You are on page 1of 5

EDDIE MANLEGRO AVILA JR., PICE, Matl Engr 1.

REGISTERED CIVIL ENGINEER


E-mail: eddie12_yurin@yahoo.com
Contact No. 0907-684-6219/0906-241-7284

PERSONAL DATA:

Nickname: Abs
Age : 26 years old Date of Birth: January 6, 1989 Religion : Baptist
Weight : 65 kgs Height : 1.74 meters Philhealth No. : 15-025253525-1
SSS No. : 08-1954320-8 TIN : 444-842-217 Passport No. : None

Home address : Purok-3 San Antonio Ozamis City Miss. Occ.


Fathers Name : Eddie C. Avila Sr.
Occupation : Foreman, City Engineer Office, Ozamis City
Mothers Name : Ma. Lilibeth M. Avila
Occupation : Bank Collector, Ozamis City

EDUCATIONAL:
1) Elementary : San Antonio Elementary School Ozamis City (March 2000)
2) High School : Holy Child High School, Clarin Misamis Occ. (March 2004)
3) College : Misamis University Ozamis City (June 2006 March 2012)

GOVERNMENT EXAMINATION PASSED:


RATING
1) Civil Engineers Licensure Exam 75.05% ( May 2012)
2) Material Engineer DPWH Accreditation Exam 73.00% (September 2013)
3) Material Engineer DPWH Accreditation Exam 68.00% ( April 2015)

WORK EXPERIENCE

1) EMPLOYER: Freyssinet International Manila Inc.


Valero St. Salcedo Village Makati City
Dec. 2014 Present

DESIGNATION/ POSITION HELD: Office Engineer


PROJECT: 1. MNTC PROJECT HARBOUR LINK SEGMENT 10,
MC-ARTHUR HIGHWAY TO C-3 ROAD

Job Description:
Technical Activities - Make transaction with supplier in other country for
The Required materials and equipment base in the
approved specification.
- Check import supplier mill certificate for every
shipment of Post Tensioning Girder materials.
- Prepare purchase Order process.
- Assist Technical Manager in Preparation for
estimating quantity of Post Tensioning materials
and stressing calculation.
- Assist and supervised with site engineer for grout
testing in the laboratory. (does cube mold sampling,
concrete cylinder)
- Review project specification and drawings.
- Reported directly to the General Manager for
Update status of importation, delivery of local
materials and Purchase Order Status.
- Check and approved Shipping docs. And Mill
Certificate before proceed the departure of
shipment.
- Make an excel file program for billing evaluation.
- Evaluate and prepare monthly billing evaluation
based on actual accomplishment and delivery of the
materials on site.

2. AYALA BRIDGE REHABILITATION PROJECT


- Ask Supplier to provide data sheets or brochure, test
Result and sample for approval with the client.
- Prepare Purchase Order to the supplier
- Arrange with the nominated broker for Import
Materials and equipment.
- Coordinate with the nominated broker for shipment
process.
- Monitor shipment delivery status.

3. QUEZON BRIDGE REPAIR.


- Collaborate with the project manager the work
proposal and method of construction use for
retrofitting.
- Assist and design the material use for replacement
member.
- Ask Supplier test result of the materials,
- Assist Preparing data sheets, plan and specs.
Required for approval to the client
- Make Purchase order to the nominated supplier.
- Arrange with the broker the importation process.
- Monitor shipment delivery status.
4. THE RUNWAY PROJECT
- Make Purchase Order to nominated Supplier
- Process importation with the nominated broker for
Pot Fixed Bearing
- Monitoring shipment status.
- Evaluate Progress billing per accomplishment to
invoice the client.

5. PLARIDEL BYPASS ROAD PACKAGE 3


- Make Purchase order to the nominated Supplier
- Supply and import High tensile Strength Threaded
bar and accessories from other country
- Check and evaluate test result of Threaded bars
- Evaluate progress billing per accomplishment to
invoice the client.

6. MAGALLANES INTERCHANGE REPLACEMENT OF


EXPANSION JOINT
- Arrange importation with the nominated broker
- Monitor delivery of materials.
- Supervised and check manpower accomplishment
on site
- Evaluate progress billing per accomplishment to
invoice the client.

2). EMPLOYER: MONOLITH CONSTRUCTION DEVELOPMENT CORP.


# 85 Scout Limbaga St. Tomas Morato Quezon City
Dec. 18, 2013 to Oct. 2014

PROJECT: Mactan 8 Newtown - Construction of


Condominium 4 Towers (18 Stories each including
Podium) Structural and Architectural located at
Mactan Island Cebu city.

DESIGNATION/ POSITION HELD: Planning and Logistics Engineer

Job Description:
Technical Activities - Evaluate and Prepare Progress Billing to
Owner and Trade- Con.
- Prepare S-Curve for Monthly Project Status and
Daily Accomplishment Report.
- Take Progress Photos for Monthly Accomplishment
Report.
- Follow-up RFP (Request for Payment) or
Endorsement to Owner regarding the Billing Status.
- Check and provide Shop Drawing and Product
Sample for Architect/Consultant Approval.
- Prepare Tender Documents.
- Ask Supplier for Quotation (at least three Suppliers
for Price and Quality Comparison) and Award the
Supplier Lowest Bid Price.
- Procurement of Materials (based on Architectural
and Structural Specification).
- Evaluate Changes/Variation Orders.
- Prepare Change Order Proposal to Architect and
Trade Con. (Does Cost Estimate).
- Prepare and Submit Budget Estimate in Particular
Area or Structure.
- Prepare Daily Activity Report.
- Does Manpower Monitoring and Accomplishment
on site
- Monitor plan lay- out prior to inspection approval.
- Coordinate with the Trade Con. For Punch list work
in particular Area for Turn-over.

3). EMPLOYER: GRACE CONSTRUCTION CORP.


Bernard Subdivision, Ozamis City
June 2012 to August 2013

PROJECT: Construction of bridge Connecting Logpond to


Limaong Island at Zamboanga City (Bored Piles,
Copping Beams, Assemble Steel Transom, Bailey
Panel Bridge materials for superstructure.

DESIGNATION/ POSITION HELD: PROJECT ENGINEER

Job Description:
Technical Activities - Construction of PCCP, shouldering, guard rail and
Rip- rap for both ends of the Bridge.
- Authorized to attend the meeting with the client or
highest personnel of the government dealing
problems encountered and development regarding
the project status.
- Use auto-cad for Bank house floor plan design and
detailed clarification for highway cutting section per
station.
- Evaluate materials needed on the project based on
the inventory report.
- Authorized to compute and released the payroll of
workers every payday.
- Monitor and supervise the accomplishment of the
project and workers.
- Lay-out reference point in the field using
engineering level and total station instrument for
proper location.
- Prepare and Conduct testing of concrete cylinder
sample and beam sample during concrete pouring.
- Supervised and witness with client the sample of
testing.
- Assist testing for PDT (Pile Dynamic Test) and Non-
Destructive test on selected columns of the bridge.
- Assist assemble Super High Shear and High Shear
Bailey Panel, Transom and other materials for Bailey
Panel Bridge.

SKILLS:
Proficient in basic computer software (MS Word, Excel, PowerPoint)
Auto Cad
Estimates & Surveying

I hereby certify that the above information are true and correct to the best of my
knowledge and belief.

EDDIE M. AVILA JR.


REGISTERED CIVIL ENGINEER
P.R.C 0123709
Republic of the Philippines

You might also like