Professional Documents
Culture Documents
BILL OF QUANTITY
CONTRACT PROCEDURES AND ESTIMATION
BNP 20602
EXCAVATION
1 | Page
Times Dimension Result Description Unit Quantity
Excavation
W.B.L.F.F
Excavate top soil
Length/breadth
5.000
Add fdn spr
0.600
5.600
Less excavation
Top soil 0.200
1.350
2 | Page
0.52
m3
Times Dimension Result Description Unit Quantity
Length
5.000
Less column stump
2/0.150 0.300
4.700
4/ Depth
0.200
Add
Blinding 0.050
3 | Page
MATERIAL
Times Dimension Result Description Unit Quantity
Blinding and Concrete
Blinding footing
Length 0.600
Breadth 0.600
Height
4/ 0.60 0.050
0.60
0.05 Concrete grade 7 blinding n. e 100 thick
0.07 laid on earth m3
Footing
Length 0.600
Breadth 0.600
4/ Height
0.60 0.250
0.60
0.25 Rein. foundation in situ concrete grade
0.36 20 in isol. foundation bases m3
Stump
Height stump below ground 1.250
Add
Slab consist of:
Hard core 0.150
Blinding 0.050
Concrete slab 0.100
1.550
4/
(continue)
Length 0.300
Breadth 0.300
1.55
0.30 Rein. in situ concrete grade 20 in isol
0.30 column stump
3
0.56 m
4 | Page
Filling soil above footing
Ground beam
Length 4.700
Breadth 0.250
Height
4/ 4.70 0.500
0.25
0.50 Rein. foundation in situ concrete grade
3
2.35 20 in ground beam m
Hard core
Length/Breadth 5.000
5 | Page
0.15 Hard core thickness 150 mm
3.32 m3
Blinding slab
4.70
4.70 Concrete grade 7 blinding not
0.05 exceeding 100 mm thick
1.10 m3
Concrete slab
4.70
4.70 Concrete grade 20 for concrete slab n. e
0.10 100 mm thick
2.21 m3
6 | Page
FORMWORK
Times Dimension Result Description Unit Quantity
Footing
Length 0.600
4/4/
Formwork to edges & faces of
foundation exceeding 250 mm and 500
0.60 mm high
9.60 m
Footing
Length 0.600
4/4/
Formwork to edges & faces of
0.25 foundation exceeding 250 mm and 500
0.60 mm high
2
2.40 m
Stump
Length 0.300
4/4/ Height
0.30 1.550
1.55
2
7.44 Formwork to sides of isol column m
stump
7 | Page
Ground beam
Length 5.000
Ground beam
Length 5.000
REINFORCEMENT
Times Dimension Result Description Unit Quantity
Footing
Length 0.600
Less
Concrete cover
2/0.040 0.080
0.520
Add
Bend
2/0.250 0.500
4/12/
Less
Concrete cover
4/0.040 0.160
0.860
8 | Page
Volume
r 2 h = 0.013 m3
Stump
Length
Stump + footing 1.500
Slab 0.300
Column
0.400
2.200
4/4/
Less
Concrete cover 0.040
Footing bars
2/0.020 0.040
2.120
Add
Bend 0.100
2.220
Volume
r 2 h = 0.004 m3
Link
Length 0.300
Less
Concrete cover
2/0/040 0.080
4/ 0.220
0.880
No of link
1.17 0.150 = 7.8
9 | Page
Approximate = 8 link
Ground beam
Length 5.000
Add
2 half column stump
2/0.150 0.300
4/4/
Less
Concrete cover
2/0.040 0.080
5.220
Add
Bend
2/0.200 0.400
5.620
Width 0.250
Less
Concrete cover
2/0.040 0.080
0.170
Height
0.500
10 | P a g e
Less
Concrete cover
2/0.040 0.080
0.420
4/24/
2/ 0.590
1.180
Add hook
24/0.010 0.240
1.420
No of stirrup
4.70 0.200 = 23.5
Approximate = 24 stirrup
Volume
r 2 h = 0.011 m3
ABSTRACT
Concrete grade 20P (1:3:6-38 mm gauge Concrete grade 15P (1:3:6-38 mm gauge
granite) as specified in foundation granite) as specified in foundation and
ground beam
11 | P a g e
2.35 (5) 0.31
3.27
2
2
=1 m
=4 m
High tensile steel bars in reinforcement to concrete work generally including all cutting,
bending and placing in position 16 32 mm diameter
0.013 (8)
0.018 (9)
0.031
=0.031
3
m
=74.60kg
=75 kg
BILL OF QUANTITY
No Work explanation Unit Quantity Rate Amount
12 | P a g e
1 Excavate oversite average 150 mm deep to m2 32 3.60 115.20
level off formation or reduce level
3
Concrete grade 20P (1:3:6-38 mm gauge m 4 254.60 1018.40
8 granite) as specified in foundation
13 | P a g e
Concrete grade 20P (1:3:6-38 mm gauge
9 granite) as specified in ground floor slab, m3 3 262.50 787.50
aprons, kerbs, steps etc.
14 | P a g e