Aramco Cogen Level 3 Schedule_RTR_rev.

1
(cut off by 2016. 07. 01)

Activity ID Activity Name Dur. Start Finish Total 2016 2017


Float Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb
28 29 30 31 32 33 34 35 36 37 38
RTR
Project Milestone
Mileston
No Cogen4_Area Phase
P
Key Milestone
No Cogen7_Sub
RPM00KE0050 Tie-in from Aramco (Electricity - Back Energization) 0 26-Jul-2016 -117 Tie-in from Aramco (Electricity - Back Energization)
RPM00KE0060 Tie-in from Aramco (Fuel Gas Available) 0 20-Aug-2016 -114 Tie-in from Aramco (Fuel Gas Available)
RPM00KE0066 GTG #1 Initial Firing_RTR 0 22-Aug-2016 -116 GTG #1 Initial Firing_RTR
RPM00KE0065 GTG Commissioning_RTR 0 22-Aug-2016 -116 GTG Commissioning_RTR
RPM00KE0067 GTG #1 Synchronization_RTR 0 25-Aug-2016 -48 GTG #1 Synchronization_RTR
RPM00KE0068 GTG #2 Initial Firing_RTR 0 29-Aug-2016 -136 GTG #2 Initial Firing_RTR
RPM00KE0069 GTG #2 Synchronization_RTR 0 01-Sep-2016 -54 GTG #2 Synchronization_RTR
RPM00KE0070 Performance Test_RTR 0 11-Oct-2016 -88 Performance Test_RTR
RPM00KE0075 Reliability Test_RTR 0 13-Nov-2016 -116 Reliability Test_RTR
RPM00KE0080 Plant Commercial Operation Date_RTR 0 14-Nov-2016 -136 Plant Commercial Operation Da
RPM00KE0085 Take Over as per EPC Contract Agreement 0 14-Nov-2016 -136 Take Over as per EPC Contrac
Construction
Common
Temporary Facility
Site Preparation
RCNC0TF1007 Site Preparation (Embankment up to MSL +3m) 610 12-Aug-2014 A 23-Jul-2016 -104 Site Preparation (Embankment up to MSL +3m)
Power Block (PB)
Civil
Others
RCNP0CV6080-01 Fuel Gas Heater, Scrubber Area #2 Fence Installation_RTR (added) 51 15-May-2016 A 12-Jul-2016 -86 Fuel Gas Heater, Scrubber Area #2 Fence Installation_RTR (added)
RCNP0CV6070 Fuel Gas System Tie-in Area Fence installation_RTR (added) 37 31-May-2016 A 12-Jul-2016 -86 Fuel Gas System Tie-in Area Fence installation_RTR (added)
RCNP0CV6080 Fuel Gas Heater, Scrubber Area #1 Fence Installation_RTR (added) 28 11-Jun-2016 A 12-Jul-2016 -86 Fuel Gas Heater, Scrubber Area #1 Fence Installation_RTR (added)
Mechanical
GTG Installation U
Unit A
RCNP0ME0552 GTG Internal Piping Pneumatic / Hydrotest_Unit #1_RTR 168 05-Jan-2016 A 18-Jul-2016 -93 GTG Internal Piping Pneumatic / Hydrotest_Unit #1_RTR
RCNP0ME0536 Air Inlet Filter Cartridges Installation (GTG)_Unit#1_RTR 89 10-Apr-2016 A 21-Jul-2016 -92 Air Inlet Filter Cartridges Installation (GTG)_Unit#1_RTR
GTG Installation U
Unit B
RCNP0ME1052 GTG Internal Piping Pneumatic/ Hydrotest_Unit #2_RTR 163 07-Jan-2016 A 14-Jul-2016 -89 GTG Internal Piping Pneumatic/ Hydrotest_Unit #2_RTR
RCNP0ME1018 Final Alignment of Turbine to Generator (GTG)_Unit#2_RTR 87 11-Apr-2016 A 20-Jul-2016 -99 Final Alignment of Turbine to Generator (GTG)_Unit#2_RTR
RCNP0ME1036 Air Inlet Filter Cartridges Installation (GTG)_Unit#2_RTR 98 07-Apr-2016 A 30-Jul-2016 -93 Air Inlet Filter Cartridges Installation (GTG)_Unit#2_RTR
RCNP0ME1020 Final Grouting of GTG (GTG)_Unit#2_RTR 14 21-Jul-2016 06-Aug-2016 -99 Final Grouting of GTG (GTG)_Unit#2_RTR
HRSG System Unit
Uni A
RCNP0ME1585 HRSG External Piping Insulation_Unit #1_RTR 47 29-May-2016 A 21-Jul-2016 -90 HRSG External Piping Insulation_Unit #1_RTR
HRSG System Unit
Uni B
RRCNP0ME1599-2 Install Iiner PI & Insulation Installation Start & Drum Setting (HRSG) _Unit#2_RTR 144 06-Feb-2016 A 21-Jul-2016 -84 Install Iiner PI & Insulation Installation Start & Drum Setting (HRSG) _Unit
RCNP0ME2095 HRSG External Piping Insulation_Unit #2_RTR 48 28-May-2016 A 21-Jul-2016 -90 HRSG External Piping Insulation_Unit #2_RTR
Balance of Plant (BOP)
(B
Civil
Road Paving Work Foundation
RCNB0CV0404 Gravel paving Equipment Area(PB)_RTR 66 25-Apr-2016 A 10-Jul-2016 -38 Gravel paving Equipment Area(PB)_RTR
RCNB0CV0401 Gravel paving TR#1,2 Area_RTR 36 30-May-2016 A 10-Jul-2016 -44 Gravel paving TR#1,2 Area_RTR
RCNB0CV0505 Asphalt Road Paving_RTR 183 15-Dec-2015 A 14-Jul-2016 -44 Asphalt Road Paving_RTR
RCNB0CV0510 Conrete Road Paving_RTR 80 15-Apr-2016 A 17-Jul-2016 -44 Conrete Road Paving_RTR
RCNB0CV0402 Gravel paving Fuel Gas heater, scrubber Area#1,2_RTR 33 12-Jun-2016 A 19-Jul-2016 -46 Gravel paving Fuel Gas heater, scrubber Area#1,2_RTR
Architectural
Control & Admin B
Building
RCNB0AR0520-52 Raised Floor Final Alignment (added) 33 07-Jun-2016 A 14-Jul-2016 -84 Raised Floor Final Alignment (added)
RCNB0AR0520 Control Building Finish work_RTR 365 01-Jun-2015 A 30-Jul-2016 -97 Control Building Finish work_RTR
RCNB0AR0520-004 Touch-Up (added) 49 04-Jun-2016 A 30-Jul-2016 -97 Touch-Up (added)
Workshop & Store Building
RCNB0AR1520 Workshop & Store Building Finish work_RTR 173 02-Jan-2016 A 20-Jul-2016 -98 Workshop & Store Building Finish work_RTR
Steel Structure
Shelter
RCNB0SS4510-0 Misc Steel Str. Work (Stair, Grating etc)_RTR (added) 49 21-May-2016 A 16-Jul-2016 -85 Misc Steel Str. Work (Stair, Grating etc)_RTR (added)
Mechanical
Fuel Gas Supply system
s
RCNB0ME1005-11 * Inspection (added) 1 02-Jul-2016 02-Jul-2016 -75 * Inspection (added)
RCNB0ME1005-14 * N2 charging (added) 1 20-Jul-2016 20-Jul-2016 -90 * N2 charging (added)
RCNB0ME1005-15 * Fuel Gas Filling (added) 1 20-Aug-2016 20-Aug-2016 -115 * Fuel Gas Filling (added)
Piping
Sample System
RCNB0PP0430-0 Sample System Piping Insulation_RTR 26 11-Jun-2016 A 10-Jul-2016 -84 Sample System Piping Insulation_RTR
Turbine Inlet Air Cooling
Co System
RCNB0PP0047-01 [A/G_L/B] TIAC Piping Hydrotest_(Others) RTR 62 21-Apr-2016 A 02-Jul-2016 -100 [A/G_L/B] TIAC Piping Hydrotest_(Others) RTR
RCNB0PP0048-00 TIAC Piping Insulation_RTR 27 03-Jul-2016 02-Aug-2016 -100 TIAC Piping Insulation_RTR
Make Up Water Sys
System
RCNB0PP5020 Make up Water Piping Insulation_RTR (added) 30 11-Jun-2016 A 14-Jul-2016 -85 Make up Water Piping Insulation_RTR (added)
Feed Water System
RCNB0PP5020-3 Suspended by SA - Feed Water Line Chemical Cleaning 12 27-Jun-2016 A 10-Jul-2016 -114 Suspended by SA - Feed Water Line Chemical Cleaning
RCNB0PP0520 Feed Water Metering Installation & Tubing 10 11-Jul-2016 21-Jul-2016 -114 Feed Water Metering Installation & Tubing
RCNB0PP0521 Feed Water Metering Calibration by SA_RTR (added) 3 23-Jul-2016 25-Jul-2016 -112 Feed Water Metering Calibration by SA_RTR (added)
RCNB0PP5020-2 Feed Water Metering Area Insulation 5 23-Jul-2016 27-Jul-2016 -114 Feed Water Metering Area Insulation
Steam Line
RCNB0PP1030 [A/G_L/B] Steam Piping Insulation _RTR 57 25-May-2016 A 30-Jul-2016 -91 [A/G_L/B] Steam Piping Insulation _RTR
RCNB0PP1015 [A/G_S/B] ]Steam Piping Insulation _Unit #1,2_RTR 55 28-May-2016 A 30-Jul-2016 -97 [A/G_S/B] ]Steam Piping Insulation _Unit #1,2_RTR
Fuel Gas Supply S
System
RCNB0PP3017 Fuel Gas Back-up Metering Skid Calibration & Commissioning (by SA) 7 02-Jul-2016 09-Jul-2016 -101 Fuel Gas Back-up Metering Skid Calibration & Commissioning (by SA)
RCNB0PP3012 Fuel Gas Piping Insulation (added) 52 16-May-2016 A 14-Jul-2016 -84 Fuel Gas Piping Insulation (added)
APU for CTG Line
RCNB0PP0068-00 GAS TURBINE(fuel gas) Piping Insulation_RTR 36 11-Jun-2016 A 21-Jul-2016 -90 GAS TURBINE(fuel gas) Piping Insulation_RTR
Electrical
Motor Solo Run
RCNB0EL0122-6 MSR_Cooling Tower Pump - 2 (added) 1 06-Jul-2016* 06-Jul-2016 -77 MSR_Cooling Tower Pump - 2 (added)
RCNB0EL0122-4 MSR_Cooling Tower Pump - 1 (added) 1 06-Jul-2016* 06-Jul-2016 -77 MSR_Cooling Tower Pump - 1 (added)
RCNB0EL0120-3 MSR_Chilled Water Pump - 1 (added) 1 08-Aug-2016 08-Aug-2016 -105 MSR_Chilled Water Pump - 1 (added)
RCNB0EL0160-03 MSR_Gas Compressor - A (added) 1 08-Aug-2016 08-Aug-2016 -117 MSR_Gas Compressor - A (added)
RCNB0EL0160-04 MSR_Gas Compressor - B (added) 1 08-Aug-2016 08-Aug-2016 -117 MSR_Gas Compressor - B (added)
RCNB0EL0120-5 MSR_Chilled Water Pump - 2 (added) 1 08-Aug-2016 08-Aug-2016 -105 MSR_Chilled Water Pump - 2 (added)
Lighting System
RCNB0EL3510-10 Lighting Conduit, J/B & Fixture Installtion at BOP_RTR 309 04-Aug-2015 A 28-Jul-2016 -96 Lighting Conduit, J/B & Fixture Installtion at BOP_RTR
Communication System
S
RCNB0EL4510-66 CCTV System Camera & Cable Pulling & Termination for Guard House_RTR 39 28-May-2016 A 11-Jul-2016 -81 CCTV System Camera & Cable Pulling & Termination for Guard House_RTR
Others

Actual Work Milestone Date Revision Checked Approved


1/4 03-Jul-2016 RTR L3 Schedule_rev.1 (cutoff by 1 Jul 2016) J.W. Kim J.H. Park
Remaining Work
Critical Remaining Work
Aramco Cogen Level 3 Schedule_RTR_rev.1
(cut off by 2016. 07. 01)

Activity ID Activity Name Dur. Start Finish Total 2016 2017


Float Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb
28 29 30 31 32 33 34 35 36 37 38
Aramco Interface Work
W
RCNB0OT0545-71 230kV Cable Pre Hi-Pot Test (by SA) 2 02-Jul-2016 03-Jul-2016 -113 230kV Cable Pre Hi-Pot Test (by SA)
RCNB0OT0545-101 Waiting SA Inspection for Cable cutting 3 30-Jun-2016 A 03-Jul-2016 -117 Waiting SA Inspection for Cable cutting
RCNB0OT0545-121 SA Inspection for Cable cutting 1 04-Jul-2016 04-Jul-2016 -117 SA Inspection for Cable cutting
RCNB0OT0545-111 GIS Fiber Optic Cable Pulling of Electrical part (by SECL) 4 05-Jul-2016 09-Jul-2016 -117 GIS Fiber Optic Cable Pulling of Electrical part (by SECL)
RCNB0OT0545-022 GIS Fiber Optic Cable Termination (by SA) 7 10-Jul-2016 17-Jul-2016 -117 GIS Fiber Optic Cable Termination (by SA)
RCNB0OT0545-03 Red Tile 2 18-Jul-2016 19-Jul-2016 -112 Red Tile
RCNB0OT0545-08 230kV Cable Final Hi-Pot Test (by SA) 14 04-Jul-2016 19-Jul-2016 -113 230kV Cable Final Hi-Pot Test (by SA)
Tie in work
RCNB0OT0565 Back Energizing from Aramco 1 26-Jul-2016 26-Jul-2016 -117 Back Energizing from Aramco
RCNB0OT725 Final Steam Line Tie-in 1 06-Sep-2016 07-Sep-2016 -102 Final Steam Line Tie-in
Utility Receiving
RCNB0OT0696 Process Water Discharging Start 1 02-Jul-2016 02-Jul-2016 -73 Process Water Discharging Start
RCNB0OT0695 Storm Water Discharging Start 1 02-Jul-2016 02-Jul-2016 -73 Storm Water Discharging Start
RCNB0OT0675 Utility Water Receiving Start 1 02-Jul-2016 02-Jul-2016 -72 Utility Water Receiving Start
RCNB0OT0685 Potable Water Receiving Start 1 02-Jul-2016 02-Jul-2016 -97 Potable Water Receiving Start
RCNB0OT0715 Sanitary Water Discharge Start 1 02-Jul-2016 02-Jul-2016 -97 Sanitary Water Discharge Start
RCNB0OT0705 Fire Water Receiving Start 1 02-Jul-2016 02-Jul-2016 -101 Fire Water Receiving Start
RCNB0OT0665 Feed Water Receiving Start 1 28-Jul-2016 28-Jul-2016 -114 Feed Water Receiving Start
RCNB0OT0550 Gas Receiving Start 1 18-Aug-2016 18-Aug-2016 -117 Gas Receiving Start
RCNB0OT0560 Steam Export Start 1 07-Sep-2016 08-Sep-2016 -102 Steam Export Start
Commissioning
No Cogen4_Area Phase
P
Construction Turn over Package H101_HRSG
H202_HRSG
H102_HRSG
H201_HRSG
G103_GTG
G105_GTG
G203_GTG
G204_GTG
G205_GTG
E118_Cathodic
E116_Overall
B117_Service
B123_BOP
B122_HVAC
B114_Service
B115_Main
A103_230kV
I103_SWAS
E115_PA
A105_Guard
A101_Steel
G101_GTG
A104_Workshop
H103_HRSG
H203_HRSG
G102_GTG
B101_Fuel
C101_Civil
E117_Lighting
G202_
A102_Control
steam
Other
-G201_GTG
(Public
System
B110_TIAC
GIS
-Auxilary
Grounding
Generator
Turbine
Air
Gas
Mech/Pipe/Civil
Elec/C&I
protection
House
Structures
and
GTG
Substation
Gas
System
-Others
System
-Turbine
address)/LAN/CCTV/Telephone
-Air
Instrument
System
Control
Insulation
System
-System
filter
&#1
#2
Air
System
&
- Admin
System
Store
Turbine
Lightning
System
filter
System
System
#1
#2
#1
#2#1
#2
Building
System
Building
Air
#1System
#2 #1
System
Protection
#1
#2 #2#2 system
Common BOP
Fire Fighting & HVAC
HV
RCM00CO0143-1 RTR_HVAC Test (CCR BLDG) (added) 78 03-Apr-2016 A 02-Jul-2016 -97 RTR_HVAC Test (CCR BLDG) (added)
RCM00CO0130-00 RTR_Deluge Valve Test_Fuel Gas Sytem #1(added) 1 03-Jul-2016 03-Jul-2016 -99 RTR_Deluge Valve Test_Fuel Gas Sytem #1(added)
RCM00CO0130-00 RTR_Deluge Valve Test UAT #2 (added) 1 03-Jul-2016 03-Jul-2016 -99 RTR_Deluge Valve Test UAT #2 (added)
RCM00CO0130-01 RTR_Deluge Valve Test_H2 Cylider for GT #2 (added) 1 03-Jul-2016 03-Jul-2016 -99 RTR_Deluge Valve Test_H2 Cylider for GT #2 (added)
RCM00CO0130-00 RTR_Deluge Valve Test GSUT #1 (added) 1 03-Jul-2016* 03-Jul-2016 -101 RTR_Deluge Valve Test GSUT #1 (added)
RCM00CO0130-01 RTR_Deluge Valve Test_Fuel Gas System (Tie-in Area) #2 (added) 1 03-Jul-2016 03-Jul-2016 -99 RTR_Deluge Valve Test_Fuel Gas System (Tie-in Area) #2 (added)
RCM00CO0130-00 RTR_Deluge Valve Test_Fuel Gas Sytem #2(added) 1 03-Jul-2016 03-Jul-2016 -99 RTR_Deluge Valve Test_Fuel Gas Sytem #2(added)
RCM00CO0130-00 RTR_Deluge Valve Test_Fuel Gas Compressor #1,2 (added) 1 03-Jul-2016 03-Jul-2016 -101 RTR_Deluge Valve Test_Fuel Gas Compressor #1,2 (added)
RCM00CO0130-00 RTR_Deluge Valve Test GSUT #2 (added) 1 03-Jul-2016 03-Jul-2016 -99 RTR_Deluge Valve Test GSUT #2 (added)
RCM00CO0130-20 RTR_F/F Fire Alarm Function Test (Workshop&Store) (added) 2 02-Jul-2016 03-Jul-2016 -98 RTR_F/F Fire Alarm Function Test (Workshop&Store) (added)
RCM00CO0130-01 RTR_Deluge Valve Test_Fuel Gas System (Tie-in Area) #1 (added) 1 03-Jul-2016 03-Jul-2016 -99 RTR_Deluge Valve Test_Fuel Gas System (Tie-in Area) #1 (added)
RCM00CO0130-00 RTR_Deluge Valve Test UAT #1 (added) 1 03-Jul-2016 03-Jul-2016 -99 RTR_Deluge Valve Test UAT #1 (added)
RCM00CO0130-00 RTR_Deluge Valve Test_H2 Cylider for GT #1 (added) 1 03-Jul-2016 03-Jul-2016 -99 RTR_Deluge Valve Test_H2 Cylider for GT #1 (added)
RCM00CO0130-01 RTR_Sprinkler Test in GIS Bldg. area 1 04-Jul-2016 04-Jul-2016 -100 RTR_Sprinkler Test in GIS Bldg. area
RCM00CO0130-01 RTR_Sprinkler Test in CCR Bldg. area 1 04-Jul-2016 04-Jul-2016 -101 RTR_Sprinkler Test in CCR Bldg. area
RCM00CO0130-05 RTR_Hydrant / Monitor Installation Test & Hose Reel Tests (added) 1 04-Jul-2016 04-Jul-2016 -99 RTR_Hydrant / Monitor Installation Test & Hose Reel Tests (added)
RCM00CO0130-02 RTR_F/F GTG#1_GT PEECC FM200 & Function Test (added) 1 05-Jul-2016 05-Jul-2016 -101 RTR_F/F GTG#1_GT PEECC FM200 & Function Test (added)
RCM00CO0130-03 RTR_F/F GTG#2_GT PEECC FM200 & Function Test (added) 1 05-Jul-2016 05-Jul-2016 -101 RTR_F/F GTG#2_GT PEECC FM200 & Function Test (added)
RCM00CO0130-09 RTR_Commissioning & Functional test FP/FA Transformer area SA Witness (added 1 05-Jul-2016 05-Jul-2016 -100 RTR_Commissioning & Functional test FP/FA Transformer area SA Witness (a
RCM00CO0130-10 RTR_Commissioning & Functional test FP/FA Fuel Gas Area SA Witness (added) 1 05-Jul-2016 05-Jul-2016 -101 RTR_Commissioning & Functional test FP/FA Fuel Gas Area SA Witness (add
RCM00CO0130-04 RTR_F/F CCR FM200 SAT (added) 54 05-May-2016 A 06-Jul-2016 -102 RTR_F/F CCR FM200 SAT (added)
RCM00CO0135 RTR_F/F F/F&F/A Final Integration Test 1 07-Jul-2016 07-Jul-2016 -102 RTR_F/F F/F&F/A Final Integration Test
RCM00CO0145 RTR_HVAC Test (Workshop) 15 02-Jul-2016 18-Jul-2016 -45 RTR_HVAC Test (Workshop)
Compressed Air System(IA/SA)
Sy
RCM00CA0120-2 RTR_IA/SA Air Blowing (added) 3 11-Jul-2016* 13-Jul-2016 -106 RTR_IA/SA Air Blowing (added)
RCM00CO0170 RTR_Compressed Air System Ready 1 14-Jul-2016 14-Jul-2016 -106 RTR_Compressed Air System Ready
Environment System
Syste
RCM00ES0110-0 RTR_CEMS(Stack) Function Test (added) 17 25-Jun-2016 A 13-Jul-2016 -76 RTR_CEMS(Stack) Function Test (added)
RCM00ES0120-0 RTR_SWAS (Sampling System) (added) 4 11-Jul-2016 14-Jul-2016 -84 RTR_SWAS (Sampling System) (added)
RCM00ES0130-0 RTR_Chemical Dosing Pump MRT (added) 3 02-Aug-2016* 04-Aug-2016 -112 RTR_Chemical Dosing Pump MRT (added)
RCM00ES0130-10 RTR_Chemical Dosing System Tuning (added) 10 06-Aug-2016 16-Aug-2016 -112 RTR_Chemical Dosing System Tuning (added)
Fuel Gas System
RCM00CO0188 Fuel Gas System - Final Leak Test (added) 4 16-Jul-2016* 19-Jul-2016 -101 Fuel Gas System - Final Leak Test (added)
RCM00CO0190 Fuel Gas System - Gas line Inerting with N2 2 20-Jul-2016 21-Jul-2016 -101 Fuel Gas System - Gas line Inerting with N2
RCM00CO0187 Fuel Gas System - Metering, PCV, PRV, ESD Test (added) 10 16-Jul-2016 26-Jul-2016 -106 Fuel Gas System - Metering, PCV, PRV, ESD Test (added)
RCM00CO0190-1 Fuel Gas System - Gas Detection Test 5 23-Jul-2016 27-Jul-2016 -101 Fuel Gas System - Gas Detection Test
RCM00CO0191 Fuel Gas System - Gas Compressor Commissioning (before Receiving) 6 09-Aug-2016 15-Aug-2016 -117 Fuel Gas System - Gas Compressor Commissioning (before Re
RCM00CO0192 Fuel Gas System - Inspection PCPC/SA 2 16-Aug-2016 17-Aug-2016 -117 Fuel Gas System - Inspection PCPC/SA
RCM00CO0193 Fuel Gas System - Gas Compressor Commissioning (after Receiving) 2 18-Aug-2016 20-Aug-2016 -115 Fuel Gas System - Gas Compressor Commissioning (after Re
Feed Water System
RCM00FW0160-00 RTR_Feed Water Filling_(added) 3 30-Jul-2016 01-Aug-2016 -114 RTR_Feed Water Filling_(added)
RCM00FW0160-00 RTR_Leak Point Check_(added) 4 02-Aug-2016 06-Aug-2016 -114 RTR_Leak Point Check_(added)
RCM00FW0150-0 RTR_Make up Water_Tank filling (added) 1 07-Aug-2016 07-Aug-2016 -110 RTR_Make up Water_Tank filling (added)
RCM00FW0160-00 RTR_Water Replacement (Drain / Filling)_(added) 6 07-Aug-2016 13-Aug-2016 -114 RTR_Water Replacement (Drain / Filling)_(added)
RCM00FW0130-0 RTR_Feed Water_Metering, PCV, H/EX Actual Test (added) 3 14-Aug-2016 16-Aug-2016 -113 RTR_Feed Water_Metering, PCV, H/EX Actual Test (added)
RCM00CC0160-001 RTR_Make up Water System Nomalizing (added) 1 17-Aug-2016 17-Aug-2016 -113 RTR_Make up Water System Nomalizing (added)
RCM00FW0160-0 RTR_Performance Heater Water Booster Pump test (added) 5 14-Aug-2016 18-Aug-2016 -114 RTR_Performance Heater Water Booster Pump test (added)
RCM00FW0160-0 RTR_Feed Water Booster Pump test (added) 5 14-Aug-2016 18-Aug-2016 -114 RTR_Feed Water Booster Pump test (added)
RCM00FW0160-0 RTR_Dew Point Heating Water Pump test (added) 5 14-Aug-2016 18-Aug-2016 -114 RTR_Dew Point Heating Water Pump test (added)
GIS & SCADA Test for Back Energizing
RCMB0PS0609-11 RTR_Unit #1&2 Intertrip Test (SA GIS - SECL GIS, Joint with SA) 5 02-Jul-2016 06-Jul-2016 -108 RTR_Unit #1&2 Intertrip Test (SA GIS - SECL GIS, Joint with SA)
RCMB0PS0555-10 RTR_SA Panel Fiber Optice Cable Interal Wiring (by SA) (added) 7 02-Jul-2016 09-Jul-2016 -117 RTR_SA Panel Fiber Optice Cable Interal Wiring (by SA) (added)
RCMB0PS0555-2 RTR_SA Panel Interface Signal Check (Internal) (added) 7 10-Jul-2016 17-Jul-2016 -117 RTR_SA Panel Interface Signal Check (Internal) (added)
RCNB0OT0545-09 230kV Cable Link Connection (GIS - SA GIS) (Joint with SA) 1 20-Jul-2016 20-Jul-2016 -113 230kV Cable Link Connection (GIS - SA GIS) (Joint with SA)
RCMB0PS0708 RTR_SA Panel Interface Signal Check (Joint Scope- SA/PCPC/SECL) 7 18-Jul-2016 25-Jul-2016 -117 RTR_SA Panel Interface Signal Check (Joint Scope- SA/PCPC/SECL)
RCMB0PS0720 RTR_Back Energizing 0 26-Jul-2016 -117 RTR_Back Energizing
RCMB0PS0800 RTR_Soak Test (GIS) (added) 2 27-Jul-2016 28-Jul-2016 -117 RTR_Soak Test (GIS) (added)
RCMB0PS0802 RTR_Soak Test (HV Cable, GSUT #1) (added) 2 30-Jul-2016 31-Jul-2016 -117 RTR_Soak Test (HV Cable, GSUT #1) (added)
RCMB0PS0804 RTR_Soak Test (HV Cable, GSUT #2) (added) 2 01-Aug-2016 02-Aug-2016 -117 RTR_Soak Test (HV Cable, GSUT #2) (added)
RCMB0PS0806 RTR_MV/LV SWGR/MCC Energizing, Parameter Tuning (Permanent) (added) 4 03-Aug-2016 07-Aug-2016 -117 RTR_MV/LV SWGR/MCC Energizing, Parameter Tuning (Permane
CCW System & Fin Fan
RCM00CO0177 RTR_CCW System Filling & Check (added) 7 07-Aug-2016 14-Aug-2016 -110 RTR_CCW System Filling & Check (added)
TIAC Commissioning
Commission
RCM00GG1182 RTR_Chilled Water Line Circulation Test 10 27-Jul-2016 07-Aug-2016 -116 RTR_Chilled Water Line Circulation Test
RCM00GG1188 RTR_RO Skid Functional Test 49 12-Jun-2016 A 07-Aug-2016 -72 RTR_RO Skid Functional Test
RCM00GG1184 RTR_Cooling Tower Functional Test 7 08-Aug-2016 15-Aug-2016 -79 RTR_Cooling Tower Functional Test
RCM00GG1186 RTR_Chiller Functional Test 12 08-Aug-2016 21-Aug-2016 -116 RTR_Chiller Functional Test
RCM00GG1190 RTR_TIAC Operation Test 10 22-Aug-2016 01-Sep-2016 -84 RTR_TIAC Operation Test
HRSG
HRSG #1
RCM00CT0121-1 RTR_HRSG #1_Function Test (added) 87 24-Apr-2016 A 02-Aug-2016 -104 RTR_HRSG #1_Function Test (added)
RCM00HR0130-03 RTR_HRSG #1_initial fill in (added) 2 03-Aug-2016 04-Aug-2016 -104 RTR_HRSG #1_initial fill in (added)
RCM00HR0130-05 RTR_HRSG #1_Blowdown System function test (added) 2 06-Aug-2016 07-Aug-2016 -104 RTR_HRSG #1_Blowdown System function test (added)

Actual Work Milestone Date Revision Checked Approved


2/4 03-Jul-2016 RTR L3 Schedule_rev.1 (cutoff by 1 Jul 2016) J.W. Kim J.H. Park
Remaining Work
Critical Remaining Work
Aramco Cogen Level 3 Schedule_RTR_rev.1
(cut off by 2016. 07. 01)

Activity ID Activity Name Dur. Start Finish Total 2016 2017


Float Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb
28 29 30 31 32 33 34 35 36 37 38
RCM00HR0135-10 RTR_HRSG #1_Cold set pipe supports check and Expansion checks on first fire (a 2 06-Aug-2016 07-Aug-2016 -104 RTR_HRSG #1_Cold set pipe supports check and Expansion chec
RCM00HR0123-1 RTR_HRSG #1_BMS Test (added) 7 15-Aug-2016* 22-Aug-2016 -88 RTR_HRSG #1_BMS Test (added)
RCM00HR0135-12 RTR_HRSG #1_Hot set pipe supports check and Expansion checks on first fire (a 2 22-Aug-2016 24-Aug-2016 -106 RTR_HRSG #1_Hot set pipe supports check and Expansion
HRSG #2
RCM00CT0122-1 RTR_HRSG #2_Function Test (added) 87 24-Apr-2016 A 02-Aug-2016 -98 RTR_HRSG #2_Function Test (added)
RCM00HR0140-03 RTR_HRSG #2_initial fill in (added) 2 03-Aug-2016 04-Aug-2016 -98 RTR_HRSG #2_initial fill in (added)
RCM00HR0140-05 RTR_HRSG #2 Blowdown System function test (added) 2 06-Aug-2016 07-Aug-2016 -98 RTR_HRSG #2 Blowdown System function test (added)
RCM00HR0140-10 RTR_HRSG #2_Cold set pipe supports check and Expansion checks on first fire (a 2 06-Aug-2016 07-Aug-2016 -98 RTR_HRSG #2_Cold set pipe supports check and Expansion chec
RCM00HR0123-12 RTR_HRSG #2_BMS Test (added) 7 15-Aug-2016* 22-Aug-2016 -88 RTR_HRSG #2_BMS Test (added)
RCM00HR0140-12 RTR_HRSG #2_Hot set pipe supports check and Expansion checks on first fire (a 2 29-Aug-2016 31-Aug-2016 -111 RTR_HRSG #2_Hot set pipe supports check and Expans
GTG
GTG
RCM00GT0115 RTR_GTG#1_Lube oil Function Test (AOP,DOP,HOP,Heater) 91 28-Mar-2016 A 11-Jul-2016 -92 RTR_GTG#1_Lube oil Function Test (AOP,DOP,HOP,Heater)
RCM00GG1190-41 RTR_GTG#1_LPCO2 Function & Interface Check (added) 3 10-Jul-2016* 12-Jul-2016 -87 RTR_GTG#1_LPCO2 Function & Interface Check (added)
RCM00GG1190-61 RTR_GTG#1_Water Wash RO Unit Test (added) 65 28-Apr-2016 A 12-Jul-2016 -102 RTR_GTG#1_Water Wash RO Unit Test (added)
RCM00GG1190-21 RTR_GTG#1_Test Pressurization Fan & Ventilation Fan (added) 48 21-May-2016 A 14-Jul-2016 -84 RTR_GTG#1_Test Pressurization Fan & Ventilation Fan (added)
RCM00GT0114-1 RTR_GTG#1_Exictor and LCI Communication Test 72 23-Apr-2016 A 14-Jul-2016 -90 RTR_GTG#1_Exictor and LCI Communication Test
RCM00GT0115-1 RTR_GTG#1_IGV & Fuel Gas Control Valve Calibration (added) 3 12-Jul-2016 14-Jul-2016 -88 RTR_GTG#1_IGV & Fuel Gas Control Valve Calibration (added)
RCM00GG1190-11 RTR_GTG#1_Test Hazardous gas system (added) 72 23-Apr-2016 A 14-Jul-2016 -84 RTR_GTG#1_Test Hazardous gas system (added)
RCM00GT0114-3 RTR_GTG#1_Loop & Function Test (Exciter/GPP/LCI) (added) 89 03-Apr-2016 A 14-Jul-2016 -90 RTR_GTG#1_Loop & Function Test (Exciter/GPP/LCI) (added)
RCM00GG1190-71 RTR_GTG#1_Water Wash Package Function Test (added) 5 13-Jul-2016 18-Jul-2016 -87 RTR_GTG#1_Water Wash Package Function Test (added)
RCM00GG1190-31 RTR_GTG#1_LPCO2 Tank Filling (added) 1 19-Jul-2016 19-Jul-2016 -93 RTR_GTG#1_LPCO2 Tank Filling (added)
RCM00GG1170-11 RTR_GTG#1_GTG Ignition & Flame Detector Check (added) 3 19-Jul-2016 21-Jul-2016 -90 RTR_GTG#1_GTG Ignition & Flame Detector Check (added)
RCM00GG1170-10 RTR_GTG#1_Loop & Function Test (Air Intake/Chiller, FG, IGV, VMS, Others) (add 96 03-Apr-2016 A 23-Jul-2016 -97 RTR_GTG#1_Loop & Function Test (Air Intake/Chiller, FG, IGV, VMS, O
RCM00GT0125 RTR_GTG#1_Turning gear Test 10 13-Jul-2016 24-Jul-2016 -102 RTR_GTG#1_Turning gear Test
RCM00GG1170-31 RTR_GTG#1_Box up & Final Inspection (added) 2 23-Jul-2016 24-Jul-2016 -92 RTR_GTG#1_Box up & Final Inspection (added)
RCM00GG1190-51 RTR_GTG#1_LPCO2 Concentration Test & Final Filling (added) 5 20-Jul-2016 25-Jul-2016 -93 RTR_GTG#1_LPCO2 Concentration Test & Final Filling (added)
RCM00GT0126 RTR_GTG#1_Generator Leak Test (air) (added) 2 25-Jul-2016 26-Jul-2016 -102 RTR_GTG#1_Generator Leak Test (air) (added)
RCM00GT0126-1 RTR_GTG#1_Generator CO2 Charging (added) 1 27-Jul-2016 27-Jul-2016 -102 RTR_GTG#1_Generator CO2 Charging (added)
RCM00GT0127 RTR_GTG#1_Generator H2 Charging 1 28-Jul-2016 28-Jul-2016 -102 RTR_GTG#1_Generator H2 Charging
RCM00GT0135 RTR_GTG#1_Cranking Test 2 08-Aug-2016 09-Aug-2016 -110 RTR_GTG#1_Cranking Test
RCM00GT0137 RTR_GTG#1_Water Wash (Offline) (added) 4 10-Aug-2016 14-Aug-2016 -110 RTR_GTG#1_Water Wash (Offline) (added)
GTG #2 Cold Com
Commissioning
RCM00GG1190-10 RTR_GTG#2_Test Pressurization Fans & Ventilation Fan (added) 1 12-Jul-2016 12-Jul-2016 -76 RTR_GTG#2_Test Pressurization Fans & Ventilation Fan (added)
RCM00GG1190-10 RTR_GTG#2_Test Hazardous gas system (added) 72 23-Apr-2016 A 14-Jul-2016 -78 RTR_GTG#2_Test Hazardous gas system (added)
RCM00GG1190-14 RTR_GTG#2_Water Wash RO Unit Test (added) 30 11-Jun-2016 A 14-Jul-2016 -87 RTR_GTG#2_Water Wash RO Unit Test (added)
RCM00GG1190-11 RTR_GTG#2_LPCO2 Tank Filling (added) 2 16-Jul-2016 17-Jul-2016 -89 RTR_GTG#2_LPCO2 Tank Filling (added)
RCM00GG1190-12 RTR_GTG#2_LPCO2 Function & Interface Check (added) 4 16-Jul-2016 19-Jul-2016 -89 RTR_GTG#2_LPCO2 Function & Interface Check (added)
RCM00GG1170-51 RTR_GTG#2_GTG Ignition & Flame Detector Check (added) 3 18-Jul-2016 20-Jul-2016 -83 RTR_GTG#2_GTG Ignition & Flame Detector Check (added)
RCM00GG1190-15 RTR_GTG#2_Water Wash Package Function Test (added) 5 16-Jul-2016 20-Jul-2016 -87 RTR_GTG#2_Water Wash Package Function Test (added)
RCM00GG1160-13 RTR_GTG#2_Loop & Function Test (Air Intake/Chiller, FG, IGV, VMS, Others) (add 76 26-Apr-2016 A 23-Jul-2016 -101 RTR_GTG#2_Loop & Function Test (Air Intake/Chiller, FG, IGV, VMS, O
RCM00GT0111-3 RTR_GTG#2_Loop & Function Test (Exciter/GPP/LCI) (added) 78 26-Apr-2016 A 25-Jul-2016 -93 RTR_GTG#2_Loop & Function Test (Exciter/GPP/LCI) (added)
RCM00GT0111-1 RTR_GTG#2_Exictor and LCI Communication Test 78 26-Apr-2016 A 25-Jul-2016 -93 RTR_GTG#2_Exictor and LCI Communication Test
RCM00GG1190-13 RTR_GTG#2_LPCO2 Concentration Test & Final Filling (added) 7 20-Jul-2016 27-Jul-2016 -89 RTR_GTG#2_LPCO2 Concentration Test & Final Filling (added)
RCM00GT0120 RTR_GTG#2_Lube oil Function Test (AOP,DOP,HOP,Heater) 82 26-Apr-2016 A 30-Jul-2016 -95 RTR_GTG#2_Lube oil Function Test (AOP,DOP,HOP,Heater)
RCM00GT0120-1 RTR_GTG#2_IGV & Fuel Gas Control Valve Calibration (added) 3 27-Jul-2016* 30-Jul-2016 -95 RTR_GTG#2_IGV & Fuel Gas Control Valve Calibration (added)
RCM00GT0130 RTR_GTG#2_Turning gear Test 6 24-Jul-2016 30-Jul-2016 -101 RTR_GTG#2_Turning gear Test
RCM00GG1170-71 RTR_GTG#2_Box up & Final Inspection (added) 2 31-Jul-2016 01-Aug-2016 -93 RTR_GTG#2_Box up & Final Inspection (added)
RCM00GT0130-2 RTR_GTG#2_Generator Leak Test (air) (added) 2 31-Jul-2016 01-Aug-2016 -101 RTR_GTG#2_Generator Leak Test (air) (added)
RCM00GT0130-1 RTR_GTG#2_Generator CO2 Charging (added) 1 02-Aug-2016 02-Aug-2016 -101 RTR_GTG#2_Generator CO2 Charging (added)
RCM00GT0132 RTR_GTG#2_Generator H2 Charging System 1 03-Aug-2016 03-Aug-2016 -101 RTR_GTG#2_Generator H2 Charging System
RCM00GT0140 RTR_GTG#2_Cranking Test 2 10-Aug-2016 11-Aug-2016 -106 RTR_GTG#2_Cranking Test
RCM00GT0142 RTR_GTG#2_Water Wash (Offline) (added) 4 13-Aug-2016 16-Aug-2016 -106 RTR_GTG#2_Water Wash (Offline) (added)
GTG #1 Hot Comm
Commissioning
RCM00GT0145-17 RTR_GTG#1_Online Analyer Test (added) 4 11-Jul-2016 14-Jul-2016 -68 RTR_GTG#1_Online Analyer Test (added)
RCM00GT0144 RTR_HRSG#1_Temp. Pipe, Silencer for Steam Blowing (added) 13 20-Jul-2016* 01-Aug-2016 -116 RTR_HRSG#1_Temp. Pipe, Silencer for Steam Blowing (added)
RCM00GT0144-1 RTR_GTG #1_Gas System Test (added) 3 18-Aug-2016 20-Aug-2016 -136 RTR_GTG #1_Gas System Test (added)
RCM00GT0144-2 RTR_GTG #1_Final Walkdown (Witness SA) 1 21-Aug-2016 21-Aug-2016 -136 RTR_GTG #1_Final Walkdown (Witness SA)
RCM00GT0145 RTR_GTG #1_Initial Firing incl. Purge 1 22-Aug-2016 22-Aug-2016 -136 RTR_GTG #1_Initial Firing incl. Purge
RCM00GT0145-01 RTR_GTG#1_Offline AVR Test (added) 1 22-Aug-2016 22-Aug-2016 -123 RTR_GTG#1_Offline AVR Test (added)
RCM00GT0145-00 RTR_GTG#1_FSNL, OST (added) 2 22-Aug-2016 23-Aug-2016 -136 RTR_GTG#1_FSNL, OST (added)
RCM00GT0145-014 RTR_GTG#1_Pre-synchronization Check & Flexible Link (added) 2 22-Aug-2016 23-Aug-2016 -123 RTR_GTG#1_Pre-synchronization Check & Flexible Link (ad
RCM00GT0145-03 RTR_GTG#1_Reverse Power Protection Check (added) 2 24-Aug-2016 25-Aug-2016 -123 RTR_GTG#1_Reverse Power Protection Check (added)
RCM00GT0145-02 RTR_GTG#1_Synchronization (added) 2 24-Aug-2016 25-Aug-2016 -123 RTR_GTG#1_Synchronization (added)
RCM00GT0145-025 RTR_GTG#1_Partial Discharge Measurement (added) 2 26-Aug-2016 27-Aug-2016 -106 RTR_GTG#1_Partial Discharge Measurement (added)
RCM00GT0130-124 RTR_GTG #1_Shaft Voltage Test (added) 2 26-Aug-2016 27-Aug-2016 -106 RTR_GTG #1_Shaft Voltage Test (added)
RCM00CT0110 RTR_HRSG#1_Steam Blowing 7 22-Aug-2016 28-Aug-2016 -136 RTR_HRSG#1_Steam Blowing
RCM00GT0145-012 RTR_HRSG#1_Reinstatement & Steam Flow Venturi Installation (added) 2 03-Sep-2016 05-Sep-2016 -136 RTR_HRSG#1_Reinstatement & Steam Flow Venturi Ins
RCM00GT0145-013 RTR_HRSG#1_Reinstatement inspection (witness SA) (added) 1 05-Sep-2016 06-Sep-2016 -136 RTR_HRSG#1_Reinstatement inspection (witness SA)
RCM00GT0145-011 RTR_SA Calibration Steam Flow Metering (added) 1 06-Sep-2016 06-Sep-2016 -118 RTR_SA Calibration Steam Flow Metering (added)
RCM00GT0145-015 RTR_SA Commissioning of Feed Water Metering (added) 1 06-Sep-2016 06-Sep-2016 -118 RTR_SA Commissioning of Feed Water Metering (adde
RCM00GT0145-026 RTR_GTG#1_DCS Tuning and Operation (added) 1 07-Sep-2016 08-Sep-2016 -132 RTR_GTG#1_DCS Tuning and Operation (added)
RCM00GT0145-021 RTR_GTG#1_Load Ramp Up & Down Test (added) 3 06-Sep-2016 08-Sep-2016 -136 RTR_GTG#1_Load Ramp Up & Down Test (added)
RCM00GT0145-024 RTR_GTG #1_Power factor measuring (added) 1 08-Sep-2016 08-Sep-2016 -134 RTR_GTG #1_Power factor measuring (added)
RCM00GT0145-022 RTR_GTG#1_Online AVR Check (added) 2 07-Sep-2016 08-Sep-2016 -136 RTR_GTG#1_Online AVR Check (added)
RCM00GT0145-05 RTR_GTG#1_Base Load Test (added) 2 07-Sep-2016 08-Sep-2016 -136 RTR_GTG#1_Base Load Test (added)
RCM00GT0145-023 RTR_GTG#1_Power system Stabilizer-PSS test - Unit #1 (added) 2 07-Sep-2016 08-Sep-2016 -134 RTR_GTG#1_Power system Stabilizer-PSS test - Unit
RCM00GT0145-051 RTR_GTG#1_10 Hours Base Load Test for Strainer Inspection (added) 0 08-Sep-2016 09-Sep-2016 -134 RTR_GTG#1_10 Hours Base Load Test for Strainer In
RCM00GT0145-052 RTR_GTG#1_PSV Popping Test - HRSG Valve Lift Test (added) 1 09-Sep-2016 09-Sep-2016 -136 RTR_GTG#1_PSV Popping Test - HRSG Valve Lift Tes
RCM00GT0145-053 RTR_GTG#1_HRSG Trip Test (added) 1 09-Sep-2016 09-Sep-2016 -135 RTR_GTG#1_HRSG Trip Test (added)
RCM00GT0145-07 RTR_GTG#1_Cool Down & Fuel Gas Strainer Inspection (added) 1 09-Sep-2016 10-Sep-2016 -135 RTR_GTG#1_Cool Down & Fuel Gas Strainer Inspect
RCM00GT0145-070 RTR_GTG#1_Tuning & Optimization (added) 1 10-Sep-2016 11-Sep-2016 -135 RTR_GTG#1_Tuning & Optimization (added)
RCM00GT0145-071 RTR_GTG#1_Cold Start Up Test (added) 2 11-Sep-2016 13-Sep-2016 -136 RTR_GTG#1_Cold Start Up Test (added)
RCM00GT0145-1 RTR_GTG#1_Load Rejection Test (50%) (added) 2 13-Sep-2016 15-Sep-2016 -136 RTR_GTG#1_Load Rejection Test (50%) (added)
RCM00GT0145-074 RTR_GTG#1_Hot Start Up Test (added) 1 15-Sep-2016 16-Sep-2016 -136 RTR_GTG#1_Hot Start Up Test (added)
RCM00GT0145-14 RTR_GTG#1_Load Rejection Test (100%) (added) 2 16-Sep-2016 18-Sep-2016 -136 RTR_GTG#1_Load Rejection Test (100%) (added)
RCM00GT0145-073 RTR_GTG#1_Warm Start Up Test (added) 2 18-Sep-2016 20-Sep-2016 -136 RTR_GTG#1_Warm Start Up Test (added)
RCM00GT0145-16 RTR_GTG #1_Grid Code test - Open circuit AVR step test (added) 4 20-Sep-2016 24-Sep-2016 -136 RTR_GTG #1_Grid Code test - Open circuit AVR
RCM00GT0145-166 RTR_GTG #1_Grid Code test - UEL test (added) 4 20-Sep-2016 24-Sep-2016 -136 RTR_GTG #1_Grid Code test - UEL test (added)
RCM00GT0145-161 RTR_GTG #1_Grid Code test - PSS gain margin test (added) 4 20-Sep-2016 24-Sep-2016 -136 RTR_GTG #1_Grid Code test - PSS gain margin
RCM00GT0145-162 RTR_GTG #1_Grid Code test - PSS step test (PSS out of service) (added) 4 20-Sep-2016 24-Sep-2016 -136 RTR_GTG #1_Grid Code test - PSS step test (PS
RCM00GT0145-170 RTR_GTG #1_Grid Code test - Turbine controller - GT Droop test (added) 4 20-Sep-2016 24-Sep-2016 -136 RTR_GTG #1_Grid Code test - Turbine controller
RCM00GT0145-171 RTR_GTG #1_Grid Code test - Turbine controller - Current interruption test (added) 4 20-Sep-2016 24-Sep-2016 -136 RTR_GTG #1_Grid Code test - Turbine controller
RCM00GT0145-163 RTR_GTG #1_Grid Code test - PSS step test (PSS in service) (added) 4 20-Sep-2016 24-Sep-2016 -136 RTR_GTG #1_Grid Code test - PSS step test (PS
RCM00GT0145-164 RTR_GTG #1_Grid Code test - Overexcited reactive power test (added) 4 20-Sep-2016 24-Sep-2016 -136 RTR_GTG #1_Grid Code test - Overexcited reac
RCM00GT0145-169 RTR_GTG #1_Grid Code test - Turbine controller - Secondary response test (adde 4 20-Sep-2016 24-Sep-2016 -136 RTR_GTG #1_Grid Code test - Turbine controller
RCM00GT0145-172 RTR_GTG #1_Grid Code test - Magnetization curve test (added) 4 20-Sep-2016 24-Sep-2016 -136 RTR_GTG #1_Grid Code test - Magnetization cu
RCM00GT0145-167 RTR_GTG #1_Grid Code test - OEL test (added) 4 20-Sep-2016 24-Sep-2016 -136 RTR_GTG #1_Grid Code test - OEL test (added)
RCM00GT0145-168 RTR_GTG #1_Grid Code test - Turbine controller - Primary response test (added) 4 20-Sep-2016 24-Sep-2016 -136 RTR_GTG #1_Grid Code test - Turbine controller

Actual Work Milestone Date Revision Checked Approved


3/4 03-Jul-2016 RTR L3 Schedule_rev.1 (cutoff by 1 Jul 2016) J.W. Kim J.H. Park
Remaining Work
Critical Remaining Work
Aramco Cogen Level 3 Schedule_RTR_rev.1
(cut off by 2016. 07. 01)

Activity ID Activity Name Dur. Start Finish Total 2016 2017


Float Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb
28 29 30 31 32 33 34 35 36 37 38
RCM00GT0145-165 RTR_GTG #1_Grid Code test - Underexcited reactive power test (added) 4 20-Sep-2016 24-Sep-2016 -136 RTR_GTG #1_Grid Code test - Underexcited rea
RCM00HR0149 RTR_HRSG #1_Duct Burner Test 2 24-Sep-2016 26-Sep-2016 -136 RTR_HRSG #1_Duct Burner Test
RCM00GT0145-07 RTR_GTG#1_Online Water Wash Test (added) 1 26-Sep-2016 27-Sep-2016 -136 RTR_GTG#1_Online Water Wash Test (added)
RCM00GT0145-07 RTR_GTG#1_Gas Fuel Flow Meter Calibration (added) 3 27-Sep-2016 30-Sep-2016 -136 RTR_GTG#1_Gas Fuel Flow Meter Calibration
GTG #2 Hot Comm
Commissioning
RCM00GT0150-17 RTR_GTG#2_Online Analyer Test (added) 4 11-Jul-2016 14-Jul-2016 -68 RTR_GTG#2_Online Analyer Test (added)
RCM00GT0149 RTR_HRSG #2_Temp. Pipe, Silencer for Steam Blowing (added) 13 20-Jul-2016* 01-Aug-2016 -109 RTR_HRSG #2_Temp. Pipe, Silencer for Steam Blowing (added)
RCM00GT0149-1 RTR_GTG #2_Gas System Test (added) 3 18-Aug-2016 20-Aug-2016 -129 RTR_GTG #2_Gas System Test (added)
RCM00GT0149-2 RTR_GTG #2_Final Walkdown (witness SA) 1 21-Aug-2016 21-Aug-2016 -129 RTR_GTG #2_Final Walkdown (witness SA)
RCM00GT0150-01 RTR_GTG#2_Offline AVR Test (added) 1 29-Aug-2016 29-Aug-2016 -129 RTR_GTG#2_Offline AVR Test (added)
RCM00GT0150 RTR_GTG#2_Initial Firing incl. Purge 1 29-Aug-2016 29-Aug-2016 -136 RTR_GTG#2_Initial Firing incl. Purge
RCM00GT0150-00 RTR_GTG#2_FSNL, OST (added) 2 29-Aug-2016 30-Aug-2016 -136 RTR_GTG#2_FSNL, OST (added)
RCM00GT0150-014 RTR_HRSG#2_Pre-synchronization Check & Flexible Link (added) 2 29-Aug-2016 30-Aug-2016 -129 RTR_HRSG#2_Pre-synchronization Check & Flexible Link
RCM00GT0150-03 RTR_GTG#2_Reverse Power Protection Check (added) 2 31-Aug-2016 01-Sep-2016 -129 RTR_GTG#2_Reverse Power Protection Check (added)
RCM00GT0150-02 RTR_GTG#2_Synchronization (added) 2 31-Aug-2016 01-Sep-2016 -129 RTR_GTG#2_Synchronization (added)
RCM00GT0140-024 RTR_GTG#2_Shaft Voltage Test (added) 2 02-Sep-2016 03-Sep-2016 -113 RTR_GTG#2_Shaft Voltage Test (added)
RCM00CT0120 RTR_HRSG#2_Steam Blowing 6 29-Aug-2016 03-Sep-2016 -136 RTR_HRSG#2_Steam Blowing
RCM00GT0150-012 RTR_HRSG#2_Reinstatement & Steam Flow Venturi Installation (added) 2 03-Sep-2016 05-Sep-2016 -135 RTR_HRSG#2_Reinstatement & Steam Flow Venturi Ins
RCM00GT0150-013 RTR_HRSG#2_Reinstatement Inspection Inspection (witness SA) (added) 1 05-Sep-2016 06-Sep-2016 -135 RTR_HRSG#2_Reinstatement Inspection Inspection (w
RCM00GT0150-011 RTR_SA Calibration Steam Flow Metering (added) 1 06-Sep-2016 06-Sep-2016 -119 RTR_SA Calibration Steam Flow Metering (added)
RCM00GT0150-015 RTR_SA Commissioning of Feed Water Metering (added) 1 07-Sep-2016 07-Sep-2016 -119 RTR_SA Commissioning of Feed Water Metering (adde
RCM00GT0150-02 RTR_GTG#2_DCS Tuning and Operation (added) 1 07-Sep-2016 08-Sep-2016 -131 RTR_GTG#2_DCS Tuning and Operation (added)
RCM00GT0150-023 RTR_GTG#2_Power system Stabilizer-PSS test - Unit #2 (added) 2 07-Sep-2016 08-Sep-2016 -133 RTR_GTG#2_Power system Stabilizer-PSS test - Unit
RCM00GT0150-022 RTR_GTG#2_Online AVR Check (added) 2 07-Sep-2016 08-Sep-2016 -135 RTR_GTG#2_Online AVR Check (added)
RCM00GT0150-021 RTR_GTG#2_Load Ramp Up & Down Test (added) 3 06-Sep-2016 08-Sep-2016 -135 RTR_GTG#2_Load Ramp Up & Down Test (added)
RCM00GT0150-05 RTR_GTG#2_Base Load Test (added) 2 07-Sep-2016 08-Sep-2016 -135 RTR_GTG#2_Base Load Test (added)
RCM00GT0150-024 RTR_GTG#2_Power Factor Meauring (added) 1 08-Sep-2016 08-Sep-2016 -133 RTR_GTG#2_Power Factor Meauring (added)
RCM00GT0150-051 RTR_GTG#2_10 Hours Base Load Test for Strainer Inspection (added) 0 08-Sep-2016 09-Sep-2016 -133 RTR_GTG#2_10 Hours Base Load Test for Strainer In
RCM00GT0150-053 RTR_GTG#2_HRSG Trip Test (added) 1 09-Sep-2016 09-Sep-2016 -134 RTR_GTG#2_HRSG Trip Test (added)
RCM00GT0150-025 RTR_GTG#2_Partial Discharge Measurement (added) 2 08-Sep-2016 09-Sep-2016 -119 RTR_GTG#2_Partial Discharge Measurement (added)
RCM00GT0150-052 RTR_GTG#2_PSV Popping Test - HRSG Valve Lift Test (added) 1 09-Sep-2016 09-Sep-2016 -135 RTR_GTG#2_PSV Popping Test - HRSG Valve Lift Tes
RCM00GT0150-07 RTR_GTG#2_Cool Down & Fuel Gas Strainer Inspection (added) 1 09-Sep-2016 10-Sep-2016 -134 RTR_GTG#2_Cool Down & Fuel Gas Strainer Inspect
RCM00GT0150-070 RTR_GTG#2_Tuning & Optimization (added) 1 10-Sep-2016 11-Sep-2016 -134 RTR_GTG#2_Tuning & Optimization (added)
RCM00GT0150-071 RTR_GTG#2_Cold Start Up Test (added) 2 11-Sep-2016 13-Sep-2016 -135 RTR_GTG#2_Cold Start Up Test (added)
RCM00GT0150-1 RTR_GTG#2_Load Rejection Test (50%) (added) 2 13-Sep-2016 15-Sep-2016 -135 RTR_GTG#2_Load Rejection Test (50%) (added)
RCM00GT0150-074 RTR_GTG#2_Hot Start Up Test (added) 0 15-Sep-2016 16-Sep-2016 -135 RTR_GTG#2_Hot Start Up Test (added)
RCM00GT0150-14 RTR_GTG#2_Load Rejection Test (100%) (added) 2 16-Sep-2016 17-Sep-2016 -135 RTR_GTG#2_Load Rejection Test (100%) (added)
RCM00GT0150-073 RTR_GTG#2_Warm Start Up Test (added) 2 18-Sep-2016 19-Sep-2016 -135 RTR_GTG#2_Warm Start Up Test (added)
RCM00GT0150-167 RTR_GTG #2_Grid Code test - UEL test (added) 4 20-Sep-2016 23-Sep-2016 -135 RTR_GTG #2_Grid Code test - UEL test (added)
RCM00GT0150-168 RTR_GTG #2_Grid Code test - OEL test (added) 4 20-Sep-2016 23-Sep-2016 -135 RTR_GTG #2_Grid Code test - OEL test (added)
RCM00GT0150-169 RTR_GTG #2_Grid Code test - Turbine controller - Primary response test (added) 4 20-Sep-2016 23-Sep-2016 -135 RTR_GTG #2_Grid Code test - Turbine controller
RCM00GT0150-170 RTR_GTG #2_Grid Code test - Turbine controller - Secondary response test (adde 4 20-Sep-2016 23-Sep-2016 -135 RTR_GTG #2_Grid Code test - Turbine controller
RCM00GT0150-162 RTR_GTG #2_Grid Code test - PSS gain margin test (added) 4 20-Sep-2016 23-Sep-2016 -135 RTR_GTG #2_Grid Code test - PSS gain margin
RCM00GT0150-163 RTR_GTG #2_Grid Code test - PSS step test (PSS out of service) (added) 4 20-Sep-2016 23-Sep-2016 -135 RTR_GTG #2_Grid Code test - PSS step test (PS
RCM00GT0150-164 RTR_GTG #2_Grid Code test - PSS step test (PSS in service) (added) 4 20-Sep-2016 23-Sep-2016 -135 RTR_GTG #2_Grid Code test - PSS step test (PS
RCM00GT0150-161 RTR_GTG #2_Grid Code test - Open circuit AVR step test (added) 4 20-Sep-2016 23-Sep-2016 -135 RTR_GTG #2_Grid Code test - Open circuit AVR
RCM00GT0150-16 RTR_GTG #2_Grid Code test - Magnetization curve test (added) 4 20-Sep-2016 23-Sep-2016 -135 RTR_GTG #2_Grid Code test - Magnetization cur
RCM00GT0150-171 RTR_GTG #2_Grid Code test - Turbine controller - GT Droop test (added) 4 20-Sep-2016 23-Sep-2016 -135 RTR_GTG #2_Grid Code test - Turbine controller
RCM00GT0150-172 RTR_GTG #2_Grid Code test - Turbine controller - Current interruption test (added) 4 20-Sep-2016 23-Sep-2016 -135 RTR_GTG #2_Grid Code test - Turbine controller
RCM00GT0150-165 RTR_GTG #2_Grid Code test - Overexcited reactive power test (added) 4 20-Sep-2016 23-Sep-2016 -135 RTR_GTG #2_Grid Code test - Overexcited reac
RCM00GT0150-166 RTR_GTG #2_Grid Code test - Underexcited reactive power test (added) 4 20-Sep-2016 23-Sep-2016 -135 RTR_GTG #2_Grid Code test - Underexcited rea
RCM00GT0150-095 RTR_HRSG #2_Duct Burner Test 2 24-Sep-2016 25-Sep-2016 -135 RTR_HRSG #2_Duct Burner Test
RCM00GT0150-096 RTR_GTG#2_Online Water Wash Test (added) 1 26-Sep-2016 26-Sep-2016 -135 RTR_GTG#2_Online Water Wash Test (added)
RCM00GT0150-099 RTR_GTG#2_Gas Fuel Flow Meter Calibration (added) 3 27-Sep-2016 29-Sep-2016 -135 RTR_GTG#2_Gas Fuel Flow Meter Calibration
Co-Generation & Test
Te
Co-Generation & T
Test
RCM00CT0145 RTR_Plant Final Tuning (added) 1 30-Sep-2016 01-Oct-2016 -136 RTR_Plant Final Tuning (added)
RCM00CT0146-0 RTR_Safe Shutdown Test (added) 0 01-Oct-2016 01-Oct-2016 -136 RTR_Safe Shutdown Test (added)
RCM00CT0145-1 RTR_Total Plant Start Up Test (added) 0 01-Oct-2016 02-Oct-2016 -136 RTR_Total Plant Start Up Test (added)
RCM00CT0149 RTR_HRSG #1,2_Duct Burner Firing Test (added) 0 02-Oct-2016 02-Oct-2016 -136 RTR_HRSG #1,2_Duct Burner Firing Test (add
RCM00CT0146-1 RTR_Load Pickup & HRSG capability test including Supplementary Firing added) 1 02-Oct-2016 03-Oct-2016 -136 RTR_Load Pickup & HRSG capability test inclu
RCM00CT0146 RTR_House Load Operation (added) 1 03-Oct-2016 04-Oct-2016 -136 RTR_House Load Operation (added)
RCM00CT190 RTR_GTG#1, 2_Cool Down & GE PT Instrument (added) 2 04-Oct-2016 06-Oct-2016 -136 RTR_GTG#1, 2_Cool Down & GE PT Instrum
RCM00CT0145-12 RTR_Offline Water Wash GT #1 & GT #2 (added) 1 06-Oct-2016 07-Oct-2016 -136 RTR_Offline Water Wash GT #1 & GT #2 (ad
RCM00CT0150-0 Unit #1,#2 - 24 Hour Trial Run (added) 1 07-Oct-2016 08-Oct-2016 -136 Unit #1,#2 - 24 Hour Trial Run (added)
RCM00CT0150-12 GE Perform IR DLN Tuning GT#1,2 (added) 2 08-Oct-2016 10-Oct-2016 -136 GE Perform IR DLN Tuning GT#1,2 (added)
RCM00CT0150 RTR_Performance Test GT #1, #2 (Incl Noise Level and Emiss. Testing) 2 10-Oct-2016 11-Oct-2016 -136 RTR_Performance Test GT #1, #2 (Incl No
RCM00CT0150-1 Cool Down & PT Instrument Removal GT#1, GT#2 1 11-Oct-2016 12-Oct-2016 -135 Cool Down & PT Instrument Removal GT#
RCM00CT0150-2 Reliability Test Run Preparation GT#1, #2 (added) 1 12-Oct-2016 13-Oct-2016 -135 Reliability Test Run Preparation GT#1, #2 (
RCM00CT0170 Unit Reliability Test of GT #1,2 30 14-Oct-2016 13-Nov-2016 -136 Unit Reliability Test of GT #1,2
RCM00CT0190 Net Dependable Capacity Test (added) 1 13-Nov-2016 14-Nov-2016 -136 Net Dependable Capacity Test

Actual Work Milestone Date Revision Checked Approved


4/4 03-Jul-2016 RTR L3 Schedule_rev.1 (cutoff by 1 Jul 2016) J.W. Kim J.H. Park