You are on page 1of 2

Villa (G+1)

LOADS ON BEAMS

For First Slab


Height of the wall above the Slab = Height F/F- Slab Thickness
= 4.2-0.20
= 4.0 m
Weight of Wall (20cm thickness) = (4.0) X3.5 =14.0 kN /m
USE = 14.0 kN/m

Weight of Wall (10cm thickness) = (4.0) X2.5 =10.0 kN /m


USE = 10.0 kN/m

For parapets
Weight of Parapet (15cm thick.) = 1.2 X0.15X25 =4.5 kN /m
USE = 4.5 kN/m
Weight of Parapet (15cm thick.) = 1.9 X0.15X25 =7.13 kN /m (Sloped)
USE = 7.2 kN/m

Stairs Weight
Weight of Stair (20cm thick.) = 57 kN/m

Water Tank Load on Roof

Load from tank base (10cm thick.) = 1.4X0.10 X25 = 3.50 kN /m2

Load from water (1200 US glns) = 73 / 3.05/2.1 = 11.33kN /m2


Total Surface Load (Factored) = 14.83 kN/m2

COLUMNS LENGTH UNDER TIE BEAMS


Assume:
The thickness of footing = 50 cm
The depth of the formation level =120 cm
The thickness of tie beam =50 cm
Level of Plinth Level =150
The length of columns from plinth level up to the top of footing
=120+150-50-50
= 170 cm
Villa (G+1)

Loads on Beam @ Landing Level


In the Staircase Tower

COL. # 1 COL. # 2
112 KN 2.80 m 112 KN

112KN

112 KN
79 KN.m

Self Weight (Factored) = 0.2X 0.5X 25 X1.4 =3.50 kN/m


Wall Weight (Factored) = 14.0X 1.4 =19.6 kN/m
Stair Weight (Factored) =57.0 kN/m
Total =80.10 kN/m
Reaction on each side = 80.10 X 2.8 /2 =112.0 kN
Max. Moment on beam = 80.10 X 2.82 /8 =78.50 kN.m

[USE 3Y16 BOT. REINF. FOR BEAM @ LANDING LEVEL]

LOADS ON TIE BEAMS


For TB (+150 cm)
Height of the wall above the Slab = Height F/F- Slab Thickness
= 4.0-0.20
= 3.80 m
Weight of Wall (20cm thickness) = (3.8) X3.5 =13.3 kN /m
USE = 13.3 kN/m
Weight of Wall (10cm thickness) = (3.8) X2.5 =9.50 kN /m
USE = 9.50 kN/m

You might also like