The Concrete Centre Bar schedule ref : 202 01 Rev: -

Site ref : Spreadsheets to BS 8110 Date prepared : 24-Jul-17

Job no : P2000 Prepared by : Rod hecked by : -

No. of Length of
No. A* B* C* D* E/R *
Bar Type and bars each bar Shape
Member of Total No.
mark size in code
mbrs mm mm mm mm mm
each mm

Double 01 H 16 4 9 36 2675 21 270 2175


Pilecaps 02 H 10 4 6 24 2175 00
03 H8 4 10 40 2075 51 270 695 115
04 H8 4 20 80 500 31 115 50 270 115
3-Pile Caps 05 H 20 3 6 18 2300 21 255 1890
06 H 12 3 4 12 1875 00
07 H8 3 8 24 1975 51 270 650 115
08 H8 3 16 48 500 31 115 50 270 115
09 H 25 3 4 12 2125 21 270 1715
10 H 12 3 4 12 1700 00
11 H8 3 7 21 1800 51 235 600 115
12 H8 3 14 42 475 31 115 50 235 115
4-Pile
13 H 16 5 10 50 2100 21 130 1890
Caps
14 H 16 5 6 30 1875 00
15 H 16 5 9 45 2100 21 135 1890
16 H 16 5 6 30 1875 00
17 H 10 5 48 240 600 31 120 60 360 120
5-Pile
18 H 16 2 12 24 2625 21 130 2410
Caps
19 H 16 2 7 14 2400 00
21 H 16 2 12 24 2650 21 150 2410
22 H 16 2 7 14 2400 00
20 H 12 2 56 112 700 31 125 75 435 125
6-Pile
23 H 16 1 14 14 2100 21 130 1890
Caps
24 H 16 1 8 8 1875 00
26 H 16 1 12 12 3425 21 145 3175
27 H 16 1 5 5 3175 00
28 H 12 1 56 56 750 31 125 75 485 125
This schedule complies with BS 8666. 1,676 kg on this schedule PILECAP DESIGN to BS 8110:2005

* Specified in multiples of 5mm. Specified in multiples of 25mm. 003-2005 Reinforced Concrete Council