You are on page 1of 2

Ports and Logistics

CONSULTING SERVICES
Project Management Consulting (PMC)

Port Development
Container terminals
General cargo berths
Liquid/dry bulk terminals
Ro-Ro terminals
Passenger terminals
Ship building/repairing/breaking facilities
Navigation channel/basin and the safety
Navigation aids
Environmental impact study
Vessel traffic service (VTS) system
Port security
Port/vessel incident survey/analysis

Construction Management (CM)

Port Operation Management and Training


Recommendation for efficient and profitable operation/management system and body
Recommendation for efficient cargo and container handling system
Electric data interchange (EDI) system

Coastal Area Development


Coastal protection facilities
Man-made beaches
Marina

Environmental Studies
Fishery resource management study
Landing, cold storage, and other related facilities
Marine/aquaculture products handling, cold chain systems
Sector Ports & Harbors
Project Type Container Port
Project Title Batangas Port Development Project Phase I & II
Location Batangas, Republic of Philippines
Client Philippine Ports Authority (PPA) / JBIC
Project Period Phase I (1990 1999), Phase II (2000 2009)

Phase I Ferry Terminal 2005 Phase II Container Terminal 2005 Phase II Container Quay Operation 2014

Problems addressed by the Project


Batangas Port is located in Central Luzon and serves as the main gateway to/from Mindoro and Visayas, but the
previous port facilities were three aged finger piers and small back up area only in 1990. It was necessary to
expand the port facilities for Ro-Ro ferry, domestic and foreign general cargoes and fast craft for increasing
cargoes and passengers. Batangas Port Development Project Phase I was implemented from 1990-1999 to
upgrade the ports facilities.
On the other hand, Manila port reached saturation stage to handle the container cargoes. There was a need to
respond to the demands arising increased container cargoes from the South Luzon area near Batangas Port.
There was heavy traffic congestion in Manila due to transportation of containers from Manila port to South Luzon
area and arise environmental issues and economic activities. Batangas Port Development Project Phase II was
implemented from 2000-2009 to construct an international container terminal to complement the Manila Port and
to accommodate over panamax container vessel which could not accommodate in Manila port due to shallow
manila bay.

Service Provided
Feasibility Studies for Phase I and II were carried out in order to be financed by JICA ODA Loans. Detailed design
and construction supervision for Phase I and II were conducted including topo-hydrographic survey, soil
investigation, detail design of berths, yard, buildings, utilities, container handling equipment, movable bridges,
port security systems, etc.
Study on Container terminal Management and Operation Program including selection of concessionaire of the
container terminal was conducted with PPA.

Actual Project Works


1. Phase I:
Two general cargo berths, transit shed, six RO-RO berths, two ferry berths, five fast craft berths, passenger
terminal buildings, elevated walkway with boarding bridges, car parking area
2. Phase II:
Container terminal berth : L = 450 m, Design Depth = -15 m
Container yard : A = 12 ha
3
C.F.S. Dredging the basin and access channel : Depth = -13 m, Dredging volume = 5.2 million m
Land reclamation fill : A = 64 ha
General cargo berth : A = 2.8 ha, L = 470 m
Port Access Road and Flyover : L= 1 km
Cargo Handling Equipment : 2 Nos. of Quay Cranes, 4 Nos. of Rubber Tired Gantry
Cranes
Supporting Port Facilities : Vessel Traffic Management System, Gate Management
System, Mobile X-ray for Ro-Ro inspection,
Patrol/Service boat
Other structures and works : buildings, passenger board bridges, road network and
utilities