Detail Measurement Sheet.


Civil works

S.No. Descriptio No L (m) B (m) H (m) Qty. Unit Remarks


n
Site
1 clearance
work
Layout and
setting out
of building
and site
clearance
of grass,
shrubs
including
dressing,
leveling Area of
and trapezoidal
area incl.
disposal of 1.0 37.82 29.608 1,119.67 Parking,Fou
excavated ntain,Guard
materials house.
all
complete
as per
drawing,
specificat
ons &
approval
of
Engineer.

Total of item 1 1,119.67 Sq. m


Earth
2.0 Work
Earth
Work in
excavaton
in soft soil
foundaton
including
dressing of
sides lift
up to 5.00
mtr.
stacking of
excavated
materials
beyond
2.1 4.00mtr.
clear from
the edge
of
excavaton
within a
lead of
10.00 mtr.
all
complete
as per
drawing
and
specificat
ons

for footing
foundatio
n

Footing F12 4.80 4.80 2 92.16


Footing F22 3.90 3.90 2 60.84 0.15
projecton
Footing F31 5.30 5.30 2 56.18 on both
Footing F42 9.90 4.10 2 162.36 side
Footing F51 10.75 6.02 2 129.43

lower
strap
beam and
wall
between
lower and
upper tie
beam

grid A-A 1.0 3.97 0.75 2 5.96


grid B-B 1.0 8.07 0.75 2 12.11
grid C-C,D-
D &E-E 3.0 3.05 0.75 2 13.73

grid 1-1 & 2.0 2.4 0.75 2 7.20


4-4
grid 2-2 & 2.0 5.5 0.75 2 16.50
3-3

Entrance
Steps

rectangula
r 1.0 3.307 1.303 0.6 2.59
exacavato
n porton

triangular
excavaton 2.0 0.5 1.303 0.6 0.78
porton
Entrance 2.0 2.943 0.84 0.6 2.97
Ramp
Entrance
Planting
area
rectangula
2.0 1.15 1.442 0.6 1.99
r porton
trapezoida 2.0 0.9045 0.6 1.09
l porton
for Exit
auditoriu 1.0 3.825 1.6 0.6 3.67
m door
for apron 1.0 52.617 0.625 0.44 14.47
drain
Total of Item 2.1 584.01 Cu. m

Filling
2.2 Work
Earthwork
in filling in
foundaton
on
trenches
and floor
with
materials
from
associated
excavaton
including
machine
2.2.1 compacto
n in 150
mm layers
with
sprinkling
water
required
to obtain
90%
density as
per
specificat
ons all
complete

(Earth to
be
supplied
from site
within
50m
distance
from the
place of
filling)

Filling of
soil from
existng 1.0 99.06 1.05 104.01
ground to
Entrance
lvl.

Filling of
soil from
existng 1.0 131.20 0.6 78.72
ground to
Plinth lvl.
faewfasf