Professional Documents
Culture Documents
Dr Philippe Richard,
CCM President
and
Prof. Joachim Ullrich,
CCU President
CCM conditions (before redefinition)
R1 Consistency
Three independent experiments (XRCD & WB)
with consistent results with urel < 510-8
R2 Uncertainty
at least one result with urel < 210-8
R3 Traceability
Extraordinary calibration with IPK @ BIPM
R4 Validation
Validation of the mise en pratique according to
the CIPM-MRA
www.bipm.org 2
Joint CCM and CCU roadmap for the new SI
14
CCM CCU
01.07.2017
Convocation Closing date
CGPM Metrologia special edition
15 for new data
Mise en pratique (mep kg) CCM (with references for the mep)
mep kg
approved
updated mep kg
Initial pilot study (kg)
16 approved
(preparation, measurements & report) CCM
CCU CCM
BIPM extraordinary Traceability R4
CCM
calibration with IPK to IPK R3 Consultation / announcement