You are on page 1of 1

Form 016-03

WIND FARM WORK SITE INSPECTION LOG Version 00: 03/08/06


Page 1 of 1

Name of Developer:
Name of Wind Farm:
Location:
GAMESA EOLICA Representative:

Date of Inspection: Inspection Log #:


Company Inspected:
Activity:
Name of Representative:

INSPECTION REPORT (please list any inspected work and include any relevant information)

Audit Technician Project Director or GAMESA Representative


(Name and Signature) (Name and Signature)

You might also like