BRIDGE OVER RIVER BRAHMAPUTRA BETWEEN Job Ref.

Project
DHUBRI AND PHULBARI Revision
Part of Calculation
Structure Sheet No.
Dwg. Ref. Calculations by Checked By Approved by
Office of Date
Kolkata MM SM NB
Origin
File Path 'file:///var/www/apps/conversion/tmp/scratch_7/355687092.xls'#$sheet 1
CALCULATIONS

Water Current Force Calculation

Maximum Mean Velocity of the water current (U) = 4.500 m/s


Maximum Velocity at the free surface of the river = 6.364 m/s
Angle of inclination of the pier and waterflow = 0
Variation of Angle of flow = 20

Flow component parallel to the direction of the pier = 5.980 m/sec

Pier Co-efficient = 0.660

HFL of Water surface = 30.360


R.L. of Top of Well = 23.000
Thickness of Well Cap = 2.500 m
R.L. of bottom of pier / top of well cap = 25.500
Height of pier submerged in water = 4.860 m

Top of Well Cap = 25.500 m


R.L. of Existing Ground Level = 20.724
Scour Depth from EGL = 8.920 m
Deepest Scour Level = 11.804
Depth of the Well submerged in water = 13.696 m

Forces on pier

Water current pressure at the top of the surface = 12.040 kN/m2


Water velocity at bottom of the pier = 5.467 m/sec
Water current pressure at the bottom of the surface = 8.887 kN/m2
Width of the pier along the direction of water current = 5.000 m
Total Force acting on the pier = 254.268 kN

Force of action from the base of the system = 16.248 m

Forces on Well

Water current pressure at the top of the well = 8.887 kN/m2


Water current pressure at the bottom of the well = 0 kN/m2
Diameter of the Well = 12.00 m
Total Force acting on the well = 730.293 kN

Force action from base of the system = 9.131 m

Net Force Calculation for the pier-well system from the base

Total Force acting on the system = 984.561 kN


Point of application of Force from the base of well = 10.969 m
BRIDGE OVER RIVER BRAHMAPUTRA BETWEEN Job Ref.
Project
DHUBRI AND PHULBARI Revision
Part of Calculation
Structure Sheet No.
Dwg. Ref. Calculations by Checked By Approved by
Office of Date
Kolkata MM SM NB
Origin
File Path 'file:///var/www/apps/conversion/tmp/scratch_7/355687092.xls'#$sheet 1
CALCULATIONS
BRIDGE OVER RIVER BRAHMAPUTRA BETWEEN Job Ref.
Project
DHUBRI AND PHULBARI Revision
Part of Calculation
Structure Sheet No.
Dwg. Ref. Calculations by Checked By Approved by
Office of Date
Kolkata MM SM NB
Origin
File Path 'file:///var/www/apps/conversion/tmp/scratch_7/355687092.xls'#$sheet 1
CALCULATIONS

Velocity Dist. (in m/sec) Pressure Dist. (in kN/m2)


6.364 12.04
Pier

4.860

Well Cap
Well
2.500 5.467 8.887

16.248
m

9.131
m
13.696
DELD-15021
R0

5/22/2017

///var/www/apps/conversion/tmp/scratch_7/355687092.xls'#$sheet 1
REFERENCES

(Refer Clause
210.5 IRC
6 2014)

(Refer Clause
210.2 IRC
6 2014)
DELD-15021
R0

5/22/2017

///var/www/apps/conversion/tmp/scratch_7/355687092.xls'#$sheet 1
REFERENCES
DELD-15021
R0

5/22/2017

///var/www/apps/conversion/tmp/scratch_7/355687092.xls'#$sheet 1
REFERENCES
Job Ref. DELD-15021
Project BRIDGE OVER RIVER BRAHMAPUTRA BETWEEN DHUBRI AND PHULBARI
Revision R0
Part of Calculation
Structure Sheet No.
Dwg. Ref. Calculations by Checked By Appvd By
Date 5/22/2017
MM PC NB
Office of Origin: Kolkata
File Name 'file:///var/www/apps/conversion/tmp/scratch_7/355687092.xls'#$Sheet2
CALCULATIONS REFERENCES

Water Current Force Calculation