tree house nihioka roof need cahnge

horse stable renovationj


repaint ceiling menara kitchen
making privacy fence marangga 2&3

Dry store omback tba


cold store omback kitchen tba
Nihioka staff toilet tba
kearmick menara floor out side vendor
l
step from lantor to the beach
step for new staff house 28.6.17 15.7.17
mak new pizza oven 15.6.17 20.6.17 3 person
making alang anyaman for stock 1.6.17 31.6.17 5 person
keramick floor newGV building tba
July Project Plan
1 re design puncak pool railing
Completed Projects
1 cover with tali ijuk drain pipe
2 cover alang2 the drain top of the roof
3 cracking floor front of the bath room omback fix
4 fix alang alang roof at the pool puncak
5 install carpet and gym stuff at the gym room
6 prepare stage and area for staff party
7 fix alang2 fence kasambi 1 ac area
8 help dig the old cable for Ro and dig new for new RO well
9 repaint roof Chocolate factory
10 additional fence at mandaka path way
11 general cleaning under deck omback
12 make alang fence side of bath room ombak
13 leveling floring of movie room for gym 4.5.17 8.5.17 6person
14 Take out nihioka sign 6.5.17 8.5.17 4 person
15 Make bambo arch at CF ( front charlie house ) 15.5.17 17.5.17 2 person
16 bni atm 25.4.17 9.5.17 4person
17 leveling floring of movie room for gym 4.5.17 9.5.17 6person
18 wamoro 1& 2 pool waal privacy 25.5.17 9.5.17 8 person
19 fixed mandaka 3 bamboo fence 25.5.17
20 change tali ijuk at the trees neo beach 24.5.17
21 making bbq grill at at Rua
22 making fence at junior staff house 13. 5 .17 27. 5.17 4 person
23 take out part of sink alang2 store side junior staff house 26.5.17 3
24 makin wall separate female and male junior staff house 26.5.17 27.5.17 3
25 change coconutre rope at the pole omback rest 24.5.17 27.5.17 3
26 install sing that take from old store to motor bike park 25.5.17 28.5.17 3
27 knock down temporary park car side of Pln trafo house 26.5.17 27.5.17 3
28 fix entrance door at genset room 24.5.17 25.5.17
29 menara entrance floor 15.5.17 30.6.17 6 person
30 storage manage 11.5.17 14.5.17
31 Change railing and fence yoga flat form 12.5.17 20.5.17 2 person
32 nihioka security post 9.5.17 7.6.15 5 person
making bambo waving fence Mandaka A & wamoro 25.5.17 14..6.17 6 person
Making hanging label for cake jug at the room 27.5.17 3.5.17 1 person
defect list nihioka 9.5.17 15.6..17 80%
blue water fall path way railing and flat form 25.5.17 30.5.17
fix the white stone umbrella at neo beach 15.5.17 30.5.17 3 person
fixing around need wooden stick omback 25.5.17 8.6.17 2 person
making budha hands 6.6.17 15.6.17 4 person
Making flloring at Rua guest dect 5.6.17 15.6.17 8 person
3
3
3
3
3

done
done
done
done
done
done
done
done
done
done
done
done
1 done
1 done
1 done
1 done
1 done
1 done
done
done
1 done
2 done
done
done
done
done
done
done
done
done
1 done
1 done
1 on progress
2 need 12 more
nihioka harian
village peoples
on progress
on progress
1
1