You are on page 1of 1

Replacement of Deteriorated GRP and AC pipelines for Rehabilitation of the Existing Pipelines at

Different areas of Al Ain


Agreement Number : A-6003.1
Plant and Equipment Histogram
Status as of : 23rd March-2017

Peak Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17
Craft
(Nos)
P R A P R A P R A P R A P R A P R A P R A P R A P R A

Plant and Equipment 0 33 0 0 33 0 0 33 0 0 33 0 0 33 0 0 33 0 0 33 0 0 33 0 0 31 0

Crane 30 / 50 T 1 1 1 1 1 1 1 1 1 1

Excavator 1 1 1 1 1 1 1 1 1 1

JCB 2 2 2 2 2 2 2 2 2 1

Dewatering/Submissable Pump 4 4 4 4 4 4 4 4 4 4

Welding Machine 3 3 3 3 3 3 3 3 3 3

Total Station 1 1 1 1 1 1 1 1 1 1

Auto Level 1 1 1 1 1 1 1 1 1 1

GPS

Dump Truck

Compressor 1 1 1 1 1 1 1 1 1 1

Power Generator 5 5 5 5 5 5 5 5 5 5

Water Tanker 1 1 1 1 1 1 1 1 1 1

Truck Crane 2 2 2 2 2 2 2 2 2 2

Trailer 0

Bus 2 2 2 2 2 2 2 2 2 2

Compactor 3 3 3 3 3 3 3 3 3 3

Pickup (3 Ton) 1 1 1 1 1 1 1 1 1 1

Pickup 4 4 4 4 4 4 4 4 4 3

Pressure Pump 1 1 1 1 1 1 1 1 1 1

35
Plant&Equipment

30

25
Equipments

20

15

10

0
P R A P R A P R A P R A P R A P R A P R A P R A P R A
Apr17 May17 Jun17 Jul17 Aug17 Sep17 Oct17 Nov17 Dec17
PlantandEquipment 0 33 0 0 33 0 0 33 0 0 33 0 0 33 0 0 33 0 0 33 0 0 33 0 0 31 0