 4 Bit
Discussion with Vishal and Dhvanish on 4 bit counter ,Dflip flop and Ma
Lunch
Creating footprints for the components Dflip-flop,nand gate,counter,co
Implementing the review design changes
Preparing the Bill Of Materials

Implementing the Dflip-flop , counter, nand gate ,counter , magnitude


Lunch
sync up
Preparing Bill Of Materials
Implementing all the review changes and release the initial draft schem

Daily Sync Up with Vishal


Reviewing the Schematic and making the review implementation
Lunch
Preparing Bill Of Materials with all the components and reviewing it
MEETING
LUNCH
Circuit implementation for LDAC, implementation for the DAC
RC filter value calculation
Design Review and Review Implementation and changes in the design

Implementing all the design review changes and updating the design a
lunch
Reviewing the schematic and preparing the final bill of materials
modifying bill of materials according to the component change and pre
sync up with vishal

Adding the PCB_FOOTPRINT property of all the components given by t


Lunch
Parallel ciruit implementation
Layout guidelines
1 hr 10 to 7:30
7hr
30 min
6 hr 10 to 7
3 hr
5 hr
1 hr
3 hr
6 hr 10 to 7
1 hr
2 hr
7 hr 10 to 6
1 hr

4 hr
1 hr
3 hr

2:30 hr 10 to 7:30
2 hr
1 hr
30 min
4 hr

2 hr 10 to 8
4 hr
3 hr
1 hr
4 hr 10 to 7:30
4 hr
1:30 hr

1 hr 10 to 7:40
2 hr
1 hr
40 min
2 hr
3 hr

2 hr
1 hr
1:30 hr
2 hr
2 hr
1:30 hr

5 hr 10 to 8:45
30 min
15 min
2 hr
3 hr

0.25 15 min
5
1
2
2.5 10 to 8
1
2
1
4

3
1
3
2
0.5

2
1
2
4
Sr# Task Done

01/03/2014
1 Guiding the layout guy for the placement of the components
Total spent time

02/03/2014

Total spent time

03/03/2014
1 Guiding the layout guy for the placement of the components and checking the schem
2 Lunch and tea
3 Updating all the components datasheets in SVN
4 Coordinating with Layout Guy and guiding him for the placement of the components
5 Coordinating with Layout Guy and guiding him for the placement of the components
6 Generating the Bill Of Materials and verifying it

Total spent time

04/03/2014
1 Checking component placement of power supply section
2 Coordinating with Layout Guy and guiding him for the placement of the components
3 Lunch
4 Coordinating with Layout Guy and giving the routing guidelines
5 Coordinating with Layout Guy and giving the routing guidelines

Total spent time

05/03/2014
1 Coordinating with Layout Guy and giving the routing guidelines
2 Lunch
3 Preparing the Final Bill Of Materials of the Project with Extra Component added
4 Coordinating with Layout Guy and giving the routing guidelines
5 Making changes in the schematic ,removing the not needed components and test poi
6 Dinner
7 Waiting for the updated Board file from the layout guy

Total spent time

06/03/2014
1 Preparing the Resistive Load Circuit Schematic
2 Meeting with Dhaval ,Vishal and Dhavinsh
3 Lunch and Tea
3 Coordinating with Layout Guy and giving the routing guidelines, Changes in the Layer
4 Modifying the Bill Of Materials for the Resistive Load Network Schematic
5 Coordinating with Layout Guy and finalyzing component placement for resistive load n

Total spent time

07/03/2014
1 Coordinating with Layout Guy and finalyzing component placement for resistive load n
2 Coordinating with Layout Guy and giving the routing guidelines for the TCS main Boar
3 Lunch
4 Making changes in the schematic adding the Buffer circuit
5 Making changes in the placement and routing of the Board
6 Coordinating with Layout Guy and giving the routing guidelines for the TCS main Boar

Total spent time

08/03/2014
Picnic

09/03/2014
Sunday

10/03/2014
1 Making changes in the schematic adding required components
2 Coordinating with Layout Guy and making changes in the routing
3 Lunch
4 Preparing the System Block Diagram of the Project and making changes in the placem
5 Meeting

Total spent time

11/03/2014
1 Cross Verifying the Bill Of Materials
2 Testing the superdiode circuit with Dhvanish
3 Lunch and Tea
4 Preparing the Test Cases for the Board Testing
5 Reviewing the Gerber files of the Project
Total spent time

12/03/2014
1 Verifying the Bill Of Materials ordered in the Digikey
2 Lunch and Snacks
3 Debugging the RC filter and DAC circuit with Dhvanish
4 Meeting with Dhaval 1-2-1
5 Discussion with Vishal and Dhvanish on the TCS project Timeline
6 Preparing the Test Cases Documents

Total spent time

13/03/2014
1 Cross Verifying the Digikey order placed
2 Lunch and Tea
3 Preparing the list of Software Binaries requried for the Board Bring up
4 Preparing the output voltage equations for the different IC's and adding that in the Sc
5 Session by Hardik on how to use Kitli
6 Discussion with Vishal and Dhvanish for the required Software Binaries to make board

Total spent time

14/03/2014
1 Meeting with Bhavin and Team for the Marketing Contents and Articles
2 Preparing the Test Cases Documents
3 Lunch and Tea
4 Discussion with the Layout guy for the Resistive Load Network Gerber issue
5 Searching for the Article topics and reading the contents on PCB optimizations
6 Techincal study on Circuit Board Layout Techniques
7 Meeting with Dhaval and TCS team
Total spent time

15/03/2014
Holiday
16/03/2014
Holiday
17/03/2014
Holiday

18/03/2014
1 Technical Study on Circuit Board Layout Techniques
2 Lunch
3 Checking the components received from Digikey
4 Preparing the Bill Of Materials for the Assembly House
5 Making the components ready for the Assembly house

Total spent time


19/03/2014
1 Bare Board Testing of the TCS-2 board
2 Checking the components received from Digikey and Element 14
3 Lunch
4 Preparing the Bill Of Materials for the Assembly House
5 Making the components ready for the Assembly House
6 Preparing the Excel for the List of the Materials taken for the Assembly
Total spent time

20/03/2014
1 Went to Amicron Baroda for the PCB assembly
Total spent time

21/03/2014
1 Board Bring Up. Tested the Boards Power Supply Section and the Digital section
2 Lunch
Total spent time

22/03/2014
1 Board Bring Up of the Full TCS Board
2 Lunch
3 Open House
Total spent time

23/03/2014
1 Board Bring Up of the Full TCS Board (Board No 3 and 4)

Total spent time

24/03/2014
1 Board Bring Up of the Full TCS Boards (Power Supply , Digital Section )
2 Lunch
3 Board Bring Up of the Full TCS Boards (Checking the Waveform and Resolving all the i

Total spent time

25/03/2014
1 Board Bring Up of the Full TCS Boards (Power Supply , Digital Section and Analog Sect
2 Lunch
3 Checking the working functionality of the DAC , Digital Section and ADC with all the 4

Total spent time


26/03/2014
1 Solving the heat issue in the sample and hold ic with vishal
2 Lunch
3 Meeting with TCS team
4 Assemble Board testing of other 6 assembled boards
5 Inventory updates of all the components came from Assembly House and Preparing th
Total spent time

27/03/2014
1 Board Bring Up of Power Supply Section for another 7 Boards.
2 Lunch
3 Inventory updates of all the components came from Assembly House and Preparing th
4 Preparing the article on Optimization techniques for High-performance Digital Circuits
5 Selecting the right value of the RC filter and techincal study on operation of band pas
Total spent time

28/03/2014
1 Inventory updates of all the components came from Assembly House and Preparing th
2 Article Writing on Optimization Techniques For High-Performance Digital Circuits
3 Lunch and Snacks
4 Board bring up and checking the sample and hold IC heat issue with Vishal
4 Boards bring up of 6 boards with Vishal. Setting the reference voltage of DAC to 16.5

Total spent time

29/03/2014
1 Placing the inductor down with the help of Soldering guy to fit into the mechanicals. C
2 Lunch
3 Open House
4 Tunning 4 boards for the accuracy and checking the logs of ADC

Total spent time

30/03/2014
Holiday

31/03/2014
1 Tunning all boards for the accuracy and checking the logs of ADC
2 Lunch
3 Tunning all boards for the accuracy and checking the logs of ADC

Total spent time


s

s and checking the schematic

ment of the components


ment of the components

ment of the components

nes
nes

nes

Component added
nes
components and test points
nes, Changes in the Layer stack up (from 4 to 6 layer)
k Schematic
cement for resistive load network

cement for resistive load network


nes for the TCS main Board

nes for the TCS main Board

nts
uting

ing changes in the placement of components with Vishal


eline

d Bring up
and adding that in the Schematic

re Binaries to make board bring up easy

nd Articles

rk Gerber issue
PCB optimizations
nt 14

e Assembly

d the Digital section

l Section )

rm and Resolving all the issues that are coming for bring up )

l Section and Analog Section )

on and ADC with all the 4 boards and doing all the required changes
bly House and Preparing the Excel sheet with it

s.

bly House and Preparing the Excel sheet Of it


rformance Digital Circuits
on operation of band pass filter

bly House and Preparing the Excel sheet Of it


ance Digital Circuits

ssue with Vishal


ce voltage of DAC to 16.5 and -16.5.

fit into the mechanicals. Checking the Power Supply section of all the boards

ADC

ADC

ADC
ing the schematic

components
components

components

added

ts and test points


es in the Layer stack up (from 4 to 6 layer)
c
resistive load network

resistive load network


TCS main Board

TCS main Board

s in the placement of components with Vishal


that in the Schematic

to make board bring up easy

ssue
zations
olving all the issues that are coming for bring up )

d Analog Section )

with all the 4 boards and doing all the required changes
nd Preparing the Excel sheet with it

nd Preparing the Excel sheet Of it


Digital Circuits
n of band pass filter

nd Preparing the Excel sheet Of it


Circuits

shal
of DAC to 16.5 and -16.5.

mechanicals. Checking the Power Supply section of all the boards


Spent time Duration

4
4

10 to 9 4
1
0.5
2.5
2
1

11

10 to 7 1
2
0.5
3
2.5

10 to 11 3
1
2
3
1
1
1

12

10 to 10 2
1
1.5
3
2
2.5

12

10 to 8:30 2
1
0.5
2
3
2

10.5

10 to 7 1
2.5
1
3
1.5

10 to 7 2
2
1.5
2
1.5
9

10 to 7 2
1.5
3
1
0.5
1

10 to 7 2
1.5
2
2
1
0.5

10 to 7 1
2
1
1
2
1
1
9

10 to 7 2
1
2.5
2.5
1

9
10 to 7 1
2
1
3
2
1
10

6AM to 10 PM 16
16

10 to 8 8
1
9

10 to 9 8.5
1
1.5
11

10 to 1 3

10 to 10 4
1
7

12

10 to 8:30 4
1
5.5

10.5
10 to 7:30 2
1
0.5
2.5
3.5
9.5

10 to 8:30 6
1
1
1.5
1
10.5

10 to 9 2.5
1.5
1
2.5
3.5

11

10 to 8.30 3
1
1.5
5

10.5

10 to 8.00 4
1
5

10
01/04/2014
1 Soldering guy work making the boards ready for testing
2 Tunning all boards for the accuracy and checking the logs of ADC
3 Lunch
4 Taking the different logs for the ADC accuracy test. Verifying the CSV. Solving the

Total spent time

02/04/2014
1 Checking the new build with Harshit. Verifying the csv with him.
2 Lunch
3 Taking the different logs on two boards for the ADC accuracy test. Verifying the

Total spent time

03/04/2014
1 Taking the different logs on two boards for the ADC accuracy test. Verifying the
2 Lunch
3 Taking the different logs on two boards for the ADC accuracy test. Verifying the
4 Bring up of the board no 5. Tunning the board for ADC accuracy, Taking the Logs
5 Solving the current issues in the board with team

Total spent time

04/04/2014
1 Bring up of the boards. Tunning the boards for ADC accuracy, Taking the Logs an
2 Lunch
3 Bring up of the boards. Tunning the boards for ADC accuracy, Taking the Logs an
4 Bring up of the boards. Tunning the boards for ADC accuracy, Taking the Logs an

Total spent time

05/04/2014
1 Bring up of the boards. Tunning the boards for ADC accuracy, Taking the Logs an
2 Lunch
3 Making all the boards same by doing the rework with soldering guy. Checking th
4 Tunning all the boards for ADC accuracy. Taking the logs and also checking the c

Total spent time


06/04/2014
1 Tunning all the working rework done 6 boards for the ADC accuracy and solving

Total spent time

07/04/2014
1 Tunning all the working rework done 6 boards for the ADC accuracy and solving
2 Lunch

Total spent time

08/04/2014
1 Hardware board tunning to achieve the desired accuracy
2 Lunch

Total spent time

09/04/2014
1 Hardware board tunning to achieve the desired accuracy. Solving the issues rela
2 Lunch

Total spent time

10/04/2014
1 Updates Remaning
2 Lunch

Total spent time

11/04/2014
1 Testing of the boards. Tunning the boards and preparing the boards for the shipm
2 Lunch

Total spent time

12/04/2014
1 Prepare the bug list and the inventory updates of the Boards
2 Lunch
3 Meeting with Dhaval and TCS team
Total spent time

13/04/2014
Holiday

14/04/2014
1 Prepare the bug list and the inventory updates of the Boards
2 Lunch

Total spent time

15/04/2014
1 Went to TI for board debugging
2 Lunch
3 Rework on boards with soldering guy
Total spent time

16/04/2014
1 Board debugging and issue solving on 3 boards
2 Lunch

Total spent time

17/04/2014
1 Soldering guy work replacement of the ICS and board bring up
2 Lunch
3 Meeting with the team
4 Board bring up and making it ready for the shipment
Total spent time

18/04/2014
1 Solving the heat issue and board issue on board no 6 and board no 9 respective
2 Lunch

Total spent time

19/04/2014
Holiday - Saturday

20/04/2014
Holiday - Sunday

21/04/2014
1 Solving the heat issue and board issue on board no 6 and board no 9 respective
2 Lunch
3 Meeting with Dhaval
Total spent time

22/04/2014
1 Kitli Update
2 Lunch
3 Packaging of the boards for shipments
4 Solving the heat issue and board issue on board no 6 and board no 9 respective
Total spent time

23/04/2014
1 Solving the heat issue and board issue on board no 6 and board no 9 respective
2 Lunch
Total spent time

24/04/2014
1 Solving the heat issue and board issue on board no 6 and board no 9 respective
2 Lunch
Total spent time

25/04/2014
1 Resolved the issue on board 9. Shorting issues.
2 Lunch
Total spent time

26/04/2014
1 Resolved the issue on board 6. Heating issues
2 Lunch
Total spent time

27/04/2014
Holiday - Sunday

28/04/2014
1 Debugging the issues on board no 6
2 Lunch
Total spent time

29/04/2014
1 Debugging the issues on board no 6
2 Lunch
3 Meditation Session
Total spent time

30/04/2014
Holiday - Election
gs of ADC

fying the CSV. Solving the issues coming in the process

with him.

uracy test. Verifying the CSV

uracy test. Verifying the CSV

uracy test. Verifying the CSV


ccuracy, Taking the Logs and Checking the CSV

uracy, Taking the Logs and Checking the CSV

uracy, Taking the Logs and Checking the CSV


uracy, Taking the Logs and Checking the CSV

uracy, Taking the Logs and Checking the CSV

ldering guy. Checking the power supply of all the boards


and also checking the csv for the desired output.
DC accuracy and solving all the issues.

DC accuracy and solving all the issues.

y. Solving the issues related to Power Supply on the boards

the boards for the shipment

oards
oards

ring up

nd board no 9 respectively

nd board no 9 respectively. making other 4 boards ready for shipment


nd board no 9 respectively

nd board no 9 respectively.

nd board no 9 respectively.
8:30 to 8.00 1.5
3
1
5

10.5

10 to 8.00 2
1
7

10

10AM to 8.00 4
1
3
4
4

16

10AM to 10.30PM 5
1
2
4.5

12.5

10AM to 10PM 4
1
3
4

12
8AM to 1:30 PM 5.5

5.5

10AM to 4:30AM 17
Late Night 1

18.5 18

12AM to 9AM 8
1

9 9

10AM to 9:00AM 10
1

11 11

10AM to 3AM 4
late night 1

18.5 5

10:30AM to 7 7
2

10:00AM to 8 8.5
1
0.5
10
10:00AM to 7:30 8.5
1

9.5

10:00AM to 8:30 5.5


1
4
10.5

10:00AM to 7:30 8.5


1

9.5

8:00AM to 8:00PM 1.5


1
0.5
9
12

10:00AM to 7:00 8
1

10:00AM to 7:00 6.5


1
0.5
8

10:00AM to 7:00PM 0.5


1
2
5.5
9

10:00AM to 7:30PM 8.5


1
9.5

10:00AM to 8:30PM 9.5


1
10.5

R
10:00AM to 7:30PM 8.5
1
9.5

R
10:00AM to 7:00PM 7
2
9

R
10:00AM to 7:00PM 7
2
9

10:00AM to 7:00PM 6
1
1.5
8.5
01/05/2014
1 Board Testing and Debugging. Checking the CSV
2 Lunch
3 Inventory updates
Total spent time

02/05/2014
1 Board Testing and Debugging. Checking the CSV
2 Lunch
3 Inventory updates
4 Puja at new office
Total spent time

03/05/2014
1 Marvell Study of the Processor A380 and Family
2 Lunch
3 Attend Session on Product Development Life Cycle By Dhaval at eitra
4 Meeting with Dhaval
Total spent time

04/05/2014
Holiday - Sunday

05/05/2014
1 Rules of Engagement session
2 Lunch
3 Marvell - Study of the Processor A380 and Family with different Interfaces
4 Meeting with Dhaval on TCS
5 Study on the Interfaces like JTAG,HDMI
Total spent time

06/05/2014
1 Meeting with Team on TCS Bug List review
2 Lunch
3 Marvell Study of the Processor A380 and Family

Total spent time

07/05/2014
1 Modifying the Bug List document according to the inputs given by Dhaval
2 Lunch
3 Marvell Study of the Processor A380 and Family
Total spent time

08/05/2014
1 Marvell Study of the Processor A380 and Family
2 Lunch
3 TCS board testing and checking the csv of the board came from client
Total spent time

09/05/2014
1 Marvell Study of the Processor A380 and Family
2 Lunch
3 TCS board testing and checking the csv of the board came from client
4 TCS REV 2.0 Inventory update
Total spent time

10/05/2014
1 Marvell Study of the Processor A380 and Family
2 Lunch
3 TCS board testing and checking the csv of the board came from client
4 TCS REV 2.0 Inventory update
Total spent time

11/05/2014
Holiday - Sunday

12/05/2014
1 Marvell Study of the Processor A380 and Family
2 Lunch
3 TCS board testing and checking the csv of the board came from client
4 TCS REV 2.0 Inventory update
5 Meeting with Dhaval
Total spent time

13/05/2014
1 TCS board testing and checking the csv of the board came from client
2 Lunch
3 Meeting with Dhaval on TCS boards updates from the client
4 Debugging of the 5V short issue on the board. Negative power supply IC issue fo
Total spent time

14/05/2014
1 Debugging of the 5V short issue on the board. Went to Einfochip to take the boa
2 Lunch
3 Client call and meeting with Dhaval
Total spent time

15/05/2014
1 Testing of the 2 boards and packging of the boards for shipment
2 Lunch
3 Taken Session on the brief introduction about the Marvell Armada A38X processo
Total spent time

5/16/2014 to 5/27/2014
1 Holiday ( Pilgrimage trip to Haridwar,Gokul,Mathura with Family- 17,18,25 Saturd

28/05/2014
1 Review of the updated schematic done by dhvanish
2 Lunch
3 Inventory Management of the TCS REV 2.0 Components
4 Studying the ICU(IN CAR UNIT) documents given by Samir to make the proposal
Total spent time

29/05/2014
1 Studying the ICU(IN CAR UNIT) documents given by Samir to make the proposal
2 Lunch
Total spent time

30/05/2014
1 Studying the ICU(IN CAR UNIT) documents given by Samir to make the proposal
2 Lunch
2 Helping dhvanish to take the treatment from TCS board
Total spent time

31/05/2014
1 Studying the ICU(IN CAR UNIT) documents given by Samir to make the proposal
2 Lunch
2 Meeting with Dhaval on the ICU2 project specifications and proposal preparation
Total spent time
haval at eitra

ifferent Interfaces

s given by Dhaval
me from client

me from client

me from client

me from client

me from client

ient
power supply IC issue found. Board has been sent to Vipul for mounting new IC

Einfochip to take the board. IC got changed and Short got removed. Board is working. And kept for the
hipment

ll Armada A38X processor

h Family- 17,18,25 Saturday Sunday Holidays

mir to make the proposal of the project

mir to make the proposal of the project

mir to make the proposal of the project

mir to make the proposal of the project

and proposal preparation


10 to 7 5
1
3
9

10 to 7 5
1
2
1
9

10 to 7 4
1.5
3
0.5
9

10 to 7 1
1
5
0.5
2
9.5

10 to 7 1
1
2

10 to 7 3
1
5
9

10 to 7 3
1
5
9

10 to 7 3
1
3
2
9

10 to 7 2
1
5
1
9

10 to 7 1
1
5
1.5
0.5
9

10 to 7 3
1
0.5
5
9.5

10 to 8:30 8
1
1.5
10.5

9 to 5 6
1
1
8

10 to 7:30 3
1
2
3.5
9.5

10 to 7:30 8.5
1
9.5

10 to 7:30 8
1
0.5
9.5

10 to 7:00 7.5
1
0.5
9
01/06/2014
Holiday - Sunday

02/06/2014
1 Studying the ICU(IN CAR UNIT) documents given by Samir to make the proposal
2 Lunch
3 Call with client along with Dhaval and Samir to discuss the scope of work and sp
4 Studying the ICU(IN CAR UNIT) documents given by Samir to make the proposal
4 Discussion with Dhaval regarding the requirement of the project, To study the sp
Total spent time

03/06/2014
1 Studying different options on how to interface the modules specified in the Proje
2 Lunch
Total spent time

04/06/2014
1 Studying different options on how to interface the modules specified in the Proje
2 Lunch
3 Discussion with Dhaval regarding the interfaces of GPS ,RFID and RTC module w
4 Call with Kavan/Dhaval regarding the scope of work and specifications of ICU2 p
5 Studying how Micropendous development board I2C will interface with the help
Total spent time

05/06/2014
1 Discussion with Dhaval on how to prepare the proposal of the project
2 Lunch
3 Studying how Micropendous development board I2C will interface with the help
4 Prepared intial draft of the proposal and sent to Dhaval for review
Total spent time

06/06/2014
1 Prepared intial draft of the proposal and sent to Dhaval for review
2 Lunch
3 Discussion with Vishal and Dhaval regarding the changes in the Proposal Docum

Total spent time

07/06/2014
Holiday - Saturday

08/06/2014
Holiday - Sunday
09/06/2014
1 Discussion with Vishal regarding the ICU2 proposal
2 Modified the proposal according to the suggestions given by Vishal
3 Searched for the different Microcontroller and GPS modules which can be used f
4 Lunch
5 Studying the project specifications and different microcontroller datasheet that c
Total spent time

10/06/2014
1 Searching the Hot Air Gun manufacturer and vendors for assembly of the SMD c
2 Doing changes in Awti schematic and bom as asked by vishal and sent the upda
3 Preparing the excel sheet with the updated part list and components required fo
4 Lunch
5 Reviewing the proposal sent by Kavan with modification
6 Studying the project specifications and different microcontroller datasheet that c
Total spent time

11/06/2014
1 Studying the project specifications and different microcontroller datasheet that c
2 Lunch and Tea
3 Went to Relief road and Shantinath Electronics shop to purchase Hot Air Gun and
4 Meeting with Dhaval and Vishal
Total spent time

12/06/2014
1 Meeting with Dhaval for Task updates and new project discussion
2 Lunch
3 Study on the new project specifications documents. Study of different types of s
4 Cadence 16.3 tool upgradation study - How to create hirerarchial schematic in c
Total spent time

13/06/2014
1 Discussion with Vishal regarding the project ITDS
2 Study on the new project specifications documents. Study of different types of s
3 Lunch
5 Prepared the Queries list with Vishal for the client call
4 Meeting with Dhaval and Vishal regarding the new project ITDS specificaitons
5 Call with client to discussion the Top Level Architecture of the System and Syste
6 Preparing the Inventory Excel sheet for 2 boards with the components list to be
Total spent time
14/06/2014
1 Study on the new project specifications documents. Study of different types of s
2 Lunch
3 New System setup and software installation by Akash
4 Fun House
5 Meeting with Dhaval and Vishal for the ITDS project specifications
Total spent time

15/06/2014
Holiday - Sunday

16/06/2014
1 Resolving the issues with Akash in the new system which was provided. Not able
2 Lunch
3 Transfer of data from new system to old system
4 Preparing the packing of the shipment of the ICU1 unit and handed over to Mani
5 Preparing the electrode cable with jigar of the TCS project which need to be ship
6 Checking the omnivison evaluation board
Total spent time

17/06/2014
1 Preparing the electrode cable with of TCS project which need to be shipped to c
2 Lunch
3 Tool Upgardation Study - Learning how to create the hirerachial block schematic
4 Datasheet and Manual study of ATxmega128A1-U. Understanding the controller
5 Checking the omnivision evaluation board and debugging the issue in the board
Total spent time

18/06/2014
1 Tool Upgardation Study - Learning how to create the hirerachial block schematic
2 Slow and Fast link part creation in orcad 16.3 along with it detailed study of the
2 Lunch
3 Meeting with Dhaval and Vishal regarding the ITDS project status and how to pro
4 Detailed study of the schematic and planning on how to proceed with the desing
5 Tested omnivision evaluation board OV7955 and packed in a box for the shipmen
Total spent time

18/06/2014
1 Tool Upgardation Study - Learning how to create the hirerachial block schematic
2 Detailed study of the schematic and planning on how to proceed with the desing
2 Lunch
3 Discussion with Vishal on Daily updates
4 Meeting with Dhaval on the part creation and parameter to be added in the sche
5 Preparing the excel sheet with the parameter list to be included in the schemati
Total spent time

19/06/2014
1 Tool Upgardation Study - Learning how to create the hirerachial block schematic
2 Detailed study of the schematic and planning on how to proceed with the desing
2 Lunch
3 Discussion with Dhaval and Vishal on ITDS project
4 Meeting with Dhaval on the part creation and parameter to be added in the sche
5 Preparing the excel sheet with the parameter list to be included in the schemati
Total spent time

20/06/2014
1 Tool Upgardation Study - Learning how to create the hirerachial block schematic
2 Collecting all the required datasheets for the project. Study of different datashee
3 Lunch
4 Study of the older schematic and preparing the query list to be sent client
Total spent time

23/06/2014
1 Study of the new set of documents sent by the client for designing of the docum
2 ITDS Project kickoff meeting with Vishal
3 Part Creation in cadence of all the connectors required in the project. (15 Conne
4 Lunch
5 All the connector parts reviewed
6 Part Creation in cadence of all the IC's required in the project. (IC's parts has be
7 Kitli updation
8 Discussion with Dhaval and Vishal for the daily tast completion and format need
Total spent time

24/06/2014
1 Part Creation of the ATxmega128A1U-AU and review of the symbol in Cadence 1
2 Review and verification of the pin assignment of the microcontroller symbol
3 Part creation and review of all the discrete components
4 Lunch
5 Call with client for the project progress and queries clarification
6 Discussion with vishal regarding schematic layout overview
Total spent time
25/06/2014
1 Review of all the components symbol which was created (includes IC's , Connect
2 Lunch
3 Preparing the Schematic skeleton spreadsheet and cover page layout
4 Discussion with Vishal regarding the schematic skeleton spreadsheet and the co
5 Discussion with the Dhaval , Done the minor changes suggested by Dhaval and
Total spent time

6/26/2014 - Updated

6/27/2014 - Updated

6/28/2014 - Updated

29/06/2014 - Sunday

6/30/2014 - Updated
mir to make the proposal of the project

the scope of work and specifications of the project


mir to make the proposal of the project
e project, To study the specific modules and requirement of the ICU1 and how it can be integrated in the ICU2

ules specified in the Project specifications documents. Deriving different options on how to interface the GPS mo

ules specified in the Project. Deriving different options on how to interface the GPS module and RFID module ove

,RFID and RTC module with Micropendous development board


d specifications of ICU2 project
ll interface with the help of muxer with two different modules GPS and RTC

of the project

ll interface with the help of muxer with two different modules GPS and RTC
for review

for review

es in the Proposal Document


n by Vishal
ules which can be used for the ICU2 project according to the specifications

ontroller datasheet that can be used and interfaces

r assembly of the SMD components


vishal and sent the updated files to him
components required for the 2 board assembly of TCS REV 2

ontroller datasheet that can be used and interfaces

ontroller datasheet that can be used and interfaces

purchase Hot Air Gun and Electronics Components respectively

discussion

dy of different types of sensors used in the project


rerarchial schematic in cadence with different methods

dy of different types of sensors used in the project , Also Study of the Microcontroller features and specifications

ect ITDS specificaitons


of the System and System Understanding
e components list to be ordered for 2 boards
dy of different types of sensors used in the project , Also Study of the Microcontroller features and specifications

cifications

h was provided. Not able to install Cadence16.3 hardware tool and Microsoft is not working

and handed over to Manishbhai


ct which need to be shipped to client

need to be shipped to client. Testing the cable and packaging it for the shipment

erachial block schematic in cadence 16.3


erstanding the controller features and specifications and along with creating the homogenous part of it
ng the issue in the board. Voltage regulator was not getting the proper input vpltage. Solved the issue board is w

erachial block schematic in cadence 16.3 and Also creating the same with the help of tutorial
h it detailed study of the CC112X module

ect status and how to proceed further


o proceed with the desing considering various aspects , Preparing the query list need to be asked to client,
d in a box for the shipment to the client

erachial block schematic in cadence 16.3 and Also creating the same with the help of tutorial
o proceed with the desing considering various aspects , Preparing the query list need to be asked to client,
r to be added in the schematic
ncluded in the schematic and for sending it to client for review

erachial block schematic in cadence 16.3 and Also creating the same with the help of tutorial
o proceed with the desing considering various aspects , Preparing the query list need to be asked to client,

r to be added in the schematic


ncluded in the schematic and for sending it to client for review

erachial block schematic in cadence 16.3 and Also creating the same with the help of tutorial
udy of different datasheets and SVN setup of the project

st to be sent client

r designing of the documents

n the project. (15 Connectors parts has been created )

roject. (IC's parts has been created and reviewed )

mpletion and format need to be sent to client, Also discussed the issues while facing the part creation

the symbol in Cadence 16.3 ( CAD Tool)


crocontroller symbol

ification
view
d (includes IC's , Connectors , Discrete Components)

er page layout
n spreadsheet and the cover page
uggested by Dhaval and Vishal for the documents to be sent to the client
the proposal of the project

of work and specifications of the project


the proposal of the project
o study the specific modules and requirement of the ICU1 and how it can be integrated in the ICU2

ed in the Project specifications documents. Deriving different options on how to interface the GPS module and R

ed in the Project. Deriving different options on how to interface the GPS module and RFID module over single UA

RTC module with Micropendous development board


ons of ICU2 project
with the help of muxer with two different modules GPS and RTC

ect

with the help of muxer with two different modules GPS and RTC

oposal Document
can be used for the ICU2 project according to the specifications

tasheet that can be used and interfaces

of the SMD components


sent the updated files to him
nts required for the 2 board assembly of TCS REV 2

tasheet that can be used and interfaces

tasheet that can be used and interfaces

ot Air Gun and Electronics Components respectively

ent types of sensors used in the project


chematic in cadence with different methods

ent types of sensors used in the project , Also Study of the Microcontroller features and specifications. How to d

ecificaitons
em and System Understanding
ents list to be ordered for 2 boards
ent types of sensors used in the project , Also Study of the Microcontroller features and specifications. How to d

ided. Not able to install Cadence16.3 hardware tool and Microsoft is not working

d over to Manishbhai
eed to be shipped to client

e shipped to client. Testing the cable and packaging it for the shipment

ck schematic in cadence 16.3


the controller features and specifications and along with creating the homogenous part of it
e in the board. Voltage regulator was not getting the proper input vpltage. Solved the issue board is working pro

ck schematic in cadence 16.3 and Also creating the same with the help of tutorial
study of the CC112X module

and how to proceed further


with the desing considering various aspects , Preparing the query list need to be asked to client,
or the shipment to the client

ck schematic in cadence 16.3 and Also creating the same with the help of tutorial
with the desing considering various aspects , Preparing the query list need to be asked to client,
ed in the schematic
the schematic and for sending it to client for review

ck schematic in cadence 16.3 and Also creating the same with the help of tutorial
with the desing considering various aspects , Preparing the query list need to be asked to client,

ed in the schematic
the schematic and for sending it to client for review

ck schematic in cadence 16.3 and Also creating the same with the help of tutorial
erent datasheets and SVN setup of the project

nt client

of the documents

ct. (15 Connectors parts has been created )

s parts has been created and reviewed )

d format need to be sent to client, Also discussed the issues while facing the part creation

l in Cadence 16.3 ( CAD Tool)


er symbol
IC's , Connectors , Discrete Components)

out
eet and the cover page
y Dhaval and Vishal for the documents to be sent to the client
10 to 7:30 3
1
1
2.5
2
9.5

10 to 7:30 8.5
1
9.5

10 to 7:30 3
1
0.5
0.5
4.5
9.5

10 to 7 2
1
3
3
9

10 to 6:30 6.5
1
1

8.5
10 to 7:30 1
1
3.5
1
3
9.5

9:30 to 7:00 2
2
2.5
1
1
1
9.5

10 to 7.30 3
1.5
4
0.75
9.25

10 to 7:45 0.5
1.5
6
1.75
9.75

10:00 to 8:30 0.5


4.5
1
0.5
0.5
1.5
2
10.5
10:00 to 7:30 1.5
1
4
2
1
9.5

10:00 to 8:00 3
1
2
1
2
1
10

10:00 to 7:30 2.5


1
1
2.5
2.5
9.5

10:00 to 7:30 2
2
1
0.5
3.5
0.5
9.5

10:00 to 8:00 1
5.5
1
0.5
1
1
10

10:00 to 8:00 2
3.5
1
1
1
1.5
10

10:00 to 7:00 3.5


2
1
2.5
9

10:00 to 8:30 1
0.5
1.5
1
0.5
3
0.5
2.5
10.5

10:00 to 7:30 3
1
3.5
1
0.5
0.5
9.5
10:00 to 7:30 3.5
1
3
0.5
1.5
9.5
01/07/2014
1 Studied the documents provided for Radio interface
2 Resolving the issue of schematic design file size.
3 Lunch
4 Prepared the Queries list for the call.
5 Intial draft schematic review with Dhaval and Vishal
6 Implemented all the feedbacks from Dhaval and Vishal in the schematic design
7 Call with the client regarding queries clarification.
Total spent time

02/07/2014
1 Implemented all the schematic changes as per the feedback given. Changes has
2 Designed the Slow Downlink Radio 1 Section by considering 001_R2 (RADIO1_2)
3 Lunch
4 Reviewed the schematic design Radio 1 section with Vishal
5 Implemented feedbacks from Vishal and all the queries in the schematic design.
Total spent time

03/07/2014
1 Implemented all the schematic changes as per the feedback given. Changes has
2 Designed the Fast Downlink Radio 2 Section by considering CC2520 & CC2591 R
3 Lunch
4 Added all the queries in the schematic design.
5 Reviewed the Fast Downlink Radio 2 section. Also rearranged the SPI 1 and SPI 2
Total spent time

04/07/2014
1 Modified all the sensors connectors pinouts according to the updated document
2 Designed the sensors connectors section according to the document Connector
3 Lunch
4 Reviewed the connectors section and added respective queries in the design.
5 System changed and clean up activity. (taken the backup of the data , installed s
Total spent time

05/07/2014 - Saturday

06/07/2014 - Sunday

07/07/2014
1 Kitli update
2 Verifying the schematic .
3 Lunch
4 Reviewed the connectors section and added respective queries in the design.
5 System changed and clean up activity. (taken the backup of the data , installed s
Total spent time

08/07/2014
1 Added desing queries in the design and Added Block diagram
2 Session on Customer,Sales and Engineering by Bhavin
3 Lunch
4 Review of the Schematic with Dhaval , suggested the modification in the Design
5 Implementing all the needful changes suggested by Dhaval

Total spent time

09/07/2014
1 Studied the feedbacks provided from the document Schematic Changes & Mark
2 Modified the Sensor Connectors pinouts according to the document Schematic
3 Lunch

Implemented all the schematic changes as per the feedback given. Changes has
Schematic Changes & Mark Ups 070814
3

4 Verified and Reviewed all the changes, Also added further queries in the design.

Changed all the capacitors and resistors values representation as per the feedba
e.g
From 0.1uF/25V changed to 0.1uF
5

Total spent time

10/07/2014
Solved all the errors while doing the annotation of the Design.Annotated the sch

1
2 Checked the DRC error of the design and solved the errors.
3 Lunch
4 Updated the Schematic properties of the ICs and created initial draft of the Bill O
5 Reviewing the schematic

Total spent time

11/07/2014
1
2 Studied CC2520 and CC2591 datasheets, CC2591_Reference Guide, CC2591 App
3 Lunch
4 Studied datasheet of CC1125 and prepared the layout guidelines.(Slow Downlink

Total spent time

12/07/2014
1
2 Symbol creation/Part creation of TPS60241, LIS3MDL, MAX21000, AD590, TEG_T
3 Lunch
4 Designed the Magnetometer, Gyrometer and ATXMEGA power section according
5 Modified the Power Distribution section according to the feedbacks. Rearrangem
6 Kitli Updates and shifting of the PC
Total spent time

13/07/2014 - Sunday

14/07/2014
1 Power Problem in office
2 Shifted the PC setup into 501 office
3 Lunch
4 Reviewed and verified all the changes from the feedbacks given document (pdfs
5 Reviewed and verified all the components footprint and full schematic reviews w
6 Power Problem solved shifted again the setup in 801 office
Total spent time
in the schematic design.

back given. Changes has been implemented according to the pdf Schematic Changes & Mark Ups - 070114
ring 001_R2 (RADIO1_2) reference design and mentioned bill of materials.

hal
in the schematic design.

back given. Changes has been implemented according to the pdf Schematic Changes & Mark Ups - 070214
ring CC2520 & CC2591 Radio for ITDS MC - Markup R1 reference design and mentioned bill of materials.

nged the SPI 1 and SPI 2 section for better schematic representation

o the updated document Connectors - Master Controller - A1U & Conn Pinouts - R6 and Also modified the de
he document Connectors - Master Controller - A1U & Conn Pinouts - R6

queries in the design.


p of the data , installed softwares in the new system)

queries in the design.


p of the data , installed softwares in the new system)
agram

odification in the Design


aval

hematic Changes & Mark Ups 070814 and listed the changes need to be done in design.
e document Schematic Changes & Mark Ups 070814

back given. Changes has been implemented according to the pdf

er queries in the design.

ntation as per the feedback.

Design.Annotated the schematic design. Verified the references and intersheet references of design.

ors.

ed initial draft of the Bill Of Materials

rence Guide, CC2591 Application Note AN086. And prepared the layout guidelines added the same in the design
guidelines.(Slow Downlink Section)

AX21000, AD590, TEG_TEMP connector. Also modified the sensors connectors pins and microcontroller pins

power section according to the feedback mentioned in the document Schematic Changes & Mark Ups 0711
e feedbacks. Rearrangement of the schematic design according to the respective modifications. Reviewed the

ks given document (pdfs)


full schematic reviews with all the provided documents.
ffice
ematic design.

. Changes has been implemented according to the pdf Schematic Changes & Mark Ups - 070114
2 (RADIO1_2) reference design and mentioned bill of materials.

matic design.

. Changes has been implemented according to the pdf Schematic Changes & Mark Ups - 070214
0 & CC2591 Radio for ITDS MC - Markup R1 reference design and mentioned bill of materials.

PI 1 and SPI 2 section for better schematic representation

ed document Connectors - Master Controller - A1U & Conn Pinouts - R6 and Also modified the de
nt Connectors - Master Controller - A1U & Conn Pinouts - R6

the design.
ta , installed softwares in the new system)

the design.
ta , installed softwares in the new system)
in the Design

hanges & Mark Ups 070814 and listed the changes need to be done in design.
t Schematic Changes & Mark Ups 070814

. Changes has been implemented according to the pdf

in the design.

per the feedback.

otated the schematic design. Verified the references and intersheet references of design.

aft of the Bill Of Materials

e, CC2591 Application Note AN086. And prepared the layout guidelines added the same in the design
Slow Downlink Section)

AD590, TEG_TEMP connector. Also modified the sensors connectors pins and microcontroller pins

ion according to the feedback mentioned in the document Schematic Changes & Mark Ups 0711
s. Rearrangement of the schematic design according to the respective modifications. Reviewed the

ocument (pdfs)
atic reviews with all the provided documents.
10 to 8:00 2
2.5
1
1.5
1.5
0.75
0.75
10

10 to 7:30 3.5
2.5
1
1.5
1
9.5

10 to 7:30 1.5
3.5
1
1
2.5
9.5

10 to 7:00 2.5
2
1
0.5
3
9

10 to 7:00 1
2
1
0.5
3
7.5

10:00 to 7:30 1
2
1
0.5
2
3
9.5

10:00 to 7:30 1
1
1

2.5

9.5

10:00 to 6:45 2.5


1.5
1
2
1.75

8.75

10:00 to 6:30 2.5


2.5
1.5
2

8.5

10:00 to 8:00 1.5


2.5
1
2
2.5
0.5
10

10:00 to 8:00 2
1
1
2
3
1
10

You might also like