SINGLE SITE ACCEPTANCE REPORT


prepared No. Program Site ID

Rendhita/Jhon P 2017 Batch 2 JPS 455A730E


Approved Checked Date Rev Reference

Waqas 2017-04-03

455A730E_LTE_TELOGO
(MALANG)
SINGLE SITE ACCEPTANCE

Abstract
This document is to provide report for XL Axiata on as Single Site Acceptance on JPS project.

RND PMO
PT.HUAWEI TECH INVESTMENT
PT. XL AXIATA Tbk PT. XL AXIATA Tbk

Name : Name : Name :


Date : Date : Date :
2 (16)
SINGLE SITE ACCEPTANCE REPORT
prepared No. Program Site ID

Rendhita/Jhon P 2017 Batch 2 JPS 455A730E


Approved Checked Date Rev Reference

Waqas 2017-04-03

Contents
1 Introduction................................................................................................................. 3
1.1 General Site Information ............................................................................................... 3
1.2 Summary of Important Key Performance Indicator on Drive Test.................................. 4
2 Performance Result .................................................................................................... 5
2.1 Drive Test Event ........................................................................................................... 6
2.2 Drive Test Plot .............................................................................................................. 7
2.2.1 RSRP (Reference Signal Received Power) .................................................................. 7
2.2.2 SINR (Signal to Noise & Interference Ratio .................................................................. 8
2.2.3 PCI Plot ........................................................................................................................ 9
2.2.4 Transmission Mode .................................................................................................... 10
2.3 Stationary Test ........................................................................................................... 11
2.3.1 Downlink (FTP) Throughput ........................................................................................ 11
2.3.2 Uplink (FTP) Throughput ............................................................................................ 11
2.3.3 Speed Test (Using OOKLA & OpenSignal) ................................................................. 12
2.4 Functional Test ........................................................................................................... 12
3 Site Audit ................................................................................................................... 13
3.1 Cell Basic Info. Audit................................................................................................... 13
3.2 Service Impacted Alarms ............................................................................................ 13
3.3 Feature Audit .............................................................................................................. 13
4 Conclusion ................................................................................................................ 14
5 Justification .............................................................................................................. 15
5.1 Long Ping latency & RTT Justification......................................................................... 15
3 (16)
SINGLE SITE ACCEPTANCE REPORT
prepared No. Program Site ID

Rendhita/Jhon P 2017 Batch 2 JPS 455A730E


Approved Checked Date Rev Reference

Waqas 2017-04-03

1 Introduction
Basic KPI report is provided to XL Axiata as part of LTE Project deliverables on cell level.

1.1 General Site Information


General Site Information
Site ID 455A730E
Site Name LTE_TLOGOSARI
SGW / MME SGW_SBY06_HW / MME_SBY7-8-9_HW
DSN.SUKASARI RT.07 RW.02 DS.SUKOREJO
Site Address
KEC.TIRTOYUDO KAB.MALANG EAST JAVA
Long Lat 112.83625 ; -8.22603
RF Team Erlangga Pradhigda Putra
DT Team Sofyan
Genex Probe 3.16
DT Measurement Devices
Samsung S5
Antenna System MIMO 2T2R
Configured Radio Bandwidth 10 Mhz
Configured Frequency Bandwidth 1800 Mhz
PCI information Sect 1 / Sect 2 / Sect 3 264/265/266
TAC (4G) / RAC (3G) configuration 55531/159
Integration Scenario Existing G900+1800+U2100, New LTE

Item Design Implementation


Radio Unit Type MRFU V2 2x MRFU V2 2x
Antenna System MIMO 2T2R MIMO 2T2R
Antena Type TTB 809016/182017/182017DE-65P TTB 809016/182017/182017DE-65P
Antenna Scenario Keep Existing Keep Existing
4 (16)
SINGLE SITE ACCEPTANCE REPORT
prepared No. Program Site ID

Rendhita/Jhon P 2017 Batch 2 JPS 455A730E


Approved Checked Date Rev Reference

Waqas 2017-04-03

1.2 Summary of Important Key Performance Indicator on Drive Test


Functionality Stationary Test (10
Sec 1 Sec 2 Sec 3 Ref Status
times)
>15 Mbps (3 MHz)

> 50 Mbps (10 MHz)


DL Single User Throughput (Max Best (MIMO)
Spot) 52.88 53.03 52.04 > 25 Mbps (10 MHZ)
Method : Find best spot on each cell. Use FTP server to
(SIMO) Pass
download 1 big file with size of 100 Gb (1 session). Observe Mbps Mbps Mbps
the speed using DU meter, record the result using Gnex
Project or TEMS Project.
> 75 Mbps (15 MHz)
*SIMO DL throughput is half than
MIMO
UL Single User Throughput (Max Best
Spot) > 4 Mbps (3 MHz)
20.56 21.53 21.35
Method : Find best spot on each cell. Use FTP server to > 15 Mbps (10 MHz) Pass
upload 1 big file with size of 50 Gb (1 session). Observe the Mbps Mbps Mbps
speed using DU meter, record the result using Gnex Project > 25 Mbps (15 MHz)
or TEMS Project.
PCI Plot (Cross Feeder Check) 264 265 266 No cross feeder Pass
CS Fallback Setup Time (Outgoing) 1.67 1.77s 1.89s < 5s Pass
CS Fallback Success Rate (Outgoing) 100% 100% 100% > 97% Pass
CS Fallback Setup Time (Incoming) 1.31s 1.22s 1.02s < 5s Pass
CS Fallback Success Rate (Incoming) 100% 100% 100% > 97% Pass
CS Fallback Return Time to LTE 1.12s 1.18s 1.19s < 5s Pass
Return Time to LTE Success Rate 100% 100% 100% > 97% Pass
Session Setup Success Rate 100% 100% 100% > 99% Pass
Session Abnormal Release Rate 0% 0% 0% < 1.4% Pass
Small / Big Ping Latency (RTT Ping 32 / 30.11/ 32.22/ 31.80/ Not
<= 20 ms / 30 ms
1000) 33.77 32.42 31.43 Pass
Handover Success Rate 100% 100% 100% > 98% Pass
Jitter (Uplink and Downlink) 9.55 < 50 ms Pass
5 (16)
SINGLE SITE ACCEPTANCE REPORT
prepared No. Program Site ID

Rendhita/Jhon P 2017 Batch 2 JPS 455A730E


Approved Checked Date Rev Reference

Waqas 2017-04-03

2 Performance Result
Cell level KPI aggregate into 1 day, taken at Cell Busy Hour except availability.
Date (Start - End) 15 June 17 to 15 June 17

Availability
No Name Reference Measured On Sector 1 Sector 2 Sector 3 Status
1 Radio Network Availability Rate > 98% Cell Daily 99.96% 99.96% 99.96% Pass

Accessibility
N Statu
Name Ref Measured On Value
o s
1 Session Setup Success Rate 99.89% Cell Busy Hour 100.00% Pass
2 CSFB Call Setup Success Rate (CSFB SR) 100.00% Cell Busy Hour 100.00% Pass
Voice - Incoming Call Setup Success Rate (Merge with
3 100.00% Cell Busy Hour 100.00% Pass
Outgoing and Incoming)

Retainability
No Name Ref Measured On Value Status
1 Session Abnormal Release Rate (SARR) <2% Cell Busy Hour 07% Pass

Integrity
No Name Reference Measured On Value Status
1 UL Packet Loss (PDCP) <1e-3 Cell Busy Hour 1.94967E-05 Pass
2 DL Packet Loss (PDCP) <1e-3 Cell Busy Hour 3.09403E-07 Pass
> 21.2 Mbps
(3 MHz)
> 70.3 Mbps
3 Downlink Peak PDCP User Throughput (10 MHz) Cell Daily 63.610994 Info only*
> 105.4
Mbps (15
MHz)
> 7.2 Mbps
(3 MHz)
> 26.2 Mbps
4 Uplink Peak PDCP User Throughput Cell Daily 24.815855 Info only*
(10 MHz)
> 40.5 Mbps
(15 MHz)
5 RTT Latency <= 8ms Cell Busy Hour 1.094870456 Info only*

6 Jitter (Uplink and Downlink) < 50 ms Cell Busy Hour N/A Info only*
* Depend on user behavior
6 (16)
SINGLE SITE ACCEPTANCE REPORT
prepared No. Program Site ID

Rendhita/Jhon P 2017 Batch 2 JPS 455A730E


Approved Checked Date Rev Reference

Waqas 2017-04-03

Mobility
N Measured Statu
Name Ref Value
o On s
> Cell Busy
1 HO Success Rate - Intra Frequency (IN & OUT) 100.00% Pass
95% Hour
> Cell Busy
2 HO Success Rate - Inter Frequency (IN & OUT) 0.00% Null
95% Hour
PS Inter-RAT HO Success Rate (IN & OUT) for WRAN (PSHO > Cell Busy
3 100.00% Pass
IRAT) 90% Hour

Traffic (for information only)


Name Ref
UL Volume (Gb) Info* 2.08188945
DL Volume (Gb) Info* 25.2383667
*Traffic data provided for information only

2.1 Drive Test Event


Drive test was performed on 17 April 2017 with result as follows.
Functionality Stationary Test (10 times) Sec 1 Sec 2 Sec 3 Ref
LTE Attach Success Rate 100% 100% 100% > 95%
Ping packet loss 0.0000% 0.0000% 0.0000% < 10e-4 %

Coverage Plot (Idle Mode) All Sector (%)


RSRP (Reference Signal Received Power) > -105 dBm 84.76%
SINR (Signal to Interference & Noise Ratio) * > 3 99.75%
* Information only
Mobility Test (Dedicated Mode) Sec 1 Sec 2 Sec 3
Intra-Frequency Handover 100% 100% 100%
Inter-Frequency Handover N/A N/A N/A
IRAT-Handover (RwR / PSHO)* N/A N/A N/A
* Information only
7 (16)
SINGLE SITE ACCEPTANCE REPORT
prepared No. Program Site ID

Rendhita/Jhon P 2017 Batch 2 JPS 455A730E


Approved Checked Date Rev Reference

Waqas 2017-04-03

2.2 Drive Test Plot

2.2.1 RSRP (Reference Signal Received Power)

Picture 1.RSRP plot on site

*RSRP plot include 1st tier neighbors

RSRP Range Percentage


> -85 dBm 27.02%
-85 dBm to < -90 dBm 12.68%
-90 dBm to < -100 dBm 23.69%
-100 dBm to < -105 dBm 17.29%
-105 dBm to < -115 dBm 19.33%
< -115 dBm 0.00%
Total 100%
Table 1. RSRP distribution (%)
8 (16)
SINGLE SITE ACCEPTANCE REPORT
prepared No. Program Site ID

Rendhita/Jhon P 2017 Batch 2 JPS 455A730E


Approved Checked Date Rev Reference

Waqas 2017-04-03

2.2.2 SINR (Signal to Noise & Interference Ratio

Picture 2.SINR plot on site


*SINR plot include 1st tier neighbors

SINR Range Percentage


SINR 20 dB 39.82%
10 dB SINR < 20 dB 44.94%
3 dB SINR < 10 dB 12.68%
0 dB SINR < 3 dB 0.51%
-5 dB SINR < 0 dB 1.28%
SINR < -5 dB 0.77%
Table 2. SINR distribution (%)
9 (16)
SINGLE SITE ACCEPTANCE REPORT
prepared No. Program Site ID

Rendhita/Jhon P 2017 Batch 2 JPS 455A730E


Approved Checked Date Rev Reference

Waqas 2017-04-03

2.2.3 PCI Plot

Summary : No Cross feeder is detected.


*PCI plot include 1st tier neighbors

c
10 (16)
SINGLE SITE ACCEPTANCE REPORT
prepared No. Program Site ID

Rendhita/Jhon P 2017 Batch 2 JPS 455A730E


Approved Checked Date Rev Reference

Waqas 2017-04-03

2.2.4 Transmission Mode

MIMO Check Result


Sec 1 Sec 2 Sec 3
ANTENNA SYSTEM MIMO MIMO MIMO
TM1 NO NO NO
TM2 YES YES YES
TM3 YES YES YES
11 (16)
SINGLE SITE ACCEPTANCE REPORT
prepared No. Program Site ID

Rendhita/Jhon P 2017 Batch 2 JPS 455A730E


Approved Checked Date Rev Reference

Waqas 2017-04-03

2.3 Stationary Test

2.3.1 Downlink (FTP) Throughput

*Pick one cell as a snapshot result, with DU meter

2.3.2 Uplink (FTP) Throughput

*Pick one cell as a snapshot result, with DU meter


12 (16)
SINGLE SITE ACCEPTANCE REPORT
prepared No. Program Site ID

Rendhita/Jhon P 2017 Batch 2 JPS 455A730E


Approved Checked Date Rev Reference

Waqas 2017-04-03

2.3.3 Speed Test (Using OOKLA & OpenSignal)

*Pick one cell as a snapshot result


* For information only
need switch on GPS and check the coordinate

2.4 Functional Test


Refer to E-NODEB INSTALLATION ACCEPTANCE document.
13 (16)
SINGLE SITE ACCEPTANCE REPORT
prepared No. Program Site ID

Rendhita/Jhon P 2017 Batch 2 JPS 455A730E


Approved Checked Date Rev Reference

Waqas 2017-04-03

3 Site Audit

3.1 Cell Basic Info. Audit


PLAN/BEFORE AFTER
Site Audit
Sec 1 Sec 2 Sec 3 Sec 1 Sec 2 Sec 3
Azimuth 30 120 240 30 120 240
Tilt (E/M) 3/4 3/4 3/4 3/4 3/4 3/4
Antenna Height 71 71 71 71 71 71
Location 112.83625 / -8.22603 112.83625 / -8.22603

Note: SoW only reuse material/Insert board, no RF Site survey/audit done

SUMMAR
SCENARI DRM BSS
Y
O UDPATE DESCRIPTIO SURVEY
SITE 3G SITE 4G TOWER SITE NAME SOLUTIO FINAL CABINET
BSS (21 N (21 feb STATUS
N BSS (21
Feb 2017) 2017)
Feb 2017)
1.Reuse
UMPTb1
existing
Scenario
2.Add
3: Insert
Scenario 1xUBBPd3 Existing cabinet NO
Board RF
355A730G 455A730E A730_TLOGOSARI_MALANG 3: Insert 3.Reuse OL/U2100/GS NEED
+ Insert
Board RF 3xMRFUV2 M SURVEY
BBU
existing
Board
4.Add
3xMRFUV2
donor

3.2 Service Impacted Alarms

alarm.xlsx
No service impacted alarms found

3.3 Feature Audit


Features have been activated as per BOQ
14 (16)
SINGLE SITE ACCEPTANCE REPORT
prepared No. Program Site ID

Rendhita/Jhon P 2017 Batch 2 JPS 455A730E


Approved Checked Date Rev Reference

Waqas 2017-04-03

4 Conclusion

We summarize that 455A730E_LTE_TLOGOSARI_MALANG meets below KPI


score:

KPI Category All Pass Fail Percentage


DT KPI 14 13 1 92.8%
NMS KPI 10 10 0 100%

We conclude that 455A730E_LTE_TLOGOSARI_MALANG is:

Pass, without note


Pass, with note
Not pass
*please tick one appropriate result
15 (16)
SINGLE SITE ACCEPTANCE REPORT
prepared No. Program Site ID

Rendhita/Jhon P 2017 Batch 2 JPS 455A730E


Approved Checked Date Rev Reference

Waqas 2017-04-03

5 Justification

5.1 Long Ping latency & RTT Justification


t1 t2 t3 t4

t1' t2' t3' t4'


UE eNodeB SGW PGW FTP
Ping 32
t1 t1 t2 t2t3 t3t4 t4
RTT = t1
Ping Latency (UE to FTP) = t1 + t2 + t3 + t4 + t4 + t3 + t2 + t1 = 30.11 (UE ping Huawei FTP)

Ping Latency (eNodeB to SGW) = t2 + t2 = 16 ms

Ping Latency(UE to FTP) Ping Latency(eNodeB to SGW) 30.1116


t1 +t3 +t4 = 2
= 2
= 7.1 ms

RTT = t1 = 7.1 ms t3 t4 < 8ms (Target)

Ping 1000
t1 t1 t2 t2t3 t3t4 t4
RTT = t1
Ping Latency (UE to FTP) = t1 + t2 + t3 + t4 + t4 + t3 + t2 + t1 = 31.43 (UE ping Huawei FTP)

Ping Latency (eNodeB to SGW) = t2 + t2 = 16 ms

Ping Latency(UE to FTP) Ping Latency(eNodeB to SGW) 31.4316


t1 +t3 +t4 = 2
= 2
= 7.72 ms

RTT = t1 = 7.72 ms t3 t4 < 8ms (Target)


16 (16)
SINGLE SITE ACCEPTANCE REPORT
prepared No. Program Site ID

Rendhita/Jhon P 2017 Batch 2 JPS 455A730E


Approved Checked Date Rev Reference

Waqas 2017-04-03