INTERIM DESIGN
Total Drawing Submittals 123 94 287 504 100% 33.33%
Submitted for Approval 123 94 287 504 100% 33.33%
Code " A " -- Approved with no comments 0 0% 0.00%
Code "B" -- Approved with Comments 123 94 287 504 100% 33.33%
Code "C "-- Not Approved Re-submit 0 0% 0.00%
Code "D" - Not Considered, Re-submit 0 0% 0.00%
DETAIL DESIGN
Total Drawing Submittals 139 93 317 549 100% 33.33%
Submitted for Approval 139 93 317 549 100% 33.33%
Code " A " -- Approved with no comments 0 0% 0.00%
Code "B" -- Approved with Comments 139 93 317 549 100% 33.33%
Code "C "-- Not Approved Re-submit 0 0% 0.00%
Code "D" - Not Considered, Re-submit 0 0% 0.00%
FINAL DESIGN- IFC DRAWINGS
Total Drawing Submittals 157 201 316 674 100% 16.67%
Submitted for Approval 87 137 316 540 80% 13.35%
Code " A " -- Approved with no comments 5 0 0 5 1% 0.12%
Code "B" -- Approved with Comments 33 116 316 465 69% 11.50%
Code "C "-- Not Approved Re-submit 9 9 0 18 3% 0.45%
Code "D" - Not Considered, Re-submit 0 0 0 0 0% 0.00%
ON HOLD 38 12 0 50 7% 1.24%
REV. NOT REQUIRED 2 0 0 2 0% 0.05%
FINAL DESIGN- SHOP DRAWINGS
Total Drawing Submittals 57 64 474 595 100% 16.67%
Submitted for Approval 1 64 243 308 52% 8.63%
Code " A " -- Approved with no comments 1 0 24 25 4% 0.70%
Code "B" -- Approved with Comments 0 62 164 226 38% 6.33%
Code "C "-- Not Approved Re-submit 0 2 28 30 5% 0.84%
Code "D" - Not Considered, Re-submit 0 0 0 0 0% 0.00%
ON HOLD 0 0 27 27 5% 0.76%
REV. NOT REQUIRED 0 0 0 0 0% 0.00%
SUMMARY OF ALL THE STAGES
Total Drawing Submittals 100.00%
Submitted for Approval 88.65%
Code " A " -- Approved with no comments 0.82%
Code "B" -- Approved with Comments 84.50%
Code "C "-- Not Approved Re-submit 1.29%
Code "D" - Not Considered, Re-submit 0.00%
ON HOLD 1.99%
REV. NOT REQUIRED 0.05%
Workflow Report - M-DR03-A Drawings 1st submission - D&B Contracts + MC4a (14 cal days)
DASO Projects
PO Box 3148 Muscat 111, Oman
INTERIM DESIGN DRAWINGS SUBMISSION DETAILS
Hard
Hard copy
No.of Workflow Transmittal Hard copy copy Pending
Date Submitted Due date Workflow Number Transmittal Subject Completed Date Late Days Submission Net Delay
Drgs. Number Submission Date Submiss Drawings
Delay days
ion
ARCHITECTURAL
10-Feb-14 24-Feb-14 48 WF-058445 GAL-WTRAN-000182 ARCHITECTURAL DRAWINGS 27-Feb-14 16-Feb-14 0 0 0 0 0
STRUCTURAL
1-Feb-14 15-Feb-14 84 WF-057332 GAL-WTRAN-000053 STRUCTURAL DRAWINGS 28-Jan-14 6-Mar-14 0 0 0 0 0
MEP DRAWINGS
26-Jan-14 9-Feb-14 23 WF-057132 GAL-WTRAN-000046 FIRE FIGHTING DRAWINGS 4-Feb-14 27-Feb-14 0 0 0 0 0
26-Jan-14 9-Feb-14 12 WF-057117 GAL-WTRAN-000043 MC-13 -COMPRESSED AIR SERVICE LAYOUT 4-Feb-14 12-Mar-14 0 0 0 0 0
1-Feb-14 15-Feb-14 16 WF-057337 GAL-WTRAN-000055 SECURITY SYSTEMS LAYOUT (MC-13) 4-Feb-14 3-Mar-14 0 0 0 0 0
27-Feb-14 13-Mar-14 25 WF-058447 GAL-WTRAN-000056 A/C & Ventilation Layout 4-Feb-14 3-Mar-14 0 0 0 0 0
2-Feb-14 16-Feb-14 17 WF-057360 GAL-WTRAN-000183 TELECOM SERVICES LAYOUT (MC-13) 4-Feb-14 27-Feb-14 0 0 0 0 0
2-Feb-14 16-Feb-14 24 WF-057374 GAL-WTRAN-000057 Electrical - Power Layout Details (MC-13) 3-Mar-14 3-Mar-14 0 0 0 0 0
9-Feb-14 23-Feb-14 5 WF-057665 GAL-WTRAN-000106 LIGHTNING PROTECTION LAYOUT (MC-13) 4-Mar-14 11-Mar-14 0 0 0 0 0
9-Feb-14 23-Feb-14 2 WF-057667 GAL-WTRAN-000107 SECURITY SYSTEMS LAYOUT UPPER ROOF 4-Feb-14 3-Mar-14 0 0 0 0 0
18-Feb-14 4-Mar-14 2 WF-058042 GAL-WTRAN-000142 Service Tunnel Water Service Layout 4-Mar-14 12-Mar-14 0 0 0 0 0
23-Feb-14 9-Mar-14 2 WF-058210 GAL-WTRAN-000159 SITE PLAN LOW CURRENT SERVICES LAYOUT 3-Mar-14 11-Mar-14 0 0 0 0 0
25-Feb-14 11-Mar-14 10 WF-058321 GAL-WTRAN-000164 Service Building Electrical Services 3-Mar-14 11-Mar-14 0 0 0 0 0
25-Feb-14 11-Mar-14 5 WF-058323 GAL-WTRAN-000166 Service Building AC & Ventilation Layout 3-Mar-14 11-Mar-14 0 0 0 0 0
26-Feb-14 12-Mar-14 8 WF-058327 GAL-WTRAN-000170 Service Building Drainage & Water supply layout 3-Mar-14 11-Mar-14 0 0 0 0 0
26-Feb-14 12-Mar-14 2 WF-058329 GAL-WTRAN-000171 Service Building Security Services Layout 3-Mar-14 11-Mar-14 0 0 0 0 0
504 TOTAL 0 0 0 0 0
Legend
A Approved 0
Drawing Submitted (Detail
B Approved with Comments 504
Design Stage)
C On Hold (for MC01 drawing only) 0 504
D Revise & Re-Submit 0
2 of 151
E Rejected 0
6/1/2017 TOTAL 504
3 of 151
15.03.2014
Returned Workflow
A B C D E
Transmittal
HAT-WTRAN-000384 48
HAT-WTRAN-000035, HAT-
WTRAN-000036, HAT-WTRAN-
000037, HAT-WTRAN-000038,
71
HAT-WTRAN-000039
HAT-WTRAN-000387 4
HAT-WTRAN-000299 84
HAT-WTRAN-000284 9
HAT-WTRAN-000360 1
HAT-WTRAN-000228 23
HAT-WTRAN-000406 12
HAT-WTRAN-000407 7
HAT-WTRAN-000405 10
HAT-WTRAN-000311 23
HAT-WTRAN-000385 21
HAT-WTRAN-000245 19
HAT-WTRAN-000242 16
HAT-WTRAN-000249
25
HAT-WTRAN-000227
17
HAT-WTRAN-000244 24
HAT-WTRAN-000293 21
HAT-WTRAN-000388 1
HAT-WTRAN-000408 1
HAT-WTRAN-000372 5
HAT-WTRAN-000241 2
HAT-WTRAN-000573 4
HAT-WTRAN-000373 1
HAT-WTRAN-000487 1
HAT-WTRAN-000404 2
HAT-WTRAN-000386 5
HAT-WTRAN-000365 3
HAT-WTRAN-000359 2
HAT-WTRAN-000350 2
HAT-WTRAN-000370 10
HAT-WTRAN-000364 6
HAT-WTRAN-000357 5
HAT-WTRAN-000356 8
HAT-WTRAN-000355 2
HAT-WTRAN-000358 2
HAT-WTRAN-000363 1
HAT-WTRAN-000374 1
HAT-WTRAN-000371 2
HAT-WTRAN-000295 3
0 504 0 0 0
4 of 151
5 of 151
Workflow Report - M-DR03-A Drawings 1st submission - D&B Contracts + MC4a (14 cal days)
DASO Projects
PO Box 3148 Muscat 111, Oman
DETAIL DESIGN DRAWINGS SUBMISSION DETAILS
Hard copy
No.of Workflow Transmittal Hard Copy Hard Copy Late Submission Pending
Date Submitted Due date Drgs. Workflow Number Nos. Transmittal Subject Submitted Date Transmittal Number Completed Date Days Delay days Net Delay Drawings
ARCHITECTURAL
STRUCTURAL
7-Mar-14 21-Mar-14 2 WF-058716 GAL-WTRAN-000214 Structural Drawings 9-Mar-14 00065/14 20-Mar-14 0 0 0 0
MEP
16-Mar-14 30-Mar-14 12 WF-058941 GAL-WTRAN-000248 Compressed Air Drawings 16-Mar-14 00086/14 19-Mar-14 0 0 0 0
16-Mar-14 30-Mar-14 19 WF-058942 GAL-WTRAN-000249 Fire Alarm Drawings 16-Mar-14 00086/14 19-Mar-14 0 0 0 0
16-Mar-14 30-Mar-14 20 WF-058943 GAL-WTRAN-000250 Emergency Lighting Drawings 16-Mar-14 00086/14 19-Mar-14 0 0 0 0
18-Mar-14 1-Apr-14 27 WF-059075 GAL-WTRAN-000267 Water Services Drawings 18-Mar-14 00094/14 19-Mar-14 0 0 0 0
18-Mar-14 1-Apr-14 23 WF-059101 GAL-WTRAN-000272 Fire Fighting Drawings 18-Mar-14 00097/14 20-Mar-14 0 0 0 0
18-Mar-14 1-Apr-14 1 WF-059121 GAL-WTRAN-000275 Fire Alarm Schematic 18-Mar-14 00098/14 20-Mar-14 0 0 0 0
23-Mar-14 6-Apr-14 24 WF-059314 GAL-WTRAN-000312 Service Bldg. - MEP Drgs. 24-Mar-14 00107/14 0 0 0 0
24-Mar-14 7-Apr-14 16 WF-059354 GAL-WTRAN-000316 Service Bldg. - MEP Drgs. 24-Mar-14 00109/14 0 0 0 0
549 TOTAL
Legend
A Approved 0
Drawing Submitted (Detail
B Approved with Comments 549 Design Stage)
6 of 151
26.03.2014
Returned Workflow A B C D E
Transmittal
18
HAT-WTRAN-000403
9
HAT-WTRAN-000402
16
HAT-WTRAN-000401
12
HAT-WTRAN-000446
2
HAT-WTRAN-000447
9
HAT-WTRAN-000532
28
HAT-WTRAN-000498
26
HAT-WTRAN-000497
18
HAT-WTRAN-000599
HAT-WTRAN-000616 1
2
HAT-WTRAN-000572
5
HAT-WTRAN-000594
HAT-WTRAN-000593 2
HAT-WTRAN-000600 42
3
HAT-WTRAN-000540
27
HAT-WTRAN-000590
HAT-WTRAN-000617 4
HAT-WTRAN-000618 5
HAT-WTRAN-000619 3
17
HAT-WTRAN-000486
HAT-WTRAN-000531 14
9
HAT-WTRAN-000530
12
HAT-WTRAN-000529
19
HAT-WTRAN-000525
20
HAT-WTRAN-000524
6
HAT-WTRAN-000523
11
HAT-WTRAN-000522
34
HAT-WTRAN-000521
24
HAT-WTRAN-000520
27
HAT-WTRAN-000519
23
HAT-WTRAN-000544
29
HAT-WTRAN-000543
1
HAT-WTRAN-000576
27
HAT-WTRAN-000608
HAT-WTRAN-000611 24
16
HAT-WTRAN-000622
0 549 0 0 0
7 of 151
Workflow Report - M-DR03-A Drawings 1st submission - D&B Contracts + MC4a (14 cal days)
DASO Projects
PO Box 3148 Muscat 111, Oman
IFC DRAWINGS RE-SUBMISSION DETAILS
Hard copy
No.of Hard Copy Hard Copy Late Submission Pending
Date Submitted Due date Drgs. Workflow Number Workflow Transmittal Nos. Transmittal Subject Submitted Date Transmittal Number Completed Date Days Delay days Net Delay Drawings
STRUCTURAL
6-May-14 20-May-14 1 WF-060927 GAL-WTRAN-000514 Service Block- RC Details of Piles (Final Design) 11-May-14 00211/14 8-May-14 0 0 0 0
7-May-14 21-May-14 1 WF-060986 GAL-WTRAN-000519 Service Block- Piles Layout & Details (Final Design) 11-May-14 00211/14 20-May-14 0 0 0 0
8-Jun-14 22-Jun-14 1 WF-062134 GAL-WTRAN-000611 Pile Layout sheet 1 to 5 (Final Design) 8-Jun-14 00256/14 23-Jun-14 0 0 0 0
28-Sep-14 12-Oct-14 3 WF-066469 GAL-WTRAN-001023 S.B General Sections (Final Design) 28-Sep-14 00455/14 2-Oct-14 0 0 0 0
28-Sep-14 12-Oct-14 3 WF-066472 GAL-WTRAN-001024 S.B Beams & Slabs Details (Final Design) 28-Sep-14 00455/14 2-Oct-14 0 0 0 0
14-Oct-14 28-Oct-14 5 WF-066962 GAL-WTRAN-001066 Pile Cap Layout & Schedule (Final Design) 14-Oct-14 00477/14
Walk Through Tunnel External Section and Details (sheet
29-Oct-14 12-Nov-14 1 WF-067630 GAL-WTRAN-001989 5 of 8) 29-Oct-14
ARCHITECTURAL
28-Aug-14 11-Sep-14 1 WF-065227 GAL-WTRAN-000883 Architectural Master Plan (Resubmission) (Final Design) 28-Aug-14 00391/14 9-Sep-14 0 0 0 0
19 TOTAL
Legend
A Approved 0
B Approved with Comments 13
C Awaiting Approval 6
D Revise & Re-Submit 0
E Rejected 0
6/1/2017 TOTAL 19
8 of 151
29-Oct-14
A B C D E
Returned Workflow Transmittal
HAT-WTRAN-001131 1
HAT-WTRAN-001201 1
HAT-WTRAN-001581 1
HAT-WTRAN-001580 1
HAT-WTRAN-001913 2
HAT-WTRAN-002566 3
HAT-WTRAN-002574 3
HAT-WTRAN-002268 1
0 13 6 0 0
9 of 151
Workflow Report - M-DR03-A Drawings 1st submission - D&B Contracts + MC4a (14 cal days)
DASO Projects
PO Box 3148 Muscat 111, Oman
DESIGN DRAWINGS SUBMISSION DETAILS
Hard copy
No.of Submission Net Delay As Pending
Date Submitted Due date Drgs. Workflow Number Workflow Transmittal Nos. Transmittal Subject Approved Date Due Delay days On Date Drawings
ARCHITECTURAL
19-Jul-14 2-Aug-14 0 WF-063724 GAL-WTRAN-000768 Architectural Master Plan (Final Design) 10-Aug-14 8 2 6 0
28-Aug-14 11-Sep-14 0 WF-065227 GAL-WTRAN-000883 Architectural Master Plan (Resubmission) (Final Design) 9-Sep-14 0 0 0 0
18-Dec-14 1-Jan-15 0 WF-070131 GAL-WTRAN-001317 Architectural Master Plan (Resubmission) (Final Design) 1-Jan-15 0 0 0 0
21-Dec-14 4-Jan-15 4 WF-070202 GAL-WTRAN-001327 Architectural - Basement Tunnel Plan 1-Jan-15 0 0 0 0
21-Jan-15 4-Feb-15 1 WF-071756 GAL-WTRAN-001427 Site plan showing Boundary Fence (For ROP Approval)
STRUCTURAL
6-May-14 20-May-14 2 WF-060927 GAL-WTRAN-000514 Service Block- RC Details of Piles (Final Design) 8-May-14 0 0 0 0
7-May-14 21-May-14 1 WF-060986 GAL-WTRAN-000519 M B- Vacuum Tunnel Pile Design & Details (Final Design) 20-May-14 0 0 0 0
8-May-14 22-May-14 0 WF-061064 GAL-WTRAN-000523 Catering Building Pile Testing Schedule (Final Design) 18-May-14 0 0 0 0
18-May-14 1-Jun-14 0 WF-061412 GAL-WTRAN-000547 M.B- Piles Testing Schedule (Final Design) 24-May-14 0 0 0 0
8-Jun-14 22-Jun-14 1 WF-062134 GAL-WTRAN-000611 Pile Layout sheet 1 to 5 (Final Design) 23-Jun-14 1 0 1 0
10-Jun-14 24-Jun-14 1 WF-062216 GAL-WTRAN-000619 M.B- Pile Testing Schedule (Resubmission) (Final Design) 23-Jun-14 0 0 0 0
22-Jul-14 5-Aug-14 2 WF-063865 GAL-WTRAN-000771 Typical RC Details of Pile Cap & Pile Cap Layout Segment-3 (Final Design) 23-Jul-14 0 0 0 0
28-Sep-14 12-Oct-14 1 WF-066469 GAL-WTRAN-001023 S.B General Sections (Final Design) 2-Oct-14 0 0 0 0
28-Sep-14 12-Oct-14 1 WF-066472 GAL-WTRAN-001024 S.B Beams & Slabs Details (Final Design) 2-Oct-14 0 0 0 0
14-Oct-14 28-Oct-14 5 WF-066962 GAL-WTRAN-001066 Pile Cap Layout & Schedule (Final Design) 6-Nov-14 9 0 9 0
Walk Through Tunnel External Section and Details (sheet 5 of 8) (Final
29-Oct-14 12-Nov-14 0 WF-067630 GAL-WTRAN-001989 Design) 6-Nov-14 0 0 0 0
Walk Through Tunnel External Section and Details (sheet 5 of 8) (Final
6-Nov-14 20-Nov-14 0 WF-068076 GAL-WTRAN-001155 Design) 12-Nov-14 0 0 0 0
18-Nov-14 2-Dec-14 3 WF-068634 GAL-WTRAN-001191 S.B Plinth Beam &General Sections (Final Design) 4-Dec-14 2 0 2 0
Vacuum Tunnel - External Section and Details sheet 4 of 8 & 8 of 8) (Final
24-Nov-14 8-Dec-14 1 WF-068927 GAL-WTRAN-001212 Design) 4-Dec-14 0 0 0 0
2-Dec-14 16-Dec-14 0 WF-069252 GAL-WTRAN-001238 M.B Plinth Beam Sections & Details Segment-3 (Final Design) 15-Dec-14 0 0 0 0
Airside & Landside ent.gate & guard room foundation plan & column axis
7-Dec-14 21-Dec-14 2 WF-069410 GAL-WTRAN-001253 layout (Final Design) 23-Dec-14 2 0 2 0
10 of 151
Workflow Report - M-DR03-A Drawings 1st submission - D&B Contracts + MC4a (14 cal days)
DASO Projects
PO Box 3148 Muscat 111, Oman
DESIGN DRAWINGS SUBMISSION DETAILS
Hard copy
No.of Submission Net Delay As Pending
Date Submitted Due date Drgs. Workflow Number Workflow Transmittal Nos. Transmittal Subject Approved Date Due Delay days On Date Drawings
10-Dec-14 24-Dec-14 0 WF-069619 GAL-WTRAN-001273 M.B Plinth Beam Sections & Details Segment-1 (Final Design) 27-Dec-14 3 0 3 0
Walk Through Tunnel External Section and Details (sheet 5 of 8) (Final
11-Dec-14 25-Dec-14 1 WF-069725 GAL-WTRAN-001290 Design) 27-Dec-14 2 0 2 0
11-Dec-14 25-Dec-14 0 WF-069714 GAL-WTRAN-001289 Manhole & Gully Trap Details (Final Design) 18-Dec-14 0 0 0 0
21-Dec-14 4-Jan-15 1 WF-070208 GAL-WTRAN-001329 M.B Column Schedules & Lift Wall Details 1-Jan-15 0 0 0 0
21-Dec-14 4-Jan-15 2 WF-070211 GAL-WTRAN-001330 S.B Plinth Beam & Beam slab Schedule 1-Jan-15 0 0 0 0
21-Dec-14 4-Jan-15 2 WF-070206 GAL-WTRAN-001328 Service Tunnel - External Sections & Roof Layout 1-Jan-15 0 0 0 0
31-Dec-14 14-Jan-15 0 WF-070756 GAL-WTRAN-001371 Manhole & Gully Trap Details (Final Design) Resubmission 7-Jan-15 0 0 0 0
31-Dec-14 14-Jan-15 7 WF-070784 GAL-WTRAN-001373 M.B Plinth Beam Sections & Details Segment-4 15-Jan-15 1 0 1 0
6-Jan-15 20-Jan-15 7 WF-071047 GAL-WTRAN-001386 M.B Plinth Beam Sections & Details Segment-3 (Resubmission) 15-Jan-15 0 0 0 0
11-Jan-15 25-Jan-15 6 WF-071186 GAL-WTRAN-001397 M.B Plinth Beam Sections & Details Segment-1 15-Jan-15 0 0 0 0
11-Jan-15 25-Jan-15 14 WF-071187 GAL-WTRAN-001398 S.B Long Sections of Plinth Beam 15-Jan-15 0 0 0 0
S.B Reinforcement Details of Ground Floor Slab
12-Jan-15 26-Jan-15 0 WF-071244 GAL-WTRAN-001408 15-Jan-15 0 0 0 0
18-Jan-15 1-Feb-15 1 WF-071529 GAL-WTRAN-001418 Vacuum Tunnel - External Section and Details sheet 4 of 8 29-Jan-15 0 0 0 0
29-Jan-15 12-Feb-15 10 WF-072139 GAL-WTRAN-001457 Airside & Landside Plinth Beam & Slab Details
99 TOTAL
Legend
A Approved 0
Drawings Revised and Resubmitted with Code D in IFC Sta
B Approved with Comments 78
C Awaiting Approval 21
After Resubmission Approved with Code B
D Revise & Re-Submit 0
E Rejected 0
Remaining Drawings with Code D (Revised and Resubmitt
6/1/2017 TOTAL 99
11 of 151
31-Jan-15
A B C D E
Returned Workflow Transmittal
HAT-WTRAN-001968 0
HAT-WTRAN-002268 0
0
HAT-WTRAN-003272
HAT-WTRAN-003273 4
HAT-WTRAN-001131 2
HAT-WTRAN-001201 1
0
HAT-WTRAN-001196
HAT-WTRAN-001272 0
HAT-WTRAN-001581 1
HAT-WTRAN-001580 1
HAT-WTRAN-001913 2
HAT-WTRAN-002566 1
HAT-WTRAN-002574 1
HAT-WTRAN-002793 5
HAT-WTRAN-002792 0
HAT-WTRAN-002883 0
HAT-WTRAN-003033 3
HAT-WTRAN-003034 1
HAT-WTRAN-003120 0
HAT-WTRAN-003199 2
12 of 151
31-Jan-15
A B C D E
Returned Workflow Transmittal
0
HAT-WTRAN-003239
HAT-WTRAN-003243 1
HAT-WTRAN-003151 0
HAT-WTRAN-003270 1
HAT-WTRAN-003271 2
HAT-WTRAN-003269 2
HAT-WTRAN-003333 5
0
HAT-WTRAN-003319
HAT-WTRAN-003380 7
HAT-WTRAN-003379 7
HAT-WTRAN-003378 6
HAT-WTRAN-003377 14
HAT-WTRAN-003376 0
HAT-WTRAN-003366 0
HAT-WTRAN-003417 1
HAT-WTRAN-003460 1
HAT-WTRAN-003453 6
HAT-WTRAN-003418 1
1
10
0 78 21 0 0
Remaining Drawings with Code D (Revised and Resubmitted ) in IFC Stage #REF!
13 of 151
DRAWING CONTROL SCHEDULE (IFC DRAWING)
Project: DESIGN & BUILD INFLIGHT CATERING BUILDING AT MUSCAT
Customer: MINISTRY OF TRANSPORT & COMMUNICATION
Managament Consultant: ADPI Discipline : ARCHITECTURAL / STRUCTURAL
Coordination Revision -- Revision - A Revision - B Revision - C Revision - D
Zone / Segm.
Drawing No.
Floor / Level
Final Status
Participant
Discipline
Sub-Disci
Building
Planned
Type
Size
Rev
Site
Sl No. Drawing No Scale Description Customer/Consult. Drg. Ref.
Issued Date AC EL BMS PL Issued Recd. Issued Recd. Issued Recd. Issued Recd. Issued
Status
Status
Status
Status
ARCHITECTURAL (CIVIL)
EXTERNAL
1 SE-GAL-ARAA-K-324ETAE-00001 SE GAL AR AA K 324 ET AE 00001 F C A0 1:1000 Master plan SE-HAT-ARAA-K-324XXXX-00001 25-Jun-14 * * * * 21-Jul-14 10-Aug-14 28-Aug-14
3 SE-GAL-ARAS-K-324ETAE-00002 SE GAL AR AS K 324 ET AE 00002 C A0 1:250 Site plan showing scope of work SE-HAT-ARAA-K-324XXXX-00003 18-Sep-14
4 SE-GAL-ARAA-K-324ETAE-00004 SE GAL AR AA K 324 ET AE 00004 -- A0 250 Site plan with Co-ordinates 18-Sep-14
5 SE-GAL-ARAA-K-324ETAE-00005 SE GAL AR AA K 324 ET AE 00005 -- S A0 250 Site plan Showing Boundary Fence (For ROP Approval) 18-Sep-14 * * * * 21-Jan-15
6 SE-GAL-ARAG-D-324ETAE-00001 SE GAL AR AG D 324 ET AE 00001 C A0 1:100 External signage part-01 SE-HAT-ARAO-G-324XXXX-00717 26-Oct-14
7 SE-GAL-ARAG-D-324ETAE-00002 SE GAL AR AG D 324 ET AE 00002 C A0 1:100 External signage part-02 SE-HAT-ARAO-G-324XXXX-00718 26-Oct-14
8 SE-GAL-LPAL-D-324ETAE-00001 SE GAL LP AL D 324 ET AE 00001 C A0 1:100 Landscape details (part 1/2) SE-HAT-LPAL-D-324XXXX-00001 26-Oct-14
9 SE-GAL-LPAL-D-324ETAE-00002 SE GAL LP AL D 324 ET AE 00002 C A0 1:100 Landscape details (part 2/2) SE-HAT-LPAL-D-324XXXX-00002 26-Oct-14
BASEMENT
10 SE-GAL-ARAO-P-324B1S0-00001 SE GAL AR AO P 324 B1 S0 00001 C B A0 Basement tunnel plan SE-HAT-ARAO-P-324XXXX-00006 18-Sep-14 * * * * 20-Dec-14 1-Jan-15 B
11 SE-GAL-ARAO-P-324B1S1-00002 SE GAL AR AO P 324 B1 S1 00002 C B A0 Basement tunnel plan(segment 1/4) SE-HAT-ARAO-P-324XXS1-00007 18-Sep-14 * * * * 20-Dec-14 1-Jan-15 B
12 SE-GAL-ARAO-P-324B1S2-00003 SE GAL AR AO P 324 B1 S2 00003 C B A0 Basement tunnel plan(segment 2/4) SE-HAT-ARAO-P-324XXS2-00008 18-Sep-14 * * * * 20-Dec-14 1-Jan-15 B
13 SE-GAL-ARAO-P-324B1S4-00004 SE GAL AR AO P 324 B1 S4 00004 C B A0 Basement tunnel plan(segment 4/4) SE-HAT-ARAO-P-324XXS4-00009 18-Sep-14 * * * * 20-Dec-14 1-Jan-15 B
15 SE-GAL-ARAF-P-324B1S1-00002 SE GAL AR AF P 324 B1 S1 00002 C A0 Floor finish (Basement) (segment 1/4) 7-Oct-14
16 SE-GAL-ARAF-P-324B1S2-00003 SE GAL AR AF P 324 B1 S2 00003 C A0 Floor finish (Basement) (segment 2/4) 7-Oct-14
17 SE-GAL-ARAF-P-324B1S4-00004 SE GAL AR AF P 324 B1 S4 00004 C A0 Floor finish (Basement) (segment 4/4) 7-Oct-14
19 SE-GAL-ARAW-P-324B1S1-00002 SE GAL AR AW P 324 B1 S1 00002 C A0 Wall finish (basement) (segment 1/4) 21-Oct-14
20 SE-GAL-ARAW-P-324B1S2-00003 SE GAL AR AW P 324 B1 S2 00003 C A0 Wall finish (basement) (segment 2/4) 21-Oct-14
21 SE-GAL-ARAW-P-324B1S3-00004 SE GAL AR AW P 324 B1 S 00004 C A0 Wall finish (basement) (segment 3/4) 21-Oct-14
GROUND FLOOR
23 SE-GAL-ARAO-P-32400S1-00006 SE GAL AR AO P 324 00 S1 00006 C A0 Plan at level 0 (segment 1/4) SE-HAT-ARAO-P-32400S1-00002 21-Sep-14
24 SE-GAL-ARAO-P-32400S2-00007 SE GAL AR AO P 324 00 S2 00007 C A0 Plan at level 0 (segment 2/4) SE-HAT-ARAO-P-32400S2-00003 21-Sep-14
25 SE-GAL-ARAO-P-32400S3-00008 SE GAL AR AO P 324 00 S3 00008 C A0 Plan at level 0 (segment 3/4) SE-HAT-ARAO-P-32400S3-00004 21-Sep-14
26 SE-GAL-ARAO-P-32400S4-00009 SE GAL AR AO P 324 00 S4 00009 C A0 Plan at level 0 (segment 4/4) SE-HAT-ARAO-P-32400S4-00005 21-Sep-14
27 SE-GAL-ARAF-P-32400S0-00005 SE GAL AR AF P 324 00 S0 00005 C A0 Floor finish (level 0) [+1500 lvl] SE-HAT-ARAO-U-32400XX-00401 9-Oct-14
28 SE-GAL-ARAF-P-32400S1-00006 SE GAL AR AF P 324 00 S1 00006 C A0 Floor finish (level 0) [+1500 lvl](segment 1/4) SE-HAT-ARAO-U-32400S1-00402 9-Oct-14
29 SE-GAL-ARAF-P-32400S2-00007 SE GAL AR AF P 324 00 S2 00007 C A0 Floor finish (level 0) [+1500 lvl](segment 2/4) SE-HAT-ARAO-U-32400S2-00403 9-Oct-14
30 SE-GAL-ARAF-P-32400S3-00008 SE GAL AR AF P 324 00 S3 00008 C A0 Floor finish (level 0) [+1500 lvl](segment 3/4) SE-HAT-ARAO-U-32400S3-00404 9-Oct-14
31 SE-GAL-ARAF-P-32400S4-00009 SE GAL AR AF P 324 00 S4 00009 C A0 Floor finish (level 0) [+1500 lvl](segment 4/4) SE-HAT-ARAO-U-32400S4-00405 9-Oct-14
32 SE-GAL-ARAI-P-32400S0-00001 SE GAL AR AI P 324 00 S0 00001 C A0 False ceiling (level 0) [+1500 lvl] SE-HAT-ARAO-U-32400XX-00414 17-Oct-14
33 SE-GAL-ARAI-P-32400S1-00002 SE GAL AR AI P 324 00 S1 00002 C A0 False ceiling (level 0) [+1500 lvl](segment 1/4) SE-HAT-ARAO-U-32400S1-00415 17-Oct-14
34 SE-GAL-ARAI-P-32400S2-00003 SE GAL AR AI P 324 00 S2 00003 C A0 False ceiling (level 0) [+1500 lvl](segment 2/4) SE-HAT-ARAO-U-32400S2-00416 17-Oct-14
35 SE-GAL-ARAI-P-32400S3-00004 SE GAL AR AI P 324 00 S3 00004 C A0 False ceiling (level 0) [+1500 lvl](segment 3/4) SE-HAT-ARAO-U-32400S3-00417 17-Oct-14
36 SE-GAL-ARAI-P-32400S4-00005 SE GAL AR AI P 324 00 S4 00005 C A0 False ceiling (level 0) [+1500 lvl](segment 4/4) SE-HAT-ARAO-U-32400S4-00418 17-Oct-14
37 SE-GAL-ARAW-P-32400S0-00005 SE GAL AR AW P 324 00 S0 00005 C A0 Wall finish (level 0) [+1500 lvl] SE-HAT-ARAW-U-32400XX-00427 23-Oct-14
38 SE-GAL-ARAW-P-32400S1-00006 SE GAL AR AW P 324 00 S1 00006 C A0 Wall finish (level 0) [+1500 lvl](segment 1/4) SE-HAT-ARAW-U-32400S1-00428 23-Oct-14
39 SE-GAL-ARAW-P-32400S2-00007 SE GAL AR AW P 324 00 S2 00007 C A0 Wall finish (level 0) [+1500 lvl](segment 2/4) SE-HAT-ARAW-U-32400S2-00429 23-Oct-14
40 SE-GAL-ARAW-P-32400S3-00008 SE GAL AR AW P 324 00 S3 00008 C A0 Wall finish (level 0) [+1500 lvl](segment 3/4) SE-HAT-ARAW-U-32400S3-00430 23-Oct-14
41 SE-GAL-ARAW-P-32400S4-00009 SE GAL AR AW P 324 00 S4 00009 C A0 Wall finish (level 0) [+1500 lvl](segment 4/4) SE-HAT-ARAW-U-32400S4-00431 23-Oct-14
44 SE-GAL-ARAA-S-3240000-00002 SE GAL AR AA S 324 00 00 00002 C A0 Wall section (part 1/5) SE-HAT-ARAO-S-324XXXX-00202 2-Oct-14
45 SE-GAL-ARAA-S-3240000-00003 SE GAL AR AA S 324 00 00 00003 C A0 Wall section (part 2/5) SE-HAT-ARAO-S-324XXXX-00203 2-Oct-14
46 SE-GAL-ARAA-S-3240000-00004 SE GAL AR AA S 324 00 00 00004 C A0 Wall section (part 3/5) SE-HAT-ARAO-S-324XXXX-00204 2-Oct-14
47 SE-GAL-ARAA-S-3240000-00005 SE GAL AR AA S 324 00 00 00005 C A0 Wall section (part 4/5) SE-HAT-ARAO-S-324XXXX-00205 2-Oct-14
48 SE-GAL-ARAA-S-3240000-00006 SE GAL AR AA S 324 00 00 00006 C A0 Wall section (part 5/5) SE-HAT-ARAO-S-324XXXX-00206 2-Oct-14
Page 14 of 151
DRAWING CONTROL SCHEDULE (IFC DRAWING)
Project: DESIGN & BUILD INFLIGHT CATERING BUILDING AT MUSCAT
Customer: MINISTRY OF TRANSPORT & COMMUNICATION
Managament Consultant: ADPI Discipline : ARCHITECTURAL / STRUCTURAL
Coordination Revision -- Revision - A Revision - B Revision - C Revision - D
Zone / Segm.
Drawing No.
Floor / Level
Final Status
Participant
Discipline
Sub-Disci
Building
Planned
Type
Size
Rev
Site
Sl No. Drawing No Scale Description Customer/Consult. Drg. Ref.
Issued Date AC EL BMS PL Issued Recd. Issued Recd. Issued Recd. Issued Recd. Issued
Status
Status
Status
Status
50 SE-GAL-ARAO-D-3240000-00002 SE GAL AR AO D 324 00 00 00002 C A0 Staircase details (part 2) SE-HAT-ARAO-D-324XXXX-00302 4-Oct-14
53 SE-GAL-ARAO-D-3240000-00005 SE GAL AR AO D 324 00 00 00005 C A0 Toilet details (part 1/5) SE-HAT-ARAO-D-324XXXX-00305 6-Oct-14
54 SE-GAL-ARAO-D-3240000-00006 SE GAL AR AO D 324 00 00 00006 C A0 Toilet details (part 2/5) SE-HAT-ARAO-D-324XXXX-00306 6-Oct-14
55 SE-GAL-ARAO-D-3240000-00007 SE GAL AR AO D 324 00 00 00007 C A0 Toilet details (part 3/5) SE-HAT-ARAO-D-324XXXX-00307 6-Oct-14
56 SE-GAL-ARAO-D-3240000-00008 SE GAL AR AO D 324 00 00 00008 C A0 Toilet details (part 4/5) SE-HAT-ARAO-D-324XXXX-00308 6-Oct-14
57 SE-GAL-ARAO-D-3240000-00009 SE GAL AR AO D 324 00 00 00009 C A0 Toilet details (part 5/5) SE-HAT-ARAO-D-324XXXX-00309 6-Oct-14
67 SE-GAL-ARAE-D-3240000-00004 SE GAL AR AE D 324 00 00 00004 C A0 Scissor lift typical drawing SE-HAT-ARAO-G-324XXXX-00704 10-Oct-14
68 SE-GAL-ARAE-D-3240000-00005 SE GAL AR AE D 324 00 00 00005 C A0 Entry gate and road barrier details SE-HAT-ARAO-G-324XXXX-00705 11-Oct-14
69 SE-GAL-ARAE-D-3240000-00006 SE GAL AR AE D 324 00 00 00006 C A0 Details of hydraulic edge dock leveler SE-HAT-ARAO-G-324XXXX-00706 10-Oct-14
70 SE-GAL-ARAE-P-32400S0-00004 SE GAL AR AE P 324 00 S0 00004 C A0 Location of insect control trap (level 0) SE-HAT-ARAO-G-32400XX-00714 26-Oct-14
73 SE-GAL-ARAE-D-3240000-00009 SE GAL AR AE D 324 00 00 00009 C A0 Acoustics movable partition details SE-HAT-ARAO-G-324XXXX-00709 20-Oct-14
74 SE-GAL-ARAE-D-3240000-00010 SE GAL AR AE D 324 00 00 00010 C A0 Details of heavy duty dock leveler SE-HAT-ARAO-G-324XXXX-00710 10-Oct-14
77 SE-GAL-ARAE-D-3240000-00001 SE GAL AR AE D 324 00 00 00001 A0 Fire rated walls and fire stopping details 15-Oct-14
78 SE-GAL-ARAE-P-32400S0-00001 SE GAL AR AE P 324 00 S0 00001 C A0 Wall & corner guard (level 0) SE-HAT-ARAO-G-32400XX-00711 26-Oct-14
FIRST FLOOR
80 SE-GAL-ARAO-P-32401S1-00011 SE GAL AR AO P 324 01 S1 00011 C A0 Plan at level 1 (segment 1/4) SE-HAT-ARAO-P-32401S1-00011 23-Sep-14
81 SE-GAL-ARAO-P-32401S2-00012 SE GAL AR AO P 324 01 S2 00012 C A0 Plan at level 1 (segment 2/4) SE-HAT-ARAO-P-32401S2-00012 23-Sep-14
82 SE-GAL-ARAO-P-32401S3-00013 SE GAL AR AO P 324 01 S3 00013 C A0 Plan at level 1 (segment 3/4) SE-HAT-ARAO-P-32401S3-00013 23-Sep-14
83 SE-GAL-ARAO-P-32401S4-00014 SE GAL AR AO P 324 01 S4 00014 C A0 Plan at level 1 (segment 4/4) SE-HAT-ARAO-P-32401S4-00014 23-Sep-14
84 SE-GAL-ARAF-P-32401S0-00010 SE GAL AR AF P 324 01 S0 00010 C A0 Floor finish (level 1) [+7800 lvl] SE-HAT-ARAO-U-32401XX-00406 11-Oct-14
85 SE-GAL-ARAF-P-32401S1-00011 SE GAL AR AF P 324 01 S1 00011 C A0 Floor finish (level 1) [+7800 lvl](segment 1/4) SE-HAT-ARAO-U-32401S1-00407 11-Oct-14
86 SE-GAL-ARAF-P-32401S2-00012 SE GAL AR AF P 324 01 S2 00012 C A0 Floor finish (level 1) [+7800 lvl](segment 2/4) SE-HAT-ARAO-U-32401S2-00408 11-Oct-14
87 SE-GAL-ARAF-P-32401S3-00013 SE GAL AR AF P 324 01 S3 00013 C A0 Floor finish (level 1) [+7800 lvl](segment 3/4) SE-HAT-ARAO-U-32401S3-00409 11-Oct-14
88 SE-GAL-ARAF-P-32401S4-00014 SE GAL AR AF P 324 01 S4 00014 C A0 Floor finish (level 1) [+7800 lvl](segment 4/4) SE-HAT-ARAO-U-32401S4-00410 11-Oct-14
89 SE-GAL-ARAI-P-32401S0-00006 SE GAL AR AI P 324 01 S0 00006 C A0 False ceiling (level 1) [+7800 lvl] SE-HAT-ARAO-U-32401XX-00419 19-Oct-14
90 SE-GAL-ARAI-P-32401S1-00007 SE GAL AR AI P 324 01 S1 00007 C A0 False ceiling (level 1) [+7800 lvl](segment 1/4) SE-HAT-ARAO-U-32401S1-00420 19-Oct-14
91 SE-GAL-ARAI-P-32401S2-00008 SE GAL AR AI P 324 01 S2 00008 C A0 False ceiling (level 1) [+7800 lvl](segment 2/4) SE-HAT-ARAO-U-32401S2-00421 19-Oct-14
92 SE-GAL-ARAI-P-32401S3-00009 SE GAL AR AI P 324 01 S3 00009 C A0 False ceiling (level 1) [+7800 lvl](segment 3/4) SE-HAT-ARAO-U-32401S3-00422 19-Oct-14
93 SE-GAL-ARAI-P-32401S4-00010 SE GAL AR AI P 324 01 S4 00010 C A0 False ceiling (level 1) [+7800 lvl](segment 4/4) SE-HAT-ARAO-U-32401S4-00423 19-Oct-14
94 SE-GAL-ARAW-P-32401S0-00010 SE GAL AR AW P 324 01 S0 00010 C A0 Wall finish (level 1) [+7800 lvl] SE-HAT-ARAW-U-32401XX-00432 25-Oct-14
95 SE-GAL-ARAW-P-32401S1-00011 SE GAL AR AW P 324 01 S1 00011 C A0 Wall finish (level 1) [+7800 lvl](segment 1/4) SE-HAT-ARAW-U-32401S1-00433 25-Oct-14
96 SE-GAL-ARAW-P-32401S2-00012 SE GAL AR AW P 324 01 S2 00012 C A0 Wall finish (level 1) [+7800 lvl](segment 2/4) SE-HAT-ARAW-U-32401S2-00434 25-Oct-14
97 SE-GAL-ARAW-P-32401S3-00013 SE GAL AR AW P 324 01 S3 00013 C A0 Wall finish (level 1) [+7800 lvl](segment 3/4) SE-HAT-ARAW-U-32401S3-00435 25-Oct-14
98 SE-GAL-ARAW-P-32401S4-00014 SE GAL AR AW P 324 01 S4 00013 C A0 Wall finish (level 1) [+7800 lvl](segment 4/4) SE-HAT-ARAW-U-32401S4-00436 25-Oct-14
99 SE-GAL-ARAE-P-32401S0-00005 SE GAL AR AE P 324 01 S0 00005 C A0 Location of insect control trap (level 1) SE-HAT-ARAO-G-32401XX-00715 26-Oct-14
100 SE-GAL-ARAE-P-32401S0-00002 SE GAL AR AE P 324 01 S0 00002 C A0 Wall & corner guard (level 1) SE-HAT-ARAO-G-32401XX-00712 26-Oct-14
ROOF FLOOR
Page 15 of 151
DRAWING CONTROL SCHEDULE (IFC DRAWING)
Project: DESIGN & BUILD INFLIGHT CATERING BUILDING AT MUSCAT
Customer: MINISTRY OF TRANSPORT & COMMUNICATION
Managament Consultant: ADPI Discipline : ARCHITECTURAL / STRUCTURAL
Coordination Revision -- Revision - A Revision - B Revision - C Revision - D
Zone / Segm.
Drawing No.
Floor / Level
Final Status
Participant
Discipline
Sub-Disci
Building
Planned
Type
Size
Rev
Site
Sl No. Drawing No Scale Description Customer/Consult. Drg. Ref.
Issued Date AC EL BMS PL Issued Recd. Issued Recd. Issued Recd. Issued Recd. Issued
Status
Status
Status
Status
102 SE-GAL-ARAO-P-324R1S1-00016 SE GAL AR AO P 324 R1 S1 00016 C A0 Plan at roof 1 (segment 1/4) SE-HAT-ARAO-P-32402S1-00016 25-Sep-14
103 SE-GAL-ARAO-P-324R1S2-00017 SE GAL AR AO P 324 R1 S2 00017 C A0 Plan at roof 1 (segment 2/4) SE-HAT-ARAO-P-32402S2-00017 25-Sep-14
104 SE-GAL-ARAO-P-324R1S3-00018 SE GAL AR AO P 324 R1 S2 00018 C A0 Plan at roof 1 (segment 3/4) SE-HAT-ARAO-P-32402S3-00018 25-Sep-14
105 SE-GAL-ARAO-P-324R1S4-00019 SE GAL AR AO P 324 R1 S4 00019 C A0 Plan at roof 1 (segment 4/4) SE-HAT-ARAO-P-32402S4-00019 25-Sep-14
106 SE-GAL-ARAF-P-324R1S0-00015 SE GAL AR AF P 324 R1 S0 00015 C A0 Floor finish (roof 1) [+13200 lvl] SE-HAT-ARAO-U-32402XX-00411 13-Oct-14
107 SE-GAL-ARAF-P-324R1S1-00016 SE GAL AR AF P 324 R1 S1 00016 C A0 Floor finish (roof 1) [+13200 lvl](segment 1/4) SE-HAT-ARAO-U-32402S1-00412 13-Oct-14
108 SE-GAL-ARAF-P-324R1S3-00017 SE GAL AR AF P 324 R1 S3 00017 C A0 Floor finish (roof 1) [+13200 lvl](segment 3/4) SE-HAT-ARAO-U-32402S3-00413 13-Oct-14
109 SE-GAL-ARAF-P-324R1S4-00018 SE GAL AR AF P 324 R1 S4 00018 C A0 Floor finish (roof 1) [+13200 lvl](segment 4/4) SE-HAT-ARAO-U-32402S4-00440 13-Oct-14
110 SE-GAL-ARAI-P-324R1S0-00011 SE GAL AR AI P 324 R1 S0 00011 C A0 False ceiling (roof 1) [+13200 lvl] SE-HAT-ARAO-U-32402XX-00424 20-Oct-14
111 SE-GAL-ARAI-P-324R1S1-00012 SE GAL AR AI P 324 R1 S1 00012 C A0 False ceiling (roof 1) [+13200 lvl](segment 1/4) SE-HAT-ARAO-U-32402S1-00425 20-Oct-14
112 SE-GAL-ARAW-P-324R1S0-00015 SE GAL AR AW P 324 R1 S0 00015 C A0 Wall finish (roof 1) [+13200 lvl] SE-HAT-ARAW-U-32402XX-00437 25-Oct-14
113 SE-GAL-ARAW-P-324R1S1-00016 SE GAL AR AW P 324 R1 S1 00016 C A0 Wall finish (roof 1) [+13200 lvl](segment 1/4) SE-HAT-ARAW-U-32402S1-00438 25-Oct-14
114 SE-GAL-ARAW-P-324R1S3-00017 SE GAL AR AW P 324 R1 S3 00017 C A0 Wall finish (roof 1) [+13200 lvl](segment 3/4) SE-HAT-ARAW-U-32402S3-00439 25-Oct-14
115 SE-GAL-ARAW-P-324R1S4-00018 SE GAL AR AW P 324 R1 S4 00018 C A0 Wall finish (roof 1) [+13200 lvl](segment 4/4) SE-HAT-ARAW-U-32402S4-00441 25-Oct-14
116 SE-GAL-ARAE-P-324R1S0-00006 SE GAL AR AE P 324 R1 S0 00006 C A0 Location of insect control trap (roof 1) SE-HAT-ARAO-G-32402XX-00716 26-Oct-14
117 SE-GAL-ARAE-P-324R1S0-00003 SE GAL AR AE P 324 R1 S0 00003 C A0 Wall & corner guard (roof 1) SE-HAT-ARAO-G-32402XX-00713 26-Oct-14
UPPER ROOF
119 SE-GAL-ARAO-P-324R2S1-00021 SE GAL AR AO P 324 R2 S1 00021 C A0 Plan at roof 2 (segment 1/4) 27-Sep-14
120 SE-GAL-ARAO-P-324R2S3-00023 SE GAL AR AO P 324 R2 S3 00023 C A0 Plan at roof 2 (segment 3/4) 27-Sep-14
121 SE-GAL-ARAO-P-324R2S4-00024 SE GAL AR AO P 324 R2 S4 00024 C A0 Plan at roof 2 (segment 4/4) 27-Sep-14
122 SE-GAL-ARAF-P-324R2S0-00019 SE GAL AR AF P 324 R2 S0 00019 C A0 Floor finish (roof 2) [+18000 lvl] SE-HAT-ARAO-U-32403XX-00444 14-Oct-14
123 SE-GAL-ARAF-P-324R2S1-00020 SE GAL AR AF P 324 R2 S1 00020 C A0 Floor finish (roof 2) [+18000 lvl](segment 1/4) SE-HAT-ARAO-U-32403S1-00445 14-Oct-14
124 SE-GAL-ARAF-P-324R2S3-00021 SE GAL AR AF P 324 R2 S3 00021 C A0 Floor finish (roof 2) [+18000 lvl](segment 3/4) 14-Oct-14
125 SE-GAL-ARAF-P-324R2S4-00022 SE GAL AR AF P 324 R2 S4 00022 C A0 Floor finish (roof 2) [+18000 lvl](segment 4/4) 14-Oct-14
126 SE-GAL-ARAW-P-324R2S0-00019 SE GAL AR AW P 324 R2 S0 00019 C A0 Wall finish (roof 2) [+18000 lvl] SE-HAT-ARAW-U-32403XX-00442 25-Oct-14
127 SE-GAL-ARAW-P-324R2S1-00020 SE GAL AR AW P 324 R2 S1 00020 C A0 Wall finish (roof 2) [+18000 lvl](segment 1/4) SE-HAT-ARAW-U-32403S1-00443 25-Oct-14
TOP ROOF
129 SE-GAL-ARAO-P-324R3S1-00026 SE GAL AR AO P 324 R3 S1 00026 C A0 Plan at roof 3 (segment 1/4) 29-Sep-14
130 SE-GAL-ARAF-P-324R3S0-00023 SE GAL AR AF P 324 R3 S0 00023 C A0 Floor finish (roof 3) [+22800 lvl] 15-Oct-14
131 SE-GAL-ARAF-P-324R3S1-00024 SE GAL AR AF P 324 R3 S1 00024 C A0 Floor finish (roof 3) [+22800 lvl](segment 1/4) 15-Oct-14
SERVICE BLOCK
BASEMENT
132 SE-GAL-ARAA-P-336B1S0-00001 SE GAL AR AA P 336 B1 S0 00001 C S A0 Service Block Basement Plan 16-Sep-14 * * * * 26-Feb-15
GROUND FLOOR
133 SE-GAL-ARAA-P-33600S0-00002 SE GAL AR AA P 336 00 00 00002 C S A0 Service Block Level 0 Plan SE-HAT-ARAA-P-336XXXX-00009 16-Sep-14 * * * * 26-Feb-15
134 SE-GAL-ARAA-E-3360000-00001 SE GAL AR AA E 336 00 00 00001 C A0 Service block (elevations & section) SE-HAT-ARAA-E-336XXXX-00010 16-Sep-14
135 SE-GAL-ARAA-H-3360000-00001 SE GAL AR AA H 336 00 00 00001 C A0 Service block (Door-window & finish schedule) SE-HAT-ARAA-H-336XXXX-00011 16-Sep-14
ROOF FLOOR
136 SE-GAL-ARAA-P-336R1S0-00003 SE GAL AR AA P 336 R1 S0 00003 C S A0 Service Block Roof Plan 16-Sep-14 * * * * 26-Feb-15
LPG GAS TANK, BULK FUEL TANK & ROP GUARD ROOM
137 SE-GAL-ARAA-P-33600S0-00003 SE GAL AR AA P 336 00 S0 00003 -- S A0 LPG Gas Tank Plan & details 18-Sep-14 * * * * 26-Feb-15
138 SE-GAL-ARAA-P-33600S0-00004 SE GAL AR AA P 336 00 S0 00004 -- S A0 Bulk Fuel Tank Plan & details 18-Sep-14 * * * * 26-Feb-15
139 SE-GAL-ARAA-P-33600S0-00005 SE GAL AR AA P 336 00 S0 00005 -- S A0 R.O.P Guard room Architectural Plan Elevation & Section 16-Sep-14 * * * * 26-Feb-15
140 SE-GAL-ARAA-P-3360000- SE GAL AR AA P 336 00 00 A0 R.O.P Guard room Floor finishes 16-Sep-14
141 SE-GAL-ARAA-P-3360000- SE GAL AR AA P 336 00 00 A0 R.O.P Guard room Wall Finishes 16-Sep-14
GUARD HOUSES
GROUND FLOOR
145 SE-GAL-ARAA-P-36900S0-00001 SE GAL AR AA P 369 00 S0 00001 C C A0 Plan of Landside ent.gate & Guard room SE-HAT-ARAA-P-369XXXX-00003 25-Sep-14 * * * * 3-Feb-15 19-Feb-15 C
Page 16 of 151
DRAWING CONTROL SCHEDULE (IFC DRAWING)
Project: DESIGN & BUILD INFLIGHT CATERING BUILDING AT MUSCAT
Customer: MINISTRY OF TRANSPORT & COMMUNICATION
Managament Consultant: ADPI Discipline : ARCHITECTURAL / STRUCTURAL
Coordination Revision -- Revision - A Revision - B Revision - C Revision - D
Zone / Segm.
Drawing No.
Floor / Level
Final Status
Participant
Discipline
Sub-Disci
Building
Planned
Type
Size
Rev
Site
Sl No. Drawing No Scale Description Customer/Consult. Drg. Ref.
Issued Date AC EL BMS PL Issued Recd. Issued Recd. Issued Recd. Issued Recd. Issued
Status
Status
Status
Status
146 SE-GAL-ARAA-P-36900S0-00003 SE GAL AR AA P 369 00 S0 00003 C C A0 Plan of Airside ent.gate & Guard room SE-HAT-ARAA-P-369XXXX-00005 25-Sep-14 * * * * 3-Feb-15 19-Feb-15 C
147 SE-GAL-ARAA-E-3690000-00005 SE GAL AR AA E 369 00 00 00005 C C A0 Elevations & section of Land side Guard Room SE-HAT-ARAA-E-369XXXX-00007 25-Sep-14 * * * * 3-Feb-15 19-Feb-15 C
148 SE-GAL-ARAA-H-3690000-00006 SE GAL AR AA H 369 00 00 00006 C A A0 Door / Window & Finish schedule of ent.gate & Guard room both Land side & Air side SE-HAT-ARAA-H-369XXXX-00008 25-Sep-14 * * * * 3-Feb-15 19-Feb-15 A
149 SE-GAL-ARAA-E-3690000-00007 SE GAL AR AA E 369 00 00 00007 C C A0 Elevations & section of Air side Guard Room SE-HAT-ARAA-E-369XXXX-00007 25-Sep-14 * * * * 3-Feb-15 19-Feb-15 C
ROOF FLOOR
150 SE-GAL-ARAA-P-369R1S0-00002 SE GAL AR AA P 369 R1 S0 00002 C A A0 Roof plan of landside ent.gate & Guard Room SE-HAT-ARAA-P-369XXXX-00004 25-Sep-14 * * * * 3-Feb-15 19-Feb-15 A
151 SE-GAL-ARAA-P-369R1S0-00004 SE GAL AR AA P 369 R1 00 00004 C A A0 Roof plan of airside ent.gate & Guard room SE-HAT-ARAA-P-369XXXX-00006 25-Sep-14 * * * * 3-Feb-15 19-Feb-15 A
SERVICE TUNNEL
152 Service tunnel Floor finishes 23-Sep-14
STRUCTURAL (CIVIL)
GENERAL
1 SE-GAL-STAS-G-3240000-00001 SE GAL ST AS G 324 00 00 00001 C B A0 1:100 General structural notes SE-HAT-STAS-G-324XXXX-00001 16-Sep-14 * * * * 26-Jan-15 4-Feb-15 C 15-Feb-15
2 SE-GAL-STAS-G-3240000-00002 SE GAL ST AS G 324 00 00 00002 C C A0 1:100 General structural details (sheet 1 of 3) SE-HAT-STAS-G-324XXXX-00002 16-Sep-14 * * * * 26-Jan-15 4-Feb-15 C 15-Feb-15
3 SE-GAL-STAS-G-3240000-00003 SE GAL ST AS G 324 00 00 00003 C B A0 1:100 General structural details (sheet 2 of 3) SE-HAT-STAS-G-324XXXX-00003 16-Sep-14 * * * * 26-Jan-15 4-Feb-15 B
4 SE-GAL-STAS-G-3240000-00004 SE GAL ST AS G 324 00 00 00004 C C A0 1:100 General structural details (sheet 3 of 3) 16-Sep-14 * * * * 26-Jan-15 4-Feb-15 B 15-Feb-15
BASEMENT
5 SE-GAL-STSI-P-324B1S0-00001 SE GAL ST SI P 324 B1 S0 00001 G B A0 1:100 Pile layout (sheet 1 of 5) SE-HAT-STSI-P-324XXXX-00004 * * * * 17-Mar-14 20-Mar-14 23-Mar-14
6 SE-GAL-STSE-D-3240000-00015 SE GAL ST SE D 324 00 00 00015 F B A1 1:50 Typical RC Details of Pile SE-HAT-STSE-D-324XXXX-00057 * * * * 25-Mar-14
7 SE-GAL-CCW-S-324XXS0-00002 SE GAL CC W S 324 XX S0 00002 C B A1 1:50 Vacuum Tunnel Pile Design 750Dia Segment-4 * * * * 7-May-14 18-May-14
8 SE-GAL-STSI-P-324B1S0-00006 SE GAL ST SI P 324 B1 S0 00006 E B A1 1:100 M B- Piles Testing Schedule * * * * 8-May-14 18-May-14 18-May-14
9 SE-GAL-STSB-P-324B1S0-00006 SE GAL ST SB P 324 B1 S0 00006 C B A0 1:100 Pile cap layout (sheet 1 of 5) SE-HAT-STSB-P-324XXXX-00009 18-Sep-14 * * * * 14-Oct-14 6-Nov-14
10 SE-GAL-STSB-P-324B1S1-00007 SE GAL ST SB P 324 B1 S1 00007 C B A1 1:100 Pile cap layout (sheet 2 of 5) SE-HAT-STSB-P-324XX01-00010 18-Sep-14 * * * * 14-Oct-14 6-Nov-14
11 SE-GAL-STSB-P-324B1S2-00008 SE GAL ST SB P 324 B1 S2 00008 C B A1 1:100 Pile cap layout (sheet 3 of 5) SE-HAT-STSB-P-324XX02-00011 17-Sep-14 * * * * 14-Oct-14 6-Nov-14
12 SE-GAL-STSB-P-324B1S3-00009 SE GAL ST SB P 324 B1 S3 00009 C B A1 1:100 Pile cap layout (sheet 4 of 5) SE-HAT-STSB-P-324XX03-00012 12-Jul-14 * * * * 21-Jul-14 23-Jul-14
13 SE-GAL-STSB-P-324B1S4-00010 SE GAL ST SB P 324 B1 S4 00010 C B A1 1:100 Pile cap layout (sheet 5 of 5) SE-HAT-STSB-P-324XX04-00013 16-Sep-14 * * * * 14-Oct-14 6-Nov-14
14 SE-GAL-STSE-D-3240000-00002 SE GAL ST SE D 324 00 00 00002 D B A1 1:100 Typical RC Details of Pile Cap SE-HAT-STSE-D-324XXXX-00058 TO 00062 18-Sep-14 * * * * 22-Jul-14 23-Jul-14 14-Oct-14
15 SE-GAL-STSP-P-324B1S0-00011 SE GAL ST SP P 324 B1 S0 00011 C B A0 1:100 Column axis layout (sheet 1 of 5) SE-HAT-STSP-X-324XXXX-00014 18-Sep-14 * * * * 29-Dec-14 12-Jan-15
16 SE-GAL-STSP-P-324B1S1-00012 SE GAL ST SP P 324 B1 S1 00012 C B A0 1:100 Column axis layout (sheet 2 of 5) SE-HAT-STSP-X-324XX01-00015 18-Sep-14 * * * * 29-Dec-14 12-Jan-15
17 SE-GAL-STSP-P-324B1S2-00013 SE GAL ST SP P 324 B1 S2 00013 C B A0 1:100 Column axis layout (sheet 3 of 5) SE-HAT-STSP-X-324XX02-00016 17-Sep-14 * * * * 29-Dec-14 12-Jan-15
18 SE-GAL-STSP-P-324B1S3-00014 SE GAL ST SP P 324 B1 S3 00014 C B A0 1:100 Column axis layout (sheet 4 of 5) SE-HAT-STSP-X-324XX03-00017 16-Sep-14 * * * * 29-Dec-14 12-Jan-15
19 SE-GAL-STSP-P-324B1S4-00015 SE GAL ST SP P 324 B1 S4 00015 C B A0 1:100 Column axis layout (sheet 5 of 5) SE-HAT-STSP-X-324XX04-00018 16-Sep-14 * * * * 29-Dec-14 12-Jan-15
20 SE-GAL-STSF-P-32400S0-00016 SE GAL ST SF P 324 00 S0 00016 C A0 1:100 Plinth Beam layout (sheet 1 of 5) SE-HAT-STSF-P-32400XX-00019 20-Sep-14
21 SE-GAL-STSF-P-32400S1-00017 SE GAL ST SF P 324 00 S1 00017 D B A0 1:100 Plinth Beam layout (sheet 2 of 5) SEG-1 SE-HAT-STSF-P-32400S1-00020 20-Sep-14 * * * * 10-Dec-14 27-Dec-14 10-Jan-15
22 SE-GAL-STSE-S-32400S1-00001 SE GAL ST SE S 324 00 S1 00001 -- B A0 1:100 Plinth Beam Sections & Details Segment-1 * * * * 10-Jan-15 15-Jan-15
23 SE-GAL-STSE-S-32400S1-00002 SE GAL ST SE S 324 00 S1 00002 D B A0 1:100 Long Section of Plinth Beam (1 OF 4) Seg-1 SE-HAT-STSE-S-32400XX-00064 * * * * 10-Dec-14 27-Dec-14 10-Jan-15
24 SE-GAL-STSE-S-32400S1-00003 SE GAL ST SE S 324 00 S1 00003 -- B A0 1:100 Long Section of Plinth Beam (2 OF 4) Seg-1 * * * * 10-Jan-15 15-Jan-15
25 SE-GAL-STSE-S-32400S1-00004 SE GAL ST SE S 324 00 S1 00004 -- B A0 1:100 Long Section of Plinth Beam (3 OF 4) Seg-1 * * * * 10-Jan-15 15-Jan-15
26 SE-GAL-STSE-S-32400S1-00005 SE GAL ST SE S 324 00 S1 00005 -- B A0 1:100 Long Section of Plinth Beam (4 OF 4) Seg-1 * * * * 10-Jan-15 15-Jan-15
27 SE-GAL-STSF-P-32400S2-00018 SE GAL ST SF P 324 00 S2 00018 D C A0 1:100 Plinth Beam layout (sheet 3 of 5) SEG-2 SE-HAT-STSF-P-32400S2-00021 20-Sep-14 * * * * 18-Jan-15 28-Jan-15 C 8-Feb-15
28 SE-GAL-STSE-S-32400S2-00001 SE GAL ST SE S 324 00 S2 00001 A C A0 1:100 Plinth Beam Sections & Details Segment-2 * * * * 18-Jan-15 28-Jan-15 -- 8-Feb-15 19-Feb-15 C
29 SE-GAL-STSE-S-32400S2-00002 SE GAL ST SE S 324 00 S2 00002 A C A0 1:100 Long Section of Plinth Beam (1 OF 4) Seg-2 * * * * 18-Jan-15 28-Jan-15 -- 8-Feb-15 19-Feb-15 C
30 SE-GAL-STSE-S-32400S2-00003 SE GAL ST SE S 324 00 S2 00003 C C A0 1:100 Long Section of Plinth Beam (2 OF 4) Seg-2 SE-HAT-STSE-S-32400XX-00065 * * * * 18-Jan-15 28-Jan-15 B 8-Feb-15 19-Feb-15 C
31 SE-GAL-STSE-S-32400S2-00004 SE GAL ST SE S 324 00 S2 00004 A C A0 1:100 Long Section of Plinth Beam (3 OF 4) Seg-2 * * * * 18-Jan-15 28-Jan-15 -- 8-Feb-15 19-Feb-15 C
32 SE-GAL-STSE-S-32400S2-00005 SE GAL ST SE S 324 00 S2 00005 A C A0 1:100 Long Section of Plinth Beam (4 OF 4) Seg-2 * * * * 18-Jan-15 28-Jan-15 -- 8-Feb-15 19-Feb-15 C
33 SE-GAL-STSF-P-32400S3-00019 SE GAL ST SF P 324 00 S3 00019 D B A0 1:100 Plinth Beam layout (sheet 4 of 5) SEG-3 SE-HAT-STSF-P-32400S3-00022 20-Sep-14 * * * * 2-Dec-14 15-Dec-14 6-Jan-15
34 SE-GAL-STSE-S-32400S3-00001 SE GAL ST SE S 324 00 S3 00001 D B A0 1:100 Plinth Beam Sections & Details Segment-3 25-Sep-14 * * * * 2-Dec-14 15-Dec-14 6-Jan-15
35 SE-GAL-STSE-S-32400S3-00002 SE GAL ST SE S 324 00 S3 00002 -- B A0 1:25 Long Section of Plinth Beam (1 OF 5) Seg-3 * * * * 6-Jan-15 15-Jan-15 B
36 SE-GAL-STSE-S-32400S3-00003 SE GAL ST SE S 324 00 S3 00003 -- B A0 1:25 Long Section of Plinth Beam (2 OF 5) Seg-3 * * * * 6-Jan-15 15-Jan-15 B
37 SE-GAL-STSE-S-32400S3-00004 SE GAL ST SE S 324 00 S3 00004 B B A0 1:25 Long Section of Plinth Beam (3 OF 5) Seg-3 SE-HAT-STSE-S-32400XX-00066 * * * * 6-Jan-15 15-Jan-15
38 SE-GAL-STSE-S-32400S3-00005 SE GAL ST SE S 324 00 S3 00005 -- B A0 1:25 Long Section of Plinth Beam (4 OF 5) Seg-3 * * * * 6-Jan-15 15-Jan-15 B
39 SE-GAL-STSE-S-32400S3-00006 SE GAL ST SE S 324 00 S3 00006 -- B A0 1:25 Long Section of Plinth Beam (5 OF 5) Seg-3 * * * * 6-Jan-15 15-Jan-15 B
40 SE-GAL-STSF-P-32400S4-00020 SE GAL ST SF P 324 00 S4 00020 C B A0 1:100 Plinth beam layout (sheet 5 of 5) SEG-4 SE-HAT-STSF-P-32400S4-00023 20-Sep-14 * * * * 31-Dec-14 15-Jan-15 B
41 SE-GAL-STSE-S-32400S4-00001 SE GAL ST SE S 324 00 S4 00001 -- B A0 1:25 Plinth Beam Sections and Details Segment-4 22-Sep-14 * * * * 31-Dec-14 15-Jan-15 B
Page 17 of 151
DRAWING CONTROL SCHEDULE (IFC DRAWING)
Project: DESIGN & BUILD INFLIGHT CATERING BUILDING AT MUSCAT
Customer: MINISTRY OF TRANSPORT & COMMUNICATION
Managament Consultant: ADPI Discipline : ARCHITECTURAL / STRUCTURAL
Coordination Revision -- Revision - A Revision - B Revision - C Revision - D
Zone / Segm.
Drawing No.
Floor / Level
Final Status
Participant
Discipline
Sub-Disci
Building
Planned
Type
Size
Rev
Site
Sl No. Drawing No Scale Description Customer/Consult. Drg. Ref.
Issued Date AC EL BMS PL Issued Recd. Issued Recd. Issued Recd. Issued Recd. Issued
Status
Status
Status
Status
42 SE-GAL-STSE-S-32400S4-00002 SE GAL ST SE S 324 00 S4 00002 -- B A0 1:25 Long Section of Plinth Beam (1 OF 5) Seg-4 * * * * 31-Dec-14 15-Jan-15 B
43 SE-GAL-STSE-S-32400S4-00003 SE GAL ST SE S 324 00 S4 00003 -- B A0 1:25 Long Section of Plinth Beam (2 OF 5) Seg-4 * * * * 31-Dec-14 15-Jan-15 B
44 SE-GAL-STSE-S-32400S4-00004 SE GAL ST SE S 324 00 S4 00004 -- B A0 1:25 Long Section of Plinth Beam (3 OF 5) Seg-4 * * * * 31-Dec-14 15-Jan-15 B
45 SE-GAL-STSE-S-32400S4-00005 SE GAL ST SE S 324 00 S4 00005 B B A0 1:25 Long Section of Plinth Beam (4 OF 5) Seg-4 SE-HAT-STSE-S-32400XX-00067 * * * * 31-Dec-14 15-Jan-15 B
46 SE-GAL-STSE-S-32400S4-00006 SE GAL ST SE S 324 00 S4 00006 -- B A0 1:25 Long Section of Plinth Beam (5 OF 5) Seg-4 * * * * 31-Dec-14 15-Jan-15 B
47 SE-GAL-STSE-H-3240000-00001 SE GAL ST SE S 324 00 00 00001 C B A0 1:50 Column schedule & Lift wall details SE-HAT-STSE-H-324XXXX-00056 27-Sep-14 * * * * 21-Dec-14 1-Jan-15 B
48 SE-GAL-STSE-U-324ETAE-00001 SE GAL ST SE U 324 ET AE 00001 C B A0 1:100 External sections & details (sheet 1 of 8) SE-HAT-STSE-U-324XXXX-00044 28-Sep-14 * * * * 29-Jan-15 16-Feb-15 B
49 SE-GAL-STSE-U-324ETAE-00002 SE GAL ST SE U 324 ET AE 00002 C B A0 1:100 External sections & details (sheet 2 of 8) SE-HAT-STSE-U-324XXXX-00045 28-Sep-14 * * * * 29-Jan-15 16-Feb-15 B
50 SE-GAL-STSE-U-324ETAE-00003 SE GAL ST SE U 324 ET AE 00003 C B A0 1:100 External sections & details (sheet 3 of 8) SE-HAT-STSE-U-324XXXX-00046 28-Sep-14 * * * * 15-Feb-15 28-Feb-15 B
51 SE-GAL-STSE-U-324ETAE-00004 SE GAL ST SE U 324 ET AE 00004 C B A0 1:100 External sections & details (sheet 4 of 8) Vacuum Tunnel SE-HAT-STSE-U-324XXXX-00047 28-Sep-14 * * * * 24-Nov-14 4-Dec-14 18-Jan-15
52 SE-GAL-STSE-U-324ETAE-00005 SE GAL ST SE U 324 ET AE 00005 C B A0 1:100 External sections & details (sheet 5 of 8) Walk Through Tunnel SE-HAT-STSE-U-324XXXX-00048 28-Sep-14 * * * * 6-Nov-14 12-Nov-14 24-Nov-14
53 SE-GAL-STSE-U-324ETAE-00006 SE GAL ST SE U 324 ET AE 00006 C A0 1:100 External sections & details (sheet 6 of 8) SE-HAT-STSE-U-324XXXX-00049 28-Sep-14
54 SE-GAL-STSE-U-324ETAE-00007 SE GAL ST SE U 324 ET AE 00007 C B A0 1:100 External sections & details (sheet 7 of 8) Service Tunnel 28-Sep-14 * * * * 20-Dec-14 1-Jan-15 B
55 SE-GAL-STSE-U-324ETAE-00008 SE GAL ST SE U 324 ET AE 00008 C B A0 1:100 External sections & details (sheet 8 of 8) Vacuum Tunnel 28-Sep-14 * * * * 24-Nov-14 4-Dec-14 B
56 SE-GAL-STSE-U-324ETAE-00010 SE GAL ST SE U 324 ET AE 00010 C B A1 1:50 Manhole detail 28-Sep-14 * * * * 11-Dec-14 18-Dec-14 31-Dec-14
57 SE-GAL-STSE-U-324ETAE-00011 SE GAL ST SE U 324 ET AE 00011 -- B A0 1:100 Service Tunnel Roof Layout 1-Dec-14 * * * * 20-Dec-14 1-Jan-15 B
58 SE-GAL-STSE-U-324ETAE-00012 SE GAL ST SE U 324 ET AE 00012 -- S A0 1:100 Scissor Lift- Foundation Details 2-Dec-14 * * * * 26-Dec-14 10-Feb-15 C 22-Feb-15 S
GROUND FLOOR
59 SE-GAL-STSE-D-3240000-00003 SE GAL ST SE D 324 00 00 00003 C A0 Details of staircase no. -01 (sheet 1 of 2) SE-HAT-STSE-D-324XXXX-00050 4-Oct-14
60 SE-GAL-STSE-D-3240000-00004 SE GAL ST SE D 324 00 00 00004 C A0 Details of staircase no. -01 (sheet 2 of 2) SE-HAT-STSE-D-324XXXX-00051 4-Oct-14
61 SE-GAL-STSE-D-3240000-00005 SE GAL ST SE D 324 00 00 00005 C A0 Details of staircase no. -02 SE-HAT-STSE-D-324XXXX-00052 4-Oct-14
62 SE-GAL-STSE-D-3240000-00006 SE GAL ST SE D 324 00 00 00006 C A0 Details of staircase no. -03 (sheet 1 of 2) 4-Oct-14
63 SE-GAL-STSE-D-3240000-00007 SE GAL ST SE D 324 00 00 00007 C A0 Details of staircase no. -03 (sheet 2 of 2) 4-Oct-14
64 SE-GAL-STSE-D-3240000-00008 SE GAL ST SE D 324 00 00 00008 C A0 Details of staircase no. -04 SE-HAT-STSE-D-324XXXX-00053 4-Oct-14
65 SE-GAL-STSE-D-3240000-00009 SE GAL ST SE D 324 00 00 00009 C A0 Details of staircase no. -05 SE-HAT-STSE-D-324XXXX-00054 6-Oct-14
67 SE-GAL-STSE-D-3240000-00011 SE GAL ST SE D 324 00 00 00011 C A0 Details of staircase no. -07 SE-HAT-STSE-D-324XXXX-00055 6-Oct-14
FIRST FLOOR
68 SE-GAL-STSF-P-32401S0-00021 SE GAL ST SF P 324 01 S0 00021 C A0 General arrangement at level 1 (sheet 1 of 5) SE-HAT-STSF-P-32401XX-00024 24-Sep-14
69 SE-GAL-STSF-P-32401S1-00022 SE GAL ST SF P 324 01 S1 00022 C A0 General arrangement at level 1 (sheet 2 of 5) Seg-1 SE-HAT-STSF-P-32401S1-00025 24-Sep-14
76 SE-GAL-STSF-P-32401S2-00023 SE GAL ST SF P 324 01 S2 00023 C A0 General arrangement at level 1 (sheet 3 of 5) Seg-2 SE-HAT-STSF-P-32401S2-00026 24-Sep-14
83 SE-GAL-STSF-P-32401S3-00024 SE GAL ST SF P 324 01 S3 00024 C A0 General arrangement at level 1 (sheet 4 of 5) Seg-3 SE-HAT-STSF-P-32401S3-00027 24-Sep-14
90 SE-GAL-STSF-P-32401S4-00025 SE GAL ST SF P 324 01 S4 00025 C A0 General arrangement at level 1 (sheet 5 of 5) Seg-4 SE-HAT-STSF-P-32401S4-00028 24-Sep-14
Page 18 of 151
DRAWING CONTROL SCHEDULE (IFC DRAWING)
Project: DESIGN & BUILD INFLIGHT CATERING BUILDING AT MUSCAT
Customer: MINISTRY OF TRANSPORT & COMMUNICATION
Managament Consultant: ADPI Discipline : ARCHITECTURAL / STRUCTURAL
Coordination Revision -- Revision - A Revision - B Revision - C Revision - D
Zone / Segm.
Drawing No.
Floor / Level
Final Status
Participant
Discipline
Sub-Disci
Building
Planned
Type
Size
Rev
Site
Sl No. Drawing No Scale Description Customer/Consult. Drg. Ref.
Issued Date AC EL BMS PL Issued Recd. Issued Recd. Issued Recd. Issued Recd. Issued
Status
Status
Status
Status
93 SE-GAL-STSE-S-32401S4-00003 SE GAL ST SE S 324 01 S4 00003 -- A0 Long Section of Beam (2 OF 5) Seg-4
ROOF FLOOR
97 SE-GAL-STSF-P-324R1S0-00026 SE GAL ST SF P 324 R1 S0 00026 C A0 General arrangement at roof 1 (sheet 1 of 5) SE-HAT-STSA-P-32402XX-00034 26-Sep-14
98 SE-GAL-STSF-P-324R1S1-00027 SE GAL ST SF P 324 R1 S1 00027 C A0 General arrangement at roof 1 (sheet 2 of 5) SE-HAT-STSA-P-32402S1-00035 26-Sep-14
105 SE-GAL-STSF-P-324R1S2-00028 SE GAL ST SF P 324 R1 S2 00028 C A0 General arrangement at roof 1 (sheet 3 of 5) SE-HAT-STSA-P-32402S2-00036 26-Sep-14
106 SE-GAL-STSE-S-324R1S2-00001 SE GAL ST SE S 324 R1 S2 00001 -- A0 Beam Sections & Details Seg-2
112 SE-GAL-STSF-P-324R1S3-00029 SE GAL ST SF P 324 R1 R3 00029 C A0 General arrangement at roof 1 (sheet 4 of 5) SE-HAT-STSA-P-32402S3-00037 26-Sep-14
113 SE-GAL-STSE-S-324R1S3-00001 SE GAL ST SE S 324 R1 R3 00001 -- A0 Beam Sections & Details Seg-3
119 SE-GAL-STSF-P-324R1S4-00030 SE GAL ST SF P 324 R1 S4 00030 C A0 General arrangement at roof 1 (sheet 5 of 5) SE-HAT-STSA-P-32402S4-00038 26-Sep-14
120 SE-GAL-STSE-S-324R1S4-00001 SE GAL ST SE S 324 R1 S4 00001 -- A0 Beam Sections & Details Seg-4
UPPER ROOF
126 SE-GAL-STSF-P-324R2S0-00031 SE GAL ST SF P 324 R2 S0 00031 C A0 General arrangement at roof 2 SE-HAT-STSA-P-32403XX-00091 30-Sep-14
127 SE-GAL-STSF-P-324R2S1-00032 SE GAL ST SF P 324 R2 S1 00032 C A0 General arrangement at roof 2 (sheet 1 of 3) SE-HAT-STSA-P-32403S1-00092 30-Sep-14
129 SE-GAL-STSE-S-324R2S1-00002 SE GAL ST SE S 324 R2 S1 00002 Long Sections of Roof Beam (Sheet 1 of 2)
130 SE-GAL-STSE-S-324R2S1-00003 SE GAL ST SE S 324 R2 S1 00003 Long Sections of Roof Beam (Sheet 2 of 2)
131 SE-GAL-STSF-P-324R2S3-00033 SE GAL ST SF P 324 R2 S3 00033 C A0 General arrangement at roof 2 (sheet 2 of 3) SE-HAT-STSA-P-32403S2-00093 30-Sep-14
133 SE-GAL-STSE-S-324R2S3-00002 SE GAL ST SE S 324 R2 S3 00002 Long Sections of Roof Beam (Sheet 1 of 2)
134 SE-GAL-STSE-S-324R2S3-00003 SE GAL ST SE S 324 R2 S3 00003 Long Sections of Roof Beam (Sheet 2 of 2)
135 SE-GAL-STSF-P-324R2S4-00034 SE GAL ST SF P 324 R2 S4 00034 C A0 General arrangement at roof 2 (sheet 3 of 3) SE-HAT-STSA-P-32403S3-00094 30-Sep-14
137 SE-GAL-STSE-S-324R2S4-00002 SE GAL ST SE S 324 R2 S4 00002 Long Sections of Roof Beam (Sheet 1 of 2)
138 SE-GAL-STSE-S-324R2S4-00003 SE GAL ST SE S 324 R2 S4 00003 Long Sections of Roof Beam (Sheet 2 of 2)
139 SE-GAL-STSE-D-3240000-00012 SE GAL ST SE D 324 00 00 00012 C A0 Details of Stair Roof SE-HAT-STSE-D-324R0XX-00078 6-Oct-14
TOP OF ROOF
140 SE-GAL-STSF-P-324R3S0-00001 SE GAL ST SF P 324 R3 S0 00001 C A0 General arrangement at roof 3 SE-HAT-STSF-P-32404XX-00079 2-Oct-14
Page 19 of 151
DRAWING CONTROL SCHEDULE (IFC DRAWING)
Project: DESIGN & BUILD INFLIGHT CATERING BUILDING AT MUSCAT
Customer: MINISTRY OF TRANSPORT & COMMUNICATION
Managament Consultant: ADPI Discipline : ARCHITECTURAL / STRUCTURAL
Coordination Revision -- Revision - A Revision - B Revision - C Revision - D
Zone / Segm.
Drawing No.
Floor / Level
Final Status
Participant
Discipline
Sub-Disci
Building
Planned
Type
Size
Rev
Site
Sl No. Drawing No Scale Description Customer/Consult. Drg. Ref.
Issued Date AC EL BMS PL Issued Recd. Issued Recd. Issued Recd. Issued Recd. Issued
Status
Status
Status
Status
143 SE-GAL-STSE-S-324R3S0-00003 SE GAL ST SE S 324 R3 S0 00003 Parapet wall Details
SERVICE BLOCK
BASEMENT
144 SE-GAL-STSI-P-336B1S0-00001 SE GAL ST SI P 336 B1 S0 00001 C B A0 1:100 Pile Layout 06.May.14 08.May.14 B
145 SE-GAL-STSE-D-3360000-00002 SE GAL ST SE D 336 00 00 00002 C B A0 1:100 Typical RC Details of Pile 06.May.14 08.May.14 B
146 SE-GAL-STAS-U-3360000-00001 SE GAL ST AS U 336 00 00 00001 C A0 Service Block Column and Axis Layout SE-HAT-STAS-U-336XXXX-00085 16-Sep-14
147 SE-GAL-STAS-U-3360000-00002 SE GAL ST AS U 336 00 00 00002 E B A0 1:100 Basement Roof Beam-Slab & Plinth Layout Keyplan SE-HAT-STAS-U-336XXXX-00083 16-Sep-14 * * * * 18-Nov-14 4-Dec-14 18-Nov-14
148 SE-GAL-STSE-H-3360000-00001 SE GAL ST SE H 336 00 00 00001 C A0 Column Schedules & Details 16-Jun-14
149 SE-GAL-STSE-U-3360000-00001 SE GAL ST SE U 336 00 00 00001 C B A0 1:25 General Sections 1 of 4 SE-HAT-STSE-U-324XXXX-00087 20-Sep-14 * * * * 28-Sep-14 2-Oct-14 B
150 SE-GAL-STSE-U-3360000-00002 SE GAL ST SE U 336 00 00 00002 -- B A0 1:25 General Sections 2 of 4 20-Sep-14 * * * * 28-Sep-14 2-Oct-14 B
151 SE-GAL-STSE-U-3360000-00003 SE GAL ST SE U 336 00 00 00003 A B A0 1:25 General Sections 3 of 4 20-Sep-14 * * * * 18-Nov-14 4-Dec-14 B
152 SE-GAL-STSE-U-3360000-00004 SE GAL ST SE U 336 00 00 00004 A B A0 1:25 General Sections 4 of 4 20-Sep-14 * * * * 18-Nov-14 4-Dec-14 B
153 SE-GAL-STAS-U-3360000-00005 SE GAL ST AS U 336 00 00 00005 E B A0 1:100 Beam & Slab Schedule SE-HAT-STAS-U-336XXXX-00083 18-Sep-14 * * * * 18-Nov-14 4-Dec-14 18-Nov-14
154 SE-GAL-STSE-U-3360000-00006 SE GAL ST SE U 336 00 00 00006 -- B A0 1:25 Plinth Beam Details SE-HAT-STAS-U-336XXXX-00086 20-Sep-14 * * * * 18-Nov-14 4-Dec-14
GROUND FLOOR
155 SE-GAL-STSE-U-3360000-00008 SE GAL ST SE U 336 00 00 00008 B B A0 Reinforcement detail of Ground floor slab sheet 01 of 03 5-Jan-15 * * * * 11-Jan-15 15-Jan-15 26-Jan-15 7-Feb-15 B 15-Feb-15 28-Feb-15 B
156 SE-GAL-STSE-U-3360000-00009 SE GAL ST SE U 336 00 00 00009 B B A0 Reinforcement detail of Ground floor slab sheet 02 of 03 5-Jan-15 * * * * 11-Jan-15 15-Jan-15 26-Jan-15 7-Feb-15 B 4-Feb-15 19-Feb-15 B
157 SE-GAL-STSE-U-3360000-00010 SE GAL ST SE U 336 00 00 00010 A B A0 Reinforcement detail of Ground floor slab sheet 02 of 03 5-Jan-15 * * * * 11-Jan-15 15-Jan-15 18-Jan-15 24-Jan-15 B
158 SE-GAL-STSE-S-3360000-00001 SE GAL ST SE S 336 00 00 00001 -- B A0 Long Sections of Plinth Beam * * * * 11-Jan-15 15-Jan-15 B
159 SE-GAL-STSE-S-3360000-00002 SE GAL ST SE S 336 00 00 00002 -- B A0 Long Sections of Plinth Beam * * * * 11-Jan-15 15-Jan-15 B
160 SE-GAL-STSE-S-3360000-00003 SE GAL ST SE S 336 00 00 00003 -- B A0 Long Sections of Plinth Beam * * * * 11-Jan-15 15-Jan-15 B
161 SE-GAL-STSE-S-3360000-00004 SE GAL ST SE S 336 00 00 00004 -- B A0 Long Sections of Plinth Beam * * * * 11-Jan-15 15-Jan-15 B
162 SE-GAL-STSE-S-3360000-00005 SE GAL ST SE S 336 00 00 00005 -- B A0 Long Sections of Plinth Beam * * * * 11-Jan-15 15-Jan-15 B
163 SE-GAL-STSE-S-3360000-00006 SE GAL ST SE S 336 00 00 00006 -- B A0 Long Sections of Plinth Beam * * * * 11-Jan-15 15-Jan-15 B
Page 20 of 151
DRAWING CONTROL SCHEDULE (IFC DRAWING)
Project: DESIGN & BUILD INFLIGHT CATERING BUILDING AT MUSCAT
Customer: MINISTRY OF TRANSPORT & COMMUNICATION
Managament Consultant: ADPI Discipline : ARCHITECTURAL / STRUCTURAL
Coordination Revision -- Revision - A Revision - B Revision - C Revision - D
Zone / Segm.
Drawing No.
Floor / Level
Final Status
Participant
Discipline
Sub-Disci
Building
Planned
Type
Size
Rev
Site
Sl No. Drawing No Scale Description Customer/Consult. Drg. Ref.
Issued Date AC EL BMS PL Issued Recd. Issued Recd. Issued Recd. Issued Recd. Issued
Status
Status
Status
Status
164 SE-GAL-STSE-S-3360000-00007 SE GAL ST SE S 336 00 00 00007 -- B A0 Long Sections of Plinth Beam * * * * 11-Jan-15 15-Jan-15 B
165 SE-GAL-STSE-S-3360000-00008 SE GAL ST SE S 336 00 00 00008 -- B A0 Long Sections of Plinth Beam * * * * 11-Jan-15 15-Jan-15 B
166 SE-GAL-STSE-S-3360000-00009 SE GAL ST SE S 336 00 00 00009 -- B A0 Long Sections of Plinth Beam * * * * 11-Jan-15 15-Jan-15 B
167 SE-GAL-STSE-S-3360000-00010 SE GAL ST SE S 336 00 00 00010 -- B A0 Long Sections of Plinth Beam * * * * 11-Jan-15 15-Jan-15 B
168 SE-GAL-STSE-S-3360000-00011 SE GAL ST SE S 336 00 00 00011 -- B A0 Long Sections of Plinth Beam * * * * 11-Jan-15 15-Jan-15 B
169 SE-GAL-STSE-S-3360000-00012 SE GAL ST SE S 336 00 00 00012 -- B A0 Long Sections of Plinth Beam * * * * 11-Jan-15 15-Jan-15 B
170 SE-GAL-STSE-S-3360000-00013 SE GAL ST SE S 336 00 00 00013 -- B A0 Long Sections of Plinth Beam * * * * 11-Jan-15 15-Jan-15 B
171 SE-GAL-STSE-S-3360000-00014 SE GAL ST SE S 336 00 00 00014 -- B A0 Long Sections of Plinth Beam * * * * 11-Jan-15 15-Jan-15 B
ROOF FLOOR
172 SE-GAL-STAS-U-336R0S0-00011 SE GAL ST AS U 336 R0 S0 00011 -- S A0 Reinforcement detail of Ground Floor Roof Slab & Beam * * * * 22-Feb-15 S
173 SE-GAL-STSE-S-3360000-00015 SE GAL ST SE S 336 00 00 00015 -- S A0 Roof Beam Short Section Details * * * * 22-Feb-15 S
174 SE-GAL-STSE-S-3360000-00016 SE GAL ST SE S 336 00 00 00016 -- S A0 Long Sections of Roof Beams (Sheet 1 of 5) * * * * 22-Feb-15 S
175 SE-GAL-STSE-S-3360000-00017 SE GAL ST SE S 336 00 00 00017 -- S A0 Long Sections of Roof Beams * * * * 22-Feb-15 S
176 SE-GAL-STSE-S-3360000-00018 SE GAL ST SE S 336 00 00 00018 -- S A0 Long Sections of Roof Beams * * * * 22-Feb-15 S
177 SE-GAL-STSE-S-3360000-00019 SE GAL ST SE S 336 00 00 00019 -- S A0 Long Sections of Roof Beams * * * * 22-Feb-15 S
178 SE-GAL-STSE-S-3360000-00020 SE GAL ST SE S 336 00 00 00020 -- S A0 Long Sections of Roof Beams * * * * 22-Feb-15 S
179 SE-GAL-STSE-S-3360000-00021 SE GAL ST SE S 336 00 00 00021 A0 Miscellaneous Details (Parapet wall details etc.)
LPG GAS TANK, BULK FUEL TANK & ROP GUARD ROOM etc
180 SE-GAL-STAS-U-3360000-00013 SE GAL ST AS U 336 00 00 00013 A0 1:30 LPG Gas tank structural details
181 SE-GAL-STAS-U-3360000-00014 SE GAL ST AS U 336 00 00 00014 A0 1:30 Bulk Fuel tank structural details details
182 SE-GAL-STAS-U-3360000-00015 SE GAL ST AS U 336 00 00 00015 A0 1:30 Pump Room for Bulk Fuel Tank Foundation, Roof Beam & Slab layout
ROP Guard room at Landside Service Road Entry Foundation, Roof Beam & Slab
183 SE-GAL-STAS-U-3360000-00016 SE GAL ST AS U 336 00 00 00016 A0 1:30 Layout
GUARD HOUSES
GROUND FLOOR
189 SE-GAL-STAS-U-3690000-00001 SE GAL ST AS U 369 00 00 00001 C B A0 Foundation plan & column axis layout (for Gate & Air side Guard room) SE-HAT-STSE-U-369XXXX-00081 2-Oct-14 * * * * 7-Dec-14 23-Dec-14 B
190 SE-GAL-STAS-U-3690000-00002 SE GAL ST AS U 369 00 00 00002 D B A0 Air side Ent.gate & Guard Room Plinth Beam and slab layout & Detail SE-HAT-STSE-U-369XXXX-00082 2-Oct-14 * * * * 25-Mar-14 9-Apr-14 B 29-Jan-15
191 SE-GAL-STSE-S-3690000-00001 SE GAL ST SE S 369 00 00 00001 -- B A0 Air side - Long Sections of Plinth Beam (1 of 4) * * * * 29-Jan-15 9-Feb-15 B
192 SE-GAL-STSE-S-3690000-00002 SE GAL ST SE S 369 00 00 00002 -- B A0 Air side - Long Sections of Plinth Beam (2 of 4) * * * * 29-Jan-15 9-Feb-15 B
193 SE-GAL-STSE-S-3690000-00003 SE GAL ST SE S 369 00 00 00003 -- B A0 Air side - Long Sections of Plinth Beam (3 of 4) * * * * 29-Jan-15 9-Feb-15 B
194 SE-GAL-STSE-S-3690000-00004 SE GAL ST SE S 369 00 00 00004 -- B A0 Air side - Long Sections of Plinth Beam (4 of 4) * * * * 29-Jan-15 9-Feb-15 B
195 SE-GAL-STAS-U-3690000-00003 SE GAL ST AS U 369 00 00 00003 C B A0 Foundation plan & column axis layout (for Gate & Land side Guard room) SE-HAT-STSE-U-369XXXX-00081 2-Oct-14 * * * * 7-Dec-14 23-Dec-14 B
196 SE-GAL-STAS-U-3690000-00004 SE GAL ST AS U 369 00 00 00004 C B A0 Land side Ent.gate & Guard Room Plinth Beam and slab layout & Detail SE-HAT-STSE-U-369XXXX-00082 2-Oct-14 * * * * 29-Jan-15 9-Feb-15 B
197 SE-GAL-STSE-S-3690000-00005 SE GAL ST SE S 369 00 00 00005 -- B A0 Land Side - Long Sections of Plinth Beam (1 of 4) * * * * 29-Jan-15 9-Feb-15 B
198 SE-GAL-STSE-S-3690000-00006 SE GAL ST SE S 369 00 00 00006 -- B A0 Land Side - Long Sections of Plinth Beam (2 of 4) * * * * 29-Jan-15 9-Feb-15 B
199 SE-GAL-STSE-S-3690000-00007 SE GAL ST SE S 369 00 00 00007 -- B A0 Land Side - Long Sections of Plinth Beam (3 of 4) * * * * 29-Jan-15 9-Feb-15 B
200 SE-GAL-STSE-S-3690000-00008 SE GAL ST SE S 369 00 00 00008 -- B A0 Land Side - Long Sections of Plinth Beam (4 of 4) * * * * 29-Jan-15 9-Feb-15 B
FIRST FLOOR
201 Land side Ent.gate & Guard Room Roof Beam and slab layout & Detail 26-Feb-15
203 Air side Ent.gate & Guard Room Roof Beam and slab layout & Detail 26-Feb-15
Status Legend: (ARCHITECTURAL) Status Legend: (STRUCTURAL) Drawings Revised and Resubmitted with Code D in IFC
#REF!
A : Approved 3 A : Approved 0 Stage
B : Approved with comments 4 B : Approved with comments 85
After Resubmission Approved with Code B 89
C : Not approved 5 C : Not approved 8
S : Submitted for Approval 7 S : Submitted for Approval 8
Remaining Drawings in IFC Stage #REF!
TOTAL = 19 TOTAL = 101
Page 21 of 151
GEN-QA-000-011-F/02 ; Rev.0
Status
Status
Status
9-Sep-14 B 18-Dec-14 7-Jan-15 C 29-Jan-14 19-Feb-14 C 19-Feb-14 C
1-Jan-15 B
1-Jan-15 B
1-Jan-15 B
1-Jan-15 B
Page 22 of 151
GEN-QA-000-011-F/02 ; Rev.0
Status
Status
Status
Page 23 of 151
GEN-QA-000-011-F/02 ; Rev.0
Status
Status
Status
S
S
S
19-Feb-15 C
Page 24 of 151
GEN-QA-000-011-F/02 ; Rev.0
Status
Status
Status
19-Feb-15 C
19-Feb-15 C
19-Feb-15 A
19-Feb-15 C
19-Feb-15 A
19-Feb-15 A
28-Feb-15 B 28-Feb-15 B
28-Feb-15 C 28-Feb-15 C
4-Feb-15 B
28-Feb-15 C 28-Feb-15 C
15-Jan-15 15-Jan-15 B
15-Jan-15 B
15-Jan-15 15-Jan-15 B
15-Jan-15 B
15-Jan-15 B
15-Jan-15 B
19-Feb-15 C 19-Feb-15 C
19-Feb-15 C
19-Feb-15 C
19-Feb-15 C
19-Feb-15 C
19-Feb-15 C
15-Jan-15 B 15-Jan-15 B
15-Jan-15 B 15-Jan-15 B
15-Jan-15 B
15-Jan-15 B
15-Jan-15 B
15-Jan-15 B
15-Jan-15 B
15-Jan-15 B
15-Jan-15 B
Page 25 of 151
GEN-QA-000-011-F/02 ; Rev.0
Status
Status
Status
15-Jan-15 B
15-Jan-15 B
15-Jan-15 B
15-Jan-15 B
15-Jan-15 B
1-Jan-15 B
16-Feb-15 B
16-Feb-15 B
28-Feb-15 B
28-Jan-15 B B
4-Dec-14 11-Dec-14 27-Dec-14 B B
1-Jan-15 B
B
7-Jan-15 18-Jan-15 24-Jan-15 B 24-Jan-15 B
1-Jan-15 B
S
Page 26 of 151
GEN-QA-000-011-F/02 ; Rev.0
Status
Status
Status
Page 27 of 151
GEN-QA-000-011-F/02 ; Rev.0
Status
Status
Status
08.May.14 B
08.May.14 B
2-Oct-14 B
2-Oct-14 B
4-Dec-14 B
4-Dec-14 B
4-Dec-14 20-Dec-14 21-Dec-14 B 21-Dec-14 B
4-Dec-14 B
28-Feb-15 B
19-Feb-15 B
24-Jan-15 B
15-Jan-15 B
15-Jan-15 B
15-Jan-15 B
15-Jan-15 B
15-Jan-15 B
15-Jan-15 B
Page 28 of 151
GEN-QA-000-011-F/02 ; Rev.0
Status
Status
Status
15-Jan-15 B
15-Jan-15 B
15-Jan-15 B
15-Jan-15 B
15-Jan-15 B
15-Jan-15 B
15-Jan-15 B
15-Jan-15 B
S
S
S
S
S
S
S
23-Dec-14 B
9-Feb-15 B 9-Feb-15 B
9-Feb-15 B
9-Feb-15 B
9-Feb-15 B
9-Feb-15 B
23-Dec-14 B
9-Feb-15 B
9-Feb-15 B
9-Feb-15 B
9-Feb-15 B
9-Feb-15 B
Page 29 of 151
DESIGN & BUILT IN-FLIGHT CATERING FACILITY AT MUSCAT INTERNATIONAL AIRPORT - MC 13.
DRAWING REGISTER
UPDATED ON :
DRAWING CODE REVISION STATUS
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
REJECTED
SUBMITTE
SEGMENT
BUILDING
DRAWING
REVISION
ON HOLD
REV. NOT
FLOOR /
S/NO. DRAWING TITLE / DESCRIPTION
ZONE /
DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
REJECTED
SUBMITTE
SEGMENT
BUILDING
DRAWING
REVISION
ON HOLD
REV. NOT
FLOOR /
S/NO. DRAWING TITLE / DESCRIPTION
ZONE /
DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
78 Fire rated walls and fire stopping details SE GAL AR AE D 324 00 00 00001
SE-GAL-ARAE-D-3240000-00001 IFC 1
79 Wall & corner guard (level 0) SE GAL AR AE P 324 00 S0 00001 SE-GAL-ARAE-P-32400S0-00001 C IFC 1
FIRST FLOOR -----
80 Plan at level 1 SE GAL AR AO P 324 01 S0 00010 SE-GAL-ARAO-P-32401S0-00010 C 2-Jul-15 WF-081486 IFC 1
81 Plan at level 1 (segment 1/4) SE GAL AR AO P 324 01 S1 00011 SE-GAL-ARAO-P-32401S1-00011 C 7-Jul-15 WF-081630 IFC 1
82 Plan at level 1 (segment 2/4) SE GAL AR AO P 324 01 S2 00012 SE-GAL-ARAO-P-32401S2-00012 C 7-Jul-15 WF-081630 IFC 1
83 Plan at level 1 (segment 3/4) SE GAL AR AO P 324 01 S3 00013 SE-GAL-ARAO-P-32401S3-00013 C 7-Jul-15 WF-081630 IFC 1
84 Plan at level 1 (segment 4/4) SE GAL AR AO P 324 01 S4 00014 SE-GAL-ARAO-P-32401S4-00014 C 7-Jul-15 WF-081630 IFC 1
DESIGN & BUILT IN-FLIGHT CATERING FACILITY AT MUSCAT INTERNATIONAL AIRPORT - MC 13.
DRAWING REGISTER
UPDATED ON :
DRAWING CODE REVISION STATUS
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
REJECTED
SUBMITTE
SEGMENT
BUILDING
DRAWING
REVISION
ON HOLD
REV. NOT
FLOOR /
S/NO. DRAWING TITLE / DESCRIPTION
ZONE /
DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
REJECTED
SUBMITTE
SEGMENT
BUILDING
DRAWING
REVISION
ON HOLD
REV. NOT
FLOOR /
S/NO. DRAWING TITLE / DESCRIPTION
ZONE /
DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
147 Plan of Landside ent.gate & Guard room SE GAL AR AA P 369 00 S0 00001 E
SE-GAL-ARAA-P-36900S0-00001 27-May-15 WF-079569 IFC 1
148 Plan of Airside ent.gate & Guard room SE GAL AR AA P 369 00 S0 00003 SE-GAL-ARAA-P-36900S0-00003 D 22-Mar-15 WF-075287 IFC 1
DESIGN & BUILT IN-FLIGHT CATERING FACILITY AT MUSCAT INTERNATIONAL AIRPORT - MC 13.
DRAWING REGISTER
UPDATED ON :
DRAWING CODE REVISION STATUS
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
REJECTED
SUBMITTE
SEGMENT
BUILDING
DRAWING
REVISION
ON HOLD
REV. NOT
FLOOR /
S/NO. DRAWING TITLE / DESCRIPTION
ZONE /
DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
REJECTED
SUBMITTE
SEGMENT
BUILDING
DRAWING
REVISION
ON HOLD
REV. NOT
FLOOR /
S/NO. DRAWING TITLE / DESCRIPTION
ZONE /
DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
APPROVED 5
APPV. WITH COM. 33
ON HOLD 38
REV. & RE-SUB. 9
REJECTED 0
REV. NOT REQUIRED 2
NOT SUBMITTED 70
TOTAL 157
26-Jul-2015
SE-HAT-ARAA-K-324XXXX-00001
SE-HAT-ARAA-P-324XXXX-00002
SE-HAT-ARAA-K-324XXXX-00003
SE-HAT-ARAO-G-324XXXX-00717
SE-HAT-ARAO-G-324XXXX-00718
SE-HAT-LPAL-D-324XXXX-00001
SE-HAT-LPAL-D-324XXXX-00002
SE-HAT-ARAO-P-324XXXX-00006
SE-HAT-ARAO-P-324XXS1-00007
SE-HAT-ARAO-P-324XXS2-00008
SE-HAT-ARAO-P-324XXS4-00009
SE-HAT-ARAO-P-32400XX-00001
SE-HAT-ARAO-P-32400S1-00002
SE-HAT-ARAO-P-32400S2-00003
SE-HAT-ARAO-P-32400S3-00004
SE-HAT-ARAO-P-32400S4-00005
SE-HAT-ARAO-U-32400XX-00401
SE-HAT-ARAO-U-32400S1-00402
SE-HAT-ARAO-U-32400S2-00403
SE-HAT-ARAO-U-32400S3-00404
SE-HAT-ARAO-U-32400S4-00405
SE-HAT-ARAO-U-32400XX-00414
SE-HAT-ARAO-U-32400S1-00415
SE-HAT-ARAO-U-32400S2-00416
SE-HAT-ARAO-U-32400S3-00417
SE-HAT-ARAO-U-32400S4-00418
SE-HAT-ARAW-U-32400XX-00427
26-Jul-2015
SE-HAT-ARAW-U-32400S1-00428
SE-HAT-ARAW-U-32400S2-00429
SE-HAT-ARAW-U-32400S3-00430
SE-HAT-ARAW-U-32400S4-00431
SE-HAT-ARAO-E-324XXXX-00101
SE-HAT-ARAO-S-324XXXX-00201
SE-HAT-ARAO-S-324XXXX-00202
SE-HAT-ARAO-S-324XXXX-00203
SE-HAT-ARAO-S-324XXXX-00204
SE-HAT-ARAO-S-324XXXX-00205
SE-HAT-ARAO-S-324XXXX-00206
SE-HAT-ARAO-D-324XXXX-00301
SE-HAT-ARAO-D-324XXXX-00302
SE-HAT-ARAO-D-324XXXX-00303
SE-HAT-ARAO-D-324XXXX-00304
SE-HAT-ARAO-D-324XXXX-00305
SE-HAT-ARAO-D-324XXXX-00306
SE-HAT-ARAO-D-324XXXX-00307
SE-HAT-ARAO-D-324XXXX-00308
SE-HAT-ARAO-D-324XXXX-00309
SE-HAT-ARAO-H-324XXXX-00501
SE-HAT-ARAO-H-324XXXX-00502
SE-HAT-ARAO-H-324XXXX-00503
SE-HAT-ARAO-H-324XXXX-00505
SE-HAT-ARAO-H-324XXXX-00506
SE-HAT-ARAO-G-324XXXX-00701
SE-HAT-ARAO-G-324XXXX-00701
SE-HAT-ARAO-G-324XXXX-00702
SE-HAT-ARAO-G-324XXXX-00703
SE-HAT-ARAO-G-324XXXX-00704
SE-HAT-ARAO-G-324XXXX-00705
SE-HAT-ARAO-G-324XXXX-00706
SE-HAT-ARAO-G-32400XX-00714
SE-HAT-ARAO-G-324XXXX-00707
SE-HAT-ARAO-G-324XXXX-00708
SE-HAT-ARAO-G-324XXXX-00709
SE-HAT-ARAO-G-324XXXX-00710
SE-HAT-ARAO-G-32400XX-00711
SE-HAT-ARAO-P-32401XX-00010
SE-HAT-ARAO-P-32401S1-00011
SE-HAT-ARAO-P-32401S2-00012
SE-HAT-ARAO-P-32401S3-00013
SE-HAT-ARAO-P-32401S4-00014
26-Jul-2015
SE-HAT-ARAO-U-32401XX-00406
SE-HAT-ARAO-U-32401S1-00407
SE-HAT-ARAO-U-32401S2-00408
SE-HAT-ARAO-U-32401S3-00409
SE-HAT-ARAO-U-32401S4-00410
SE-HAT-ARAO-U-32401XX-00419
SE-HAT-ARAO-U-32401S1-00420
SE-HAT-ARAO-U-32401S2-00421
SE-HAT-ARAO-U-32401S3-00422
SE-HAT-ARAO-U-32401S4-00423
SE-HAT-ARAW-U-32401XX-00432
SE-HAT-ARAW-U-32401S1-00433
SE-HAT-ARAW-U-32401S2-00434
SE-HAT-ARAW-U-32401S3-00435
SE-HAT-ARAW-U-32401S4-00436
SE-HAT-ARAO-G-32401XX-00715
SE-HAT-ARAO-G-32401XX-00712
SE-HAT-ARAO-P-32402XX-00015
SE-HAT-ARAO-P-32402S1-00016
SE-HAT-ARAO-P-32402S2-00017
SE-HAT-ARAO-P-32402S3-00018
SE-HAT-ARAO-P-32402S4-00019
SE-HAT-ARAO-U-32402XX-00411
SE-HAT-ARAO-U-32402S1-00412
SE-HAT-ARAO-U-32402S3-00413
SE-HAT-ARAO-U-32402S4-00440
SE-HAT-ARAO-U-32402XX-00424
SE-HAT-ARAO-U-32402S1-00425
SE-HAT-ARAW-U-32402XX-00437
SE-HAT-ARAW-U-32402S1-00438
SE-HAT-ARAW-U-32402S3-00439
26-Jul-2015
SE-HAT-ARAW-U-32402S4-00441
SE-HAT-ARAO-G-32402XX-00716
SE-HAT-ARAO-G-32402XX-00713
SE-HAT-ARAO-U-32403XX-00444
SE-HAT-ARAO-U-32403S1-00445
SE-HAT-ARAW-U-32403XX-00442
SE-HAT-ARAW-U-32403S1-00443
SE-HAT-ARAA-P-336XXXX-00009
SE-HAT-ARAA-E-336XXXX-00010
SE-HAT-ARAA-H-336XXXX-00011
SE-HAT-ARAA-P-369XXXX-00003
SE-HAT-ARAA-P-369XXXX-00005
26-Jul-2015
SE-HAT-ARAA-E-369XXXX-00007
SE-HAT-ARAA-H-369XXXX-00008
SE-HAT-ARAA-E-369XXXX-00007
SE-HAT-ARAA-P-369XXXX-00004
SE-HAT-ARAA-P-369XXXX-00006
26-Jul-2015
PARTICIPAN
APPV. WITH
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
PARTICIPAN
APPV. WITH
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
PARTICIPAN
APPV. WITH
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
PARTICIPAN
APPV. WITH
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
PARTICIPAN
APPV. WITH
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
PARTICIPAN
APPV. WITH
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
APPROVED 0
APPV. WITH COM. 116
ON HOLD 12
REV. & RE-SUB. 9
REJECTED 0
REV. NOT REQUIRED 0
NOT SUBMITTED 64
TOTAL 201
26-Jul-2015
SE-HAT-STAS-G-324XXXX-00001
SE-HAT-STAS-G-324XXXX-00002
SE-HAT-STAS-G-324XXXX-00003
SE-HAT-STSI-P-324XXXX-00004
SE-HAT-STSE-D-324XXXX-00057
SE-HAT-STSB-P-324XXXX-00009
SE-HAT-STSB-P-324XX01-00010
SE-HAT-STSB-P-324XX02-00011
SE-HAT-STSB-P-324XX03-00012
SE-HAT-STSB-P-324XX04-00013
SE-HAT-STSE-D-324XXXX-00058 TO 00062
SE-HAT-STSP-X-324XXXX-00014
SE-HAT-STSP-X-324XX01-00015
SE-HAT-STSP-X-324XX02-00016
SE-HAT-STSP-X-324XX03-00017
SE-HAT-STSP-X-324XX04-00018
SE-HAT-STSF-P-32400XX-00019
SE-HAT-STSF-P-32400S1-00020
SE-HAT-STSE-S-32400XX-00064
SE-HAT-STSF-P-32400S2-00021
SE-HAT-STSE-S-32400XX-00065
SE-HAT-STSF-P-32400S3-00022
SE-HAT-STSE-S-32400XX-00066
SE-HAT-STSF-P-32400S4-00023
SE-HAT-STSE-S-32400XX-00067
SE-HAT-STSE-H-324XXXX-00056
26-Jul-2015
SE-HAT-STSE-U-324XXXX-00044
SE-HAT-STSE-U-324XXXX-00045
SE-HAT-STSE-U-324XXXX-00046
SE-HAT-STSE-U-324XXXX-00047
SE-HAT-STSE-U-324XXXX-00048
SE-HAT-STSE-U-324XXXX-00049
SE-HAT-STSE-D-324XXXX-00050
SE-HAT-STSE-D-324XXXX-00051
SE-HAT-STSE-D-324XXXX-00052
SE-HAT-STSE-D-324XXXX-00053
SE-HAT-STSE-D-324XXXX-00054
SE-HAT-STSE-D-324XXXX-00055
SE-HAT-STSF-P-32401XX-00024
SE-HAT-STSF-P-32401S1-00025
SE-HAT-STSF-P-32401S2-00026
SE-HAT-STSF-P-32401S3-00027
SE-HAT-STSF-P-32401S4-00028
26-Jul-2015
SE-HAT-STSA-P-32402XX-00034
SE-HAT-STSA-P-32402S1-00035
SE-HAT-STSA-P-32402S2-00036
SE-HAT-STSA-P-32402S3-00037
SE-HAT-STSA-P-32402S4-00038
SE-HAT-STSA-P-32403XX-00091
SE-HAT-STSA-P-32403S1-00092
SE-HAT-STSA-P-32403S2-00093
26-Jul-2015
SE-HAT-STSA-P-32403S3-00094
SE-HAT-STSE-D-324R0XX-00078
SE-HAT-STSF-P-32404XX-00079
SE-HAT-STAS-U-336XXXX-00085
SE-HAT-STAS-U-336XXXX-00083
SE-HAT-STSE-U-324XXXX-00087
SE-HAT-STAS-U-336XXXX-00083
SE-HAT-STAS-U-336XXXX-00086
26-Jul-2015
SE-HAT-STSE-U-369XXXX-00081
SE-HAT-STSE-U-369XXXX-00082
SE-HAT-STSE-U-369XXXX-00081
SE-HAT-STSE-U-369XXXX-00082
26-Jul-2015
PARTICIPAN
APPV. WITH
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
PARTICIPAN
APPV. WITH
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
PARTICIPAN
APPV. WITH
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
PARTICIPAN
APPV. WITH
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
PARTICIPAN
APPV. WITH
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
PARTICIPAN
APPV. WITH
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
PARTICIPAN
APPV. WITH
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
PARTICIPAN
APPV. WITH
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
PARTICIPAN
APPV. WITH
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
PARTICIPAN
APPV. WITH
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
APPROVED 0
APPV. WITH COM. 316
ON HOLD 0
REV. & RE-SUB. 0
REJECTED 0
REV. NOT REQUIRED 0
NOT SUBMITTED 0
TOTAL 316
26-Jul-2015
SE-HAT-MCAM-H-324XXXX-00101
SE-HAT-MCAM-P-324XXXX-00125
SE-HAT-MCAM-P-32400XX-00102
SE-HAT-MCAM-P-32400S1-00103
SE-HAT-MCAM-P-32400S2-00104
SE-HAT-MCAM-P-32400S3-00105
SE-HAT-MCAM-P-32400S4-00106
SE-HAT-MCAM-P-32401XX-00107
SE-HAT-MCAM-P-32401S1-00108
SE-HAT-MCAM-P-32401S2-00109
SE-HAT-MCAM-P-32401S3-00110
SE-HAT-MCAM-P-32401S4-00111
SE-HAT-MCAM-P-32402XX-00112
SE-HAT-MCAM-P-32402S1-00130
SE-HAT-MCAM-P-32402S2-00131
SE-HAT-MCAM-P-32402S3-00132
SE-HAT-MCAM-P-32402S4-00113
SE-HAT-MCAM-P-324R0S4-00114
SE-HAT-MCAM-H-324XXXX-00115
SE-HAT-MCAM-H-324XXXX-00116
SE-HAT-MCAM-H-324XXXX-00117
SE-HAT-MCAM-H-324XXXX-00118
SE-HAT-MCAM-H-324XXXX-00119
SE-HAT-MCAM-H-324XXXX-00120
SE-HAT-MCAM-D-324XXXX-00123
SE-HAT-MCAM-D-324XXXX-00124
*
26-Jul-2015
SE-HAT-PHXX-P-324XXXX-00102
SE-HAT-PHXX-P-324XXXX-00103
SE-HAT-PHXX-P-324XXXX-00103
SE-HAT-PHXX-P-32400XX-00104
SE-HAT-PHXX-P-32400S1-00105
SE-HAT-PHXX-P-32400S2-00106
SE-HAT-PHXX-P-32400S3-00107
SE-HAT-PHXX-P-32400S4-00108
SE-HAT-PHXX-P-32401XX-00109
SE-HAT-PHXX-P-32401S1-00110
SE-HAT-PHXX-P-32401S2-00111
SE-HAT-PHXX-P-32401S3-00112
SE-HAT-PHXX-P-32401S4-00113
SE-HAT-PHXX-P-32402XX-00114
SE-HAT-PHXX-P-32402S1-00115
SE-HAT-PHXX-P-32402S2-00116
SE-HAT-PHXX-P-32402S3-00117
SE-HAT-PHXX-P-32402S4-00118
SE-HAT-PHXX-P-324R0XX-00119
SE-HAT-PHXX-P-324R0S1-00128
SE-HAT-PHXX-P-324R0S1-00129
SE-HAT-PHXX-P-324R0S1-00130
SE-HAT-PHXX-P-324R0S1-00131
SE-HAT-PHXX-P-32403XX-00127
*
*
SE-HAT-PLAP-P-32400XX-00101
SE-HAT-PLAP-P-32400S1-00102
SE-HAT-PLAP-P-32400S1-00103
SE-HAT-PLAP-P-32400S1-00104
SE-HAT-PLAP-P-32400S1-00105
SE-HAT-PLAP-P-32400XX-00113
SE-HAT-PLAP-P-32400XX-00113
SE-HAT-PLAP-P-32401XX-00106
26-Jul-2015
SE-HAT-PLAP-P-32401S1-00107
SE-HAT-PLAP-P-32401S1-00108
SE-HAT-PLAP-P-32401S1-00109
SE-HAT-PLAP-P-32401S1-00110
SE-HAT-PLAP-P-32401S2-00114
SE-HAT-PLAP-P-32401S4-00115
SE-HAT-PLAP-P-32401S4-00115
SE-HAT-PLAP-P-32402XX-00111
SE-HAT-PLAP-P-32402XX-00112
SE-HAT-PLAP-P-32402S4-00116
SE-HAT-PLAP-P-32403XX-00122
SE-HAT-PLAP-H-336XXXX-00121
SE-HAT-PHXX-D-324XXXX-00117
SE-HAT-UTAU-P-32400XX-00101
SE-HAT-UTAU-P-32401XX-00106
SE-HAT-UTAU-P-32401S1-00107
SE-HAT-UTAU-P-32401S4-00109
SE-HAT-UTAU-P-32402XX-00110
SE-HAT-UTAU-H-324XXXX-00112
SE-HAT-UTAU-H-324XXXX-00124
SE-HAT-UTAU-P-32400XX-00101
SE-HAT-UTAU-P-32400S1-00102
SE-HAT-UTAU-P-32400S2-00103
SE-HAT-UTAU-P-32400S3-00104
SE-HAT-UTAU-P-32400S4-00105
SE-HAT-UTAU-P-32401XX-00106
SE-HAT-UTAU-P-32401S1-00107
SE-HAT-UTAU-P-32401S2-00108
SE-HAT-UTAU-P-32401S3-00123
SE-HAT-UTAU-P-32401S4-00109
SE-HAT-UTAU-P-32402XX-00110
26-Jul-2015
SE-HAT-UTAU-P-32402XX-00111
SE-HAT-UTAU-P-32400XX-00113
SE-HAT-UTAU-P-32400S1-00114
SE-HAT-UTAU-P-32400S2-00115
SE-HAT-UTAU-P-32400S3-00116
SE-HAT-UTAU-P-32400S4-00117
SE-HAT-UTAU-P-32401XX-00118
SE-HAT-UTAU-P-32401S1-00119
SE-HAT-UTAU-P-32401S2-00120
SE-HAT-UTAU-P-32401S3-00121
SE-HAT-UTAU-D-324XXXX-00122
SE-HAT-FPAF-P-324XXXX-00103
*
SE-HAT-FPAF-P-32400XX-00104
SE-HAT-FPAF-P-32400S1-00105
SE-HAT-FPAF-P-32400S2-00106
SE-HAT-FPAF-P-32400S3-00107
SE-HAT-FPAF-P-32400S4-00108
SE-HAT-FPAF-P-32401XX-00114
SE-HAT-FPAF-P-32401S1-00115
SE-HAT-FPAF-P-32401S1-00116
SE-HAT-FPAF-P-32401S1-00117
SE-HAT-FPAF-P-32401S1-00118
SE-HAT-FPAF-P-32402XX-00124
SE-HAT-FPAF-P-32402S1-00139
SE-HAT-FPAF-P-32402S1-00140
SE-HAT-FPAF-P-32402S1-00141
SE-HAT-FPAF-P-32402S1-00142
SE-HAT-FPAF-P-32403XX-00138
SE-HAT-FPAF-H-324XXXX-00128
SE-HAT-FPAF-G-324XXXX-00101
SE-HAT-FPAF-D-324XXXX-00102
*
*
SE-HAT-FPAD-P-32400XX-00109
SE-HAT-FPAD-P-32400S1-00110
26-Jul-2015
SE-HAT-FPAD-P-32400S2-00111
SE-HAT-FPAD-P-32400S3-00112
SE-HAT-FPAD-P-32400S4-00113
SE-HAT-FPAD-P-32401XX-00119
SE-HAT-FPAD-P-32401S1-00120
SE-HAT-FPAD-P-32401S2-00121
SE-HAT-FPAD-P-32401S3-00122
SE-HAT-FPAD-P-32401S4-00123
SE-HAT-FPAD-P-32401XX-00119
SE-HAT-FPAD-P-32401S1-00120
SE-HAT-FPAD-P-32401S2-00121
SE-HAT-FPAD-P-32401S3-00122
SE-HAT-FPAD-P-32401S4-00123
SE-HAT-FPAD-P-32402S2-00137
SE-HAT-FPAD-P-32402S2-00137
SE-HAT-FPFD-H-324XXXX-00129
*
*
SE-HAT-FPAD-P-32400XX-00109
SE-HAT-FPAD-P-32400S1-00110
SE-HAT-FPAD-P-32400S2-00111
SE-HAT-FPAD-P-32400S3-00112
SE-HAT-FPAD-P-32400S4-00113
SE-HAT-FPAD-P-32401XX-00119
SE-HAT-FPAD-P-32401S1-00120
SE-HAT-FPAD-P-32401S2-00121
SE-HAT-FPAD-P-32401S3-00122
SE-HAT-FPAD-P-32401S4-00123
SE-HAT-FPAD-P-32401XX-00119
SE-HAT-FPAD-P-32401S1-00120
SE-HAT-FPAD-P-32401S2-00121
SE-HAT-FPAD-P-32401S3-00122
SE-HAT-FPAD-P-32401S4-00123
SE-HAT-FPAD-P-32402S2-00137
SE-HAT-FPAD-P-32402S2-00137
SE-HAT-FPFA-H-324XXXX-00130
SE-HAT-ELEL-P-324XXXX-00102
*
SE-HAT-ELEL-P-32400XX-00103
SE-HAT-ELEL-P-32400S1-00104
26-Jul-2015
SE-HAT-ELEL-P-32400S2-00105
SE-HAT-ELEL-P-32400S3-00106
SE-HAT-ELEL-P-32400S4-00107
SE-HAT-ELEL-P-32401XX-00109
SE-HAT-ELEL-P-32401S1-00110
SE-HAT-ELEL-P-32401S2-00111
SE-HAT-ELEL-P-32401S3-00112
SE-HAT-ELEL-P-32401S4-00113
SE-HAT-ELEL-P-32402XX-00114
SE-HAT-ELEL-P-32402S1-00119
SE-HAT-ELEL-P-32402S2-00120
SE-HAT-ELEL-P-32402S3-00121
SE-HAT-ELEL-P-32402S4-00122
SE-HAT-ELEL-P-32402XX-00114
SE-HAT-ELEL-P-32402S1-00119
SE-HAT-ELEL-P-324XXXX-00108
*
SE-HAT-ELEL-P-324XXXX-00116
SE-HAT-ELEP-P-324XXXX-00101
*
SE-HAT-ELEP-P-32400XX-00102
SE-HAT-ELEP-P-32400S1-00103
SE-HAT-ELEP-P-32400S2-00104
SE-HAT-ELEP-P-32400S3-00105
SE-HAT-ELEP-P-32400S4-00106
SE-HAT-ELEP-P-32401XX-00107
SE-HAT-ELEP-P-32401S1-00108
SE-HAT-ELEP-P-32401S2-00109
SE-HAT-ELEP-P-32401S3-00110
SE-HAT-ELEP-P-32401S4-00111
SE-HAT-ELEP-P-32402XX-00112
SE-HAT-ELEP-P-32402S1-00113
SE-HAT-ELEP-P-32402S2-00114
SE-HAT-ELEP-P-32402S3-00115
SE-HAT-ELEP-P-32402S4-00116
SE-HAT-ELEP-P-324R0XX-00117
*
26-Jul-2015
SE-HAT-ELEP-H-324XXXX-00118
SE-HAT-ELEP-H-324XXXX-00119
SE-HAT-ELEP-H-324XXXX-00120
SE-HAT-ELEP-H-324XXXX-00121
SE-HAT-ELEP-H-324XXXX-00122
SE-HAT-SCXX-D-324XXXX-00116
SE-HAT-SCXX-D-324XXXX-00117
SE-HAT-SCXX-D-324XXXX-00118
SE-HAT-TLAT-P-32400XX-00101
SE-HAT-TLAT-P-32400S1-00102
SE-HAT-TLAT-P-32400S2-00103
SE-HAT-TLAT-P-32400S3-00104
SE-HAT-TLAT-P-32400S4-00105
SE-HAT-TLAT-P-32401XX-00106
SE-HAT-TLAT-P-32401S1-00107
SE-HAT-TLAT-P-32401S2-00108
SE-HAT-TLAT-P-32401S3-00109
SE-HAT-TLAT-P-32401S4-00110
SE-HAT-TLAT-P-32402XX-0011
SE-HAT-TLAT-P-32402S1-00113
SE-HAT-TLAT-P-32402S3-00115
SE-HAT-TLAT-P-32402S4-00116
*
*
SE-HAT-TLAT-H-324XXXX-00112
SE-HAT-MCAM-H-336XXXX-00129
SE-HAT-MCAM-H-324XXXX-00123
SE-HAT-MCAM-H-324XXXX-00124
*
SE-HAT-SCXX-P-324XXXX-00119
SE-HAT-SCXX-P-32400XX-00101
SE-HAT-SCXX-P-32400S1-00102
SE-HAT-SCXX-P-32400S2-00103
SE-HAT-SCXX-P-32400S3-00104
SE-HAT-SCXX-P-32400S4-00105
SE-HAT-SCXX-P-32401XX-00106
SE-HAT-SCXX-P-32401S1-00107
SE-HAT-SCXX-P-32401S2-00108
SE-HAT-SCXX-P-32401S3-00109
26-Jul-2015
SE-HAT-SCXX-P-32401S4-00110
SE-HAT-SCXX-P-32402XX-00111
SE-HAT-SCXX-P-32402S1-00122
SE-HAT-SCXX-P-32402S3-00124
SE-HAT-SCXX-P-32402S3-00125
*
*
SE-HAT-SCXX-H-324XXXX-00113
SE-HAT-SCXX-H-324XXXX-00114
SE-HAT-SCXX-P-324XXXX-00115
SE-HAT-MCAM-P-336XXXX-00126
SE-HAT-MCAM-P-336XXXX-00126
SE-HAT-MCAM-P-336XXXX-00126
SE-HAT-MCAM-H-336XXXX-00128
SE-HAT-MCAM-H-336XXXX-00128
SE-HAT-PHXX-P-33600XX-00125
SE-HAT-PHXX-P-33600XX-00125
SE-HAT-PHXX-P-33600XX-00125
SE-HAT-PHXX-P-336R0XX-00126
SE-HAT-PLAP-P-336XXXX-00118
SE-HAT-PLAP-P-33600XX-00119
SE-HAT-PLAP-P-33600XX-00119
SE-HAT-PLAP-P-336R0XX-00120
26-Jul-2015
SE-HAT-FPAF-P-336XXXX-00132
SE-HAT-FPAF-P-336XXXX-00132
SE-HAT-FPAF-P-336XXXX-00132
SE-HAT-FPAF-P-324XXXX-00131
*
*
*
SE-HAT-ELEL-P-33600XX-00117
SE-HAT-ELEL-P-336R0XX-00118
*
SE-HAT-ELEP-P-33600XX-00124
SE-HAT-ELEP-P-33600XX-00124
*
SE-HAT-ELEP-H-336XXXX-00125
SE-HAT-ELEP-H-336XXXX-00125
SE-HAT-ELEP-H-336XXXX-00125
SE-HAT-TLAT-H-336XXXX-00120
SE-HAT-SCXX-P-336XXXX-00120
*
SE-HAT-SCXX-P-336XXXX-00121
26-Jul-2015
SE-HAT-MCAM-P-324XXXX-00125
*
DESIGN & BUILT IN-FLIGHT CATERING FACILITY AT MUSCAT INTERNATIONAL AIRPORT - MC 13.
DRAWING REGISTER
UPDATED ON :
DRAWING CODE RIVISION STATUS
PARTICIPAN
APPV. WITH
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
ARCHITECTURAL -----
MAIN BUILDING -----
PARTICIPAN
APPV. WITH
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
APPROVED 1
APPV. WITH COM. 0
ON HOLD 0
REV. & RE-SUB. 0
REJECTED 0
REV. NOT REQUIRED 0
NOT SUBMITTED 56
TOTAL 57
26-Jul-2015
PARTICIPAN
APPV. WITH
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
STRUCTURAL -----
MAIN BUILDING
1 Typical Section of Subtructure - Seg 3 & 4 SE GAL ST SE D 324 00 00 00031 SE-GAL-STSE-D-3240000-00031 -- 17-Jun-14 WF-061559 SHOP 1
2 PILE CAP TYPE PCT2A, PCT4B & PCT4C SE GAL ST SE D 324 00 00 00032 SE-GAL-STSE-D-3240000-00032 A 15-Jul-14 WF-062796 SHOP 1
3 PILE CAP TYPE PCT5A, PCT5B & PCT5D SE GAL ST SE D 324 00 00 00033 SE-GAL-STSE-D-3240000-00033 A 15-Jul-14 WF-062796 SHOP 1
4 PILE CAP TYPE PCT6A & PCT6B SE GAL ST SE D 324 00 00 00034 SE-GAL-STSE-D-3240000-00034 A 15-Jul-14 WF-062796 SHOP 1
5 PILE CAP TYPE PCT9A & PCT9B SE GAL ST SE D 324 00 00 00035 SE-GAL-STSE-D-3240000-00035 A 15-Jul-14 WF-062796 SHOP 1
6 RCC Column Sectional Elevations SE GAL ST SE D 324 00 00 00036 SE-GAL-STSE-D-3240000-00036 B 5-Apr-15 WF-075292 SHOP 1
7 Pile Cutt-off Level Layout SE GAL ST SB P 324 B1 S0 00037 SE-GAL-STSB-P-324B1S0-00037 A 15-Jul-14 WF-062796 SHOP 1
8 Typical Details of Pile Cap & Plinth Beam SE GAL ST SE D 324 00 00 00037 SE-GAL-STSE-D-3240000-00037 C 17-Feb-15 WF-072889 SHOP 1
9 Column Expansion Joint Details SE GAL ST SE D 324 00 00 00038 SE-GAL-STSE-D-3240000-00038 A 17-Jul-14 WF-062941 SHOP 1
10 PILE CAP TYPE PCT6D SE GAL ST SE D 324 00 00 00039 SE-GAL-STSE-D-3240000-00039 -- 17-Jul-14 WF-062839 SHOP 1
11 PILE CAP TYPE PCT6E SE GAL ST SE D 324 00 00 00040 SE-GAL-STSE-D-3240000-00040 -- 17-Jul-14 WF-062839 SHOP 1
12 PILE CAP TYPE PCT6H SE GAL ST SE D 324 00 00 00041 SE-GAL-STSE-D-3240000-00041 -- 17-Jul-14 WF-062839 SHOP 1
13 PILE CAP TYPE PCT7A SE GAL ST SE D 324 00 00 00042 SE-GAL-STSE-D-3240000-00042 -- 17-Jul-14 WF-062839 SHOP 1
14 PILE CAP TYPE PCT7B SE GAL ST SE D 324 00 00 00043 SE-GAL-STSE-D-3240000-00043 -- 17-Jul-14 WF-062839 SHOP 1
15 PILE CAP TYPE PCT8B SE GAL ST SE D 324 00 00 00044 SE-GAL-STSE-D-3240000-00044 -- 17-Jul-14 WF-062839 SHOP 1
16 PILE CAP TYPE PCT1A & PCT1B SE GAL ST SE D 324 00 00 00045 SE-GAL-STSE-D-3240000-00045 -- 17-Jul-14 WF-062839 SHOP 1
17 PILE CAP TYPE PCT2B & PCT3B SE GAL ST SE D 324 00 00 00046 SE-GAL-STSE-D-3240000-00046 A 21-Sep-14 WF-065617 SHOP 1
18 PILE CAP TYPE PCT8A SE GAL ST SE D 324 00 00 00047 SE-GAL-STSE-D-3240000-00047 -- 2-Sep-14 WF-064642 SHOP 1
19 PILE CAP TYPE PCT6C SE GAL ST SE D 324 00 00 00048 SE-GAL-STSE-D-3240000-00048 -- 2-Sep-14 WF-064642 SHOP 1
20 PILE CAP TYPE PCT4D & PCT7D SE GAL ST SE D 324 00 00 00049 SE-GAL-STSE-D-3240000-00049 -- 2-Sep-14 WF-064642 SHOP 1
21 PILE CAP TYPE PCT5G & PCT5H SE GAL ST SE D 324 00 00 00050 SE-GAL-STSE-D-3240000-00050 -- 5-Aug-14 WF-064092 SHOP 1
22 PILE CAP TYPE PCT4H & PCT6J SE GAL ST SE D 324 00 00 00051 SE-GAL-STSE-D-3240000-00051 -- 2-Sep-14 WF-064642 SHOP 1
23 PILE CAP TYPE PCT6K & PCT9C SE GAL ST SE D 324 00 00 00052 SE-GAL-STSE-D-3240000-00052 A 21-Sep-14 WF-065617 SHOP 1
24 PILE CAP TYPE PCT8E SE GAL ST SE D 324 00 00 00053 SE-GAL-STSE-D-3240000-00053 A 21-Sep-14 WF-065617 SHOP 1
25 PILE CAP TYPE PCT8F SE GAL ST SE D 324 00 00 00054 SE-GAL-STSE-D-3240000-00054 A 21-Sep-14 WF-065617 SHOP 1
PILE CAP TYPE PCT1C, PCT1D, PCT2C &
26 SE GAL ST SE D 324 00 00 00055 SE-GAL-STSE-D-3240000-00055 -- 23-Oct-14 WF-066968 SHOP 1
PCT2G
27 PILE CAP TYPE PCT3A & PCT3C SE GAL ST SE D 324 00 00 00056 SE-GAL-STSE-D-3240000-00056 -- 23-Oct-14 WF-066968 SHOP 1
PILE CAP TYPE PCT4E, PCT4F, PCT4G &
28 SE GAL ST SE D 324 00 00 00057 SE-GAL-STSE-D-3240000-00057 -- 23-Oct-14 WF-066968 SHOP 1
PCT5C
29 PILE CAP TYPE PCT5E & PCT5F SE GAL ST SE D 324 00 00 00058 SE-GAL-STSE-D-3240000-00058 -- 23-Oct-14 WF-066968 SHOP 1
30 PILE CAP TYPE PCT6F & PCT6G SE GAL ST SE D 324 00 00 00059 SE-GAL-STSE-D-3240000-00059 -- 23-Oct-14 WF-066968 SHOP 1
31 PILE CAP TYPE PCT6 I & PCT8C SE GAL ST SE D 324 00 00 00060 SE-GAL-STSE-D-3240000-00060 -- 23-Oct-14 WF-066968 SHOP 1
32 PILE CAP TYPE PCT8D & PCT8G SE GAL ST SE D 324 00 00 00061 SE-GAL-STSE-D-3240000-00061 -- 23-Oct-14 WF-066968 SHOP 1
33 Vacumm Tunnel Sectional Details SE GAL ST SE D 324 00 00 00062 SE-GAL-STSE-D-3240000-00062 -- 14-Sep-14 WF-065354 SHOP 1
34 Vacumm Tunnel Water proofing Details SE GAL ST SE D 324 00 00 00063 SE-GAL-STSE-D-3240000-00063 -- 14-Sep-14 WF-065354 SHOP 1
35 Retaining Wall Layout & Details SE GAL ST SE D 324 00 00 00064 SE-GAL-STSE-D-3240000-00064 B 4-Dec-14 WF-068930 SHOP 1
36 PILE CAP TYPE PCT7C SE GAL ST SE D 324 00 00 00065 SE-GAL-STSE-D-3240000-00065 -- 23-Oct-14 WF-066968 SHOP 1
PILE CAP TYPE PCT2D, PCT2E, PCT2F & PCT5
37 SE GAL ST SE D 324 00 00 00066 SE-GAL-STSE-D-3240000-00066 -- 23-Oct-14 WF-067086 SHOP 1
I
38 PILE CAP TYPE PCT3D & PCT4 I SE GAL ST SE D 324 00 00 00067 SE-GAL-STSE-D-3240000-00067 -- 23-Oct-14 WF-067086 SHOP 1
39 PILE CAP TYPE PCT3E SE GAL ST SE D 324 00 00 00068 SE-GAL-STSE-D-3240000-00068 -- 23-Oct-14 WF-067086 SHOP 1
40 PILE CAP TYPE PCT6L & PCT6M SE GAL ST SE D 324 00 00 00069 SE-GAL-STSE-D-3240000-00069 -- 23-Oct-14 WF-067086 SHOP 1
41 PILE CAP TYPE PCT6N & PCT8H SE GAL ST SE D 324 00 00 00070 SE-GAL-STSE-D-3240000-00070 -- 23-Oct-14 WF-067086 SHOP 1
42 Future Expansion Column Detail SE GAL ST SE D 324 00 00 00071 SE-GAL-STSE-D-3240000-00071 -- 24-Nov-14 WF-068074 SHOP 1
M.B & S.B Typical Connection Details of
43 SE GAL ST SE D 324 00 00 00076 --
Column & Wall SE-GAL-STSE-D-3240000-00076 9-Dec-14 WF-069394 SHOP 1
Typical Rebar Anchor System for Retaining
44 SE GAL ST SE D 324 00 00 00077 B
wall to Pile cap SE-GAL-STSE-D-3240000-00077 14-Jan-15 WF-070694 SHOP 1
M.B Retaining wall Sectional Elevations Grid
45 SE GAL ST SE D 324 00 00 00078 --
J-D SE-GAL-STSE-D-3240000-00078 15-Jan-15 WF-070716 SHOP 1
DESIGN & BUILT IN-FLIGHT CATERING FACILITY AT MUSCAT INTERNATIONAL AIRPORT - MC 13.
DRAWING REGISTER
UPDATED ON :
DRAWING CODE RIVISION STATUS
PARTICIPAN
APPV. WITH
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
STRUCTURAL -----
M.B Connection of Apron wall base to the
46 SE GAL ST SE D 324 00 00 00079 --
"L" Shaped Base anchored to Pilecap SE-GAL-STSE-D-3240000-00079 1-Jan-15 WF-070805 SHOP 1
Connection Details of Service Block to
47 SE GAL ST SE D 324 00 00 00082 --
Service Tunnel SE-GAL-STSE-D-3240000-00082 18-Mar-15 WF-074073 SHOP 1
SHOP DRAWING - CATERING BUILDING SG-04
48 SE GAL ST SE D 324 00 00 00085 --
PLINTH BEAM PB28 SE-GAL-STSE-D-3240000-00085 15-Apr-15 WF-076603 SHOP 1
SERVICE BLOCK -----
49 Pile cap sections (Sheet 1 of 2) SE GAL ST SE D 336 00 00 00003 SE-GAL-STSE-D-3360000-00003 A 17-Jul-14 WF-062797 SHOP 1
50 Pile cap sections (Sheet 2 of 2) SE GAL ST SE D 336 00 00 00004 SE-GAL-STSE-D-3360000-00004 -- 23-Jul-14 WF-063866 SHOP 1
51 Pile Cutt-off Level Layout SE GAL ST SB P 336 B1 S0 00005 SE-GAL-STSB-P-336B1S0-00005 A 17-Jul-14 WF-062797 SHOP 1
52 S.B Sectional Details of Sump SE GAL ST SE D 336 00 00 00005 SE-GAL-STSE-D-3360000-00005 A 15-Jul-14 WF-062600 SHOP 1
Typical Details of Water proofing for Type-2
53 SE GAL ST AS D 336 00 00 00007 --
& Type-3 Membrane SE-GAL-STAS-D-3360000-00007 17-Jul-14 WF-062942 SHOP 1
Reinforcement Details for Basement Raft
54 SE GAL ST SE D 336 00 00 00008 A
(sheet 1 of 2) SE-GAL-STSE-D-3360000-00008 21-Sep-14 WF-065618 SHOP 1
Reinforcement Details for Basement Raft
55 SE GAL ST SE D 336 00 00 00009 A
(sheet 2 of 2) SE-GAL-STSE-D-3360000-00009 21-Sep-14 WF-065618 SHOP 1
56 Column Schedule & Details SE GAL ST SE D 336 00 00 00010 SE-GAL-STSE-D-3360000-00010 A 21-Sep-14 WF-065618 SHOP 1
57 Apron wall Layout & Details SE GAL ST SE D 336 00 00 00011 SE-GAL-STSE-D-3360000-00011 -- 2-Oct-14 WF-066259 SHOP 1
Service Block Basement wall Elevation-1
58 SE GAL ST SE D 336 00 00 00012 --
Reinforcement Details SE-GAL-STSE-D-3360000-00012 23-Oct-14 WF-067242 SHOP 1
Construction Joint Showing Water Tank
59 SE GAL ST SE D 336 00 00 00013 --
Outer Wall SE-GAL-STSE-D-3360000-00013 12-Feb-15 WF-072144 SHOP 1
Typical Rebar Anchor System for Trench
60 SE GAL ST SE D 336 00 00 00014 --
Wall to Pile Cap SE-GAL-STSE-D-3360000-00014 16-Feb-15 WF-072411 SHOP 1
Service Block Typical Details of Pile Cap &
61 SE GAL ST SE D 336 00 00 00015 A
Plinth Beam SE-GAL-STSE-D-3360000-00015 10-Mar-15 WF-073679 SHOP 1
Service Block Basement - Roof Beam, Slab &
62 SE GAL ST SE D 336 00 00 00015 A
Plinth Layout - Key Plan SE-GAL-STSE-D-3360000-00015 10-May-15 WF-078273 SHOP 1
Service Block - Roof Beam - RCB1 - Grid 6 to
63 SE GAL ST SE D 336 00 00 00016 --
7&M SE-GAL-STSE-D-3360000-00016 9-Jul-15 WF-081552 SHOP 1
GUARD HOUSES -----
Guard Houses Typical Details of Foundation
64 SE GAL ST SE D 369 00 00 00001 B
Water Proofing SE-GAL-STSE-D-3690000-00001 10-Mar-15 WF-073679 SHOP 1
APPROVED 0
APPV. WITH COM. 62
ON HOLD 0
REV. & RE-SUB. 2
REJECTED 0
REV. NOT REQUIRED 0
NOT SUBMITTED 0
TOTAL 64
26-Jul-2015
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
DRAINAGE -----
MAIN BUILDING
BASEMENT -----
1 DRAINAGE LAYOUT - KEY PLAN SE GAL PH DR P 324 B1 S0 00001 SE-GAL-PHDR-P-324B1S0-00001 C 3-Aug-14 WF-063917 SHOP 1
2 DRAINAGE DETAILED LAYOUT SE GAL PH DR P 324 B1 S4 00002 SE-GAL-PHDR-P-324B1S4-00002 C 3-Aug-14 WF-063917 SHOP 1
GROUND FLOOR -----
3 DRAINAGE LAYOUT - KEY PLAN SE GAL PH DR P 324 00 S0 00003 SE-GAL-PHDR-P-32400S0-00003 C 22-Dec-14 WF-069996 SHOP 1
4 DRAINAGE LAYOUT - SEGMENT - 1 SE GAL PH DR P 324 00 S1 00004 SE-GAL-PHDR-P-32400S1-00004 C 22-Dec-14 WF-069996 SHOP 1
5 DRAINAGE LAYOUT - SEGMENT - 2 SE GAL PH DR P 324 00 S2 00005 SE-GAL-PHDR-P-32400S2-00005 C 21-Dec-14 WF-069521 SHOP 1
6 DRAINAGE LAYOUT - SEGMENT - 3 SE GAL PH DR P 324 00 S3 00006 SE-GAL-PHDR-P-32400S3-00006 E 1-Dec-14 WF-06878 SHOP 1
7 DRAINAGE LAYOUT - SEGMENT - 4 SE GAL PH DR P 324 00 S4 00007 SE-GAL-PHDR-P-32400S4-00007 C 10-Dec-14 WF-069000 SHOP 1
SKETCH-DRAINAGE LAYOUT-LAUNDRY
8 SE GAL PH DR L 324 00 S0 00001 --
AREA SE-GAL-PHDR-L-32400S0-00001 1-Jan-15 WF-070330 SHOP 1
DETAIL FOR COLD ROOM WATER
9 SE GAL PH DR L 324 00 S0 00002 B
PROOFING CONNECTING TO LSD SE-GAL-PHDR-L-32400S0-00002 19-Apr-15 WF-077071 SHOP 1
FIRST FLOOR -----
10 DRAINAGE LAYOUT - KEY PLAN SE GAL PH DR P 324 01 S0 00008 SE-GAL-PHDR-P-32401S0-00008 C SHOP 1
11 DRAINAGE LAYOUT - SEGMENT - 1 SE GAL PH DR P 324 01 S1 00009 SE-GAL-PHDR-P-32401S1-00009 C SHOP 1
12 DRAINAGE LAYOUT - SEGMENT - 2 SE GAL PH DR P 324 01 S2 00010 SE-GAL-PHDR-P-32401S2-00010 C SHOP 1
13 DRAINAGE LAYOUT - SEGMENT - 3 SE GAL PH DR P 324 01 S3 00011 SE-GAL-PHDR-P-32401S3-00011 C SHOP 1
14 DRAINAGE LAYOUT - SEGMENT - 4 SE GAL PH DR P 324 01 S4 00012 SE-GAL-PHDR-P-32401S4-00012 C SHOP 1
ROOF FLOOR -----
15 DRAINAGE LAYOUT - KEY PLAN SE GAL PH DR P 324 R1 S0 00013 SE-GAL-PHDR-P-324R1S0-00013 C SHOP 1
16 DRAINAGE LAYOUT - SEGMENT - 1 SE GAL PH DR P 324 R1 S1 00014 SE-GAL-PHDR-P-324R1S1-00014 C SHOP 1
17 DRAINAGE LAYOUT - SEGMENT - 2 SE GAL PH DR P 324 R1 S2 00015 SE-GAL-PHDR-P-324R1S2-00015 C SHOP 1
18 DRAINAGE LAYOUT - SEGMENT - 3 SE GAL PH DR P 324 R1 S3 00016 SE-GAL-PHDR-P-324R1S3-00016 C SHOP 1
19 DRAINAGE LAYOUT - SEGMENT - 4 SE GAL PH DR P 324 R1 S4 00017 SE-GAL-PHDR-P-324R1S4-00017 C SHOP 1
UPPER ROOF -----
20 DRAINAGE LAYOUT - KEY PLAN SE GAL PH DR P 324 R2 S0 00018 SE-GAL-PHDR-P-324R2S0-00018 C SHOP 1
21 DRAINAGE LAYOUT - SEGMENT - 1 SE GAL PH DR P 324 R2 S1 00019 SE-GAL-PHDR-P-324R2S1-00019 C SHOP 1
22 DRAINAGE LAYOUT - SEGMENT - 2 SE GAL PH DR P 324 R2 S2 00020 SE-GAL-PHDR-P-324R2S2-00020 C SHOP 1
23 DRAINAGE LAYOUT - SEGMENT - 3 SE GAL PH DR P 324 R2 S3 00021 SE-GAL-PHDR-P-324R2S3-00021 C SHOP 1
24 DRAINAGE LAYOUT - SEGMENT - 4 SE GAL PH DR P 324 R2 S4 00022 SE-GAL-PHDR-P-324R2S4-00022 C SHOP 1
TOP ROOF -----
25 DRAINAGE LAYOUT - SEGMENT - 1 SE GAL PH DR P 324 R3 S1 00023 SE-GAL-PHDR-P-324R3S1-00023 C SHOP 1
STANDARD DETAILS -----
26 DRAINAGE STANDARD DETAILS SE GAL PH DR D 324 00 00 00001 SE-GAL-PHDR-D-3240000-00001 E 23-Feb-15 WF-073229 SHOP 1
82 To 151
DESIGN & BUILT IN-FLIGHT CATERING FACILITY AT MUSCAT INTERNATIONAL AIRPORT - MC 13.
DRAWING REGISTER
UPDATED ON :
DRAWING CODE RIVISION STATUS
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
DRAINAGE -----
EXTERNAL SERVICES -----
35 EXTERNAL DRAINAGE LAYOUT SE GAL PH DR K 324 ET AE 00001 SE-GAL-PHDR-K-324ETAE-00001 D 29-Apr-15 WF-077811 SHOP 1
83 To 151
DESIGN & BUILT IN-FLIGHT CATERING FACILITY AT MUSCAT INTERNATIONAL AIRPORT - MC 13.
DRAWING REGISTER
UPDATED ON :
DRAWING CODE RIVISION STATUS
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
DRAINAGE -----
MISC. -----
64 PLUMBING TEMPLATE SE GAL PL AP T 324 00 00 00001 SE-GAL-PLAP-T-3240000-00001 C SHOP 1
WATER & UTILITIES LEGEND, SYMBOLS &
65 SE GAL PL AP G 324 00 00 00001 C
GEN. NOTES SE-GAL-PLAP-G-3240000-00001 SHOP 1
FIRE FIGHTING -----
MAIN BUILDING
BASEMENT -----
66 FIRE FIGHTING LAYOUT - KEY PLAN SE GAL FP AF P 324 B1 S0 00001 SE-GAL-FPAF-P-324B1S0-00001 C 8-Mar-15 WF-073605 SHOP 1
67 FIRE FIGHTING DETAILED LAYOUT SE GAL FP AF L 324 B1 S0 00001 SE-GAL-FPAF-L-324B1S0-00001 C 8-Mar-15 WF-073605 SHOP 1
GROUND FLOOR -----
68 FIRE FIGHTING LAYOUT - KEY PLAN SE GAL FP AF P 324 00 S0 00003 SE-GAL-FPAF-P-32400S0-00003 C 16-Apr-15 WF-076328 SHOP 1
69 FIRE FIGHTING LAYOUT - SEGMENT - 1 SE GAL FP AF P 324 00 S1 00004 SE-GAL-FPAF-P-32400S1-00004 C 16-Apr-15 WF-076328 SHOP 1
FIRE PROTECTION & SUPRESSION SYSTEM
70 SE GAL FP AF L 324 00 S1 00002 SE-GAL-FPAF-L-32400S1-00002 A 30-Jun-15 WF-081284 SHOP 1
FOR BMS & CCTV ROOM
FIRE PROTECTION & SUPRESSION SYSTEM
71 SE GAL FP AF L 324 00 S1 00003 SE-GAL-FPAF-L-32400S1-00003 A 30-Jun-15 WF-081284 SHOP 1
FOR SERVER ROOM
FIRE PROTECTION & SUPRESSION SYSTEM
72 SE GAL FP AF L 324 00 S1 00004 SE-GAL-FPAF-L-32400S1-00004 A 21-Jun-15 WF-080354 SHOP 1
FOR UPS & CBS ROOM
73 FIRE FIGHTING LAYOUT - SEGMENT - 2 SE GAL FP AF P 324 00 S2 00005 SE-GAL-FPAF-P-32400S2-00005 C 16-Apr-15 WF-076328 SHOP 1
74 FIRE FIGHTING LAYOUT - SEGMENT - 3 SE GAL FP AF P 324 00 S3 00006 SE-GAL-FPAF-P-32400S3-00006 C 16-Apr-15 WF-076328 SHOP 1
75 FIRE FIGHTING LAYOUT - SEGMENT - 4 SE GAL FP AF P 324 00 S4 00007 SE-GAL-FPAF-P-32400S4-00007 C 16-Apr-15 WF-076328 SHOP 1
MEZZANINE FLOOR -----
76 FIRE FIGHTING LAYOUT SE GAL FP AF L 324 M1 S0 00009 SE-GAL-FPAF-L-324M1S0-00009 -- 30-Jun-15 WF-081284 SHOP 1
FIRST FLOOR -----
77 FIRE FIGHTING LAYOUT - KEY PLAN SE GAL FP AF P 324 01 S0 00008 SE-GAL-FPAF-P-32401S0-00008 C SHOP 1
78 FIRE FIGHTING LAYOUT - SEGMENT - 1 SE GAL FP AF P 324 01 S1 00009 SE-GAL-FPAF-P-32401S1-00009 C SHOP 1
79 FIRE FIGHTING LAYOUT - SEGMENT - 2 SE GAL FP AF P 324 01 S2 00010 SE-GAL-FPAF-P-32401S2-00010 C SHOP 1
80 FIRE FIGHTING LAYOUT - SEGMENT - 3 SE GAL FP AF P 324 01 S3 00011 SE-GAL-FPAF-P-32401S3-00011 C SHOP 1
81 FIRE FIGHTING LAYOUT - SEGMENT - 4 SE GAL FP AF P 324 01 S4 00012 SE-GAL-FPAF-P-32401S4-00012 C SHOP 1
ROOF FLOOR -----
82 FIRE FIGHTING LAYOUT - KEY PLAN SE GAL FP AF P 324 R1 S0 00013 SE-GAL-FPAF-P-324R1S0-00013 C SHOP 1
83 FIRE FIGHTING LAYOUT - SEGMENT - 1 SE GAL FP AF P 324 R1 S1 00014 SE-GAL-FPAF-P-324R1S1-00014 C SHOP 1
84 FIRE FIGHTING LAYOUT - SEGMENT - 2 SE GAL FP AF P 324 R1 S2 00015 SE-GAL-FPAF-P-324R1S2-00015 C SHOP 1
85 FIRE FIGHTING LAYOUT - SEGMENT - 3 SE GAL FP AF P 324 R1 S3 00016 SE-GAL-FPAF-P-324R1S3-00016 C SHOP 1
86 FIRE FIGHTING LAYOUT - SEGMENT - 4 SE GAL FP AF P 324 R1 S4 00017 SE-GAL-FPAF-P-324R1S4-00017 C SHOP 1
UPPER ROOF -----
87 FIRE FIGHTING LAYOUT SE GAL FP AF P 324 R2 S0 00018 SE-GAL-FPAF-P-324R2S0-00018 C SHOP 1
SCHEMATICS
88 FIRE FIGHTING SCHEMATIC DIAGRAM SE GAL FP AF H 324 00 00 00001 SE-GAL-FPAF-H-3240000-00001 C 16-Apr-15 WF-076328 SHOP 1
SERVICE BLOCK -----
BASEMENT & SERVICE TUNNEL
89 FIRE FIGHTING LAYOUT SE GAL FP AF P 336 B1 S0 00001 SE-GAL-FPAF-P-336B1S0-00001 C 8-Mar-15 WF-073605 SHOP 1
GROUND FLOOR -----
90 FIRE FIGHTING LAYOUT - KEY PLAN SE GAL FP AF P 336 00 S0 00002 SE-GAL-FPAF-P-33600S0-00002 C 8-Mar-15 WF-073605 SHOP 1
91 FIRE FIGHTING ENLARGED LAYOUT SE GAL FP AF L 336 00 S0 00001 SE-GAL-FPAF-L-33600S0-00001 C 8-Mar-15 WF-073605 SHOP 1
92 FOAM FIRE SUPPRESSION SYSTEM SE GAL FP AF L 336 00 S1 00002 SE-GAL-FPAF-L-33600S1-00002 -- 8-Mar-15 WF-073605 SHOP 1
WATER SPRAY SYSTEM FOR GAS
93 SE GAL FP AF L 336 00 S1 00003 SE-GAL-FPAF-L-33600S1-00003 A 21-Jun-15 WF-080354 SHOP 1
TANKSYSTEM
FIRE PROTECTION & SUPRESSION SYSTEM
94 SE GAL FP AF L 336 00 S1 00004 SE-GAL-FPAF-L-33600S1-00004 A 21-Jun-15 WF-080354 SHOP 1
FOR LV ROOM - 1
FIRE PROTECTION & SUPRESSION SYSTEM
95 SE GAL FP AF L 336 00 S1 00005 SE-GAL-FPAF-L-33600S1-00005 -- 13-Apr-15 WF-075952 SHOP 1
FOR LV ROOM - 2
84 To 151
DESIGN & BUILT IN-FLIGHT CATERING FACILITY AT MUSCAT INTERNATIONAL AIRPORT - MC 13.
DRAWING REGISTER
UPDATED ON :
DRAWING CODE RIVISION STATUS
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
DRAINAGE -----
FIRE PROTECTION & SUPRESSION SYSTEM
96 SE GAL FP AF L 336 00 S1 00006 SE-GAL-FPAF-L-33600S1-00006 A 21-Jun-15 WF-080354 SHOP 1
FOR HT PANEL ROOM
EXTERNAL SERVICES -----
97 FIRE HYDRANTS LAYOUT SE GAL FP AF K 324 ET AE 00001 SE-GAL-FPAF-K-324ETAE-00001 C 16-Apr-15 WF-076328 SHOP 1
MISC. -----
98 FIRE PROTECTION TEMPLATE SE GAL FP AF T 324 00 00 00001 SE-GAL-FPAF-T-3240000-00001 C 8-Mar-15 WF-073605 SHOP 1
85 To 151
DESIGN & BUILT IN-FLIGHT CATERING FACILITY AT MUSCAT INTERNATIONAL AIRPORT - MC 13.
DRAWING REGISTER
UPDATED ON :
DRAWING CODE RIVISION STATUS
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
DRAINAGE -----
SERVICE BLOCK -----
BASEMENT & SERVICE TUNNEL
124 BASEMENT & SERVICE TUNNEL -COMPRESSED
SE AIR
GALLAYOUT
UT AU P 336 B1 S0 00003 C
SE-GAL-UTAU-P-336B1S0-00003 SHOP 1
GROUND FLOOR -----
GROUND FLOOR-COMPRESSED AIR
125 SE GAL UT AU P 336 00 S0 00004 --
LAYOUT & SCHEMATIC DIAGRAM SE-GAL-UTAU-P-33600S0-00004 13-Apr-15 WF-076303 SHOP 1
STEAM SERVICES -----
MAIN BUILDING
BASEMENT -----
126 STEAM SERVICES LAYOUT SE GAL UT AU P 324 B1 S0 00001 SE-GAL-UTAU-P-324B1S0-00001 -- 10-Mar-15 WF-073600 SHOP 1
GROUND FLOOR -----
127 STEAM SERVICES LAYOUT - KEY PLAN SE GAL UT AU P 324 00 S0 00021 SE-GAL-UTAU-P-32400S0-00021 C 10-Mar-15 WF-073600 SHOP 1
128 STEAM SERVICES LAYOUT - SEGMENT - 1 SE GAL UT AU P 324 00 S1 00022 SE-GAL-UTAU-P-32400S1-00022 C 10-Mar-15 WF-073600 SHOP 1
129 STEAM SERVICES LAYOUT - SEGMENT - 2 SE GAL UT AU P 324 00 S2 00023 SE-GAL-UTAU-P-32400S2-00023 C 10-Mar-15 WF-073600 SHOP 1
130 STEAM SERVICES LAYOUT - SEGMENT - 3 SE GAL UT AU P 324 00 S3 00024 SE-GAL-UTAU-P-32400S3-00024 C 10-Mar-15 WF-073600 SHOP 1
131 STEAM SERVICES LAYOUT - SEGMENT - 4 SE GAL UT AU P 324 00 S4 00025 SE-GAL-UTAU-P-32400S4-00025 C 10-Mar-15 WF-073600 SHOP 1
FIRST FLOOR -----
132 STEAM SERVICES LAYOUT - KEY PLAN SE GAL UT AU P 324 01 S0 00026 SE-GAL-UTAU-P-32401S0-00026 C SHOP 1
133 STEAM SERVICES LAYOUT - SEGMENT - 1 SE GAL UT AU P 324 01 S1 00027 SE-GAL-UTAU-P-32401S1-00027 C SHOP 1
134 STEAM SERVICES LAYOUT - SEGMENT - 3 SE GAL UT AU P 324 01 S3 00029 SE-GAL-UTAU-P-32401S3-00029 C SHOP 1
135 STEAM SERVICES LAYOUT - SEGMENT - 4 SE GAL UT AU P 324 01 S4 00030 SE-GAL-UTAU-P-32401S4-00030 C SHOP 1
SCHEMATICS
136 STEAM SERVICES SCHEMATIC LAYOUT SE GAL UT AU H 324 00 00 00001 SE-GAL-UTAU-H-3240000-00001 C 14-Apr-15 WF-076839 SHOP 1
STANDARD DETAILS -----
137 STEAM SERVICES STANDARD DETAILS SE GAL UT AU D 324 00 00 00001 SE-GAL-UTAU-D-3240000-00001 C SHOP 1
SERVICE BLOCK -----
BASEMENT & SERVICE TUNNEL
138 STEAM SERVICES LAYOUT SE GAL UT AU P 336 B1 S0 00005 SE-GAL-UTAU-P-336B1S0-00005 C SHOP 1
GROUND FLOOR -----
139 STEAM SERVICES ENLARGED LAYOUT SE GAL UT AU P 336 00 S0 00006 SE-GAL-UTAU-P-33600S0-00006 C 14-Apr-15 WF-076839 SHOP 1
FUEL SUPPLY SYSTEM -----
SERVICE BLOCK -----
FUEL SUPPLY SYSTEM LAYOUT &
140 SE GAL UT AU P 336 00 S0 00007 C
SCHEMATIC DIAGRAM SE-GAL-UTAU-P-33600S0-00007 14-Apr-15 WF-076839 SHOP 1
HVAC -----
MAIN BUILDING
BASEMENT -----
86 To 151
DESIGN & BUILT IN-FLIGHT CATERING FACILITY AT MUSCAT INTERNATIONAL AIRPORT - MC 13.
DRAWING REGISTER
UPDATED ON :
DRAWING CODE RIVISION STATUS
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
DRAINAGE -----
150 AC & VENTILATION LAYOUT - SEGMENT - 1 SE GAL MC AM P 324 01 S1 00008 SE-GAL-MCAM-P-32401S1-00008 C SHOP 1
151 AC & VENTILATION LAYOUT - SEGMENT - 2 SE GAL MC AM P 324 01 S2 00009 SE-GAL-MCAM-P-32401S2-00009 C SHOP 1
152 AC & VENTILATION LAYOUT - SEGMENT - 3 SE GAL MC AM P 324 01 S3 00010 SE-GAL-MCAM-P-32401S3-00010 C SHOP 1
153 AC & VENTILATION LAYOUT - SEGMENT - 4 SE GAL MC AM P 324 01 S4 00011 SE-GAL-MCAM-P-32401S4-00011 C SHOP 1
AC & VENTILATION DETAILED & SECTIONS
154 SE GAL MC AM L 324 01 S0 00004 C
- PART - 1 SE-GAL-MCAM-L-32401S0-00004 SHOP 1
AC & VENTILATION DETAILED & SECTIONS
155 SE GAL MC AM L 324 01 S0 00005 C
- PART - 2 SE-GAL-MCAM-L-32401S0-00005 SHOP 1
ROOF FLOOR -----
87 To 151
DESIGN & BUILT IN-FLIGHT CATERING FACILITY AT MUSCAT INTERNATIONAL AIRPORT - MC 13.
DRAWING REGISTER
UPDATED ON :
DRAWING CODE RIVISION STATUS
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
DRAINAGE -----
DETAILED AHU SCHMATIC DIAGRAM -
176 SE GAL MC MH H 324 00 00 00013 --
SHEET - 7 SE-GAL-MCMH-H-3240000-00013 SHOP 1
DETAILED AHU SCHMATIC DIAGRAM -
177 SE GAL MC MH H 324 00 00 00014 --
SHEET - 8 SE-GAL-MCMH-H-3240000-00014 SHOP 1
DETAILED AHU SCHMATIC DIAGRAM -
178 SE GAL MC MH H 324 00 00 00015 --
SHEET - 9 SE-GAL-MCMH-H-3240000-00015 SHOP 1
DETAILED AHU SCHMATIC DIAGRAM -
179 SE GAL MC MH H 324 00 00 00016 --
SHEET - 10 SE-GAL-MCMH-H-3240000-00016 SHOP 1
DETAILED AHU SCHMATIC DIAGRAM -
180 SE GAL MC MH H 324 00 00 00017 --
SHEET - 11 SE-GAL-MCMH-H-3240000-00017 SHOP 1
DETAILED AHU SCHMATIC DIAGRAM -
181 SE GAL MC MH H 324 00 00 00018 --
SHEET - 12 SE-GAL-MCMH-H-3240000-00018 SHOP 1
DETAILED AHU SCHMATIC DIAGRAM -
182 SE GAL MC MH H 324 00 00 00019 --
SHEET - 13 SE-GAL-MCMH-H-3240000-00019 SHOP 1
STANDARD DETAILS -----
MECHANICAL STANDARD DETAILS - PART -
183 SE GAL MC MH D 324 00 00 00001 C
1 SE-GAL-MCMH-D-3240000-00001 22-Apr-15 WF-077380 SHOP 1
MECHANICAL STANDARD DETAILS - PART -
184 SE GAL MC MH D 324 00 00 00002 C
2 SE-GAL-MCMH-D-3240000-00002 22-Apr-15 WF-077380 SHOP 1
SERVICE BLOCK -----
BASEMENT & SERVICE TUNNEL
88 To 151
DESIGN & BUILT IN-FLIGHT CATERING FACILITY AT MUSCAT INTERNATIONAL AIRPORT - MC 13.
DRAWING REGISTER
UPDATED ON :
DRAWING CODE RIVISION STATUS
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
DRAINAGE -----
198 ENLARGED LIGHTING LAYOUT SE GAL EL EL L 324 B1 S0 00001 SE-GAL-ELEL-L-324B1S0-00001 E 2-Mar-15 WF-073330 SHOP 1
GROUND FLOOR -----
199 LIGHTING LAYOUT - KEY PLAN SE GAL EL EL P 324 00 S0 00002 SE-GAL-ELEL-P-32400S0-00002 C 12-Feb-15 WF-072344 SHOP 1
200 LIGHTING LAYOUT - SEGMENT - 1 SE GAL EL EL P 324 00 S1 00003 SE-GAL-ELEL-P-32400S1-00003 C 12-Feb-15 WF-072344 SHOP 1
201 LIGHTING LAYOUT - SEGMENT - 2 SE GAL EL EL P 324 00 S2 00004 SE-GAL-ELEL-P-32400S2-00004 C 12-Feb-15 WF-072344 SHOP 1
202 LIGHTING LAYOUT - SEGMENT - 3 SE GAL EL EL P 324 00 S3 00005 SE-GAL-ELEL-P-32400S3-00005 D 13-Jul-15 WF-081375 SHOP 1
203 LIGHTING LAYOUT - SEGMENT - 4 SE GAL EL EL P 324 00 S4 00006 SE-GAL-ELEL-P-32400S4-00006 D 13-Jul-15 WF-081375 SHOP 1
MEZZANINE FLOOR
204 LIGHTING LAYOUT - KEY PLAN SE GAL EL EL P 324 M1 S0 00007 SE-GAL-ELEL-P-324M1S0-00007 C 14-Jan-15 WF-070803 SHOP 1
205 LIGHTING ENLARGED LAYOUT SE GAL EL EL L 324 M1 S0 00002 SE-GAL-ELEL-L-324M1S0-00002 C 14-Jan-15 WF-070803 SHOP 1
FIRST FLOOR -----
206 LIGHTING LAYOUT - KEY PLAN SE GAL EL EL P 324 01 S0 00008 SE-GAL-ELEL-P-32401S0-00008 C SHOP 1
207 LIGHTING LAYOUT - SEGMENT - 1 SE GAL EL EL P 324 01 S1 00009 SE-GAL-ELEL-P-32401S1-00009 C SHOP 1
208 LIGHTING LAYOUT - SEGMENT - 2 SE GAL EL EL P 324 01 S2 00010 SE-GAL-ELEL-P-32401S2-00010 C SHOP 1
209 LIGHTING LAYOUT - SEGMENT - 3 SE GAL EL EL P 324 01 S3 00011 SE-GAL-ELEL-P-32401S3-00011 C SHOP 1
210 LIGHTING LAYOUT - SEGMENT - 4 SE GAL EL EL P 324 01 S4 00012 SE-GAL-ELEL-P-32401S4-00012 C SHOP 1
ROOF FLOOR -----
211 LIGHTING LAYOUT - KEY PLAN SE GAL EL EL P 324 R1 S0 00013 SE-GAL-ELEL-P-324R1S0-00013 C SHOP 1
212 LIGHTING LAYOUT - SEGMENT - 1 SE GAL EL EL P 324 R1 S1 00014 SE-GAL-ELEL-P-324R1S1-00014 C SHOP 1
213 LIGHTING LAYOUT - SEGMENT - 2 SE GAL EL EL P 324 R1 S2 00015 SE-GAL-ELEL-P-324R1S2-00015 C SHOP 1
214 LIGHTING LAYOUT - SEGMENT - 3 SE GAL EL EL P 324 R1 S3 00016 SE-GAL-ELEL-P-324R1S3-00016 C SHOP 1
215 LIGHTING LAYOUT - SEGMENT - 4 SE GAL EL EL P 324 R1 S4 00017 SE-GAL-ELEL-P-324R1S4-00017 C SHOP 1
UPPER ROOF -----
216 LIGHTING LAYOUT - KEY PLAN SE GAL EL EL P 324 R2 S0 00018 SE-GAL-ELEL-P-324R2S0-00018 C SHOP 1
217 LIGHTING LAYOUT - SEGMENT - 1 SE GAL EL EL P 324 R2 S1 00019 SE-GAL-ELEL-P-324R2S1-00019 C SHOP 1
TOP OF ROOF
218 LIGHTING LAYOUT - KEY PLAN SE GAL EL EL P 324 R3 S0 00020 SE-GAL-ELEL-P-324R3S0-00020 C SHOP 1
219 LIGHTING LAYOUT - SEGMENT - 1 SE GAL EL EL P 324 R3 S1 00021 SE-GAL-ELEL-P-324R3S1-00021 C SHOP 1
SERVICE BLOCK -----
BASEMENT & SERVICE TUNNEL
220 LIGHTING LAYOUT SE GAL EL EL P 336 B1 S0 00001 SE-GAL-ELEL-P-336B1S0-00001 C 23-Jul-14 WF-063647 SHOP 1
GROUND FLOOR -----
221 LIGHTING LAYOUT - KEY PLAN SE GAL EL EL P 336 00 S0 00002 SE-GAL-ELEL-P-33600S0-00002 C 22-Dec-14 WF-069540 SHOP 1
222 LIGHTING ENLARGED LAYOUT SE GAL EL EL L 336 00 S0 00001 SE-GAL-ELEL-L-33600S0-00001 C 22-Dec-14 WF-069540 SHOP 1
ROOF FLOOR -----
223 LIGHTING DETAILED LAYOUT SE GAL EL EL P 336 R1 S0 00003 SE-GAL-ELEL-P-336R1S0-00003 C 20-Apr-15 WF-076486 SHOP 1
GUARD HOUSE
89 To 151
DESIGN & BUILT IN-FLIGHT CATERING FACILITY AT MUSCAT INTERNATIONAL AIRPORT - MC 13.
DRAWING REGISTER
UPDATED ON :
DRAWING CODE RIVISION STATUS
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
DRAINAGE -----
90 To 151
DESIGN & BUILT IN-FLIGHT CATERING FACILITY AT MUSCAT INTERNATIONAL AIRPORT - MC 13.
DRAWING REGISTER
UPDATED ON :
DRAWING CODE RIVISION STATUS
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
DRAINAGE -----
91 To 151
DESIGN & BUILT IN-FLIGHT CATERING FACILITY AT MUSCAT INTERNATIONAL AIRPORT - MC 13.
DRAWING REGISTER
UPDATED ON :
DRAWING CODE RIVISION STATUS
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
DRAINAGE -----
284 POWER LAYOUT - KEY PLAN SE GAL EL EP P 324 00 S0 00002 SE-GAL-ELEP-P-32400S0-00002 C 10-Mar-15 WF-073800 SHOP 1
285 POWER LAYOUT - SEGMENT - 1 SE GAL EL EP P 324 00 S1 00003 SE-GAL-ELEP-P-32400S1-00003 C 10-Mar-15 WF-073800 SHOP 1
286 POWER LAYOUT - SEGMENT - 2 SE GAL EL EP P 324 00 S2 00004 SE-GAL-ELEP-P-32400S2-00004 C 10-Mar-15 WF-073800 SHOP 1
287 POWER LAYOUT - SEGMENT - 3 SE GAL EL EP P 324 00 S3 00005 SE-GAL-ELEP-P-32400S3-00005 C 10-Mar-15 WF-073800 SHOP 1
288 POWER LAYOUT - SEGMENT - 4 SE GAL EL EP P 324 00 S4 00006 SE-GAL-ELEP-P-32400S4-00006 C 10-Mar-15 WF-073800 SHOP 1
FIRST FLOOR -----
289 POWER LAYOUT - KEY PLAN SE GAL EL EP P 324 01 S0 00007 SE-GAL-ELEP-P-32401S0-00007 C SHOP 1
290 POWER LAYOUT - SEGMENT - 1 SE GAL EL EP P 324 01 S1 00008 SE-GAL-ELEP-P-32401S1-00008 C SHOP 1
291 POWER LAYOUT - SEGMENT - 2 SE GAL EL EP P 324 01 S2 00009 SE-GAL-ELEP-P-32401S2-00009 C SHOP 1
292 POWER LAYOUT - SEGMENT - 3 SE GAL EL EP P 324 01 S3 00010 SE-GAL-ELEP-P-32401S3-00010 C SHOP 1
293 POWER LAYOUT - SEGMENT - 4 SE GAL EL EP P 324 01 S4 00011 SE-GAL-ELEP-P-32401S4-00011 C SHOP 1
ROOF FLOOR -----
294 POWER LAYOUT - KEY PLAN SE GAL EL EP P 324 R1 S0 00012 SE-GAL-ELEP-P-324R1S0-00012 C SHOP 1
295 POWER LAYOUT - SEGMENT - 1 SE GAL EL EP P 324 R1 S1 00013 SE-GAL-ELEP-P-324R1S1-00013 C SHOP 1
296 POWER LAYOUT - SEGMENT - 2 SE GAL EL EP P 324 R1 S2 00014 SE-GAL-ELEP-P-324R1S2-00014 C SHOP 1
297 POWER LAYOUT - SEGMENT - 3 SE GAL EL EP P 324 R1 S3 00015 SE-GAL-ELEP-P-324R1S3-00015 C SHOP 1
298 POWER LAYOUT - SEGMENT - 4 SE GAL EL EP P 324 R1 S4 00016 SE-GAL-ELEP-P-324R1S4-00016 C SHOP 1
UPPER ROOF -----
299 POWER LAYOUT - KEY PLAN SE GAL EL EP P 324 R2 S0 00017 SE-GAL-ELEP-P-324R2S0-00017 C SHOP 1
300 POWER LAYOUT - SEGMENT - 1 SE GAL EL EP P 324 R2 S1 00018 SE-GAL-ELEP-P-324R2S1-00018 C SHOP 1
SCHEMATICS
301 POWER SCHEMATIC DIAGRAM - PART - 1 SE GAL EL EP H 324 00 00 00001 SE-GAL-ELEP-H-3240000-00001 C SHOP 1
302 POWER SCHEMATIC DIAGRAM - PART - 2 SE GAL EL EP H 324 00 00 00002 SE-GAL-ELEP-H-3240000-00002 C SHOP 1
303 POWER SINGLE LINE DIAGRAM - PART - 3 SE GAL EL EP H 324 00 00 00003 SE-GAL-ELEP-H-3240000-00003 C SHOP 1
304 POWER SINGLE LINE DIAGRAM - PART - 4 SE GAL EL EP H 324 00 00 00004 SE-GAL-ELEP-H-3240000-00004 C SHOP 1
305 POWER SINGLE LINE DIAGRAM - PART - 5 SE GAL EL EP H 324 00 00 00005 SE-GAL-ELEP-H-3240000-00005 C SHOP 1
STANDARD DETAILS -----
92 To 151
DESIGN & BUILT IN-FLIGHT CATERING FACILITY AT MUSCAT INTERNATIONAL AIRPORT - MC 13.
DRAWING REGISTER
UPDATED ON :
DRAWING CODE RIVISION STATUS
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
DRAINAGE -----
93 To 151
DESIGN & BUILT IN-FLIGHT CATERING FACILITY AT MUSCAT INTERNATIONAL AIRPORT - MC 13.
DRAWING REGISTER
UPDATED ON :
DRAWING CODE RIVISION STATUS
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
DRAINAGE -----
360 GROUND FLOOR - BMS LAYOUT - KEY PLAN SE GAL EL SS P 336 00 S0 00002 --
SE-GAL-ELSS-P-33600S0-00002 24-Dec-14 WF-069741 SHOP 1
361 GROUND FLOOR - BMS ENLARGED LAYOUT SE GAL EL SS L 336 00 S0 00001 SE-GAL-ELSS-L-33600S0-00001 -- 24-Dec-14 WF-069741 SHOP 1
362 ROOF - BMS LAYOUT SE GAL EL SS P 336 R1 S0 00003 SE-GAL-ELSS-P-336R1S0-00003 -- 12-Apr-15 WF-076322 SHOP 1
SECURITY SYSTEM
MAIN BUILDING
GROUND FLOOR -----
94 To 151
DESIGN & BUILT IN-FLIGHT CATERING FACILITY AT MUSCAT INTERNATIONAL AIRPORT - MC 13.
DRAWING REGISTER
UPDATED ON :
DRAWING CODE RIVISION STATUS
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
DRAINAGE -----
363 SECURITY SYSTEM LAYOUT - KEY PLAN SE GAL SC SE P 324 00 S0 00001 SE-GAL-SCSE-P-32400S0-00001 D 9-Apr-15 WF-076572 SHOP 1
95 To 151
DESIGN & BUILT IN-FLIGHT CATERING FACILITY AT MUSCAT INTERNATIONAL AIRPORT - MC 13.
DRAWING REGISTER
UPDATED ON :
DRAWING CODE RIVISION STATUS
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
DRAINAGE -----
TELECOM SERVICES LAYOUT - SEGMENT -
388 SE GAL TL AT P 324 00 S2 00003 C
2 SE-GAL-TLAT-P-32400S2-00003 4-Jun-15 WF-080107 SHOP 1
TELECOM SERVICES LAYOUT - SEGMENT -
389 SE GAL TL AT P 324 00 S3 00004 C
3 SE-GAL-TLAT-P-32400S3-00004 4-Jun-15 WF-080107 SHOP 1
TELECOM SERVICES LAYOUT - SEGMENT -
390 SE GAL TL AT P 324 00 S4 00005 C
4 SE-GAL-TLAT-P-32400S4-00005 4-Jun-15 WF-080107 SHOP 1
391 IDS / IPTV LOCATIONS - KEY PLAN SE GAL TL AT P 324 00 S0 00017 SE-GAL-TLAT-P-32400S0-00017 -- 23-Apr-15 WF-077443 SHOP 1
FIRST FLOOR -----
392 TELECOM SERVICES LAYOUT - KEY PLAN SE GAL TL AT P 324 01 S0 00006 SE-GAL-TLAT-P-32401S0-00006 C SHOP 1
TELECOM SERVICES LAYOUT - SEGMENT -
393 SE GAL TL AT P 324 01 S1 00007 C
1 SE-GAL-TLAT-P-32401S1-00007 SHOP 1
TELECOM SERVICES LAYOUT - SEGMENT -
394 SE GAL TL AT P 324 01 S2 00008 C
2 SE-GAL-TLAT-P-32401S2-00008 SHOP 1
TELECOM SERVICES LAYOUT - SEGMENT -
395 SE GAL TL AT P 324 01 S3 00009 C
3 SE-GAL-TLAT-P-32401S3-00009 SHOP 1
TELECOM SERVICES LAYOUT - SEGMENT -
396 SE GAL TL AT P 324 01 S4 00010 C
4 SE-GAL-TLAT-P-32401S4-00010 SHOP 1
397 IDS / IPTV LOCATIONS - KEY PLAN SE GAL TL AT P 324 01 S0 00018 SE-GAL-TLAT-P-32401S0-00018 -- 23-Apr-15 WF-077443 SHOP 1
ROOF FLOOR -----
398 TELECOM SERVICES LAYOUT - KEY PLAN SE GAL TL AT P 324 R1 S0 00011 SE-GAL-TLAT-P-324R1S0-00011 C SHOP 1
TELECOM SERVICES LAYOUT - SEGMENT -
399 SE GAL TL AT P 324 R1 S1 00012 C
1 SE-GAL-TLAT-P-324R1S1-00012 SHOP 1
TELECOM SERVICES LAYOUT - SEGMENT -
400 SE GAL TL AT P 324 R1 S3 00013 C
3 SE-GAL-TLAT-P-324R1S3-00013 SHOP 1
TELECOM SERVICES LAYOUT - SEGMENT -
401 SE GAL TL AT P 324 R1 S4 00014 C
4 SE-GAL-TLAT-P-324R1S4-00014 SHOP 1
UPPER ROOF -----
402 TELECOM SERVICES LAYOUT - KEY PLAN SE GAL TL AT P 324 R2 S0 00015 SE-GAL-TLAT-P-324R2S0-00015 C SHOP 1
TELECOM SERVICES LAYOUT - SEGMENT -
403 SE GAL TL AT P 324 R2 S1 00016 C
1 SE-GAL-TLAT-P-324R2S1-00016 SHOP 1
SCHEMATICS
404 TELECOM SCHEMATIC DIAGRAM SE GAL TL AT H 324 00 00 00001 SE-GAL-TLAT-H-3240000-00001 C SHOP 1
SERVICE BLOCK
GROUND FLOOR -----
405 TELECOM SERVICES LAYOUT - KEY PLAN SE GAL TL AT P 336 00 S0 00001 SE-GAL-TLAT-P-33600S0-00001 C 12-Mar-15 WF-069746 SHOP 1
406 TELECOM SERVICES ENLARGED LAYOUT SE GAL TL AT L 336 00 S0 00001 SE-GAL-TLAT-L-33600S0-00001 C 12-Mar-15 WF-069746 SHOP 1
BASEMENT & SERVICE TUNNEL
407 TELECOM SERVICES LAYOUT - KEY PLAN SE GAL TL AT P 336 B1 S0 00002 SE-GAL-TLAT-P-336B1S0-00002 -- 12-Mar-15 WF-070779 SHOP 1
GUARD HOUSE
GUARD HOUSE-AIR SIDE-TELECOM
408 SE GAL TL AT P 369 00 S0 00001 SE-GAL-TLAT-P-36900S0-00001 C 9-Apr-15 WF-076587 SHOP 1
SERVICES LAYOUT
GUARD HOUSE-LAND SIDE-TELECOM
409 SE GAL TL AT P 369 00 S0 00002 C
SERVICES LAYOUT SE-GAL-TLAT-P-36900S0-00002 9-Apr-15 WF-076587 SHOP 1
CO-ORDINATION
EXTERNAL
EXTERNAL. MEP CO-ORD. LAYOUT-KEY
410 SE GAL AL CO K 324 ET AE 00001 --
PLAN SE-GAL-ALCO-K-324ETAE-00001 SHOP 1
MAIN BUILDING
BASEMENT
VACUUM TUNNEL. MEP CO-ORD. LAYOUT-
411 SE GAL AL CO P 324 B1 S0 00001 --
KEY PLAN SE-GAL-ALCO-P-324B1S0-00001 SHOP 1
GROUND FLOOR -----
96 To 151
DESIGN & BUILT IN-FLIGHT CATERING FACILITY AT MUSCAT INTERNATIONAL AIRPORT - MC 13.
DRAWING REGISTER
UPDATED ON :
DRAWING CODE RIVISION STATUS
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
DRAINAGE -----
HIGH LVL. MEP CO-ORD. LAYOUT-KEY
412 SE GAL AL CO P 324 00 S0 00002 --
PLAN SE-GAL-ALCO-P-32400S0-00002 SHOP 1
HIGH LVL. MEP CO-ORD. LAYOUT-
413 SE GAL AL CO L 324 00 S1 00001 --
SEGMENT-1A SE-GAL-ALCO-L-32400S1-00001 SHOP 1
HIGH LVL. MEP CO-ORD. LAYOUT-
414 SE GAL AL CO L 324 00 S1 00002 --
SEGMENT-1B SE-GAL-ALCO-L-32400S1-00002 SHOP 1
HIGH LVL. MEP CO-ORD. LAYOUT-
415 SE GAL AL CO L 324 00 S1 00003 --
SEGMENT-1C SE-GAL-ALCO-L-32400S1-00003 SHOP 1
HIGH LVL. MEP CO-ORD. LAYOUT-
416 SE GAL AL CO L 324 00 S1 00004 --
SEGMENT-1D SE-GAL-ALCO-L-32400S1-00004 SHOP 1
HIGH LVL. MEP CO-ORD. LAYOUT-
417 SE GAL AL CO L 324 00 S2 00005 --
SEGMENT-2A SE-GAL-ALCO-L-32400S2-00005 SHOP 1
HIGH LVL. MEP CO-ORD. LAYOUT-
418 SE GAL AL CO L 324 00 S2 00006 --
SEGMENT-2B SE-GAL-ALCO-L-32400S2-00006 SHOP 1
HIGH LVL. MEP CO-ORD. LAYOUT-
419 SE GAL AL CO L 324 00 S2 00007 --
SEGMENT-2C SE-GAL-ALCO-L-32400S2-00007 SHOP 1
HIGH LVL. MEP CO-ORD. LAYOUT-
420 SE GAL AL CO L 324 00 S2 00008 --
SEGMENT-2D SE-GAL-ALCO-L-32400S2-00008 SHOP 1
HIGH LVL. MEP CO-ORD. LAYOUT-
421 SE GAL AL CO L 324 00 S3 00009 --
SEGMENT-3A SE-GAL-ALCO-L-32400S3-00009 SHOP 1
HIGH LVL. MEP CO-ORD. LAYOUT-
422 SE GAL AL CO L 324 00 S3 00010 --
SEGMENT-3B SE-GAL-ALCO-L-32400S3-00010 SHOP 1
HIGH LVL. MEP CO-ORD. LAYOUT-
423 SE GAL AL CO L 324 00 S3 00011 --
SEGMENT-3C SE-GAL-ALCO-L-32400S3-00011 SHOP 1
HIGH LVL. MEP CO-ORD. LAYOUT-
424 SE GAL AL CO L 324 00 S3 00012 --
SEGMENT-3D SE-GAL-ALCO-L-32400S3-00012 SHOP 1
HIGH LVL. MEP CO-ORD. LAYOUT-
425 SE GAL AL CO L 324 00 S4 00013 --
SEGMENT-4A SE-GAL-ALCO-L-32400S4-00013 SHOP 1
HIGH LVL. MEP CO-ORD. LAYOUT-
426 SE GAL AL CO L 324 00 S4 00014 --
SEGMENT-4B SE-GAL-ALCO-L-32400S4-00014 SHOP 1
HIGH LVL. MEP CO-ORD. LAYOUT-
427 SE GAL AL CO L 324 00 S4 00015 --
SEGMENT-4C SE-GAL-ALCO-L-32400S4-00015 SHOP 1
HIGH LVL. MEP CO-ORD. LAYOUT-
428 SE GAL AL CO L 324 00 S4 00016 --
SEGMENT-4D SE-GAL-ALCO-L-32400S4-00016 SHOP 1
FIRST FLOOR -----
HIGH LVL. MEP CO-ORD. LAYOUT-KEY
429 SE GAL AL CO P 324 01 S0 00003 SE-GAL-ALCO-P-32401S0-00003 -- SHOP 1
PLAN
HIGH LVL. MEP CO-ORD. LAYOUT-
430 SE GAL AL CO L 324 01 S1 00017 SE-GAL-ALCO-L-32401S1-00017 -- SHOP 1
SEGMENT-1A
HIGH LVL. MEP CO-ORD. LAYOUT-
431 SE GAL AL CO L 324 01 S1 00018 SE-GAL-ALCO-L-32401S1-00018 -- SHOP 1
SEGMENT-1B
HIGH LVL. MEP CO-ORD. LAYOUT-
432 SE GAL AL CO L 324 01 S1 00019 SE-GAL-ALCO-L-32401S1-00019 -- SHOP 1
SEGMENT-1C
HIGH LVL. MEP CO-ORD. LAYOUT-
433 SE GAL AL CO L 324 01 S1 00020 SE-GAL-ALCO-L-32401S1-00020 -- SHOP 1
SEGMENT-1D
HIGH LVL. MEP CO-ORD. LAYOUT-
434 SE GAL AL CO L 324 01 S3 00021 SE-GAL-ALCO-L-32401S3-00021 -- SHOP 1
SEGMENT-3A
HIGH LVL. MEP CO-ORD. LAYOUT-
435 SE GAL AL CO L 324 01 S3 00022 SE-GAL-ALCO-L-32401S3-00022 -- SHOP 1
SEGMENT-3B
HIGH LVL. MEP CO-ORD. LAYOUT-
436 SE GAL AL CO L 324 01 S3 00023 SE-GAL-ALCO-L-32401S3-00023 -- SHOP 1
SEGMENT-3C
HIGH LVL. MEP CO-ORD. LAYOUT-
437 SE GAL AL CO L 324 01 S3 00024 SE-GAL-ALCO-L-32401S3-00024 -- SHOP 1
SEGMENT-3D
HIGH LVL. MEP CO-ORD. LAYOUT-
438 SE GAL AL CO L 324 01 S4 00025 SE-GAL-ALCO-L-32401S4-00025 -- SHOP 1
SEGMENT-4A
97 To 151
DESIGN & BUILT IN-FLIGHT CATERING FACILITY AT MUSCAT INTERNATIONAL AIRPORT - MC 13.
DRAWING REGISTER
UPDATED ON :
DRAWING CODE RIVISION STATUS
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
DRAINAGE -----
HIGH LVL. MEP CO-ORD. LAYOUT-
439 SE GAL AL CO L 324 01 S4 00026 SE-GAL-ALCO-L-32401S4-00026 -- SHOP 1
SEGMENT-4B
HIGH LVL. MEP CO-ORD. LAYOUT-
440 SE GAL AL CO L 324 01 S4 00027 SE-GAL-ALCO-L-32401S4-00027 -- SHOP 1
SEGMENT-4C
HIGH LVL. MEP CO-ORD. LAYOUT-
441 SE GAL AL CO L 324 01 S4 00028 SE-GAL-ALCO-L-32401S4-00028 -- SHOP 1
SEGMENT-4D
ROOF FLOOR -----
HIGH LVL. MEP CO-ORD. LAYOUT-KEY
442 SE GAL AL CO P 324 R1 S0 00004 SE-GAL-ALCO-P-324R1S0-00004 -- SHOP 1
PLAN
HIGH LVL. MEP CO-ORD. LAYOUT-
443 SE GAL AL CO L 324 R1 S1 00029 SE-GAL-ALCO-L-324R1S1-00029 -- SHOP 1
SEGMENT-1A
HIGH LVL. MEP CO-ORD. LAYOUT-
444 SE GAL AL CO L 324 R1 S1 00030 SE-GAL-ALCO-L-324R1S1-00030 -- SHOP 1
SEGMENT-1B
HIGH LVL. MEP CO-ORD. LAYOUT-
445 SE GAL AL CO L 324 R1 S1 00031 SE-GAL-ALCO-L-324R1S1-00031 -- SHOP 1
SEGMENT-1C
HIGH LVL. MEP CO-ORD. LAYOUT-
446 SE GAL AL CO L 324 R1 S1 00032 SE-GAL-ALCO-L-324R1S1-00032 -- SHOP 1
SEGMENT-1D
HIGH LVL. MEP CO-ORD. LAYOUT-
447 SE GAL AL CO L 324 R1 S3 00033 SE-GAL-ALCO-L-324R1S3-00033 -- SHOP 1
SEGMENT-3A
HIGH LVL. MEP CO-ORD. LAYOUT-
448 SE GAL AL CO L 324 R1 S3 00034 SE-GAL-ALCO-L-324R1S3-00034 -- SHOP 1
SEGMENT-3B
HIGH LVL. MEP CO-ORD. LAYOUT-
449 SE GAL AL CO L 324 R1 S3 00035 SE-GAL-ALCO-L-324R1S3-00035 -- SHOP 1
SEGMENT-3C
HIGH LVL. MEP CO-ORD. LAYOUT-
450 SE GAL AL CO L 324 R1 S3 00036 SE-GAL-ALCO-L-324R1S3-00036 -- SHOP 1
SEGMENT-3D
HIGH LVL. MEP CO-ORD. LAYOUT-
451 SE GAL AL CO L 324 R1 S4 00037 SE-GAL-ALCO-L-324R1S4-00037 -- SHOP 1
SEGMENT-4A
HIGH LVL. MEP CO-ORD. LAYOUT-
452 SE GAL AL CO L 324 R1 S4 00038 SE-GAL-ALCO-L-324R1S4-00038 -- SHOP 1
SEGMENT-4B
HIGH LVL. MEP CO-ORD. LAYOUT-
453 SE GAL AL CO L 324 R1 S4 00039 SE-GAL-ALCO-L-324R1S4-00039 -- SHOP 1
SEGMENT-4C
HIGH LVL. MEP CO-ORD. LAYOUT-
454 SE GAL AL CO L 324 R1 S4 00040 SE-GAL-ALCO-L-324R1S4-00040 -- SHOP 1
SEGMENT-4D
UPPER ROOF
HIGH LVL. MEP CO-ORD. LAYOUT-KEY
455 SE GAL AL CO P 324 R2 S0 00004 SE-GAL-ALCO-P-324R2S0-00004 -- SHOP 1
PLAN
SERVICE BLOCK
BASEMENT & SERVICE TUNNEL
BASEMET & SERVICE TUNNEL H/L CO-ORD.
456 SE GAL AL CO P 336 B1 S0 00001 B
LAYOUT-PART-1 SE-GAL-ALCO-P-336B1S0-00001 1-Jul-15 WF-081453 SHOP 1
BASEMET & SERVICE TUNNEL H/L CO-ORD.
457 SE GAL AL CO P 336 B1 S0 00002 A
LAYOUT-PART-2 SE-GAL-ALCO-P-336B1S0-00002 1-Jul-15 WF-081453 SHOP 1
BASEMET & SERVICE TUNNEL H/L CO-ORD.
458 SE GAL AL CO S 336 B1 S0 00001 B
LAYOUT-SEISMIC SUPPORT DETAILS SE-GAL-ALCO-S-336B1S0-00001 1-Jul-15 WF-081453 SHOP 1
BASEMET & SERVICE TUNNEL L/L CO-ORD.
459 SE GAL AL CO P 336 B1 S0 00003 --
LAYOUT-PART-1 SE-GAL-ALCO-P-336B1S0-00003 1-Jul-15 WF-081453 SHOP 1
BASEMET & SERVICE TUNNEL L/L PUMP
460 SE GAL AL CO L 336 B1 S0 00001 --
BASE ENLARGED LAYOUT & SECTIONS SE-GAL-ALCO-L-336B1S0-00001 1-Jul-15 WF-081453 SHOP 1
BASEMET & SERVICE TUNNEL L/L CO-ORD.
461 SE GAL AL CO L 336 B1 S0 00002 --
LAYOUT-PART-2 SE-GAL-ALCO-L-336B1S0-00002 1-Jul-15 WF-081453 SHOP 1
GROUND FLOOR -----
GROUND FLOOR H/L (CHILLER PLANT
462 SE GAL AL CO S 336 00 S0 00002 --
ROOM & LV ROOM) SECTION DETAILS SE-GAL-ALCO-S-33600S0-00002 13-Jul-15 WF-081914 SHOP 1
GROUND FLOOR H/L (WATER TREATMENT
463 ROOM, BOILER ROOM & LV SE GAL AL CO S 336 00 S0 00003 --
ROOM)SECTION DETAILS -PART-3 SE-GAL-ALCO-S-33600S0-00003 13-Jul-15 WF-081914 SHOP 1
98 To 151
DESIGN & BUILT IN-FLIGHT CATERING FACILITY AT MUSCAT INTERNATIONAL AIRPORT - MC 13.
DRAWING REGISTER
UPDATED ON :
DRAWING CODE RIVISION STATUS
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
REQUIRED
SUBMITTE
REJECTED
BUILDING
SEGMENT
DRAWING
ON HOLD
REV. NOT
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
DATE
TYPE
SUB-
SUB.
SITE
NOT
NO.
NO.
IFC / SHOP
D
T
NUMBER
DRAINAGE -----
GROUND FLOOR H/L (GENE. & HT PANEL
464 ROOM)CO-ORD. LAYOUT & SECTIONS SE GAL AL CO P 336 00 S0 00004 --
-PART-1 SE-GAL-ALCO-P-33600S0-00004 13-Jul-15 WF-081914 SHOP 1
GROUND FLOOR H/L (CHILLER PLANT
465 ROOM & LV ROOM)CO-ORD. LAYOUT-PART- SE GAL AL CO P 336 00 S0 00005 --
2 SE-GAL-ALCO-P-33600S0-00005 13-Jul-15 WF-081914 SHOP 1
GROUND FLOOR H/L (WATER TREATMENT
466 ROOM, BOILER ROOM)CO-ORD. LAYOUT- SE GAL AL CO P 336 00 S0 00006 --
PART-3 SE-GAL-ALCO-P-33600S0-00006 13-Jul-15 WF-081914 SHOP 1
GROUND FLOOR H/L (LV ROOM &
467 RECYCLABLE WASTE STORE)CO-ORD. SE GAL AL CO P 336 00 S0 00007 --
LAYOUT-PART-4 SE-GAL-ALCO-P-33600S0-00007 13-Jul-15 WF-081914 SHOP 1
GROUND FLOOR L/L (GENE. & HT PANEL
468 SE GAL AL CO P 336 00 S0 00008 --
ROOM)CO-ORD. LAYOUT-PART-1 SE-GAL-ALCO-P-33600S0-00008 2-Jul-15 WF-081472 SHOP 1
GROUND FLOOR L/L (CHILLER PLANT
469 ROOM & LV ROOM)CO-ORD. LAYOUT-PART- SE GAL AL CO P 336 00 S0 00009 --
2 SE-GAL-ALCO-P-33600S0-00009 2-Jul-15 WF-081472 SHOP 1
GROUND FLOOR L/L (WATER TREATMENT
470 ROOM, BOILER ROOM & LV ROOM)CO- SE GAL AL CO P 336 00 S0 00010 --
ORD. LAYOUT-PART-3 SE-GAL-ALCO-P-33600S0-00010 2-Jul-15 WF-081472 SHOP 1
GROUND FLOOR L/L EQPT. BASE
471 SE GAL AL CO L 336 00 S0 00003 --
ENLARGED LAYOUT & SECTIONS SE-GAL-ALCO-L-33600S0-00003 2-Jul-15 WF-081472 SHOP 1
ROOF FLOOR -----
472 ROOF MEP CO-ORD. LAYOUT SE GAL AL CO P 336 R1 S0 00005 SE-GAL-ALCO-P-336R1S0-00005 -- SHOP 1
GUARD HOUSE
LAND SIDE GUARD HOUSE MEP CO-ORD.
473 SE GAL AL CO P 369 00 S0 00001 --
LAYOUT SE-GAL-ALCO-P-36900S0-00001 SHOP 1
AIR SIDE GUARD HOUSE MEP CO-ORD.
474 SE GAL AL CO P 369 00 S0 00002 --
LAYOUT SE-GAL-ALCO-P-36900S0-00002 SHOP 1
APPROVED 24
APPV. WITH COM. 164
ON HOLD 27
REV. & RE-SUB. 28
REJECTED 0
REV. NOT REQUIRED 0
NOT SUBMITTED 231
TOTAL 474
99 To 151
26-Jul-2015
100 To 151
26-Jul-2015
101 To 151
26-Jul-2015
102 To 151
26-Jul-2015
103 To 151
26-Jul-2015
104 To 151
26-Jul-2015
105 To 151
26-Jul-2015
106 To 151
26-Jul-2015
107 To 151
26-Jul-2015
108 To 151
26-Jul-2015
109 To 151
26-Jul-2015
110 To 151
26-Jul-2015
111 To 151
26-Jul-2015
112 To 151
26-Jul-2015
113 To 151
26-Jul-2015
114 To 151
26-Jul-2015
115 To 151
26-Jul-2015
116 To 151
26-Jul-2015
117 To 151
DESIGN & BUILT IN-FLIGHT CATERING FACILITY AT MUSCAT INTERNATIONAL AIRPORT - MC 13.
DRAWING REGISTER
UPDAT
DRAWING CODE RIVISION STATUS
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
SEGMENT
BUILDING
DRAWING
ON HOLD
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
TYPE
SUB-
SITE
NO.
NO.
IFC / SHOP
T
NUMBER
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
SEGMENT
BUILDING
DRAWING
ON HOLD
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
TYPE
SUB-
SITE
NO.
NO.
IFC / SHOP
T
NUMBER
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
SEGMENT
BUILDING
DRAWING
ON HOLD
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
TYPE
SUB-
SITE
NO.
NO.
IFC / SHOP
T
NUMBER
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
SEGMENT
BUILDING
DRAWING
ON HOLD
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
TYPE
SUB-
SITE
NO.
NO.
IFC / SHOP
T
NUMBER
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
SEGMENT
BUILDING
DRAWING
ON HOLD
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
TYPE
SUB-
SITE
NO.
NO.
IFC / SHOP
T
NUMBER
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
SEGMENT
BUILDING
DRAWING
ON HOLD
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
TYPE
SUB-
SITE
NO.
NO.
IFC / SHOP
T
NUMBER
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
SEGMENT
BUILDING
DRAWING
ON HOLD
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
TYPE
SUB-
SITE
NO.
NO.
IFC / SHOP
T
NUMBER
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
SEGMENT
BUILDING
DRAWING
ON HOLD
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
TYPE
SUB-
SITE
NO.
NO.
IFC / SHOP
T
NUMBER
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
SEGMENT
BUILDING
DRAWING
ON HOLD
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
TYPE
SUB-
SITE
NO.
NO.
IFC / SHOP
T
NUMBER
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
SEGMENT
BUILDING
DRAWING
ON HOLD
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
TYPE
SUB-
SITE
NO.
NO.
IFC / SHOP
T
NUMBER
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
SEGMENT
BUILDING
DRAWING
ON HOLD
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
TYPE
SUB-
SITE
NO.
NO.
IFC / SHOP
T
NUMBER
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
SEGMENT
BUILDING
DRAWING
ON HOLD
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
TYPE
SUB-
SITE
NO.
NO.
IFC / SHOP
T
NUMBER
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
SEGMENT
BUILDING
DRAWING
ON HOLD
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
TYPE
SUB-
SITE
NO.
NO.
IFC / SHOP
T
NUMBER
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
SEGMENT
BUILDING
DRAWING
ON HOLD
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
TYPE
SUB-
SITE
NO.
NO.
IFC / SHOP
T
NUMBER
APPV. WITH
PARTICIPAN
DISCIPLINE
DISCIPLINE
APPROVED
SEGMENT
BUILDING
DRAWING
ON HOLD
RIVISION
FLOOR /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION DRAWING NUMBER WORKFLOW
LEVEL
COM.
TYPE
SUB-
SITE
NO.
NO.
IFC / SHOP
T
NUMBER
STATUS
REJECTED
REV. NOT
REQUIRED
NOT
SUBMITTE
UPDATED ON :
D REMARKS
1-Jun-2017
REV. & RE-
SUB.
STATUS
REJECTED
REV. NOT
REQUIRED
NOT
SUBMITTE
D
REMARKS
REV. & RE-
SUB.
STATUS
REJECTED
REV. NOT
REQUIRED
NOT
SUBMITTE
D
REMARKS
REV. & RE-
SUB.
STATUS
REJECTED
REV. NOT
REQUIRED
NOT
SUBMITTE
D
REMARKS
REV. & RE-
SUB.
STATUS
REJECTED
REV. NOT
REQUIRED
NOT
SUBMITTE
D
REMARKS
REV. & RE-
SUB.
STATUS
REJECTED
REV. NOT
REQUIRED
NOT
SUBMITTE
D
REMARKS
REV. & RE-
SUB.
STATUS
REJECTED
REV. NOT
REQUIRED
NOT
SUBMITTE
D
REMARKS
REV. & RE-
SUB.
STATUS
REJECTED
REV. NOT
REQUIRED
NOT
SUBMITTE
D
REMARKS
REV. & RE-
SUB.
STATUS
REJECTED
REV. NOT
REQUIRED
NOT
SUBMITTE
D
REMARKS
REV. & RE-
SUB.
STATUS
REJECTED
REV. NOT
REQUIRED
NOT
SUBMITTE
D
REMARKS
REV. & RE-
SUB.
STATUS
REJECTED
REV. NOT
REQUIRED
NOT
SUBMITTE
D
REMARKS
REV. & RE-
SUB.
STATUS
REJECTED
REV. NOT
REQUIRED
NOT
SUBMITTE
D
REMARKS
REV. & RE-
SUB.
STATUS
REJECTED
REV. NOT
REQUIRED
NOT
SUBMITTE
D
REMARKS
REV. & RE-
SUB.
STATUS
REJECTED
REV. NOT
REQUIRED
NOT
SUBMITTE
D
REMARKS
REV. & RE-
SUB.
STATUS
REJECTED
REV. NOT
REQUIRED
NOT
SUBMITTE
D
REMARKS
DRAWING CODE RIVISION DRAWING CODE RIVISION DRAWING CODE RIVISION DRAWING CODE RIVISION
PARTICIPAN
PARTICIPAN
PARTICIPAN
PARTICIPAN
DISCIPLINE
DISCIPLINE
STATUS
DISCIPLINE
DISCIPLINE
STATUS
DISCIPLINE
DISCIPLINE
STATUS
DISCIPLINE
DISCIPLINE
STATUS
SEGMENT
SEGMENT
SEGMENT
SEGMENT
BUILDING
DRAWING
BUILDING
DRAWING
BUILDING
DRAWING
BUILDING
DRAWING
RIVISION
RIVISION
RIVISION
RIVISION
FLOOR /
FLOOR /
FLOOR /
FLOOR /
ZONE /
ZONE /
ZONE /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION WORKFLOW REMARKS S/NO. DRAWING TITLE / DESCRIPTION WORKFLOW REMARKS S/NO. DRAWING TITLE / DESCRIPTION WORKFLOW REMARKS S/NO. DRAWING TITLE / DESCRIPTION WORKFLOW
LEVEL
LEVEL
LEVEL
LEVEL
TYPE
TYPE
TYPE
TYPE
SUB-
SUB-
SUB-
SUB-
SITE
SITE
SITE
SITE
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
IFC / SHOP IFC / SHOP IFC / SHOP IFC / SHOP
T
NUMBER NUMBER NUMBER NUMBER
4 Site plan with Co-ordinates SE GAL AR AA K 324 ET AE 00004 -- 140 R.O.P Guard room Floor finishes SE GAL AR AA P 336 00 00
Site plan Showing Boundary Fence
5 SE GAL AR AA K 324 ET AE 00005 -- 141 R.O.P Guard room Wall Finishes SE GAL AR AA P 336 00 00
(For ROP Approval)
6 External signage part-01 SE GAL AR AG D 324 ET AE 00001 C 142 Transformer yard - architectural details SE GAL AR AA P 336 00 00
7 External signage part-02 SE GAL AR AG D 324 ET AE 00002 C 143 Truck wash architectural plan SE GAL AR AA P 336 00 00
8 Landscape details (part 1/2) SE GAL LP AL D 324 ET AE 00001 C 144 Truck wash - sections SE GAL AR AA P 336 00 00
9 Landscape details (part 2/2) SE GAL LP AL D 324 ET AE 00002 C
BASEMENT BASEMENT
10 Basement tunnel plan SE GAL AR AO P 324 B1 S0 00001 C 132 Service Block Basement Plan SE GAL AR AA P 336 B1 S0 00001 C
11 Basement tunnel plan(segment 1/4) SE GAL AR AO P 324 B1 S1 00002 C
12 Basement tunnel plan(segment 2/4) SE GAL AR AO P 324 B1 S2 00003 C
13 Basement tunnel plan(segment 4/4) SE GAL AR AO P 324 B1 S4 00004 C
14 Floor finish (Basement) SE GAL AR AF P 324 B1 S0 00001 C
Floor finish (Basement) (segment
15 SE GAL AR AF P 324 B1 S1 00002 C
1/4)
Floor finish (Basement) (segment
16 SE GAL AR AF P 324 B1 S2 00003 C
2/4)
Floor finish (Basement) (segment
17 SE GAL AR AF P 324 B1 S4 00004 C
4/4)
18 Wall finish (Basement) SE GAL AR AW P 324 B1 S0 00001 C
PARTICIPAN
PARTICIPAN
PARTICIPAN
PARTICIPAN
DISCIPLINE
DISCIPLINE
STATUS
DISCIPLINE
DISCIPLINE
STATUS
DISCIPLINE
DISCIPLINE
STATUS
DISCIPLINE
DISCIPLINE
STATUS
SEGMENT
SEGMENT
SEGMENT
SEGMENT
BUILDING
DRAWING
BUILDING
DRAWING
BUILDING
DRAWING
BUILDING
DRAWING
RIVISION
RIVISION
RIVISION
RIVISION
FLOOR /
FLOOR /
FLOOR /
FLOOR /
ZONE /
ZONE /
ZONE /
ZONE /
S/NO. DRAWING TITLE / DESCRIPTION WORKFLOW REMARKS S/NO. DRAWING TITLE / DESCRIPTION WORKFLOW REMARKS S/NO. DRAWING TITLE / DESCRIPTION WORKFLOW REMARKS S/NO. DRAWING TITLE / DESCRIPTION WORKFLOW
LEVEL
LEVEL
LEVEL
LEVEL
TYPE
TYPE
TYPE
TYPE
SUB-
SUB-
SUB-
SUB-
SITE
SITE
SITE
SITE
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
IFC / SHOP IFC / SHOP IFC / SHOP IFC / SHOP
T
NUMBER NUMBER NUMBER NUMBER
STATUS
PARTICIPAN
DISCIPLINE
DISCIPLINE
SEGMENT
BUILDING
DRAWING
RIVISION
FLOOR /
ZONE /
REMARKS S/NO. DRAWING TITLE / DESCRIPTION WORKFLOW REMARKS
LEVEL
TYPE
SUB-
SITE
NO.
NO.
IFC / SHOP
T
NUMBER
ARCHITECTURAL (CIVIL)
SERVICE TUNNEL
STATUS
PARTICIPAN
DISCIPLINE
DISCIPLINE
SEGMENT
BUILDING
DRAWING
RIVISION
FLOOR /
ZONE /
REMARKS S/NO. DRAWING TITLE / DESCRIPTION WORKFLOW REMARKS
LEVEL
TYPE
SUB-
SITE
NO.
NO.
IFC / SHOP
T
NUMBER
ARCHITECTURAL (CIVIL)
SERVICE TUNNEL