You are on page 1of 52

Check List

MEP
Sanitary Ware Installation

Project:

Name of Tower : Floor Name:


Reference Drawing no:

(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Check points Flat No. Remarks
1 2 3 4
Type of sanitary ware installation
Installed positioning (Height,
distance , Orientation)
Stability & regidibility
Check for defects
Check for damage
Protection
Fuctional.

Remarks of quality assurance engineer:

Signature Contractor Site Engineer Consultant Remarks/ Comments


Checked By
Date
Dated

oor Name:

ot OK' work)
Remarks

Remarks/ Comments
Check List
MEP
Sanitary Fixtures

Project:

Name of Tower : Floor Name:


Reference Drawing no:

(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Check points Flat No. Remarks
1 2 3 4
Gyser angle valve height
Wash basin angle valve height
Washing machine tap height
RO tap height
Concealed valve height
Helalth faucet height
Wall hung WC height
Floor Mounted WC Point distance
Flush height
Head shower height
Wall Mixer height
Bottle Trap Height
Waste Trap Sizes
Pipe testing at 10 kg/cm2
Pipe testing at 4 kg/cm2
Mirror
C P fittings

Remarks of quality assurance engineer:


Signature Contractor Site Engineer Consultant Remarks/ Comments
Checked By
Date
Dated

Floor Name:

& for 'Not OK' work)


Remarks
Remarks/ Comments
Check List
MEP
Cold Water & Drainage Pipe Work

Project:

Name of Tower : Floor Name:


Reference Drawing no:

(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Check points Flat No. Remarks
1 2 3 4
Used Pipe materials
Proper glue Used
Pipe joints
Line , Alignment & position
Ball Valves & fitting connections
Support bracket, horizontal &
vertical
Waste pipe for required size and
type
Soil pipe for required size and
type
Vent pipe for required size and
type
Traps installed properly
Ceiling drain pipes are supported
Check slope 1:100 where water
pipe escaped
Incoming supply pipes connected
Water Charged
Drainage and vent water test,
filling stack with water
Inspected system for leaks and
workmanship
PRV installed with Pressure Gauge
PRV & Valves to be located and
installed as to provide access for
observation, maintenance,
servicing and replacement
Check water pressure with a
gauge
Kudda Packing
Debris Removal
Protection of system from others

Remarks of quality assurance engineer:


Signature Contractor Site Engineer Consultant Remarks/ Comments
Checked By
Date
Dated

Floor Name:

for 'Not OK' work)


Remarks
emarks/ Comments
Check List
MEP
Shaft Work

Project:

Name of Tower : Floor Name:


Reference Drawing no:

(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Check points Flat No.
1 2 3
T1 T2 T3+K T4 T1 T2 T3+K T4 T1 T2 T3+K
Used Pipe materials
Proper glue Used
Pipe joints
Line , Alignment & position
Ball Valves & fitting connections
Support bracket, horizontal &
vertical
Waste pipe for required size and
type
Soil pipe for required size and type
Vent pipe for required size and
type
Traps installed properly
Check slope 1:100 where water
pipe escaped
Drainage and vent water test,
filling stack with water
Inspected system for leaks and
workmanship

PRV installed with Pressure Gauge

PRV & Valves to be located and


installed as to provide access for
observation, maintenance,
servicing and replacement
Check water pressure with a gauge

Kudda Packing
Debris Removal
Protection of system from others

Remarks of quality assurance engineer:

Signature Contractor Site Engineer


Checked By
Date
Dated

Remarks
3 4
T4 T1 T2 T3+K T4
Consultant Remarks/ Comments
Check List
MEP
Flats Water Charging

Project:

Name of Tower :
Reference Drawing no:

(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Floor Details. Flat No. Remarks
1 2 3 4
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1

Remarks of quality assurance engineer:


Signature Contractor Site Engineer Consultant Remarks/ Comments
Checked By
Date
Dated

for 'OK' & for 'Not OK' work)


Remarks
Remarks/ Comments
Che
M
PRV

Project:

Name of Tower :
Reference Drawing no:

(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Floor No. F
1 2
T1 T2 T3 T4 K T1 T2 T3
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1

Remarks of quality assurance engineer:


Signature Contractor Site Engineer
Checked By
Date
Check List
MEP
PRV Status

ork)
Flat No.
2 3 4
T4 K T1 T2 T3 T4 K T1 T2 T3 T4 K
Site Engineer Consultant
Dated

Remarks
Remarks/ Comments
Project:

Name of Tower :
Reference Drawing no:

Time Period
Signature
Checked By
Date
PROGRESS REPORT
MEP
PLUMBING WORK

Tower :
e Drawing no:

Progress Status
Site Engineer
Dated

Remarks
Check List
MEP
Tower Rain Water

Project:

Name of Tower :
Reference Drawing no:

(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Floor No. Flat No.
1 2 3
B-1 B-2 B-3 B-4 B-1 B-2 B-3 B-4 B-1 B-2 B-3 B-4
Connected with Main Sewer

Leakage observed in
Basement

Leakage Rectified

Remarks of quality assurance engineer:

Signature Contractor Site Engineer


Checked By
Date
Dated

Remarks
4
B-1 B-2 B-3 B-4

Consultant Remarks/ Comments


Check List
MEP
Damage Items Status

Project: MAPSKO CASABELLA


Vendor Name:
Name of Tower : Floor
Reference Drawing no:

(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Damaged Item Details Flat No.
1 2 3
T1 T2 T3 T4 K T1 T2 T3 T4 K T1
PVC Items:-
PVC P-Trap 110mm
PVC Bend-110mm
PVC Bend-75mm
PVC Pipe -110mm
PVC Pipe -75mm
PVC Plain Tee - 110 x 75mm
PVC Door Tee - 110 x 75mm
PVC Nahani Trap- 110mm
PVC Door Tee- 110mm
PVC Y Tee- 75mm
PVC Y Tee-110mm x 75mm
PVC Elbow- 40mm
PVC Pipe- 40mm
CPVC Items:-
CPVC Ball Valve-20mm
Check List
MEP
Damage Items Status

Project: MAPSKO CASABELLA


Vendor Name:
Name of Tower : Floor
Reference Drawing no:

(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Damaged Item Details Flat No.
1 2 3
T1 T2 T3 T4 K T1 T2 T3 T4 K T1
CPVC Ball Valve-15mm
CPVC Plain Tee-15mm
CPVC Elbow Tee-15mm
CPVC Plain Tee-20mm
CPVC Elbow Tee-20mm
CPVC Reducer -20 x 15 mm
CPVC Pipe -15mm
CPVC Pipe -20mm
UPVC SCH-80 Tee ( Size in Diameter
(mm)) :-
40 x 40
32 x 32
65 X 25
50 X 25
40 X 25
32 X 25
Check List
MEP
Damage Items Status

Project: MAPSKO CASABELLA


Vendor Name:
Name of Tower : Floor
Reference Drawing no:

(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Damaged Item Details Flat No.
1 2 3
T1 T2 T3 T4 K T1 T2 T3 T4 K T1
25 X 25
65 X 20
50 X 20
40 X 20
32 X 20
25 X 20
20 X 20
65 X 15
50 X 15
40 X 15
32 X 15
25 X 15
Check List
MEP
Damage Items Status

Project: MAPSKO CASABELLA


Vendor Name:
Name of Tower : Floor
Reference Drawing no:

(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Damaged Item Details Flat No.
1 2 3
T1 T2 T3 T4 K T1 T2 T3 T4 K T1
20 X 15
15 X 15
CP & Chinaware :-
Health Faucet
Angle Valve
Over Head Shower
Single Liver Basin Mixer
Wall Mixer
Sink Mixer
Sink Mixer ( Table Mounted)
SS Kitchen sink ( SFMC)
SS Kitchen sink ( Combine)
Wash Basin Oval type
Wash Basin Back Support
Full Pedestal
Half Pedestal
Check List
MEP
Damage Items Status

Project: MAPSKO CASABELLA


Vendor Name:
Name of Tower : Floor
Reference Drawing no:

(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Damaged Item Details Flat No.
1 2 3
T1 T2 T3 T4 K T1 T2 T3 T4 K T1
Corner Wash Basin
CP Bottle Trap
Waste Coupling for Wash Basin
PVC Connection Pipes
PVC Waste Pipe for Sink 32 mm Dia
(1-1/4")
Long Body Bib Cock
Pillar Cock
EWC
Cistern
PVC Seat Cover
EWC CALAGHAN Fittings
EWC ( servent)
EWC ( Wall Hung )
Mason deployed
Labour deployed
Check List
MEP
Damage Items Status

Project: MAPSKO CASABELLA


Vendor Name:
Name of Tower : Floor
Reference Drawing no:

(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Damaged Item Details Flat No.
1 2 3
T1 T2 T3 T4 K T1 T2 T3 T4 K T1

Remarks of quality
assurance engineer:

Signature Contractor Site Engineer


Checked By
Date
eck List Dated
MEP
e Items Status

Floor Name:

No. Remarks
3 4
T2 T3 T4 K T1 T2 T3 T4 K
eck List Dated
MEP
e Items Status

Floor Name:

No. Remarks
3 4
T2 T3 T4 K T1 T2 T3 T4 K
eck List Dated
MEP
e Items Status

Floor Name:

No. Remarks
3 4
T2 T3 T4 K T1 T2 T3 T4 K
eck List Dated
MEP
e Items Status

Floor Name:

No. Remarks
3 4
T2 T3 T4 K T1 T2 T3 T4 K
eck List Dated
MEP
e Items Status

Floor Name:

No. Remarks
3 4
T2 T3 T4 K T1 T2 T3 T4 K
eck List Dated
MEP
e Items Status

Floor Name:

No. Remarks
3 4
T2 T3 T4 K T1 T2 T3 T4 K

r Consultant Remarks/ Comments


Check List
MEP
Damage Items Status

Project:

Name of Tower : Floor


Reference Drawing no:

(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Damaged Item Details Flat No.
1 2 3
T1 T2 T3 T4 K T1 T2 T3 T4 K T1
Remarks of quality
assurance engineer:

Signature Contractor Site Engineer


Checked By
Date
eck List Dated
MEP
e Items Status

Floor Name:

No. Remarks
3 4
T2 T3 T4 K T1 T2 T3 T4 K
r Consultant Remarks/ Comments