Typical floor construction types.

I
t is not unusual to create an opening in of existing construction documents, if available,
existing floors during building renovations will provide basic information; however, physical
and alterations. A new opening may be used inspections and probes are essential to determine
for stairs, an elevator shaft, a duct penetra- as-built conditions. Based on the findings of a
tion, skylights, etc. In order to execute a feasible comprehensive study of the floor system, the loca-

E
modification and maintain the existing buildings tion of the openings can be adjusted and finalized.
structural stability, a qualified structural engineer

R
should be involved during the initial planning
phase. With varied knowledge of floor construc-
Evaluation of Existing Structures

U
tion types and extensive rexperience
ht in structural Once the opening is located, relevant exist-
y ig

T
Copevaluation and strength- ing floor structures must be carefully assessed.
ening, the structural The proposed opening may affect existing floor
Creating an Opening in
C
engineer can present valu- structures in one or all of the following ways:

e
U
able suggestions regarding (1) the design live load is increased at the new
Existing Floors the selection of opening
n stair landing area, thereby overloading adjacent
i
R
locations, construction portions of the floor; (2) the original structural
z
T
feasibility and possible design assumptions (e.g., continuous beam, arch
From Planning a
strengthening options. This article presents a
g
action, etc.) will not be satisfied after the opening

S
typical procedure to create openings in existing is made; (3) in the case of a T-beam, the flange is
to Completion
a
floors, and discusses some practical issues. partially or completely removed at the opening
By Dominick R. Pilla, P.E., C.E.,
S.E., RA and Xiaoli Tong, P.E.
m
Planning of an Opening
side, thereby reducing flexural resistance and stiff-
ness; and (4) structural capacities are undermined
when floor reinforcement is eliminated or cut
Where to make an opening in a floor sounds off when creating an opening in a concrete slab.
very simple just put it where it should be but Actual effects on any existing floor structures are
this is true only for new construction, when all dependent on its construction type.
kinds of openings can be accommodated using Masonry arch floor construction, made of hollow
Dominick R. Pilla, P.E., C.E., various structural design methods. However, it is tiles or terra cotta, was very popular for buildings
S.E., R.A., owns and operates a very different situation to create a new opening constructed from the late 1800s to early 1900s.
Dominick R. Pilla Associates, in an existing floor where construction is con- The segmental masonry pieces work together, and
P.C. In addition, Mr. Pilla is strained by surrounding elements that are part of span between adjacent steel beams by using arch
an associate professor at the structural systems. An improper location of the action with tie rods to resist the tension thrust.
Bernard & Anne Spitzer School opening may lead to a large amount of renova- Once some segments are removed for an opening,
of Architecture at City College of tion work, making the project uneconomical and the corresponding arch action will be lost. The
New York. He can be reached at perhaps even rendering it impossible to develop remaining pieces will not be stable and should
dominick@drpilla.com. a feasible structural solution. be removed. If a tie rod is to be cut off, it may be
A good plan for an opening is half the battle; necessary to install a new steel beam beforehand,
Xiaoli Tong, P.E., is an Engineer
the first and primary rule of thumb is to avoid unless field conditions suggest that the required
with DRPILLA. Prior to joining
locating the opening across major existing build- tension thrust is properly resolved by the stability
DRPILLA, Mr. Tong gained most
ing elements i.e., girders, columns and walls of the adjacent spans or bays.
of his professional experience while
to limit the affected zone, in regard to altering Steel wire catenary floor construction became
working in a prominent national
the structural continuity of the building. Due popular in 1910 and disappeared gradually after
research institute on building
to the many possible types of construction that World War II. The steel wires are draped and con-
technology in China. He can be
may be encountered such as a masonry arch tinuous over steel beams so that gravity loads are
reached at xiaolit@drpilla.com.
floor, a steel-wire catenary floor, and modern sustained by the tension in the suspended wires,
beam/plate floor types that consist of wood or which are encased in cinder concrete mainly for
light gauge steel joists, steel beams, precast con- the purpose of fire protection. When an opening
crete planks, cast-in-place concrete slabs, etc. a is to be made in this system, it is inevitable that
thorough understanding of the existing building some wires will need to be cut, which will disrupt
type and floor system must be obtained. A review the continuity and stability of the system. In order

14 April 2013
Finite element analysis of a two-way slab
with opening.

Effects of an opening to existing concrete slab.


based on the aspect ratio of the length in
to stabilize the floor at adjacent spans, proper loads to adjacent planks in accordance with the long direction
to the width in the short
anchorage of the cut wires must be designed. the guidelines presented in the PCI Design direction. A one-way slab is considered when

E
For floors consisting of joists or floor beams, Manual, and the relevant planks should be an aspect ratio of at least two is realized. A

R
an opening can usually be framed simply by evaluated for design loads per the renovation one-way slab will function like a beam in the
installing new transfer beams, which form plan in addition to the distributed loads from short direction, continuously spanning over

U
the perimeter of the new opening. These the header. Moreover, the remaining parts supports such as T-beams or walls. However,
ht
transfer beams can support the floor joists/ of planks withopproposed
yrig openings must be continuity will be interrupted at the pro-

T
C
beams at the opening, and distribute design reassessed to determine whether the develop- posed opening and the slabs required design

C
loads to adjacent girders, columns and walls. ment length of the residual strands, from the moments at adjacent spans will be increased.
Evaluation of the existing structures under cut edge to the point of maximum required In addition, the T-beams flange will be par-
e
U
new loading conditions is straightforward moment, is still valid for the full specified ten- tially or completely removed at the opening
but essential. sile strength. Otherwise, the residual flexural
i n side, weakening the T-beams design strength

R z
An opening in precast plank floors can be resistance should be adjusted. and stiffness and perhaps even inducing tor-

T a
framed by the installation of steel headers. A reinforced concrete slab may be treated sion effects.

g
S
The new members will redistribute the design as either a one-way slab or a two-way slab continued on next page.

a
m
ADVERTISEMENTFor Advertiser Information, visit www.STRUCTUREmag.org

STRUCTURE magazine 15 April 2013


New transfer beams around the opening. Externally bonded/bolted steel plates method.

E
A two-way slab is considered when an aspect new beams will take design loads on residual peer review is mandatory per the building
ratio of less than two is realized. It supports floor structures around the opening and dis- code. If possible, the buildings original struc-

R
the design loads in both directions on its tribute the loads to adjacent existing girders, tural engineer of record, who has the greatest
column strips and middle strips simultane- columns or walls. The new beams can often knowledge of the existing structural design,

U
ously. When an opening is to be made, part be framed flush with ht existing floor structures is the most appropriate design professional
yrig

T
of the slabs column strip and/or middle strip Cop inside finish ceilings. Due
and totally hidden to serve as the peer reviewer. The peer review
is removed, and relevant reinforcement is to its simplicity and efficiency, the transfer involves confirming the renovation design

C
cut off. To calculate the required moment beam is generally the first choice to strengthen criteria, attesting to the general completeness

e
U
capacity after creation of the opening, the an opening whenever possible. of the construction documents, and verifying
equivalent frame method specified in ACI However, for certain floor construction
i n the new design in accordance with build-

R
318 is still applicable as long as the assump- types like concrete slabs, new transfer beams ing codes and relevant industry standards.
z
T
tions are satisfied. However, a finite element cannot be framed flush, but must instead be All comments by the peer review must be
analysis is a better way to find relatively more a
installed underneath the slab to connect with
g
answered and manifested in the final con-

S
accurate solutions to the design moments and adjacent existing columns or girders. When struction documents.
maximum deflections concerned. a
floor headroom and aesthetic appearance are The construction itself begins with shoring
In a finite element model, at least two adja-
cent floor spans around the opening must be m
of paramount concern, externally bonded or
bolted plate methods may be employed.
installation to support all interim design loads
during construction. The shoring often simply
considered. Load-bearing walls and additional For this popular and economical strengthening consists of 2x stud walls around the proposed
spans of the floor slab may be simplified as approach, the steel plates are considered to be opening. It may be omitted if floor structures
proper boundary conditions. To calculate the tension reinforcement placed on the surfaces are to be properly strengthened, as per the
residual flexural resistance, the actual amount of concrete slabs. The plates are sized based on design, prior to making the opening. An over-
and placement of steel reinforcement in the the required design moments under superim- cut should be prohibited; marking opening
slab must be investigated and verified by posed loads. The bonding agent (e.g., epoxy edges and drilling holes at the corners is good
using non-destructive test instruments such resin) and anchor bolts provide the surface shear practice to prevent this. Diamond blade saws
as ground penetration radar. By comparing stresses needed for composite action between the are commonly used to cut existing floors. After
the required design moment to the residual plates and the concrete. When it is necessary to the opening is made, fire protection should be
flexural resistance, it can be determined if strengthen the slab in both directions, the inter- applied on new steel members either by spray
strengthening of the slab due to the opening is section of steel plates must be properly detailed. or as part of a rated ceiling assembly.
necessary. It should be noted that if an open- Some practical solutions include encasing the
ing is located completely within the slab steel plate in one direction into the concrete slab
portion of a two-way slabi.e., not located or pre-welding the steel plates in both directions
Summary
across column strips then the resulting at the intersection points. Each building is unique, and there is no
opening may not require reinforcement. one universal method by which to create
openings in every building type. In this
Peer Review and Construction article, we have discussed basic principles
Strengthening Design Options Prior to making a new opening in an exist- that should be respected when consider-
An efficient strengthening method is to install ing building, a construction permit is often ing a proposed opening. There will arise
new transfer beams to frame an opening. The required, for which an independent structural many deviations when facing actual proj-
ects. A structural engineer, with appropriate
knowledge and experience, will be required
to coordinate thoroughly with the owner,
architect and other relevant parties in order
to evaluate and implement an appropriate
and economical proposal, design and con-
Ground penetration radar image of slab reinforcement. struction for a new floor opening.