PROYECTO : CONSTRUCCION DE MUROS DE CONTENCION

T1.

Hp = 8.34 m
FSD = 2.00
FSV = 1.50 0.3
(gs) = 1.90 T/m3
() = 25.00 Grados
(s t) = 2.00 Kg/cm2 Hp
f`c = 240.00 kg/cm2
fy = 4200.00 kg/cm2
recub. pantalla= 4.00 cm 3
recub. cimentacin= 7.50 cm
c = 2.50 T/m3

Para concreto vaciado in situ : T2


Coeficiente Friccion : f = tg = 0.466 Hz
debe ser < = 0.6, por lo tanto asumimos :
f = 0.85
B2. B1
^
Ka = tg^2 (45-/2)= 0.480
Ka x gs = 0.912 Ton/m3

Asumimos T1 = 0.3 m

1. DIMENSIONAMIENTO DE LA PANTALLA

Mu = 1.7 M = 1.7 (Ka s s) Hp^3/6 = 149.896 Ton x m


adems :
Mu = 0.9 x b x d`2 x fc x w x (1-0.59w) siendo d = Mu (a)
0.9 * b * fc* w *(1-0.59w)
w = ro x fy/fc = 0.07

Remplazando valores en (a), se obtiene : d = 101.69 cm

Refuerzo flexion Dvarilla = 5/8 "


T2 = d + recub+(Dvarilla/2) = 106.48 cm USAR T2 = 1 m

d (de diseo) = 95.21 cm

2. VERIFICACION POR CORTE

Vdu = 1.7 Vd = 1.7 x 0.5 x (Ka x ss) x (hp-d)^2 = 42.31 Ton

Vu / = 49.78

Vc = 0.53 x ( fc ^.5 ) x b x d = 78.17 Ton

Si As se traslapa en la base : Vce = 2/3 Vc = 52.11 Ton > Vu /() = 49.78 OK

3. DIMENSIONAMIENTO DE LA ZAPATA

Hz = T2 + 5 cm = 105.00 cm

Po lo tanto : H = Hp + Hz = 9.39 m

3.1.- CALCULO DE B1

- B1 / H > = FSD . (Ka . gs) / (2 . gm . f) = 0.536 B1 > = 5.04 m

B1 = 5.04 + (T2-T1)/2 = 5.39 m

USAR B1 = 5.40 m

3.2.- CALCULO DE B2

- B2 / H > = f x FSV)/(3 x FSD) - B1/(2H) = -0.075 B2 > = -0.70

Valor minimo de B2 = Hz = 1.05 m

USAR B2 = 1.05 m
PROYECTO : CONSTRUCCION DE MUROS DE CONTENCION
P5
T1.
VERIFICACION DE ESTABILIDAD

DATOS m
Hp = 8.34
Hz = 1.05
B1 = 5.40
B2 = 1.05 Hp P4
T1 = 0.3
T2 = 1 P2
B3 4.40 Ha = 1/2 Ka * Y *h^2
B 6.45
P5 20 tn P3
H3
P PESOS (Ton) Brazo Giro(m) P*X B3
P1 16.93 3.225 54.603 Hz
P2 6.255 1.9 11.885 P1
P3 7.2975 1.52 11.068
P4 69.7224 4.25 296.320
P5 5 1.9 9.500 B2. B1
TOTAL 105.21 383.376
P Mr

Ka = tg^2 (45-/2)= 0.480

Ha=1/2 x (Ka x gs) x H^2= 40.206 Ma = Ha * H / 3 H = Hz + Hp

Ma = 125.846 Tn - m

VERIFICACION AL DESLIZAMIENTO Y AL VOLTEO

FSD = Hr/Ha = f * P/ Ha = 2.224 > 2.00 OK

FSV = Mr/Ma = 3.046 > 1.50 OK

VERIFICACION DE PRESIONES SOBRE EL TERRENO

Xo = (Mr-Ma) / P = 2.448

e = B/2-Xo = 0.777

B/6= 1.08

e= 0.777 < B/6 = 1.08 m OK, cae dentro del tercio c.

q1 = P / B (1+ 6 * e /B) = 28.10 Tn/m2

q2 = P / B (1- 6 * e /B) = 4.52 Tn/m2

q mayor = 28.10 < st = 7.50 Tn /m2 VERIFICAR

Determinacin de la Capacidad Portante del Suelo (Qu)

Resist. Terreno 0.75 Kg/cm2


PROYECTO : CONSTRUCCION DE MUROS DE CONTENCION

DISEO POR FLEXIN DE LA PANTALLA :

En la Base :

Mu = 1.7 M = 1.7 (Ka s s) Hp^3/6 = 149.90 Ton-m

As = Mu / ( 0.9 x f`y * (d - a/2) = 42.66 cm2

Asumiendo a = 4.50 cm

a = As x fy / ( .85 x fc x b ) = 8.78 cm OK

Refuerzo Vertical
Mu = 149.90 Ton x m
B1 = 5.40
T2 = 1 m
d1 = 95.21 cm
fy = 4200 kg/cm2
fc = 240 kg/cm2
d2 = 30 cm
Hp = 8.34
T1 = 0.30
Hz = 1.05
B= 6.45
q1 = 28.10
q2 = 4.52

Verificamos el As min :

en T1 (Base) : Asmin = 0.0018* b *d = 17.14 cm2/m


en T2 (Lado Sup.) : Asmin = 0.0018* b *d = 5.40 cm2/m

Acero Separacin
asumido Calculada Asumida
Escogemos fierro de : 5/8 '' @ 11.67 cm @ 35.00 cm 2.00 cm

Como la pantalla es de seccin variable, el momento resistente tambin vara linealmente.


se puede trazar lneas de resistencia para determinar los puntos de corte : Mmax/2

Mmax / 2 = Mu / 2 = 74.95 Ton - m = Mu /Hp^3 * (Hp - Hc)^3 = 0.258 ( 8.34 - Hc )^3

Determinacin del Punto de Corte (Lc):

Hc = Hp - [ Mu/2 /0.17]^ 1/3 = 1.7218 m


d (de diseo) = 0.9521 m

Lc = 1.7218 + 0.9521 = 2.670 m

S1 = 0.35 m
S2 = 0.18 m
Lc = 2.67 m

UNIDAD DE ESTUDIOS Y PROYECTOS 3 de 8


PANTALLA
0.35 m

S1

Lc

2.670 =

S2

0.175 m

Refuerzo Horizontal

Ast = r t x b x t 1) rt = 0.0020 , si f < = 5/8" y fy > = 4200 kg / cm2


2) rt = 0.0025 , si f > 5/8" o fy < 4200 kg / cm2

Si T2 > = 25 cm : usar refuerzo horizontal en 2 capas.

1 ) Arriba: T1 = 30.00 cm = 0.002 x 100 x 30 = 6.00 cm2/cm

Acero Separacin
asumido Calculada Asumida
2/3 Ast = 4.00 cm2 usar f= 1/ 2 '' @ 32.25 cm @ 35 cm
1/3 Ast = 2.00 cm2 usar f= 1/ 2 '' @ 64.50 cm @ 45 cm

2 ) Intermedio Ti = 65.00 cm = 0.002 x 100 x 65 = 13.00 cm2/m

Acero Separacin
asumido Calculada Asumida
2/3 Ast = 8.67 cm2 usar f= 1/ 2 '' @ 14.88 cm @ 25 cm
1/3 Ast = 4.33 cm2 usar f= 1/ 2 '' @ 29.77 cm @ 45 cm

3 ) Abajo T2 = 100.00 cm = 0.002 x 100 x 100 = 20.00 cm2/m

Acero Separacin
asumido Calculada Asumida
2/3 Ast = 13.33 cm2 usar f= 1/ 2 '' @ 9.68 cm @ 20 cm
1/3 Ast = 6.67 cm2 usar f= 1/ 2 '' @ 19.35 cm @ 45 cm

Refuerzo de Montaje

Espaciamiento usar s = 36 x f
Acero Separacin
: @ 1.27 cm asumido Calculada Asumida
1/ 2 '' @ 45.72 cm @ 45 cm

UNIDAD DE ESTUDIOS Y PROYECTOS 4 de 8


DISEO DE LA ZAPATA

Ws = gs x Hp = 15.85 Ton/m
Wpp = Hz x 1.0 x wc = 2.625 Ton/m
q1 = 28.10 Tn/m2 Z.A. Z.P
B2 = 1.05 m Ws
B2.
A) Zapata Anterior
Wpp

Wu max = 1.7 x q1 - 0.9 x Wpp = 45.41 Tn/m


qd q1.
Conservadoramente : q2.
Mu = Wumax * ( B2 )2 / 2 = 25.033 To-m d
qd
As min = 0.0018 x b x d = 17.14 cm2 Rige

As = Mu / ( 0.9 x f`y x 0.9 x d ) = 7.73 cm2

d = Hz - ( recub + ( D varilla / 2 ) ) = 96.9 cm

Acero Separacin
asumido Calculada Asumida
1/ 2 '' @ 7.53 cm @ 20 cm 1.29 cm

Acero Transversal

Espaciamiento S = A . b / As
S= 7.53 cm S max = 45 cm

Valor de S asumido : 20.00 cm

1/ 2 '' @ 20.00 cm

Lab = 0.06 Ab . fy / f'c = 20.98


Ld = 1.4 Lab = 29.38

Ld asumido = 35.00 cm

B) Zapata Posterior

qB = ( q1-q2 ) x (B1-T2 ) / (B1+B2) = 16.09 Tn/m

qB = q2 + qB = 20.61 Tn/m

Wu = 1.4 x ( Ws + Wpp ) = 25.86 Tn/m

Mu = ( Wu -1.4 x q2) x ( B1 - T2 )^2 / 2 - 1.4 x qB x ( B1 - T2 )^2 / 6 = 95.98 Tn-m

As = Mu / ( 0.9 x f`y x0.9 x d ) = d= 96.9 cm

As min = 0.0018 x b x d = 17.44 cm2 Rige

Acero Separacin
asumido Calculada Asumida
1/ 2 '' @ 7.40 cm @ 20 cm 1.29 cm

Acero Transversal

Espaciamiento S = A . b / As
S= 7.40 cm S max = 45 cm

Valor de S asumido : 20.00 cm

1/ 2 '' @ 20.00 cm

Lab = 0.06 Ab . fy / f'c = 20.98


Ld = 1.4 Lab = 29.38

Ld asumido = 35.00 cm

UNIDAD DE ESTUDIOS Y PROYECTOS 5 de 8


DISTRIBUCION DE ACERO

Acero principal :

5/ 8 '' @ 35.00 cm

Lc = 2.670 m

Ld = 35.00 cm

Acero de motaje :

1/ 2 '' @ 45.00 cm

Ld
Lab = 0.06 Ab . fy / f'c = 32.53
Ld = 1.4 Lab = 45.55

Ld asumido = 35.00 cm

1/2'' @ 35.00 cm 1/2'' @ 45.00 cm

1/2'' @ 25.00 cm 1/2'' @ 45.00 cm

1/2'' @ 20.00 cm 1/2'' @ 45.00 cm

Ld

Ld

Acero de principal = 1/ 2 '' @ 20 cm Acero de principal = 1/ 2 '' @ 20 cm


Acero de reparticin = 1/ 2 '' @ 20 cm Acero de reparticin = 1/ 2 '' @ 20 cm
La = 15 cm La = 15 cm
Ld = 35 cm Ld = 35 cm

UNIDAD DE ESTUDIOS Y PROYECTOS 6 de 8


N Area ( cm2 ) Peso ( Kg/m ) Dimetro ( pulg. ) Dimetro ( cm )

9/4 '' 18 25.810 20.238 2.257 5.733


7/4 '' 14 14.520 11.348 1.693 4.300
1 1/8 '' 11 10.060 7.906 1.410 3.581
5/4 '' 10 8.190 6.403 1.270 3.226
9/8 '' 9 6.450 5.060 1.128 2.865
1/1 '' 8 5.100 3.973 1.000 2.540
7/8 '' 7 3.870 3.042 0.875 2.222
3/4 '' 6 2.840 2.235 0.750 1.905
5/8 '' 5 2.000 1.552 0.655 1.588
1/2 '' 4 1.290 0.994 0.500 1.270
3/8 '' 2 0.710 0.560 0.375 0.952
Gancho de anclaje ( cm )

68.80
51.60
42.97
38.71
34.38
30.48
26.66
22.86
19.06
15.24
11.42