All the defects have been cleared. Tilted water tank supports were re-levelled and the damaged
wooden base repaired and changed to concrete pad footing. During the joint inspection, estate
representatives are satisfactory with the defects work repaired. Other than that, there is no issues
with the structure.
Site Photos
Prepared By,
__________________________________________
(William Ting)
PROJECT ENGINEER, KTSR PD3, SIBU
Ref: SB016/BLDK3/02/UMB/PC06/SR01 Date of Inspection: 20 June 2017
Prepared By,
__________________________________________
(William Ting)
PROJECT ENGINEER, KTSR PD3, SIBU
Ref: SB016/BLDK3/02/UMB/PC06/SR01 Date of Inspection: 20 June 2017
Prepared By,
__________________________________________
(William Ting)
PROJECT ENGINEER, KTSR PD3, SIBU
Ref: SB016/BLDK3/02/UMB/PC06/SR01 Date of Inspection: 20 June 2017
Prepared By,
__________________________________________
(William Ting)
PROJECT ENGINEER, KTSR PD3, SIBU
Ref: SB016/BLDK3/02/UMB/PC06/SR01 Date of Inspection: 20 June 2017
__________________________________________
(William Ting)
PROJECT ENGINEER, KTSR PD3, SIBU