You are on page 1of 11

TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES

ON-THE-JOB TRAINING / PRACTICUM WEEKLY REPORT

Name of Student Trainee: Melric J. Lamparas

Name of Company: World Citi Inc.

DAILY WORK ACTIVITIES

NO. OF
DAY DATE DAILY ACCOMPLISHMENTS WORKING
HOURS

Monday June 26, 2017

Filled out Service Report Outsource Form


Tuesday June 27, 2017 6
Maintained Hospital Telephone Local Network

Filled out Maintenance Service Request and Report Form


Wednesday June 28, 2017 for repaired BP apparatus 6.5
Maintained and calibrated BP apparatus

Thursday June 29, 2017

Friday June 30, 2017

Saturday July 01, 2017

TOTAL NO. OF HOURS:

Certified by: _________________________________________


Signature over Printed Name of Trainer
Training Day 4 Accomplishment Summary
Date June 27, 2017

Training Location / Site 960 Aurora Blvd.Quezon City Filled out Service Report
Description of Daily Training
Activity Outsource Form
Maintained Hospital
Telephone Local Network

Industry / Company Name / BioMed / World Citi Inc. / 960 Aurora Blvd.Quezon City
Address

Name and Signature of


Supervisor Edilberto Custodio Jr.

Duration 10:30am 5:30pm Number of Hours 6


On our fourth day of training, Our supervisor instructed us to do some paper works like filling up Service Report
Outsource Form. Service Report Outsource Form was the compilation of reports of the service of the other
company like when they are conducting some preventive maintenance on the apparatus or equipment in
laboratory, radiology and etc.

In the afternoon we conducted maintenance for Hospital Telephone Local Network. This maintenance must be
done weekly because telephone calls are very important in the hospital especially when emergency happen so
Details of Training Activity we conducted test calls in the different telephone inside the hospital to know if it was functioning well.

Some telephone are not functioning so we troubleshoot those telephone but some telephones are need to be
replaced by a new telephone. After troubleshooting and replacing those defective telephone we conducted a
test calls again to verify that all the telephones in the hospital is functioning. We also filled up some
maintenance form for telephones inside the hospital because all of the maintenance that is being conducted
must be written in Maintenance form to check by the head of the engineering department of the company.
Pictures of Evidences

Filling up Service Report Outsource Form Maintenance for Hospital Telephone Local Network

Conducting Test calls for Hospital Telephones


Training Day 5 Accomplishment Summary
Date June 28, 2017
Filled out Maintenance
Training Location / Site 960 Aurora Blvd.Quezon City Service Request and Report
Description of Daily Training
Activity Form for repaired BP
apparatus
Maintained and calibrated
BP apparatus

Industry / Company Name / BioMed / World Citi Inc. / 960 Aurora Blvd.Quezon City
Address

Name and Signature of


Supervisor Edilberto Custodio Jr.

Duration 9:00am 5:00pm Number of Hours 8


On our fifth day of training, Our supervisor trained us on how to fill out Maintenance Service Request and
Report Form for repaired BP apparatus. This form was the written report for repairing some apparatus like BP
apparatus and Oxygen Flow Meter after finishing this report form and repairing, it will brought to its designated
department. After that the report form must be signed by the authorized personnel of the department.

In the afternoon our supervisor brought us to the 7 th floor of the hospital to check the preventive maintenance
of the suction machine. Suction machine was used to extract mucus and other bodily fluids from an individual.
Details of Training Activity It was used in hospitals, clinics, physicians offices, nursing homes, ambulances and other medical
environments, and also in homecare situations.

We also repaired Radiant Drop Light that is use for infant to maintained a certain temperature for their health
purposes. We able to detect the problem of the Radiant Drop Light that is the transformer that did not
produced voltage and current.
Pictures of Evidences

Conducting Preventive Maintenance for BP Apparatus Filled out Maintenance Service Request and
Report Form for repaired BP

Repairing and calibrating Suction Machine Repairing Radiant Drop Light


Training Day 3 Accomplishment Summary
Date June 23, 2017
Filled maintenance service
Training Location / Site 960 Aurora Blvd.Quezon City request and report form for
Description of Daily Training
Activity room temperature
monitoring system
Maintained centrifuge in
Laboratory Room

Industry / Company Name / BioMed / World Citi Inc. / 960 Aurora Blvd.Quezon City
Address

Name and Signature of


Supervisor Edilberto Custodio Jr.

Duration 1:30pm 5:30pm Number of Hours 4


Our supervisor instructed us to past the maintenance service request and report for room temperature
monitoring system and he instructed me to fill up the details and after that he told me to bring the
maintenance service request and report to the radiology together with the temperature monitoring system
device.

Temperature monitoring system device was used to monitor the temperature in radiology room because some
apparatus that used in the radiology are temperature sensitive. Apparatus that was used in the radiology are
Details of Training Activity very sensitive in temperature and humidity because when the temperature and humidity was not monitored it
may cause rust in the component of the apparatus.

After we finished the maintenance service request and report for room temperature monitoring system our
supervisor also taught us how to conduct centrifuge maintenance. Centrifuge are us in laboratory for
separating fluids of different densities like separating white blood cells and red blood cells.
Pictures of Evidences

Cheking the functionality of the centrifuge Filling of Maintenance service request and report form for room
temperature monitoring system

Maintenance of centrifuge in Laboratory Room

You might also like