PQR -PL02 (tie in)

BEFORE WELDING

Root Gap -2mm


Bevel Angle 32

Root Gap -2mm Root Gap -2mm


Bevel Angle 32 Bevel Angle 32

Root Gap -2mm


Bevel Angle 32
** High low less then 1mm

PIPE MATERIAL
Heat no Mterial Grade
1 1223323 ISO 3183 L 415
2 1223323 ISO 3183 L 415

ELECTROD
Electrod type Lot no
1 E6010 1066B
2 8010P1 1092D

** Welder ID M03 & M04

DURING WELDING

Pre heat Temperature 135c


Welder M03 Welder M04
Start Time End time Inter pas temp Start Time End time Inter pas temp
1st Pass 15:07PM 15:27PM ___ 15:07PM 15:30PM ___
2nd Pass 15:37PM 15:42 PM 138 15:37 PM 15:42PM 134
3rd Pass 15:45PM 15:51PM 142 15:45PM 15:51PM 152
4th Pass 15:55PM 16:05PM 136 15:55PM "16:06 PM 128
5th Pass 16:10PM 16:18PM __ 16:10PM 16:21PM __

***12:03 to 12:11 welded to fill improper field area

AFTER WELDING

1. Cap hight 2mm


2. Root penetration 1mm
3. No major under cut
PQR -PL01 ( PIPE TO PIPE)

BEFORE WELDING

Root Gap -2mm


Bevel Angle 32

Root Gap -2mm Root Gap -2mm


Bevel Angle 32 Bevel Angle 32

Root Gap -2mm


Bevel Angle 32
** High low less then 1mm

PIPE MATERIAL
Heat no Mterial Grade
1 1223323 ISO 3183 L 415
2 1223323 ISO 3183 L 415

ELECTROD
Electrod type Lot no
1 E6010 1066B
2 8010P1 1092D

** Welder ID M01 & M02

DURING WELDING

Pre heat Temperature 120c


Welder M01 Welder M02
Start Time End time Inter pas temp Start Time End time Inter pas temp
1st Pass 11:18am 11:28AM ___ 11:18 AM 11:30 AM ___
2nd Pass 11:34 AM 11:41 AM 137 11:34 AM 11:42 AM 148
3rd Pass 11:43 AM 11:50 AM 152 11:45 AM 11:51 AM 150
4th Pass 11:55 AM 12:00 126 11:55 AM 12:00 135
5th Pass 12:14 PM 12:18 PM __ 12:14PM 12:26PM __

***12:03 to 12:11 welded to fill improper field area

AFTER WELDING

1. Cap hight 2mm


2. Root penetration 1mm
3. No major under cut