You are on page 1of 32

CHHABRA THERMAL POWER PLANT

ELECTRICAL MAINTENANCE CIRCLE


Annual maintenance programme of 250 MW Unit # 4 for the year 2016.
Area:- Electrical System (Power transformers, Service Transformers & IPBD of Unit # 4).
PERT CHART
S.
Description of Works/Active Day (25 May 2016 to June 2016)
No.

A Power Transformers 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11

Preventive maintenance and associated


1
work of Generator Transformer#4

Preventive maintenance of station


2
Transformer#4 and associated work

Inspection of terminal box, Bus duct


3 and their thightness in UAT#4A &
UAT#4B Transformers

Attending the various cooling fans & As the work is perfo


4 Pumps of Power Transformers and their with other agenc
panels Engineers so there
Checking of various protection charges possible in
5 per available of t
schemes of Power Transformer
equipm
Checking of oil BDV and level and
6 topup, Inspection and replacment of
silica gel
B Service Transformers
Cleaning, Inspection of terminal box
1 and Bus duct and their tightness of
Transformers ESP 4A. 4B
Cleaning, Inspection of terminal box
2 and Bus duct and their tightness of
Transformers AHT 4B.
Cleaning, Inspection of terminal box
3 and Bus duct and their tightness of
Transformers INT silo 1,3 & Final silo

Cleaning, Inspection of terminal box


4 and Bus duct and their thightness of
Transformers WTP 4B & IDCT 4B
Cleaning, Inspection terminal box and
5 Bus duct and their tightness of
Transformers UST 4A & 4B
As the work is performed in parallel
with other agencies/services
Engineers so there may be some
charges possible in the schedule as
per available of the system &
equipment
CHHABRA THERMAL POWER PLANT
ELECTRICAL MAINTENANCE CIRCLE
Annual maintenance programme of 250 MW Unit # 2 for the year 2016.
Area:- Electrical System (Power transformers, Service Transformers & IPBD of Unit # 2).
PERT CHART
S.
Description of Works/Active Day (17 June 2016 to 1st July 2016)
No.
A Power Transformers 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Remarks
Preventive maintenance and associated Oil leakage in GT#2
1 will be attended by
work of Generator Transformer#2
ourselves only without
Preventive maintenance of station the supervision of
2
Transformer#2 and associated work BHEL engineer due to
non availability of
Inspection of terminal box, Bus duct and spares not supplied by
3 their thightness in UAT#2A & UAT#2B BHEL,LOI for hiring of
Transformers oil filtration machine
has been placed
Attending the various cooling fans & therefore any
4 Pumps of Power Transformers and their emergency may be As the work is
panels handled by topping up parallel wi
Checking of various protection schemes of the oil. agencies/servic
5
Power Transformer so there may
changes poss
Checking of oil BDV and level and topup, schedule as per
6
Inspection and replacment of silica gel the system &

B Service Transformers
Cleaning, Inspection of terminal box and
1 Bus duct and their tightness of
Transformers ESP 2A. 2B
Cleaning, Inspection of terminal box and
2 Bus duct and their tightness of
Transformers AHT 2B.
Cleaning, Inspection of terminal box and
3 Bus duct and their tightness of
Transformers INT silo 1,3 & Final silo
Cleaning, Inspection of terminal box and
Bus duct and their thightness of
4
Transformers WTP 2A & 2B & IDCT 2A &
2B
Cleaning, Inspection terminal box and Bus
5 duct and their tightness of Transformers
UST 2A & 2B
he work is performed in
parallel with other
cies/services Engineers
o there may be some
anges possible in the
dule as per available of
e system & equipment
CHHABRA THERMAL POWER PLANT
ELECTRICAL MAINTENANCE CIRCLE
Annual maintenance programme of 250 MW Unit # 3 for the year 2016.
Area:- Electrical System (Power transformers, Service Transformers & IPBD of Unit # 3).
PERT CHART
S.
Description of Works/Active Day (03 August 2016 to 23 August 2016)
No.
A Power Transformers 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Remarks
Oil leakage in ST#3
Preventive maintenance and associated
1 will be attended by
work of Generator Transformer#3
ourselves only w.o. for
Preventive maintenance of station hiring of oil filtration
2 Transformer#3 and oil leakage will also machine has been
be attended. placed therefore any
emergency may be
Inspection of terminal box, Bus duct and handled by topping up
3 their thightness in UAT#3A & UAT#3B the oil.
Transformers

Maintenance of 16.5 KV Bus Duct


cleaning of insulators & inner shell
4 tightening of CT Terminals including
Meggaring of bus duct after completion
of work .

Maintenance of neutral grounding


5 cubicle, LAVT cubicle, air pressurisation
system and hot air blowing system

Checking of various protection schemes


6
of Power Transformer
Checking of oil BDV and level and
7 topup, Inspection and replacment of
silica gel
B Service Transformers
Cleaning, Inspection of terminal box and
1 their tightness of Transformers ESP 3A.
3B AHT 2A.
Cleaning, Inspection of terminal box and
2 their tightness of Transformers SST 2A,
UST 3A, UST 3B,

Cleaning, Inspection of terminal box and


3 their tightness of Transformers INT silo
3 & Final silo 3
Cleaning, Inspection of terminal box and
4 their thightness of Transformers WTP 2A
& IDCT 2A.
As the work is
performed in
parallel with other
agencies/services
Engineers so
there may be
some changes
possible in the
schedule as per
available of the
system &
equipment
CHHABRA THERMAL POWER PLANT
ELECTRICAL MAINTENANCE CIRCLE
Preventive maintenance Schedule of Power transformers, Service Transformers & IPBD of Unit # 1 to 4.

S. Name of
No.
Date
Equipment
Description of Works/Activity Remarks

In the given
General cleaning of Transformer with cloth including
Preventive
radiator, marshalling box cooling fan, tightness of schedule all the
maintenance and preventive
flanges. Inspection of Silica Gel and replacement if
1 15.10.2016 associated work of maintenance
required checking of oil level and BDV in Service
Generator works are
Transformers and yard cleaning, preventive
Transformer#1 included which
maintenance of cooling fans.
may be perform
General cleaning of Transformer with cloth including during the charged
Preventive Transformers
radiator, marshalling box cooling fan, tightness of
maintenance and
flanges. Inspection of Silica Gel and replacement if taking with all
2 16.10.2016 associated work of
required checking of oil level and BDV in Service safety measures
Station
Transformers and yard cleaning, preventive and rest
Transformer#1
maintenance of cooling fans. maintenance work
will be done with
General cleaning of Transformer with cloth including proper PTW and
Preventive
radiator, marshalling box cooling fan, tightness of supply isolation
maintenance and
flanges. Inspection of Silica Gel and replacement if and
3 17.10.2016 associated work of
required checking of oil level and BDV in Service changeover/shiftin
Generator
Transformers and yard cleaning, preventive
Transformer#2 g of load to
maintenance of cooling fans.
adjacent
Transformer.
General cleaning of Transformer with cloth including
Preventive
radiator, marshalling box cooling fan, tightness of
maintenance and
flanges. Inspection of Silica Gel and replacement if
4 18.10.2016 associated work of
required checking of oil level and BDV in Service
Station
Transformers and yard cleaning, preventive
Transformer#2
maintenance of cooling fans.

General cleaning of Transformer with cloth including


Preventive
radiator, marshalling box cooling fan, tightness of
maintenance and
flanges. Inspection of Silica Gel and replacement if
5 19.10.2016 associated work of
required checking of oil level and BDV in Service
Generator
Transformers and yard cleaning, preventive
Transformer#3
maintenance of cooling fans.

General cleaning of Transformer with cloth including


Preventive
radiator, marshalling box cooling fan, tightness of
maintenance and
flanges. Inspection of Silica Gel and replacement if
6 20.10.2016 associated work of
required checking of oil level and BDV in Service
Station
Transformers and yard cleaning, preventive
Transformer#3
maintenance of cooling fans.

General cleaning of Transformer with cloth including


Preventive
radiator, marshalling box cooling fan, tightness of
maintenance and
flanges. Inspection of Silica Gel and replacement if
7 21.10.2016 associated work of
required checking of oil level and BDV in Service
Generator
Transformers and yard cleaning, preventive
Transformer#4
maintenance of cooling fans.

Page 13 of 32
General cleaning of Transformer with cloth including
Preventive
radiator, marshalling box cooling fan, tightness of
maintenance and
flanges. Inspection of Silica Gel and replacement if
8 22.10.2016 associated work of
required checking of oil level and BDV in Service
Station
Transformers and yard cleaning, preventive
Transformer#4
maintenance of cooling fans.

In the given
General cleaning of Transformer with cloth including
Preventive radiator, marshalling box cooling fan, tightness of schedule all the
maintenance and flanges. Inspection of Silica Gel and replacement if preventive
9 23.10.2016 maintenance
associated work of required checking of oil level and BDV in Service
ICT Transformers and yard cleaning, preventive works are
maintenance of cooling fans. included which
may be perform
Preventive General cleaning of Transformer with cloth including during the charged
maintenance and radiator, marshalling box cooling fan, tightness of Transformers
associated work in flanges. Inspection of Silica Gel and replacement if taking with all
10 24.10.2016
UAT#1A & required checking of oil level and BDV in Service safety measures
UAT#1B Transformers and yard cleaning, preventive and rest
Transformers maintenance of cooling fans. maintenance work
will be done with
Preventive General cleaning of Transformer with cloth including proper PTW and
maintenance and radiator, marshalling box cooling fan, tightness of supply isolation
associated work in flanges. Inspection of Silica Gel and replacement if and
11 25.10.2016
UAT#2A & required checking of oil level and BDV in Service changeover/shiftin
UAT#2B Transformers and yard cleaning, preventive g of load to
Transformers maintenance of cooling fans. adjacent
Transformer.
Preventive General cleaning of Transformer with cloth including
maintenance and radiator, marshalling box cooling fan, tightness of
associated work in flanges. Inspection of Silica Gel and replacement if
12 26.10.2016
UAT#3A & required checking of oil level and BDV in Service
UAT#3B Transformers and yard cleaning, preventive
Transformers maintenance of cooling fans.

Preventive General cleaning of Transformer with cloth including


maintenance and radiator, marshalling box cooling fan, tightness of
associated work in flanges. Inspection of Silica Gel and replacement if
13 27.10.2016
UAT#4A & required checking of oil level and BDV in Service
UAT#4B Transformers and yard cleaning, preventive
Transformers maintenance of cooling fans.

General cleaning of Transformer with cloth including


Preventive radiator, marshalling box cooling fan, tightness of
maintenance and flanges. Inspection of Silica Gel and replacement if
14 28.10.2016
associated work of required checking of oil level and BDV in Service
RWT 1 & 2 Transformers and yard cleaning, preventive
maintenance of cooling fans.

General cleaning of Transformer with cloth including


Preventive
radiator, marshalling box cooling fan, tightness of
maintenance and
15 29.10.2017 flanges. Inspection of Silica Gel and replacement if
associated work of
required checking of oil level and BDV in Service
Reactor 1 & 2
Transformers and yard cleaning.

General cleaning of Transformer with cloth including


Preventive
radiator, marshalling box cooling fan, tightness of
maintenance and
16 30.10.2018 flanges. Inspection of Silica Gel and replacement if
associated work of
required checking of oil level and BDV in Service
Reactor 3 & 4
Transformers and yard cleaning.

Page 14 of 32
Preventive General cleaning of Transformer with cloth including
maintenance and radiator, marshalling box cooling fan, tightness of
17 31.10.2016 associated work of flanges. Inspection of Silica Gel and replacement if
Service Transformer required checking of oil level and BDV in Service
of unit#1 Transformers and yard cleaning.
In the given
Preventive General cleaning of Transformer with cloth including schedule all the
maintenance and radiator, marshalling box cooling fan, tightness of preventive
18 01.10.2016 associated work of flanges. Inspection of Silica Gel and replacement if maintenance
Service Transformer required checking of oil level and BDV in Service works are
of unit#1 Transformers and yard cleaning. included which
may be perform
during the charged
Preventive General cleaning of Transformer with cloth including Transformers
maintenance and radiator, marshalling box cooling fan, tightness of taking with all
19 02.10.2016 associated work of flanges. Inspection of Silica Gel and replacement if safety measures
Service Transformer required checking of oil level and BDV in Service and rest
of unit#1 Transformers and yard cleaning. maintenance work
will be done with
Preventive General cleaning of Transformer with cloth including proper PTW and
maintenance and radiator, marshalling box cooling fan, tightness of supply isolation
20 03.11.2016 associated work of flanges. Inspection of Silica Gel and replacement if and
Service Transformer required checking of oil level and BDV in Service changeover/shiftin
of unit#2 Transformers and yard cleaning. g of load to
adjacent
Transformer.
Preventive General cleaning of Transformer with cloth including
maintenance and radiator, marshalling box cooling fan, tightness of
21 04.11.2016 associated work of flanges. Inspection of Silica Gel and replacement if
Service Transformer required checking of oil level and BDV in Service
of unit#2 Transformers and yard cleaning.

Preventive General cleaning of Transformer with cloth including


maintenance and radiator, marshalling box cooling fan, tightness of
22 05.11.2016 associated work of flanges. Inspection of Silica Gel and replacement if
Service Transformer required checking of oil level and BDV in Service
of unit#2 Transformers and yard cleaning.

Preventive General cleaning of Transformer with cloth including


maintenance and radiator, marshalling box cooling fan, tightness of
23 06.11.2016 associated work of flanges. Inspection of Silica Gel and replacement if
Service Transformer required checking of oil level and BDV in Service
of unit#3 Transformers and yard cleaning.

Preventive General cleaning of Transformer with cloth including


maintenance and radiator, marshalling box cooling fan, tightness of
24 07.11.2016 associated work of flanges. Inspection of Silica Gel and replacement if
Service Transformer required checking of oil level and BDV in Service
of unit#3 Transformers and yard cleaning.

Preventive General cleaning of Transformer with cloth including


maintenance and radiator, marshalling box cooling fan, tightness of
25 08.11.2016 associated work of flanges. Inspection of Silica Gel and replacement if
Service Transformer required checking of oil level and BDV in Service
of unit#3 Transformers and yard cleaning.

Page 15 of 32
Preventive General cleaning of Transformer with cloth including
maintenance and radiator, marshalling box cooling fan, tightness of
26 09.11.2016 associated work of flanges. Inspection of Silica Gel and replacement if
Service Transformer required checking of oil level and BDV in Service
of unit#4 Transformers and yard cleaning.

In the given
Preventive General cleaning of Transformer with cloth including schedule all the
maintenance and radiator, marshalling box cooling fan, tightness of preventive
27 10.11.2016 associated work of flanges. Inspection of Silica Gel and replacement if maintenance
Service Transformer required checking of oil level and BDV in Service works are
of unit#4 Transformers and yard cleaning. included which
may be perform
during the charged
Preventive General cleaning of Transformer with cloth including Transformers
maintenance and radiator, marshalling box cooling fan, tightness of taking with all
28 11.11.2016 associated work of flanges. Inspection of Silica Gel and replacement if
safety measures
Service Transformer required checking of oil level and BDV in Service
of unit#4 Transformers and yard cleaning. and rest
maintenance work
will be done with
Preventive proper PTW and
General cleaning of Transformer with cloth including
radiator, marshalling box cooling fan, tightness of supply isolation
maintenance and
associated work of and
29 12.11.2016 flanges. Inspection of Silica Gel and replacement if
Switchyard
required checking of oil level and BDV in Service changeover/shiftin
Transformer of g of load to
Transformers and yard cleaning.
unit#1 & 2 adjacent
Transformer.
Preventive
General cleaning of Transformer with cloth including
maintenance and
radiator, marshalling box cooling fan, tightness of
associated work of
30 13.11.2016 flanges. Inspection of Silica Gel and replacement if
Switchyard
required checking of oil level and BDV in Service
Transformer of
Transformers and yard cleaning.
unit#3 & 4

Preventive General cleaning of Transformer with cloth including


maintenance and radiator, marshalling box cooling fan, tightness of
31 14.11.2016 associated work of flanges. Inspection of Silica Gel and replacement if
Adminbuilding required checking of oil level and BDV in Service
Transformer#1 & 2 Transformers and yard cleaning.

Page 16 of 32
Annual shutdown works (2017-18) of Power and service Transformers for unit#4at CTPP Chhab
S.No. Description of Works Work order/ Contract Status of spares
A Power Transformers

Annual maintenance and associated work of


Generator Transformer#4 including. Cleaning and M/s Sunil Enterprises Kota vide
tightening of HV &LV side terminals, cleaning W.O. No. No specific spare
1
and tightening of marshalling box, checking RVUNL/CTPP/SE(Gen.)/D-112 dt. required
terminals of WTI & OTI. Checking of emulsifier 21.05.2016. TN-55/2015-16.
system.

Annual maintenance and associated work of


station Transformer#4. including. Cleaning and M/s Sunil Enterprises Kota vide
tightening of HV &LV side terminals, cleaning W.O. No. No specific spare
2
and tightening of marshalling box. Maintenance RVUNL/CTPP/SE(Gen.)/D-112 dt. required
of LT motors used in cooling fans of the radiator. 21.05.2016. TN-55/2015-16.
Checking of emulsifier system.

Inspection of terminal box, Bus duct and their M/s Sunil Enterprises Kota vide
thightness in UAT#4A & UAT#4B Transformers, W.O. No. No specific spare
3
cleaning and tightening of marshalling box. RVUNL/CTPP/SE(Gen.)/D-112 dt. required
Checking of emulsifier system. 21.05.2016. TN-55/2015-16.

M/s Sunil Enterprises Kota vide


Checking of various protection schemes of Power
W.O. No. No specific spare
4 Transformer. such as PRV, Buchholz, OSR, WTI
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
& OTI alarm & tripping & MOLG alarm etc.
21.05.2016. TN-55/2015-16.

Checking of Transformer Oil level, BDV & M/s Sunil Enterprises Kota vide
topping up of oil if required if any leakage W.O. No. No specific spare
5
persisting attending the same, Inspection and RVUNL/CTPP/SE(Gen.)/D-112 dt. required
replacment of silica gel. 21.05.2016. TN-55/2015-16.

B Service Transformers
Annual maintenance and associated work of
M/s Sunil Enterprises Kota vide
Transformers ESP 4A. 4B AHT 4A. Including
W.O. No. No specific spare
1 cleaning, Inspection of terminal box and their
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
tightness & Checking of various protection
21.05.2016. TN-55/2015-16.
schemes.

Annual maintenance and associated work of


M/s Sunil Enterprises Kota vide
Transformers SST 4A, UST 4A, UST 4B.
W.O. No. No specific spare
2 Including cleaning, Inspection of terminal box
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
and their tightness & Checking of various
21.05.2016. TN-55/2015-16.
protection schemes.

Annual maintenance and associated work of


M/s Sunil Enterprises Kota vide
Transformers INT silo 1&2 & Final silo 4.
W.O. No. No specific spare
3 Including cleaning, Inspection of terminal box
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
and their tightness & Checking of various
21.05.2016. TN-55/2015-16.
protection schemes.

Annual maintenance and associated work of


M/s Sunil Enterprises Kota vide
Transformers WTP 3B & IDCT 3B. Including
W.O. No. No specific spare
4 cleaning, Inspection of terminal box and their
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
thightness & Checking of various protection
21.05.2016. TN-55/2015-16.
schemes.
C Isolator Phase bus duct (16.5 KV)
Annual maintenance and associated work of
M/s Sunil Enterprises Kota vide
Isolator Phase bus duct (16.5 KV)#4 including
W.O. No. No specific spare
1 cleaning of insulators & inner shell tightening of
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
CT Terminals including Meggaring of bus duct
21.05.2016. TN-55/2015-16.
after completion of work .

Annual maintenance and associated work of M/s Sunil Enterprises Kota vide
Neutral grounding cubicle, including Cleaning W.O. No. No specific spare
2 and tightening of LAVT cubicle and hot air RVUNL/CTPP/SE(Gen.)/D-112 dt. required
blowing system. 21.05.2016. TN-55/2015-16.
4at CTPP Chhabra
Remark
Annual shutdown works (2017-18) of Power and service Transformers for unit#3 at CTPP Chhab
S.No. Description of Works Work order/ Contract Status of spares
A Power Transformers

Annual maintenance and associated work of


Generator Transformer#3 including. Cleaning and M/s Sunil Enterprises Kota vide
tightening of HV &LV side terminals, cleaning W.O. No. No specific spare
1
and tightening of marshalling box, checking RVUNL/CTPP/SE(Gen.)/D-112 dt. required
terminals of WTI & OTI. Checking of emulsifier 21.05.2016. TN-55/2015-16.
system.

Annual maintenance and associated work of


station Transformer#3. including. Cleaning and M/s Sunil Enterprises Kota vide
tightening of HV &LV side terminals, cleaning W.O. No. No specific spare
2
and tightening of marshalling box. Maintenance RVUNL/CTPP/SE(Gen.)/D-112 dt. required
of LT motors used in cooling fans of the radiator. 21.05.2016. TN-55/2015-16.
Checking of emulsifier system.

Inspection of terminal box, Bus duct and their M/s Sunil Enterprises Kota vide
thightness in UAT#3A & UAT#3B Transformers, W.O. No. No specific spare
3
cleaning and tightening of marshalling box. RVUNL/CTPP/SE(Gen.)/D-112 dt. required
Checking of emulsifier system. 21.05.2016. TN-55/2015-16.

M/s Sunil Enterprises Kota vide


Checking of various protection schemes of Power
W.O. No. No specific spare
4 Transformer. such as PRV, Buchholz, OSR, WTI
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
& OTI alarm & tripping & MOLG alarm etc.
21.05.2016. TN-55/2015-16.

Checking of Transformer Oil level, BDV & M/s Sunil Enterprises Kota vide
topping up of oil if required if any leakage W.O. No. No specific spare
5
persisting attending the same, Inspection and RVUNL/CTPP/SE(Gen.)/D-112 dt. required
replacment of silica gel. 21.05.2016. TN-55/2015-16.

B Service Transformers
Annual maintenance and associated work of
M/s Sunil Enterprises Kota vide
Transformers ESP 3A. 3B AHT 3A. Including
W.O. No. No specific spare
1 cleaning, Inspection of terminal box and their
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
tightness & Checking of various protection
21.05.2016. TN-55/2015-16.
schemes.

Annual maintenance and associated work of


M/s Sunil Enterprises Kota vide
Transformers SST 3A, UST 3A, UST 3B.
W.O. No. No specific spare
2 Including cleaning, Inspection of terminal box
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
and their tightness & Checking of various
21.05.2016. TN-55/2015-16.
protection schemes.

Annual maintenance and associated work of


M/s Sunil Enterprises Kota vide
Transformers INT silo 1&2 & Final silo 3.
W.O. No. No specific spare
3 Including cleaning, Inspection of terminal box
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
and their tightness & Checking of various
21.05.2016. TN-55/2015-16.
protection schemes.

Annual maintenance and associated work of


M/s Sunil Enterprises Kota vide
Transformers WTP 3A & IDCT 3A. Including
W.O. No. No specific spare
4 cleaning, Inspection of terminal box and their
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
thightness & Checking of various protection
21.05.2016. TN-55/2015-16.
schemes.
C Isolator Phase bus duct (16.5 KV)
Annual maintenance and associated work of
M/s Sunil Enterprises Kota vide
Isolator Phase bus duct (16.5 KV)#3 including
W.O. No. No specific spare
1 cleaning of insulators & inner shell tightening of
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
CT Terminals including Meggaring of bus duct
21.05.2016. TN-55/2015-16.
after completion of work .

Annual maintenance and associated work of M/s Sunil Enterprises Kota vide
Neutral grounding cubicle, including Cleaning W.O. No. No specific spare
2 and tightening of LAVT cubicle and hot air RVUNL/CTPP/SE(Gen.)/D-112 dt. required
blowing system. 21.05.2016. TN-55/2015-16.
3 at CTPP Chhabra
Remark
Annual shutdown works (2017-18) of Power and service Transformers for unit#2 at CTPP Chhab
S.No. Description of Works Work order/ Contract Status of spares
A Power Transformers

Annual maintenance and associated work of


Generator Transformer#2 including. Cleaning and M/s Sunil Enterprises Kota vide
tightening of HV &LV side terminals, cleaning W.O. No. No specific spare
1
and tightening of marshalling box, checking RVUNL/CTPP/SE(Gen.)/D-112 dt. required
terminals of WTI & OTI. Checking of emulsifier 21.05.2016. TN-55/2015-16.
system.

Annual maintenance and associated work of


station Transformer#1. including. Cleaning and M/s Sunil Enterprises Kota vide
tightening of HV &LV side terminals, cleaning W.O. No. No specific spare
2
and tightening of marshalling box. Maintenance RVUNL/CTPP/SE(Gen.)/D-112 dt. required
of LT motors used in cooling fans of the radiator. 21.05.2016. TN-55/2015-16.
Checking of emulsifier system.

Inspection of terminal box, Bus duct and their M/s Sunil Enterprises Kota vide
thightness in UAT#2A & UAT#2B Transformers, W.O. No. No specific spare
3
cleaning and tightening of marshalling box. RVUNL/CTPP/SE(Gen.)/D-112 dt. required
Checking of emulsifier system. 21.05.2016. TN-55/2015-16.

M/s Sunil Enterprises Kota vide


Checking of various protection schemes of Power
W.O. No. No specific spare
4 Transformer. such as PRV, Buchholz, OSR, WTI
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
& OTI alarm & tripping & MOLG alarm etc.
21.05.2016. TN-55/2015-16.

Checking of Transformer Oil level, BDV & M/s Sunil Enterprises Kota vide
topping up of oil if required if any leakage W.O. No. No specific spare
5
persisting attending the same, Inspection and RVUNL/CTPP/SE(Gen.)/D-112 dt. required
replacment of silica gel. 21.05.2016. TN-55/2015-16.

B Service Transformers
Annual maintenance and associated work of
M/s Sunil Enterprises Kota vide
Transformers ESP 2A. 2B AHT 2B. Including
W.O. No. No specific spare
1 cleaning, Inspection of terminal box and their
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
tightness & Checking of various protection
21.05.2016. TN-55/2015-16.
schemes.

Annual maintenance and associated work of


M/s Sunil Enterprises Kota vide
Transformers SST 2A, UST 2A, UST 2B.
W.O. No. No specific spare
2 Including cleaning, Inspection of terminal box
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
and their tightness & Checking of various
21.05.2016. TN-55/2015-16.
protection schemes.

Annual maintenance and associated work of


M/s Sunil Enterprises Kota vide
Transformers INT silo 1&2 & Final silo 2.
W.O. No. No specific spare
3 Including cleaning, Inspection of terminal box
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
and their tightness & Checking of various
21.05.2016. TN-55/2015-16.
protection schemes.

Annual maintenance and associated work of


M/s Sunil Enterprises Kota vide
Transformers WTP 1B & IDCT 1B. Including
W.O. No. No specific spare
4 cleaning, Inspection of terminal box and their
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
thightness & Checking of various protection
21.05.2016. TN-55/2015-16.
schemes.
C Isolator Phase bus duct (16.5 KV)
Annual maintenance and associated work of
M/s Sunil Enterprises Kota vide
Isolator Phase bus duct (16.5 KV)#2 including
W.O. No. No specific spare
1 cleaning of insulators & inner shell tightening of
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
CT Terminals including Meggaring of bus duct
21.05.2016. TN-55/2015-16.
after completion of work .

Annual maintenance and associated work of M/s Sunil Enterprises Kota vide
Neutral grounding cubicle, including Cleaning W.O. No. No specific spare
2 and tightening of LAVT cubicle and hot air RVUNL/CTPP/SE(Gen.)/D-112 dt. required
blowing system. 21.05.2016. TN-55/2015-16.
2 at CTPP Chhabra
Remark
Annual shutdown works (2017-18) of Power and service Transformers for unit#1 at CTPP Chhab
S.No. Description of Works Work order/ Contract Status of spares
A Power Transformers

Annual maintenance and associated work of


Generator Transformer#1 including. Cleaning and M/s Sunil Enterprises Kota vide
tightening of HV &LV side terminals, cleaning W.O. No. No specific spare
1
and tightening of marshalling box, checking RVUNL/CTPP/SE(Gen.)/D-112 dt. required
terminals of WTI & OTI. Checking of emulsifier 21.05.2016. TN-55/2015-16.
system.

Annual maintenance and associated work of


station Transformer#1. including. Cleaning and M/s Sunil Enterprises Kota vide
tightening of HV &LV side terminals, cleaning W.O. No. No specific spare
2
and tightening of marshalling box. Maintenance RVUNL/CTPP/SE(Gen.)/D-112 dt. required
of LT motors used in cooling fans of the radiator. 21.05.2016. TN-55/2015-16.
Checking of emulsifier system.

Inspection of terminal box, Bus duct and their M/s Sunil Enterprises Kota vide
thightness in UAT#1A & UAT#1B Transformers, W.O. No. No specific spare
3
cleaning and tightening of marshalling box. RVUNL/CTPP/SE(Gen.)/D-112 dt. required
Checking of emulsifier system. 21.05.2016. TN-55/2015-16.

M/s Sunil Enterprises Kota vide


Checking of various protection schemes of Power
W.O. No. No specific spare
5 Transformer. such as PRV, Buchholz, OSR, WTI
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
& OTI alarm & tripping & MOLG alarm etc.
21.05.2016. TN-55/2015-16.

Checking of Transformer Oil level, BDV & M/s Sunil Enterprises Kota vide
topping up of oil if required if any leakage W.O. No. No specific spare
6
persisting attending the same, Inspection and RVUNL/CTPP/SE(Gen.)/D-112 dt. required
replacment of silica gel. 21.05.2016. TN-55/2015-16.

B Service Transformers
Annual maintenance and associated work of
M/s Sunil Enterprises Kota vide
Transformers ESP 1A. 1B AHT 2A. Including
W.O. No. No specific spare
1 cleaning, Inspection of terminal box and their
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
tightness & Checking of various protection
21.05.2016. TN-55/2015-16.
schemes.

Annual maintenance and associated work of


M/s Sunil Enterprises Kota vide
Transformers SST 2A, UST 1A, UST 1B.
W.O. No. No specific spare
2 Including cleaning, Inspection of terminal box
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
and their tightness & Checking of various
21.05.2016. TN-55/2015-16.
protection schemes.

Annual maintenance and associated work of


M/s Sunil Enterprises Kota vide
Transformers INT silo 3 & Final silo 3. Including
W.O. No. No specific spare
3 cleaning, Inspection of terminal box and their
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
tightness & Checking of various protection
21.05.2016. TN-55/2015-16.
schemes.

Annual maintenance and associated work of


M/s Sunil Enterprises Kota vide
Transformers WTP 1A & IDCT 1A. Including
W.O. No. No specific spare
4 cleaning, Inspection of terminal box and their
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
thightness & Checking of various protection
21.05.2016. TN-55/2015-16.
schemes.
C Isolator Phase bus duct (16.5 KV)
Annual maintenance and associated work of
M/s Sunil Enterprises Kota vide
Isolator Phase bus duct (16.5 KV)#1 including
W.O. No. No specific spare
1 cleaning of insulators & inner shell tightening of
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
CT Terminals including Meggaring of bus duct
21.05.2016. TN-55/2015-16.
after completion of work .

Annual maintenance and associated work of M/s Sunil Enterprises Kota vide
Neutral grounding cubicle, including Cleaning W.O. No. No specific spare
2 and tightening of LAVT cubicle and hot air RVUNL/CTPP/SE(Gen.)/D-112 dt. required
blowing system. 21.05.2016. TN-55/2015-16.
1 at CTPP Chhabra