The 15% cost estimate is closely aligned to the Citys budget for this project.
The current estimated total cost is $2,360,000 which is approximately 4%
greater than the Citys budget allocation for the project. The estimate includes
allowance for contingencies and variations.
It is recommended that the Council approve the completion of documentation for the
Brabham Pavilion and Neighbourhood Park as described within the 15% Design Report
issued by Site Architecture Studio on 28 April 2016.
BACKGROUND
Brabham forms part of the Swan Urban Growth Corridor (UGC) and is a key population
growth area for the City of Swan. The UGC is expected to house approximately 33,000
people once fully developed.
The Brabham Pavilion and Neighbourhood Park are being developed by the City to serve
the sporting needs of the local community. The development will include one senior sized
AFL oval playing field, sports floodlighting to training standards, a playground, cricket
practice wickets, car parking, dual use path, landscaping, terraced seating and the
Pavilion.
Page 1
Ordinary Meeting of Council
25 May 2016
DETAILS
On 24 February 2016, Site Architecture Studio (SITE) was appointed by the City to
design and document the Brabham Pavilion and Neighbourhood Park. The new facility is
to provide an activity room, kiosk, internal stores, external stores, toilets and change
room facilities for the local sporting and residential community of Brabham.
SITE issued their initial concept plan to the City on 29 February for review, and
subsequently issued a revised concept plan on 21 March 2016 which then proceeded to
the 15% design stage. SITE has since received preliminary advice from their sub-
consultants in order to refine the design and prepare the 15% Design Report.
The 15% design prepared by SITE is 26m2 smaller in area than the schedule of
accommodation included within the request for tender (RFT) and includes the following
functional spaces:
Activity Room;
Kitchenette;
Communications Room;
Verandah; and
The Pavilion location has been selected to suit site services infrastructure and planning of
the site to achieve spatial requirements for all sporting activities, vehicular access and
parking.
The design and planning of the building provides maximum functionality within an
efficient sized floor plan. The external form of the building is simple and articulated with
different materials such as rammed earth and shadowclad lining which have been
specified for their durable characteristics and properties. The single plane skillion roof
cantilevers beyond the front of the pavilion to provide unobstructed cover and protection
from the elements.
The current estimated total commitment is $2,360,000 which is closely aligned with the
Citys allocated budget of $2,265,189. The estimated difference of $94,811 is not large
and can be managed during the design development and contract documentation stages
of this process to be delivered on budget. The estimate includes allowance for
contingencies and variations.
Page 2
Ordinary Meeting of Council
25 May 2016
Upon receiving approval of the 15% design, SITE will continue with their scope of works
and development of the design of the Brabham Pavilion and Neighbourhood Park. The
contract documentation package when complete will comprise of architectural and
engineering drawings, specifications and schedules which will be used by the City to
tender the construction works.
CONSULTATION
Community engagement has occurred through the preparation of the DCP and with City
staff on the concept design. No broader community engagement has taken place in
regards to the design of the pavilion as the vast majority of the local community is yet to
arrive in the new development.
City staff have focussed on internal consultation utilising experience gained on recent
similar projects. City staff has ensured that the 15% design of the pavilion is in line with
DCP requirements and City of Swan community building guidelines.
ATTACHMENTS
STRATEGIC IMPLICATIONS
The development of this facility for the community aligns with the following items in the
Strategic Community Plan:
STATUTORY IMPLICATIONS
Nil
Page 3
Ordinary Meeting of Council
25 May 2016
FINANCIAL IMPLICATIONS
The cost estimate and the Citys budget are closely aligned for this project. Based on the
current cost estimate completed for the developed 15% design, the estimated total
commitment for the project is $2,360,000.
The current estimated total commitment is $94,811 (approximately 4%) in excess of the
Citys current budget allocation for this project of $2,265,189. The estimated total
commitment includes an 8% design contingency, 5% construction contingency and a
1.3% allowance for escalation. The construction market has become very competitive
recently with tendered prices being less than the estimated cost.
These costs are included in the 2016/2017 and 2017/2018 draft budgets.
VOTING REQUIREMENTS
Simple majority
RECOMMENDATION
1) Approve the completion of the design and contract documentation for the
Brabham Pavilion and Neighbourhood Park, as described within the 15% Design
Report prepared by Site Architecture Studio, April 2016.
CARRIED
Page 4
BRABHAM PAVILION
PERCENTAGE COMPLETE
S-001 COVER SHEET
S-002 NOTES SHEET
CURRENT REVISION
S-100 FOOTING & PLAN DETAILS
S-200 ROOF FRAMING PLAN
SHEET NUMBER
CHECKED BY
DRAWN BY
DRAWING LIST CIVIL REAR VIEW
SHEET CURRENT 1:1
PROJECT
BRABHAM PAVILION
Enter address here
TITLE
COVER SHEET
21/04/2016 3:37:33 PM
DATE I 01/05/07 DWG REV
SCALE @A1 I 1:1
A0.0 A
JOB No I 21546
DRAWN BY I Author
CHECKED I Checker
DO NOT SCALE FROM THE DRAWINGS, IF IN DOUBT: ASK
SITE PLAN LEGEND FORWARD WORKS LEGEND
.
END
LEG ST BE
NOTES NOTES
R IC U
NE M
1. ALL DRAWINGS TO BE READ IN 1. CAP OFF EXISTING SERVICES
A GE S OF IT E USE.
CONJUNCTION WITH THE APPROX. WHERE SHOWN FOR
SPECIFICATION. EXTENSION FOR NEW WORKS
2. FOR S IS T
HI EN FOR
2. ALL FIGURE DIMENSIONS TO TAKE FILL AND COMPACTION
PRECEDENCE TO SCALED DRAWINGS.
TGEOTECHNICAL
REQUIREMENTS,
O N T
REFER
B E
TO ENGINEER'S
E CDIVERSION ED
REPORT
ND.
INFORMATION & DETAILS INCLUDING SERVICES ON AND OR ADJACENT TO THE
30.70
EGE
0 30.60 EXPANSION JOINTS, LOCATIONS & ALL SITE.
0.5
E
0
IC L MUST B
+3 30.60 9.3 MEMBER SIZES, ETC.
5 +2
30.50 0.0 5. THE CONTRACTOR SHALL TAKE ALL
+3
R
5 30.50
E
9.9 30.10 1. SITE PLAN TO BE READ IN PRECAUTIONS NECESSARY TO PREVENT
N
+2 30.40
A GE SWORKS F IT USE.
B
30.40 CONJUNCTION WITH ALL CONSULTANTS DAMAGE TO EXISTING SERVICES DURING
0 30.1
30.30 0
O
0.2 30.30 0 DWGS. THE CONSTRUCTION PERIOD
9.5
S
+3 6
0.1 30.20 +2
SI T OR AS E
THI OREMOVED EN
+3 30.20
OFF SITE ANDF
2. ALL DEMOLITION TO BE 6. DEMOLITION AND BULK EARTHWORKS
NTLOCAL
BUILDER. ED
C PER BE
COUNCIL
DISPOSED
REGULATIONS BY
TO BE CARRIED OUT PRIOR TO THE MAIN
CONTRACT BY SHIRE
THE EV3.ICOMPLETE
EW ACCURACY OF EXISTING 7. ALLOW TO CUT AND SEAL REDUNDANT
0.0
0 R SERVICES CANNOT BE GUARANTEED.
ALL INFORMATION SHOULD BE FURTHER
SEWER AT EXISTING SEWER JUNCTION
AND REMOVE ALL REDUNDANT
PIPEWORK FROM SITE
+3
VERIFIED ON SITE PRIOR TO
COMMENCEMENT OF EXCAVATION AND 8. ALLOW TO CUT AND SEAL EXISTING
0 CONSTRUCTION. WATER SERVICE AT METER AND
0.5
+3 REMOVE ALL REDUNDANT PIPEWORK
4. ALL PROPOSED PAVING, CONCRETE FROM SITE
AND BITUMEN LEVELS ARE TO BE
0 CHECKED AND CONFIRMED ON SITE 9. ALLOW TO REMOVE ALL REDUNDANT
1.0
0 +3 WITH THE ARCHITECT AND GAS PIPEWORK FROM SITE AND RETURN
0.1
+3 CONTRACTOR PRIOR TO FINALIZING. ALL GAS BOTTLES, PIG TAILS AND
30.10 PAVEMENTS ARE TO FALL AWAY FROM REDUNDANT APPLIANCES (HWU's,
THE BUILDING STOVES ETC.) TO CLIENT.
0
1.5 5. ALL STORMWATER TO BE SPLIT AND 10. ALLOW TO REMOVE REDUNDANT
+3
DIVERTED INTO LOCAL AUTHORITY STORMWATER SUMPS AND PIPEWORK
STORMWATER SYSTEM. UP TO FINAL CONNECTION TO SPILLWAY.
30.10 ALTER EXISTING SPILLWAY CONNECTION
0 6. LANDSCAPING AS PER PROVISIONAL TO SUIT PROPOSED NEW STORMWATER
.0
+ 32 SUM. REFER TO THE FUTURE LAYOUT.
LANDSCAPE PLAN A1.1 FOR DETAILS
11. EXISTING TELSTRA SERVICES CABLE
30.10 7. ALL KERBS IN VERGE TO BE PROFILE PIT IS TO BE LOCATED AND ISOLATED
0
2.5 AND RADIUS AS PER LOCAL AUTHORITY ONSITE PRIOR TO WORKS COMMENCING
+3
REQUIREMENTS AND PROTECTED DURING
CONSTRUCTION AT ALL TIMES. RE-USE
8. ALL KERB DIMENSIONS ARE TO FRONT EXISTING PIT TO PROVIDE CABLE
0 OF THE KERB (ROAD SIDE) ACCESS TO NEW TELEPHONE BUILDING
3.0
+3 DISTRIBUTOR FOR NEW TELSTRA
9. ALL KERB RADIUS NOT IN VERGES SERVICES.
(NOTE 3) TO BE R1.2m UNLESS
OTHERWISE SHOWN. 12. ISOLATE, DISCONNECT AND REMOVE
THE EXISTING POWER SUPPLY TO THE
0
10. ALL KERBS TO BE SEMI-MOUNTABLE EXISTING CLUBHOUSE PRIOR TO THE
3.5 TYPE 1 UNLESS OTHERWISE SHOWN. COMMENCEMENT OF THE DEMOLITION
+3
WORKS
11. ALL KERB TRANSITIONS TO BE 1m
UNLESS OTHERWISE SHOWN. 13. REMOVE AND RETAIN THE EXISTING
0 PUBLIC ADDRESS HEADEND EQUIPMENT,
0 3.8
0.0 +3 12. EXPANSION JOINTS 10mm WIDE CUT SPEAKERS AND CABLING PRIOR TO THE
+3
THROUGH THE KERB EVERY ALTERNATE COMMENCEMENT OF THE DEMOLITION
30.1
30.00
.80
31.50
31.90
30.60
31.00
30.20
3 2500, AT TANGENT POINTS AND ROAD WORKS. ALL EXISTING EQUIPMENT
0
+3 GULLYS. 24 HOURS AFTER PLACEMENT, SHALL REMAIN THE PROPERTY OF THE
CLEAN OUT AND SEAL EXPANSION JOINT CLIENT.
TW 30.60
TW 34.00
WITH FOAM (OR POLYURETHANE)
BACKING AND SILICONE (OR CO- 14. REFER TO ELEC. ENG. DWGS FOR:
30.00
POLYMER) SEALANT. - DETAILS OF EXISTING POWER
SUPPLY
0 13. CRACK CONTROL CUTS, TWO - PA EQUIPMENT AND WIRING
3.8 THIRDS THE DEPTH OF THE KERB, REMOVAL
+3
EVERY ALTERNATE 2500 AND FINISH OFF
WITH A GROOVING TOOL.
0
3.5
+3 14. REFER TO FLOOR PLANS A2.0 & A2.1
FOR RWDP LOCATIONS
31.50
0
29.90 0
2.0
30.20
30.50
+3
31.00
KEY:
29
.92 NORTH
29.90 EXISTING BUILDINGS
0
.92 1.5
29 +3
.91
29
.96 5
29 9.929.95
+2 29
.93 NEW BUILDING PART 2
.97
29 0
0 .96 29.9 0
.96
9.9 1.0
29
29
+2 .00 +3
29.9
30
LANDSCAPED AREAS
0
.96
29
0 .00
0.0 0
30
30
.10
30
30
.96
IN
.05
.30
29 30
.00
AD
30
30
30
.08
LO
.40
30
.04
30 .60
.12
0 30
EXISTING TREES
.50
30
0.1
30
.85 .04
+3
30
29 30
.70
.00
30
30 B
.10
.80
.14 30
.06 .16
30
30 .90 .96
29 29 30 30
0
.90
0.2
31
.07
.15 .00 .94 .00 .10 .20
+3 30
.00
30 30 29 30 30 30
31
.40
.10
.20
1
31
+3
30 30.0
.24 .15
0
.20
30 30
31
29
.36 .41
0.3 .25 .38
31.4
+3
30 30 30
.25 30 30.3
30
.30
0
0 30.4
30 .29 .95 30.1 30.2 0 30.5
30 29 0 0 0
.20 0
.15 .20 .30
1.5
30
.24 30 30 30 EXISTING CONTOURS
+3
30
.30 .35 .45
30 30 30
B D 0
.14 .20 .2
30 30 30
ABBREVIATIONS:
TITLE
1 LOCATION PLAN B SELECTED BOLLARDS NEIGHBOURHOOD PARK PLAN
21/04/2016 3:38:25 PM
BR SELECTED BIKE RACK
A4.0 1 : 500 DP DOWNPIPE OVER GULLY/ CONCRETE
EX. EXISTING
FFL FINISHED FLOOR LEVEL DATE I 08/23/11 DWG REV
HC HOSE COCK. REFER TO HYRD. ENG. SCALE @A1 I As indicated
DWGS FOR DETAILS
A1.0 B
JOB No I 21546
RC RECONSTITUTED
DRAWN BY I Author
TGI SELETCED SURFACE MOUNTED TACTILE
CHECKED I Checker
INDICATORS IN COMPLIANCE TO AS 1428.4
TOW TOP OF WALL DO NOT SCALE FROM THE DRAWINGS, IF IN DOUBT: ASK
SITE PLAN LEGEND FORWARD WORKS LEGEND
ND.
NOTES NOTES
EGE E
1. ALL DRAWINGS TO BE READ IN
E
1. CAP OFF EXISTING SERVICES
RIC L MUST B
GEN OF IT USE.
CONJUNCTION WITH THE APPROX. WHERE SHOWN FOR
SPECIFICATION.
S A
EXTENSION FOR NEW WORKS
I AND COMPACTION S E
2. FOR S T
FOR
29
HI TENTO ENGINEER'S
29.9
30.
2. ALL FIGURE DIMENSIONS TO TAKE FILL
TREQUIREMENTS,
ONREPORT D BE
+30.00
PRECEDENCE TO SCALED DRAWINGS. REFER
E CDIVERSION WBYELOCAL
GEOTECHNICAL
THAUTHORITY
29.97
E
+30.00
3. VERIFY ALL LEVELS & DIMENSIONS
V I
RE
SHOWN. BUILDER TO REPORT ANY 3. SEWER
+29.95
29.95
DISCREPANCIES TO ARCHITECT FOR
DECISION BEFORE PROCEEDING WITH
WORK ON SITE. 4. PRIOR TO COMMENCING WORK, THE
B CONTRACTOR SHALL FAMILIARIZE
4. REFER TO STRUCTURAL ENGINEERS THEMSELVES, AND ALL PERSONNEL,
A5.0
DRAWINGS FOR ALL STRUCTURAL WITH THE LOCATION OF ALL EXISTING
.
END BE
INFORMATION & DETAILS INCLUDING SERVICES ON AND OR ADJACENT TO THE
EXPANSION JOINTS, LOCATIONS & ALL SITE.
LEG
MEMBER SIZES, ETC.
RIC MUST
B
5. THE CONTRACTOR SHALL TAKE ALL
E
1. SITE PLAN TO BE READ IN PRECAUTIONS NECESSARY TO PREVENT
N
29.96
30.00
A GE SWORKS F IT USE.
VERANDAH CONJUNCTION WITH ALL CONSULTANTS DAMAGE TO EXISTING SERVICES DURING
T O DISPOSED
DWGS. THE CONSTRUCTION PERIOD
29.96
30.00
149 m
SIS2. ALLTDEMOLITION
PAVING
TO BE E
EN R AS
THI OREMOVED OFF SITE ANDF O 6. DEMOLITION AND BULK EARTHWORKS
HE C BUILDER.
PER
W E
LOCAL COUNCIL REGULATIONS BY CONTRACT BY SHIRE
T EV E
3.ICOMPLETE ACCURACY OF EXISTING
7. ALLOW TO CUT AND SEAL REDUNDANT
29.90
WITH THE ARCHITECT AND GAS PIPEWORK FROM SITE AND RETURN
CONTRACTOR PRIOR TO FINALIZING. ALL GAS BOTTLES, PIG TAILS AND
PAVING PAVEMENTS ARE TO FALL AWAY FROM REDUNDANT APPLIANCES (HWU's,
THE BUILDING STOVES ETC.) TO CLIENT.
29.96
PAVING
5. ALL STORMWATER TO BE SPLIT AND 10. ALLOW TO REMOVE REDUNDANT
+30.00
30.04
6. LANDSCAPING AS PER PROVISIONAL TO SUIT PROPOSED NEW STORMWATER
30.00
SUM. REFER TO THE FUTURE LAYOUT.
B
LANDSCAPE PLAN A1.1 FOR DETAILS
11. EXISTING TELSTRA SERVICES CABLE
7. ALL KERBS IN VERGE TO BE PROFILE PIT IS TO BE LOCATED AND ISOLATED
AND RADIUS AS PER LOCAL AUTHORITY ONSITE PRIOR TO WORKS COMMENCING
REQUIREMENTS AND PROTECTED DURING
30.00
CONSTRUCTION AT ALL TIMES. RE-USE
8. ALL KERB DIMENSIONS ARE TO FRONT EXISTING PIT TO PROVIDE CABLE
OF THE KERB (ROAD SIDE) ACCESS TO NEW TELEPHONE BUILDING
DISTRIBUTOR FOR NEW TELSTRA
9. ALL KERB RADIUS NOT IN VERGES SERVICES.
(NOTE 3) TO BE R1.2m UNLESS
OTHERWISE SHOWN. 12. ISOLATE, DISCONNECT AND REMOVE
30.15
THE EXISTING POWER SUPPLY TO THE
10. ALL KERBS TO BE SEMI-MOUNTABLE EXISTING CLUBHOUSE PRIOR TO THE
TYPE 1 UNLESS OTHERWISE SHOWN. COMMENCEMENT OF THE DEMOLITION
WORKS
30.00
30.07
30.04
+30.00
30.00
THROUGH THE KERB EVERY ALTERNATE COMMENCEMENT OF THE DEMOLITION
2500, AT TANGENT POINTS AND ROAD WORKS. ALL EXISTING EQUIPMENT
GULLYS. 24 HOURS AFTER PLACEMENT, SHALL REMAIN THE PROPERTY OF THE
CLEAN OUT AND SEAL EXPANSION JOINT CLIENT.
WITH FOAM (OR POLYURETHANE)
BACKING AND SILICONE (OR CO- 14. REFER TO ELEC. ENG. DWGS FOR:
POLYMER) SEALANT. - DETAILS OF EXISTING POWER
30.25
LOADING
SUPPLY
13. CRACK CONTROL CUTS, TWO - PA EQUIPMENT AND WIRING
THIRDS THE DEPTH OF THE KERB, REMOVAL
EVERY ALTERNATE 2500 AND FINISH OFF
WITH A GROOVING TOOL.
30.15
DIMENSIONS TO BASE OF WALLS.
30.00
30.00
30.00
NORTH
BIN STORE KEY:
10 m
EXISTING BUILDINGS
30.00
29.95
29.90
29.85
NEW BUILDING
30.00
A4.0 1 : 100
0.00
LANDSCAPED AREAS
0.00
EXISTING TREES
NEW CONTOURS
EXISTING CONTOURS
280
1:40 -35 1:8 FALL -35 1:40 PROJECT
-50 -50
FALL -35 -35 FALL BRABHAM PAVILION
1:40 FALL Enter address here
ABBREVIATIONS:
21/04/2016 3:39:05 PM
EX. EXISTING
1 : 50 FFL FINISHED FLOOR LEVEL
HC HOSE COCK. REFER TO HYRD. ENG.
DWGS FOR DETAILS DATE I 08/09/11 DWG REV
RC RECONSTITUTED SCALE @A1 I As indicated
A1.1 A
TGI SELETCED SURFACE MOUNTED TACTILE JOB No I 21546
INDICATORS IN COMPLIANCE TO AS 1428.4 DRAWN BY I Author
TOW TOP OF WALL CHECKED I Checker
DO NOT SCALE FROM THE DRAWINGS, IF IN DOUBT: ASK
WALL TYPES CONSTRUCTION LEGEND FLOOR PLAN LEGEND
33740
WALL - HATCH NOTES
RAMMED EARTH WALL 1. REFER TO ROOM LAYOUTS AND
ELEVATIONS IN THE A9 SERIES FOR
4400 11235 7215 6720 4170 BRICK WALL JOINERY DESIGN AND DETAILS
300 2835 90 1650 90 1950 300 BLOCK WALL 2. LOOSE FURNITURE SHOWN DASHED BY
OWNER
STUD WALL 3. COLUMN TYPES ONLY INDICATIVE -
REFER TO STRUCTURAL DRAWINGS
W7
2845
SHW
2427
90
CONC.
90
ACTIVITY ROOM
6010
W6
BUILDING ELEMENT TAGS
3455
LEG ST BE
90 800 90
90
NER
W6
MU
90
A GE S OF IT E USE.
W4 SHW SHW HYD. ENG. DWGS FOR DETAILS
W4 FR NOMINATED FRIGDE
H2 SIS
ACCESS PLAN LEGEND:
T R
H1 HEIGHT TO U/S OF CEILING
DUCT
4300
C ED
TILES W1 ELEC. DRAWINGS FOR
3410
3485
DETAILS
THESB EVIEW
CONC. CONC. DETAILS HWU LOCATION OF HOT WATER UNIT. REFER TO
910
1
RL 290.20 - DENOTES PROPOSED GROUND LEVEL
GROUND FLOOR e.g.
WALL TYPES
NORTH CLIENT
CITY OF SWAN
W1- RAMMED EARTH W3- INTERNAL STUD WALL W5- INTERNAL BRICK WALL W7- INTERNAL WALL SYSTEM mail@sitearchitecture.com.au I www.sitearchitecture.com.au
External Internal Internal Internal
RAMMED EARTH
300mm THICK RAMMED EARTH USG FIBREROCK SELECTED TILING 35mm TOPHAT
Internal 90mm STUD FRAMING 10mm HWP 13mm USG FIBEROCK PROJECT
USG FIBREROCK 90mm BWK SELECTED TILING BRABHAM PAVILION
Internal 10mm HWP Internal Enter address here
W2- REVERSE BRICK VENEER
External SELECTED TILING
TIMBER
CLADDING W4- INTERNAL BRICK WALL Internal
TIMBER CLADDING
90mm STUD 90mm STUD FRAMING Internal
FRAMING 10mm HWP
TITLE
50mm CAVITY W6- INTERNAL BRICK WALL
CAVITY AIR
90mm BWK 90mm BWK Internal FLOOR PLAN
SPACE
21/04/2016 3:39:42 PM
10mm HWP 10mm HWP 10mm HWP
BRICK Internal
Internal 90mm BWK
HWP 10mm HWP
SELCTED TILING DATE I 08/11/11 DWG REV
Internal SCALE @A1 I As indicated
A2.0 B
JOB No I 21546
DRAWN BY I Author
CHECKED I Checker
DO NOT SCALE FROM THE DRAWINGS, IF IN DOUBT: ASK
EN
LEG T BE
EN ERIC IT MUS .
A G S OF E USE
SIS T R
THI ONTEN BEFO
B
A5.0
E C W ED
THROOF
A
IE
PLAN LEGEND
REV
NOTES LEGEND
1. FALL ALL GUTTERS TOWARDS DOWN A/C A/C CONDENSER UNITS. REFER TO MECH. NOTES FOR COMPOSITE ROOF PANELS
PIPES @ 1 IN 200 (MIN) IN DIRECTION ENG. DWGS FOR DETAILS
3500
3500
SHOWN UNLESS NOTED. AP NOMINATED ROOF ACCESS PANEL 1. LAPPING OF ROOF PANELS, 250mm MIN. ROOF
DP DOWN PIPE AS SELECTED (NOMINATED TOP SKIN OVERLAP, SEAL WITH POLYURETHANE
2. BUILDER TO LAP & SEAL FLASHING 150mm DIA. PVC DOWN PIPE) SEALANT AND BUTYL TAPE AT CUTS TO RIBS.
JOINTS TO ENSURE WATER TIGHT J LOCATION OF GUTTER JOINT. LAP & SEAL REFER TO DETAIL 4 ON A6.3 AND TO
RE ROOF EXHAUST. REFER TO MECH. ENG. MANUFACTURERS STANDARD DETAILS TO ENSURE
3. BUILDER TO LAP & SEAL ALL ROOF DWGS FOR DETAILS. PROVIDE ADEQUATE WATERTIGHT CONNECTIONS.
PENETRATIONS AND ROOF ACCESS CLADDING OVER ROOF PENETRATION TO
1 SAFETY SYSTEMS TO ENSURE WATER ENSURE WATER TIGHT. 2. REFER TO MANUFACTURERS STANDARD DETAILS
TIGHT FOR FLASHINGS AROUND ROOF SERVICES
SYMBOLS PENETRATIONS. ENSURE WATERTIGHT
4, LOCATION OF PROPOSED ROOF CONNECTIONS.
PENETRATIONS FOR ALL SERVICES TO DASHED LINE INDICATES BUILDING
BE COMFIRMED BY ARCHITECT PRIOR TO OUTLINE BELOW
METAL ROOF DECK INSTALLATION. ANY PENETRATIONS MADE
WITHOUT APPROVAL MAYBE
INSTRUCTURED TO BE
RELOCATED AT THE
CONSTRUCTORS COST
3 FALL
5. ROOF ACCESS SYSTEMS AS
PER SPECIFICATION
NOTES: ELECTRICAL FIXTURES LEGEND
1. ALL EXPOSED DOWNPIPES TO BE 6mm STEEL
A ELECTRICAL FIXTURES LEGEND GALVANISED TO ARCHITECTURAL FINISH. EMERGENCY LIGHT
A5.0 LIGHT LEVEL SENSOR
2. ALLOW FOR FLUSH MDF ACCESS PANELS FOR MOTION SENSOR
EMERGENCY LIGHT ALL AUTOMATED DOOR HEADS.
LIGHT LEVEL SENSOR SMOKE DETECTOR
ND.FITTING
MOTION SENSOR 3. ALLOW FOR ALL ACCESS PANELS SHOWN ON SPEAKER
UNLESSE
1895 THIS DRAWING, PLUS ANY ADDITIONAL PANELS RECESSED LIGHT
EGENG.OTHERWISE
SMOKE DETECTOR
C
DRAWINGS. OVER AND ABOVE ALLOW FOR AN
REFER TO ELT. ENG. DWG. FOR FITTING TYPES AND SIZES ADDITIONAL 5 ACCESS PANELS.
R I
REFER TO
E MECHANICAL M U SDWG. FOR
GE N IT .
AREA OF PERFORATION A F SE
FIXTURES LEGEND
MECHANICAL FIXTURES LEGEND
SIS TS O RE USENSOR
THI ONTEN BEFOMECHANICAL
C D
MECHANICAL SENSOR
E
SUPPLY AIR DIFFUSER
THE EVIEW
SUPPLY AIR DIFFUSER
RETURN / EXHAUST AIR GRILLE
R
RETURN / EXHAUST AIR GRILLE
900
1 ROOF PLAN
REFLECTED CEILING PLAN LEGEND
A4.0 1 : 100 KEY: LEGEND: ELECTRICAL FIXTURES LEGEND MECHANICAL FIXTURES LEGEND
CP 1 COMPOSITE PANEL COLORBOND 'SURFMIST' EMERGENCY LIGHT SURFACE MOUNT LUMINARE SUPPLY AIR DIFFUSER
EB EXPOSED BEAM
FC FIBRE CEMENT HATCH INDICATES FLUSH
PLASTERBOARD CEILING MOTION SENSOR SURFACE MOUNT LUMINARE RETURN / EXHAUST AIR GRILLE
FPB FLUSHED PLASTERBOARD
1 MR MOISTURE RESISTANT SMOKE DETECTOR RECESSED FLUORESENT
A5.0 PR PROJECTOR (BY SHIRE) HATCH INDICATES MOISTURE LUMINARE
SPEAKER RETURN / EXHAUST AIR GRILLE
NOTES: RESISTANT FLUSH
PLASTERBOARD CEILING WALL MOUNTED SPLIT AC UNIT
1. LOCATE ALL SURFACE MOUNTED LIGHT THERMAL DETECTOR
FITTINGS ON CP CEILINGS OVER PANEL JOINTS A/C
AND CONCEAL ALL CABLING WITHIN PANEL AS PER AIRCON CASSETTE UNIT/GRILLE.
HATCH INDICATES EXPOSED RECESSED DOWNLIGHT CEILING FAN FIXED TO U/S OF REFER TO MECH. ENG. DWGS
MANUFACTURES RECOMMENDATIONS COMPOSITE PANEL COMPOSITE ROOF PANEL
CF FOR DETAILS
SURFACE MOUNT DOWNLIGHT
2. ALL ACCESS HATCH PANELS REQUIRED BY 600x600mm ACCESS PANEL WITH
HYDRAULIC, MECHANICAL AND ELECTRICAL HATCH INDICATES 6mm FIBRE FLUSH OR PERFORATED
EMERGENCY EXIT SIGNAGE NOTE: REFER TO ELEC. ENG. DWGS
SERVICES NOT SHOWN ARE TO BE ALLOWED FOR CEMENT SHEETING
B BY THE CONTRACTOR. FINAL LOCATION OF
FOR FITTING TYPES AND SIZES PLASTERBOARD TO MATCH
ADJACENT CEILING
REQUIRED ACCESS HATCH PANELS TO BE SURFACE MOUNTED LOW BAY
A5.0
CONFIRMED BY ARCHITECT. LIGHT FITTING. REFER TO ELEC.
HATCH INDICATES PERFORATED REFER TO MECH. ENG. DWGS FOR EQUIPMENT
ENG. DWGS FOR DETAILS
A PLASTERBOARD. TYPES AND SIZES
3. ALL INTERNAL WALLS TO FINISH TO UNDERSIDE SURFACE MOUNTED LIGHT
OF ROOF UNLESS SHOWN OTHERWISE. TO BE FITTING. REFER TO ELEC. ENG.
READ IN CONJUNCTION WITH GROUND FLOOR DASHED LINES INDCATES WALLS DWGS FOR DETAILS
PLAN A2.0 FINISHING TO UNDERSIDE OF
FLUSH MOUNTED LIGHT FITTING
CEILING OR TO DETAIL
IN FPB CEILING WHERE SHOWN.
REFER TO ELEC. ENG. DWGS
LINED SOFFIT FOR DETAILS
1 CP COMPOSITE PANEL
RECESSED LIGHTING FIXTURE. AIRCON CASSETTE UNIT/GRILLE.
EB EXPOSED BEAM
EC EXPOSED CONCRETE HATCH INDICATES MINI ORB REFER TO ELEC. ENG. DWGS REFER TO MECH. ENG. DWGS
FOR DETAILS FOR DETAILS
NOTES: SURFACE MOUNTED LIGHT
Plain FITTING. REFER TO ELEC. ENG.
REFER TO MECH. ENG. DWG. FOR EQUIPMENT TYPES AND
Plain 2700 mm AFL - LOCATE ALL SURFACE MOUNTED LIGHT HATCH INDICATES DWGS FOR DETAILS
EXT. AFL STORE 2700 mm AFL FITTINGS ON CP CEILINGS OVER PANEL JOINTS AND COMPOSITE PANEL
SIZES
CONCEAL ALL CABLING WITHIN PANEL AS PER REFER TO ELT. ENG. DWG. FOR
Plain
2700 mm AFL Plain MANUFACTURES RECOMMENDATIONS FITTING TYPES AND SIZES
2700 mm AFL
HATCH INDICATES EXPOSED
COMMS KITCHEN CONCRETE
CHANGE ROOM 1 CHANGE ROOM 2 FEMALE Plain
2700 mm AFL
FULL HT CHAIN
ACTIVITY ROOM
2700 mm AFL
LINK FENCE
PASSAGE
Plain Plain
2700 mm AFL 2700 mm AFL CLN
Plain
3 CEILING PLAN LEGEND
Plain
2700 mm AFL
Plain
2700 mm AFL A 1 : 100
MECH
Plain A5.0
Plain 2700 mm AFL
2700 mm AFL
21.04.2016 B ISSUED TO QS FOR SD COST PE
EXT. CRICKET REPORT
STORE 1
STORE 11.04.2016 A ISSUED FOR DRAFT SD REPORT PE
1
A5.0
TITLE
ROOF PLAN
21/04/2016 3:40:15 PM
DATE I 12/06/12 DWG REV
SCALE @A1 I 1 : 100
A2.3 B
JOB No I 21546
DRAWN BY I Author
CHECKED I Checker
DO NOT SCALE FROM THE DRAWINGS, IF IN DOUBT: ASK
.
END
A A
IC LEG ST BE
A5.0 A5.0
NE R MU
A GE S OF IT E USE.
SIS T R
THI ONTEN BEFO
C ED
THE EVIEW
PAINTED EAVES LINING
1 PAINTED EAVES LINING 1
RELEVATIONS / SECTIONS LEGEND
NOTES
1. BUILDER TO LOCALLY GRADE FINISHED LANDSCAPING TO
TIMBER SHADOWCLAD TIMBER SHADOWCLAD ENTIRE PERIMETER OF BUILDING TO ENSURE ADEQUATE
WATER RUN OFF IS ACHIEVED
GATES
2. PROVIDE MINIMUM FALL AWAY FROM BUILDING OF 1:100 FOR
STORM WATER RUN OFF TO ALL EXTERNAL PAVING
RAMMED EARTH RAMMED EARTH
RAMMED EARTH 3. REFER TO COLOUR SCHEDULES FOR MORE INFORMATION
LEGEND
MO 1 MINI ORB CLADDING. COLORGUARD COLOUR
REFER TO COLOUR SCHEDULE.
MO 2 MINI ORB CLADDING COLORGUARD COLOUR
B 1
A5.0 A5.0
RAMMED EARTH
GROUND FLOOR RL 30.100
2 NORTH ELEVATION
1 : 100
1 B
A5.0 A5.0
CLIENT
CITY OF SWAN
RAMMED EARTH RAMMED EARTH RAMMED EARTH
3 SOUTH ELEVATION
1 : 100
Site Architecture Studio
Level 3, 56 William Street, Perth 6000 WA
T 08 9226 5661
mail@sitearchitecture.com.au I www.sitearchitecture.com.au
PROJECT
BRABHAM PAVILION
Enter address here
TITLE
ELEVATIONS
21/04/2016 3:40:51 PM
DATE I 08/11/11 DWG REV
SCALE @A1 I 1 : 100
A4.0 B
JOB No I 21546
DRAWN BY I Author
CHECKED I Checker
DO NOT SCALE FROM THE DRAWINGS, IF IN DOUBT: ASK
1 B
A A5.0
A5.0
3
A6.2
GROUND FLOOR RL
A SECTION A
A1.1 1 : 50
1
A6.2 A
1 A5.0
900
2
A6.2
4230
3423
3192
ACTIVITY ROOM
2700
2700
60 m
B SECTION B
A1.1 1 : 50
CLIENT
CITY OF SWAN
PROJECT
BRABHAM PAVILION
Enter address here
TITLE
SECTIONS
1 SECTION C
21/04/2016 3:41:22 PM
A1.1 1 : 50
DATE I 08/11/11 DWG REV
SCALE @A1 I 1 : 50
A5.0 B
JOB No I 21546
DRAWN BY I Author
CHECKED I Checker
DO NOT SCALE FROM THE DRAWINGS, IF IN DOUBT: ASK