You are on page 1of 14

S/N Site ID Site Address

1 NO ID ENI GHANA OFFICE

2 NO ID CHAIRMAN'S RESIDENCE
3 NO ID MD'S RESIDENCE
4 NO ID MERIDIAN APARTMENT
5 NO ID VILLAGIO APARTMENT
Site Cordinate Confirm Site Cordinate is Ok
planned

N 05.56124 W 000.20323 OK

N 05.579729 W 000.167553 OK
N 05.560391 W 000.192087 OK
N 05.60429 W 000.18205 OK
N 05.62023 W 000.17784 OK
Region Region /State / LGA

ACCRA GHANA ACCRA/ GHANA

ACCRA GHANA ACCRA/ GHANA


ACCRA GHANA ACCRA/ GHANA
ACCRA GHANA ACCRA/ GHANA
ACCRA GHANA ACCRA/ GHANA
Direction(s) Shelter Type

Building / Indoor
ENI GHANA OFFICE to CHAIRMAN'S RESIDENCE,
MD'S RESIDENCE, MERIDIAN APARTMENT,
VILLAGIO APARTMENT

CHAIRMAN'S RESIDENCE to ENI GHANA OFFICE BUILDING


MD'S RESIDENCE to ENI GHANA OFFICE BUILDING
MERIDIAN APARTMENT to ENI GHANA OFFICE BUILDING
VILLAGIO APARTMENT to ENI GHANA OFFICE BUILDING
Type of Availability Space availability on Space availability
Rack of Rack Existing Rack for New Rack

19 Inch Yes NO ACCESS EQT ROOM YES

NO NO NO Yes
NO NO NO Yes
NO NO NO Yes
NO NO NO Yes
Confirm availability Space for New Confirm Rectifier Capacity
of Plint and size Plinth & Size DC (watts)
Rectifier
&
Capacity

NA NA No NO

NA NA NO NO
NA NA NO NO
NA NA NO NO
NA NA NO NO
Total Number of Batery Rating Free DC No of Free DC
Batteries / Bank on Breaker Free DC Breaker
Rectifier Rack Breaker Rating

NO NO NO NO NO

NO NO NO NO NO
NO NO NO NO NO
NO NO NO NO NO
NO NO NO NO NO
DC Power feed Gantry to Feeder Type of Mount /Tower/ mast
Distance to Shelter Entry plate /
Rectifier Free Holes

NO NO NO Building

NO NO NO Building
NO NO NO Building
NO NO NO Building
NO NO NO Building
Total Height Confirm LOS Obstruction
Building/Tower/M Cordinate
ast

21M Yes NO

6M Yes NO
18M Yes NO
27M Yes NO
87M Yes NO
Availability of space at Confirm Availability of space at Confirm
the Proposed height for Space below the Proposed height for Space below
the Main Antenna or Above Space Antenna or Above
Proposed Proposed
Main Main

No NO No No

No NO No NO
No NO No NO
No NO No NO
No NO No NO
Confirm Confirming Total Length of Confirm
Mounting Pole Earthing and ODU Grounding Shelter/Room
availability, grouding Cable Earth Bar /
Size, & system for Earthing on
number tower Plinth

NO NO NO yes

NO NO NO NO
NO NO NO NO
NO NO NO NO
NO NO NO NO
Total IF Cable Risk Log
length
(Direction(s))

30M NO

70M NO
60M NO
50M NO
120M NO
Remark

10m mask is recommend on top of paint house

30m Mast recmmend on ground besaid over head water tank


10m mast recmmend on top roof
3m mounting pole recmmend on top roof
3m mounting pole recmmend on top roof
Survey conducted by

CLEMENT/ HYCENT

CLEMENT/ HYCENT
CLEMENT/ HYCENT
CLEMENT/ HYCENT
CLEMENT/ HYCENT

You might also like