Paraiso - Tabasco
TG-2 UNIT
DATA SHEET
2. GENERAL DATA
Existing panel location .......................Turbine Control Compartment
Existing MCC type .............................Hitachi
Existing MCC elementary drawing .....Hitachi Dwg# 331SF92915
Item designation ................................MCC TG-2
Language ...........................................English-Spanish
Reference Codes ...............................NEMA ICS2-322 / ANSI C37.20.1 / NEC
NP General specifications ................ ITN62802, ITN62000.01
Customer specifications.................... N/A
Material list ....................................... ITK28100.01, ITK28100.02, ITK28202.00,
SOK4402785
Tests ..................................................ITN62801/A and general specification
Technical documentation .................. ITK28300.00
Tech. docs. min. requirement .......... ITK28300.06
Spare parts & maintenance data ...... ITN01303
Electric Load List ...............................SOM6631219/4 (latest revision)
Reference documents........................SOK0901192/3, SOK0901193/3
CE Marking ........................................Not required
Certification ........................................Underwriters Laboratories listing mark under
standard UL845
3. AMBIENT CONDITIONS
The MCC panel will be installed inside the Control Cabin provided with HVAC system.
In case of HVAC system failure MCC may be subjected to outdoor conditions for a
short period, in such case MCC shall be able to operate without alteration of its
performance in the following condition:
According to Site Data specification SOM6629118/4 (latest revision)
Design temperature ........................ 42 C
4.1. Mechanical
Manufacturer .............................General Electric
Model ........................................8000 Line
Switchgear type ........................._____
Accessibility ...............................Single front
Maintenance rear access ..........Not required / Mounted against wall or other
panels
Installation .................................Indoor
Protection degree ......................NEMA Type 12 / _____ for indoor use
HVAC-2
LN-OUT
HVAC-1
LN-ACC CONV-1
MKVI-1
LN-GT CONV-2
TAG SPARE SPARE 23MC LN-GEN CONV-3
GAC-1 UCP UPS
HVAC-GAC1 SPARE SPARE
GCP-1 FH-1
HVAC-GAC2
4 SPARE 20TW-1
2 SPARE
AVR-1
4 SPARE
Type TM TM TM TM TM TM TM TM
N of poles 1 1 1 1 1 1 1 1
Quantity 1 1 1 8 12 8 2 2
Rating (A) 6 15 20 6 15 20 35 45
Contactor Yes Yes Yes No No No No No
Diff. block
Yes Yes Yes Yes Yes Yes Yes Yes
30mA
TM = thermo-magnetic
Note 1: The outgoing feeders relevant to motor space heaters powered by the
MCC specified in this Data Sheet are not indicated in distribution section.
They shall be provided inside of the dedicated feeder of relevant electric
motors.
Note 2: If the available space for circuit breaker is not sufficient, can be used
MA2TB terminal compartment (see Annex 1)
MKVI-2
HMI-1
TAG 3 SPARE AVR-2 3 SPARE
GCP-2
2 SPARE
Type TM TM TM
N of poles 1 1 1
Quantity 3 6 3
Rating (A) 6 15 20
Contactor No No No
Diff. block
Yes Yes Yes
30mA
TM = thermo-magnetic
Circuit Breaker
Rated Power
NP Tag Item Designation Rating Rev.
(HP)
(A)
120 Vac UPS Feeders
MKVI-2 MKVI ups power supply 1.3 15
HMI-1 HMI ups power supply 1.3 15
AVR-4 AVR ups power supply 1.3 15
GCP-2 GCP ups power supply 1.3 15
Interconnection
three pole circuit breaker rated current
2 between AC-MCC1 N/A
_____@ 42 C
and AC-MCC2
Note: _____ To be filled by manufacturer
Protecti
Reference Additional
Q.t Reference to on NEMA Item
to Rev
y Requirement device designation
ITK28100.01 frame
ITK28100.02 s and notes
A2 x sec
LE-GT GCP-3
FF-1 52G
TAG 2 SPARE 2 SPARE SPARE 2 SPARE SPARE
AVR2 AVR-3
2 SPARE 1 SPARE
Type TM TM TM TM TM TM TM
N of poles 2 2 2 2 2 2 2
Quantity 2 2 1 5 2 4 1
TM = thermo-magnetic
Circuit Breaker
Rated Power
NP Tag Item Designation Rating Rev.
(HP)
(A)
Emergency lighting GT
LE-GT 2 15
compartment
52G 52G/trip/close 4 50
Note: If the available space for circuit breaker is not sufficient, can be used
MB2TB terminal compartment (see Annex 2)
Type TM TM TM TM
TM = thermo-magnetic
9. REQUIRED ACCESSORIES
- ........ Base irons
- ........ Lifting eyebolts
- ........ Space heaters with thermostat
- ........ Key set
- ........ N 1 set of spare lamps & fuses
- ........ N 1 finish/touch-up paint tin
- ........ Safety shutters
The table shall includes also all incoming relay setting, loss of voltage relay
setting and setting of the others relay/system included in the scope (e.g. soft
starter , VFD etc.)
All relays shall be set before the FAT (final acceptance test) at Manufacturer
workshop according to the latest revision of above mentioned document.
QUALIFICATIONS FORM
Other Notes:
After the evaluation of the proposal, the Supplier shall be returned with the
Qualification Form completed by GE Oil &Gas.
Supplier, if required, shall resubmit the proposal taking into account to rejected
points which shall be them amended until they become acceptable by GE Oil &
Gas.
ITE DWG
DESCRIPTION DELIVERY NOTES
M NUMBER
8.1.a Data sheet of MCC panel filled in AO
8.1.b MCC outline dwg (preliminary) AO
8.1.c MCC Painting specification AO
2 weeks
8.3.a MCC panel outline drawing SOM6634290 $
AOD
2 weeks
8.3.b MCC panel single line diagram SOM6634291 $
AOD
2 weeks
8.3.c MCC panel elementary diagram SOM6634292 $
AOD
2 weeks
8.3.d MCC Profibus I/O List TC-3 N/A $
AOD
8.3.e Equipment & material list
MCC panel protection setting list (all cubicles, 6 weeks
8.3.f $
including incoming) AOD
8.3.g MCC Equipment instruction manual 1 week ATD
8.3.h MCC Final inspection report 1 week ATD
3 weeks
MCC Quality control plan $
AOD
MCC Supplier test report form (blank copy for 3 weeks
approval) AOD
3 weeks
MCC Preservation procedures
AOD
12.2. Legend:
AO .....................................................- Attached To Offer
AOD ...................................................- After Order Date
ATD ...................................................- After Test Date
$.........................................................- Subject to penalty for late delivery
The quotation submitted from the Manufacturer, including all the related documentation,
MUST BE in English language.
Quotations not complete and not in English will be considered NOT VALID and rejected.
NP will never accept any production delay for late document approval if not
timely advised.