You are on page 1of 2

Ref: IC 04

Ver: 6
Inspection Checklist: Concrete Floor Issued: 21 Nov 2014
Doc No: IT-639936
Page 1 of 2

BC No: Contact on site (Name, licence no.- RBW, company & position)

Date:
Inspector: Area of work inspected:
Inspection Comments / Notes: (Include comment on any alternative solutions identified, site observation statements, warranties
or As Laids to be provided, if applicable)

If Inspection Result = PASS then Date Signature


date and sign here
If Inspection Result = FAIL then complete instruction sheet (record number here and on
summary card)
F= Fail = Non-compliance with approved plans & documentation
P= Pass = Compliance with approved plans & documentation.
N/A = Means that Building officer feels that this portion of the prompt sheet is not
relevant

Concrete Pre-floor B1, B2 Comments (reasons for decisions)


Approved Consent documents on site
1 P F NA

Previous comments, BC/PIM conditions


2 P F NA
and endorsements
3 Floor construction type (record type) P F NA

Specified datum height is achieved (record


4 P F NA
how verified)

Shrinkage control & construction joints


5 P F NA
formed where necessary
Floor height above finished ground level
6 (discuss with contractor ability to meet min P F NA
floor heights when project finished)

Hardfill compaction (binding layer protecting


7 P F NA
DPM)

DPM type (note lap & penetration details)


8 P F NA

Slab thickenings / pads


9 P F NA

Reinforcing type
10 P F NA

Slab thickness
11 P F NA
Reinforcing support
12 P F NA

Reinforcing side, top and bottom cover


13 P F NA

If SED, has Engineer inspected design?


14 (Confirm that engineer has inspected design if P F NA
conditioned. no inspection - no pour).
600mm max hard fill compaction only
15 NZS3604 Engineer PS4 for deeper back P F NA
fill
Steel laps
16 P F NA

Perimeter rod position ( under starters)


17 P F NA

Mesh is cut (for expansion joints if required)


18 P F NA

Bottom plate connectors spacing and


19 position in relation to slab edge. P F NA

Steel radius bends correct


20 P F NA

Cladding rebates been constructed


21 correctly?(50mm min) P F NA

22 Concrete strength. P F NA
Floor thickness is maintained under
23 showers P F NA

Underfloor heating systems are installed


24 to manufacturers specifications and P F NA
clearances
Thermal break required to isolate areas
25 of underfloor heating P F NA

Thermal resistance completed as per


26 consent P F NA

Ref: IC 04 Version: 6 2 of 2 Issued: 21 November 2014