HUAWEI BTS Base Station

Pre Acceptance Test

Site Name:

Site Address:

BTS Type: BBU 3900 BTS 3012AE

BTS Configuration:

BTS Frequency: 900 MHz 1800 MHz 900&1800 MHz

Site Inspector (Huawei):

Site Inspector (Airtel):

Site Inspection Date:

Page 1
HUAWEI BTS Base Station
Pre Acceptance Test

T 01 Hardware Installation

Results
Test Description PASS NOT N/A Comments
PASS

T01- 01 Overall hardware installation


inspection

T01- 02 BTS cabinet(s) has been properly


secured to the floor

T01- 03 BTS door can open and close


easily

T01- 04 BTS door locks and unlocks


easily

T01- 05 Rectifier has been properly


secured to the floor

T01- 06 Batteries has been properly


secured to the floor

T 02 Cable Installation

Results
Test Description PASS NOT N/A Comments
PASS

T02- 01 Cables are properly laid out


on the cable ladder with no
crossovers between trunk
and E1 cables

T02- 02 BTS internal cables are laid


properly and secured

T02- 03 Connection of RF cables to


DPPU is properly secured

Page 2
HUAWEI BTS Base Station
Pre Acceptance Test

T02- 04 Check that the DC power


cable from the BTS cabinet
top to the rectifier (+)
busbar and (-) busbar are
installed correctly

T02- 05 Check that the AC power


cable from rectifier to the
ACDB is installed properly

T02- 06 All PGND cables are


connected to the grounding
busbar in the equipment
room

T02- 07 Connection of transmission


equipments to the rectifier
is correct

T02- 08 Connection of RF jumper


cables to DPPU is
connected securely

T02- 09 The DB25 cable is


connected at the BTS top to
the microwave DDF
properly

T02- 10 Alarm cables for external


sensors from the BTS to
the DDF box and BTS to
the rectifier is installed

Page 3
HUAWEI BTS Base Station
Pre Acceptance Test

T 03 External Alarm

Results
Test Description PASS NOT N/A Comments
PASS

T03- 01 High Battery Temperature

T03- 02 Fire Alarm

T03- 03 Start Fault ( Fail to start)

T03- 04 Stop Fault ( Fail to stop)

T03- 05 Alternator Fault/ LLOP/HCT/WHT

T03- 06 Mains Fail

T03- 07 DG ON

T03- 08 DG on load

T03- 09 Door Open

T03- 10 Fuel Low

T 05 DTRU Power Output Test (Huawei)

Test Item Power (Watts) Comments


T06- 01 DDPU output sector A1

T06- 02 DDPU output sector A2


T06- 03 DDPU output sector B1

T06- 04 DDPU output sector B2


T06- 05 DDPU output sector C1

T06- 06 DDPU output sector C2

Page 4
HUAWEI BTS Base Station
Pre Acceptance Test

T 07 Antenna & Fiber Installation (Applicable to new or reinstallation sites)

Results
Test Description PASS NOT N/A Comments
PASS

T07- 01 Fiber Type () Sector A1:


Sector A2:
Sector B1:
Sector B2:
Sector C1:
Sector C2:

T07- 02 RRU Cable Jumper Length Sector A1:


Sector A2:
Sector B1:
Sector B2:
Sector C1:
Sector C2:

T07- 03 RRU Cable Jumper Type Sector A1:


Sector A2:
Sector B1:
Sector B2:
Sector C1:
Sector C2:

T07- 04 Fiber Cable Length Sector A1:


Sector A2:
Sector B1:
Sector B2:
Sector C1:
Sector C2:

T07- 05 Fiber Cable Type Sector A1:


Sector A2:

Page 5
HUAWEI BTS Base Station
Pre Acceptance Test

Sector B1:
Sector B2:
Sector C1:
Sector C2:

T07- 06 Fiber clamping (Distance <1.5m) Sector A1:


Sector A2:
Sector B1:
Sector B2:
Sector C1:
Sector C2:

T07- 07 Fiber inlet sealed

T07- 08 Antenna model Sector A:


Sector B:
Sector C:

T07- 09 Use correct Antenna tilt brackets Sector A:


Sector B:
Sector C:

T07- 10 Antenna down tilt (measure Sector A:


through tilt meter) Sector B:
Sector C:

T07- 11 Antenna in correct tower leg Sector A:


Sector B:
Sector C:

T07- 12 Antenna in correct height Sector A:


Sector B:
Sector C:

T07- 13 Antenna directions (As according Sector A:


to Airtel information) Sector B:
Sector C:

T07- 14 RRU & Jumper connector Sector A1:


properly sealed Sector A2:
Sector B1:

Page 6
HUAWEI BTS Base Station
Pre Acceptance Test

Sector B2:
Sector C1:
Sector C2:

T07- 15 Sector A1:


Sector A2:
Sector B1:
Sector B2:
Sector C1:
Sector C2:

T07- 16 TMA has been installed and Sector A:


tested properly Sector B:
Sector C:

T07- 17 VSWR Test (< 1.4) Sector A1:


Sector A2:
Sector B1:
Sector B2:
Sector C1:
Sector C2:

T 08 Call Test

Test Item Power (Watts) Comments


T08- 01 Mobile to Mobile
T08- 02 Mobile to Fixed Line

T08- 03 GPRS Testing

Page 7
HUAWEI BTS Base Station
Pre Acceptance Test

T 09 As Built Drawing

Page 8
HUAWEI BTS Base Station
Pre Acceptance Test

T 10 Cable connectivity diagram

Page 9
HUAWEI BTS Base Station
Pre Acceptance Test

T 10 BTS 3012 Inventory & Serial Number

Description Serial Number


T11- 01 BBU 3900

T11- 02 DPD
T11- 03 EMUA

T11- 04 FAPU

T11- 05 RRU
T11- 06 RRU

T11- 07 RRU
T11- 08 Rectifier

T11- 09 Rectifier
T11- 10

T11- 11

T11- 12

T11- 13

T11- 14

Preliminary Acceptance Test for BTS installation has passed.

Airtel Huawei
Name: Name:

------------------------------------
Inspection company

Page 10