Professional Documents
Culture Documents
NPDES Coverage:
All land disturbing activities > 1 acre
Any size within 1/2 mile of a receiving water
body in the S.C. Coastal Zone.
3
Construction Site Requirements
CGP Requirements:
Develop and implement
Storm Water Pollution
Prevention Plan (SWPPP).
Select, install, implement and
maintain best management
practices (BMPs).
SWPPP must be signed and
retained on site.
4
New NPDES Phase II
Construction General Permit (CGP)
5
Phase II NPDES CGP Requirements
(Pre-Construction Meeting)
6
Phase II NPDES CGP Requirements
(Contractor Certification)
7
Phase II NPDES CGP Requirements
(Inspection Frequency)
8
Phase II NPDES CGP
Requirements
(Inspector Qualifications)
10
Federal NPDES Stormwater Program
11
MS4 NPDES Ph. II Permit Status
12
MS4 NPDES Phase II Program
13
Phase II MS4s in S.C. Coastal
Zone
Berkeley Goose N. Conway Surfside
Co. Creek Charleston Beach
14
MS4 NPDES Ph. II Application
Requirements
15
MS4 NPDES Ph. II Six Minimum
Elements
16
MS4 NPDES Ph. II Public
Education and Outreach
17
MS4 NPDES Ph. II Public
Involvement/Participation
18
MS4 NPDES Ph. II Construction Site
Stormwater Runoff Control
19
MS4 NPDES Ph. II Post-Construction
Stormwater Management
Must develop, implement and enforce a
program to address stormwater runoff from
new development and redevelopment
projects that disturb greater than one (1)
acre that discharge into the MS4.
Must implement the local post-construction
stormwater management program in the
entire MS4 area on or before Sept. 1, 2007.
20
MS4 NPDES Ph. II Illicit Discharge
Detection and Elimination
21
MS4 NPDES Ph. II
Pollution/Good Housekeeping
22
Questions?
23