You are on page 1of 40

GenieEvo

Metalclad, vacuum
indoor switchgear

installation,operation and maintenance


instructions
version 4.0 / November 2009
Details of revision
Version Comment Date
1.0 First Issue April 2003

2.0 Padlock interlock August 2003


operation added.
Busbar earth panel
added.

2.1 Live primary VT April 2004


isolation added.
And ENA comments
incorporated.

3.0 Withdrawable VT fuse March 2005


option added.
Weights of options
added

4.0 Addition of 2500A November 2009

Schneider GenieEvo 2
GenieEvo
contents
Page
General
general description 4
weights and dimensions 4
offloading 5
storage 6

Installation
floor preparation 7
connection of panels 8
connection of busbars 9
installation of pilot cables 10

Connection
main cable connection 11
bus end cable box connection 12

Operation
panel architecture - circuit connected 14
panel architecture - busbar connected 15
operation flow chart 16
operation of circuit breaker
main on 17
isolated 18
earthing scheme 19
circuit / cable earthing 20
operation of bus section
LHS busbar earth 21
RHS busbar earth 23
cable testing 25
vacuum interrupter testing 26
Lever rest button 28
VT access / isolation
standard 29
key interlocked 30
withdrawable fuses 31
phase live indication / comparison 33

Commissioning
introduction
physical checks 34
H.V. withstand test 34
test voltages 35
test connection 35

Maintenance 36
Endurance characteristics 38

Schneider GenieEvo 3
GenieEvo
general description

Introduction

These instructions cover


all operations concerning
handling, installation,
operation and
maintenance of the
GenieEvo range of
equipment.

The range comprises:-


VC2 200A circuit breaker VBES busbar earthing panel
VC6 630A circuit breaker BBVT busbar VT panel
VC12 1250A circuit breaker VC21/25
VB6 630A bus section VB21/25
VB12 1250A bus section.

Weights and dimensions


unit(s) VC2, VC6, VC12, VB6, VB12 VC21, VC25 VB21, VB25
VBES, BBVT
Standard Bus-section Standard Bus-section

Average dimensions 500W, 1900H, 1230D 1000W, 1900H, 1230D 750W, 1900H, 1200D 1250W, 1900H, 1200D
(mm)
packed 600W, 200H, 1330D 1100W, 2000H, 1330D 850W, 2000H, 1300D 1350W, 2000H, 1300D

Average weight (kg) 365kg 560kg 550kg 800kg


packed 465kg 660kg 650kg 900kg

Maximum weight (kg)* 650kg 750kg 800kg 1000kg


packed 750kg 850kg 900kg 1100kg

* Maximum weight includes for a single freestanding unit which includes all available options, such as inverted cable box, voltage transformers, surge
arrestors, busbar connected cable box, motors etc.

Schneider GenieEvo 4
GenieEvo
storage

GenieEvo lifting instructions


Panel types: Note: Lifting chains/ropes Panel types: Note: Lifting chains/ropes
VC2, VC6, VC12, VBES, shall be positioned at VB6 & VB12 shall be positioned at
& VBVT 2000mm from the lifting 2000mm from the lifting
points as shown. points as shown.

Important: during the lifting Important: during the lifting


of the unit, all four lifting of the unit, all three lifting

m
m

points must be used points must be used

0m
0m

200
200

200
2000

0m
mm

m
Lifting points
Lif Lifting points
tin
gp
oin
ts

Forklift truck lifting points Maximum mass = 650kg Forklift truck lifting points Maximum mass = 750kg

Panel types: Panel types:


VC21, VC25 VB21, VB25

Maximum mass = 800kG


Maximum mass = 1000kG

Schneider GenieEvo 5
GenieEvo
storage

Storage These units are designed for indoor use only and must not be left outdoors. It
is therefore necessary to protect the equipment from the environment before
and during erection/commissioning. The unit should be stored in a warm, dry
switchroom and protected against dust and debris. Should the busbar
chamber or cable box become exposed to the elements, they should be
thoroughly cleaned prior to energising.

Offloading All units can be offloaded by forklift truck using the integral lifting points at the
bottom of each panel. They can also be offloaded using a kit consisting of
the appropriate number of lifting lugs and can be offloaded using an
overhead crane (see above diagrams).

Ancillary kits Ancillary kits containing busbars, dyscon boots, glands, screws etc. are
either supplied loose with each unit, fastened to the panel, or secured in the
cable box.

Schneider GenieEvo 6
GenieEvo
installation

Floor preparation Please refer to the arrangement drawing for the foundation details.
M10 channel fixing
730 Note: floor level
Foot of unit flush to +/ - 1mm
with foundation
channel

41 Spring loaded
channel nut

70

Channels grouted in Channels made in


position using setting jigs subfloor
supplied

The units can be directly bolted to Where it is not possible to


the concrete floor by use of 2 x guarantee that the floor is within the
10mm rawlbolts for single width specified tolerance, we strongly
panels or 4 x 10mm rawlbolts for recommend the use of foundation
bus-section panels. The floor channels I.e. Unistrut P3270 or
tolerance is 1mm over 1 metre similar.

Installation of note: the floor must be 1mm below the


top of the Unitstrut.
circuit breaker panel

Line up the first panel in position (see


Unistrut diagram). Insert 2 channel nuts
into the Unistruts shown and slide into
position. Finger tighten the M10 screws at
the front and rear of the unit (do not
tighten). Manoeuvre the next panel into
position and repeat.

If the panel is being bolted directly to the


floor, line up the first panel in position and
remove the lower panel front plate. Drill
front and back fixing position's through
the access holes. The recommended drill
size is 16mm . Install rawlbolts, (shown
above). Finger connect the M10 nuts and
washers. Manoeuvre the next panel into
position and repeat.

Nylon hole plug to be fitted from the


underside of the base to ensure vermin
proofing.

Schneider GenieEvo 7
GenieEvo
installation

connection of panels VC2-12, VB6-12

Remove the busbar chamber top With the busbar chamber cover
and rear cover plate. To remove removed, bolt the panel busbar
undo the M6 captive screws along chamber flanges together using 16
the top and rear of the busbar off M8 screws and nuts via the
chamber cover. flange holes along the lower and
front edges.
Repeat until all panels within the
switchboard have been installed
and bolted together.

Multicore pilot cable riser kit


(bottom entry cables)

A multicore pilot riser kit is available


for switchboards which require
bottom entry multicore cable. This
allows easy fixing and support for
all multicore cables associated with
the switchboard. It can be supplied
loose for installation to an existing
switchboard, or factory installed via
a busbar trunking. An additional
pilot cable tray can supplied for
fitting to the LV compartment to
allow multicores to travel to the
relevant panel.
Full assembly instructions are
provided with the appropriate kits.

Schneider GenieEvo 8
GenieEvo
installation

Connection of busbars

1250A

2500A

Ensure that the environment is Clean busbar boots and bushings Refer to accessory kits for full
clean and dry. using cleaning pad provided. details.
Apply silicon grease* to boots. Fit
busbars into boots as shown note: is recommended prior to
above. refitting the busbar chamber
covers that the busbars are tested
* Silicone Paste type:- - see page 34/35 for typical tests
Unisilkon TKM 1011
Part No. 2D58121

Busbar torque

1250A Totally encapsulated 56Nm

1250A Totally encapsulated with earth screening 75Nm

2500A Totally encapsulated 28Nm

Schneider GenieEvo 9
GenieEvo
installation

Arrangement of bus-section busbars


connection of busbars totally encapsulted/earth screened

Rear view (1250A) Rear view (2500A)

N.b - boots Riser panel Bus section circuit Riser panel Bus section circuit
terminate to breaker panel breaker panel
disconnector
mouldings

Ensure that the environment is clean and dry


Remove busbar boot and clean bushings using cleaning pad provided. Apply Kluber silicon grease to boots.
Fit busbars into boots as shown below.
Refer to accessory kits for full details.

Installation of pilot cables through pilot cable box

Remove the pilot cable box cover. To remove undo


the 10 x M6 captive screws along the top and rear of
the pilot cable box cover. Pilot cables can be
installed from above using the pre-punched gland
plate with various sized mechanical knockouts.

Schneider GenieEvo 10
GenieEvo
connection

Main cable connection

All units are fitted with dry type cable Ensure that the cable is note: L1 phase bushing is on
connections suitable for accepting supported by gland plate rear right of the unit
shrink fit termination kits. before placing on bushings.
Accessory kits containing gland Failure to do so combined with
plates etc are available. the physical stresses which
could be encountered during
Cable termination torque = 75Nm termination may result in
damage to the resin insulation.

Standard cable entry (1250A)

Inverted cable entry (1250A)

Schneider GenieEvo 11
GenieEvo
installation

Bus end cable box connection

standard cable entry (1250A)

Inverted cable entry (1250A)

Dyscon elbow adapters


Can be used for double cable
connection

note: hole size in the dyscon palm is


14mm for M12 fixing

Schneider GenieEvo 12
GenieEvo
installation

Standard cable entry (2500A)

Inverted cable entry (2500A)

Always clamp the cable with the appropriate glanding system before connecting the cable to the bushing.
Proceeding otherwise will put unacceptable stress on the bushing and could damage the bushing, leading to
equipment failure. The weight of the cable must always be supported by the cable gland.

Schneider GenieEvo 13
GenieEvo
operation

Architecture
Circuit connected panel

GenieEvo consists of a (demountable) fixed pattern


vacuum circuit breaker with a series, 3 position,
disconnector between the Vacuum Interrupter (VI)
and the busbars.


The series disconnector is an off load device which
can only be moved from one position to another with
the circuit breaker in the OFF position.

An interlock prevents the circuit breaker from being


closed if the series disconnector is part way between
one of its three positions.

All load and fault current interruption is carried out by


the vacuum circuit breaker.

3 position series disconnector vacuum circuit breaker

Schneider GenieEvo 14
GenieEvo
operation

Architecture
Busbar connected panel

The bus section panel consists of a (demountable) fixed


pattern vacuum circuit breaker with 2 off series
disconnector on either side of the Vacuum Interrupter (VI)

The series disconnectors are off load devices which can


only be moved from one position to another with the
circuit breaker in the OFF position.

An interlock prevents the circuit breaker from being


closed if the series disconnector is part way between one
of its three positions.

All load and fault current interruption is carried out by the


vacuum circuit breaker.

Schneider GenieEvo 15
GenieEvo
operation

Operation map

This is an operation map showing the position of the panel and the process required to get to the next stage.
Each step of the operation is interlocked to ensure that the equipment can only operate in accordance with the
procedure below.

Circuit Breaker ON
Disconnector MAIN MAIN ON
Test Access CLOSED

Close Circuit Breaker to ON Trip Circuit Breaker

Circuit Breaker OFF


Disconnector MAIN
Test Access CLOSED

Close Disconnector to MAIN


Disconnector cannot be moved in this position

Circuit Breaker ON Circuit Breaker OFF


Disconnector OFF Disconnector OFF ISOLATED
Test Access CLOSED Test Access CLOSED

Open Disconnector to OFF Close disconnector to EARTH

Circuit Breaker OFF


Disconnector EARTH
Test Access CLOSED

Open Circuit Breaker to OFF Close Circuit Breaker to Earth circuit

Circuit Breaker ON
Disconnector EARTH EARTH ON
Test Access CLOSED

Close Test Access Point

Circuit Breaker ON
Disconnector EARTH CABLE TEST
Test Access OPEN

Close Circuit Breaker to ON Open Circuit Breaker to OFF

Circuit Breaker OFF


Disconnector EARTH VI TEST
Test Access OPEN

Schneider GenieEvo 16
GenieEvo
operation

Operation of circuit beaker

Main On Position

Check the fascia diagram for the Move the disconnector lever
service condition. Remove down to the free position.
padlocks if fitted. Move the
selector to the disconnector
position.

Insert the operating handle, found in Close the vacuum circuit breaker to
If the motorised mechanism is
the LHS end cover plate, and rotate Main On by depressing the black
has not been chosen the circuit
clockwise until the selector resets in manual close button. Clear plastic
breaker close springs can be
the locked position, and the shields may be secured over the trip
charged via the integral multi
disconnector is in the Main On & close buttons, using padlocks to
stroke charging handle as
position. prevent unauthorised access.
indicated above

Schneider GenieEvo 17
GenieEvo
operation

Operation of circuit beaker

Main Off Position

Check the fascia diagram for the Move the disconnector lever Insert the operating handle,
service condition. Remove down to the free position. found in the LHS end cover
padlocks if fitted. Open the plate, and rotate anti-clockwise
vacuum circuit breaker to the Off until the lever resets in the
position by depressing the red locked position, and the
manual trip bush button. disconnector is in the Isolated
position.

Move the selector to the centre


position.

Schneider GenieEvo 18
GenieEvo
operation

Earthing schemes

circuit earthing

All circuit breaker panels have the ability to earth the


circuit as standard. The circuit is earthed via the main
Main
vacuum circuit breaker and the position of the series
disconnector. Being an off load device the circuit
Isolated
earth can only be selected with the circuit breaker in
the open position. Disconnector Earth
Once the disconnector is in the earth select position select
the breaker can be closed earthing the circuit.
On

Off
Vacuum
circuit
breaker

Left hand side busbar Right hand side busbar


busbar earthing
Main
The bus section panel has two series Isolated
disconnectors utilised to offer either right hand
or left hand side busbar earthing from the same Earth
panel, this does away with the need for an Disconnector 1
select
additional busbar earth panel.
To earth the right hand side of the switchboards
busbars, with the vacuum circuit breaker in the On
off position disconnector number two can be
Off
moved to the main select position and number Vacuum
one to the earth position. circuit
When the circuit breaker is then closed the breaker
right hand side of the switchboards busbars are
earthed. The position of the two disconnectors
is reversed to earth the left hand sides of the Earth
switchboards busbars. select

Isolated
Disconnector 2 Main

Schneider GenieEvo 19
GenieEvo
operation

Operation of circuit beaker

Earth On Position

Check the fascia diagram for the Remove padlocks if fitted.


service condition. Move the Move the lever down to the free
selector to the earth switch position.
position.

Insert the operating handle, found in If the circuit breaker close Close the vacuum circuit breaker
the LHS end cover plate, and rotate springs are not already charged to Main On by depressing the
anti-clockwise until the lever resets in they can be via the integral multi black manual close button as
the locked position, and the stroke charging handle as indicated above. The main MV
disconnector is in the Earth Select indicated above circuit is now earthed.
position.

Schneider GenieEvo 20
GenieEvo
operation

operation of bus section

Earth Left hand side bars

Check the fascia diagram for the Move the upper (LHS) lever down Insert the operating handle, found
service condition. Remove to the free position. in the LHS end cover plate, and
padlocks if fitted. Move the rotate clockwise until the selector
upper (LHS) disconnector resets in the locked position, and
selector to the disconnector the disconnector is in the Main On
position. position.

Check the fascia diagram for the Move the lower (RHS) lever Insert the operating handle and
service condition. Remove down to the free position. rotate anti-clockwise until the
padlocks if fitted. Move the selector resets in the locked
lower (RHS) disconnector position, and the disconnector is
selector to the earth switch in the Earth Select position.
position.

Schneider GenieEvo 21
GenieEvo
operation

If the circuit breaker close Close the vacuum circuit breaker


springs are not already charged to Main On by depressing the
they can be via the integral multi black manual close button as
stroke charging handle as indicated above. The LHS
indicated above busbars are now earthed.

Schneider GenieEvo 22
GenieEvo
operation

operation of bus section

Earth Right hand side bars

Check the fascia diagram for the Move the upper (LHS) lever Insert the operating handle,
service condition. Remove down to the free position. found in the LHS end cover
padlocks if fitted. Move the plate, and rotate anti-clockwise
upper (LHS) disconnector until the selector resets in the
selector to the earth switch locked position, and the
position. disconnector is in the Earth
Select position.

Check the fascia diagram for the Move the lower (RHS) lever Insert the operating handle and
service condition. Remove down to the free position. rotate clockwise until the selector
padlocks if fitted. Move the lower resets in the locked position, and
(RHS) disconnector selector to the disconnector is in the Main
the disconnector position. On position.

Schneider GenieEvo 23
GenieEvo
operation

If the circuit breaker close springs Close the vacuum circuit breaker
are not already charged they can to Main On by depressing the
be via the integral multi stroke black manual close button as
charging handle as indicated indicated above. The RHS
above busbars are now earthed.

Schneider GenieEvo 24
GenieEvo
operation

Cable testing main cable

Ensure that the unit is in the Remove padlock if fitted, move Insulated bushing shrouds can
Earth On position see page 19. the test access interlock to the be withdrawn from the fascia to
This will allow the test access right and hold it in position, at increase clearances between the
interlock to be moved the same time open the door bushings and earth.
using the hand recess. This
Note: The disconnector cannot
operation will remove the earth
be operated with the test cover
star point and provide access to
opened.
the testing bushings (marked
with phase identification labels). Reverse the procedure to return
to the service condition.

Warning: ensure the cables Note: If VTs are fitted to the


are discharged to earth before panel then they must be isolated
touching the bushings before prior to cable testing (please
and after testing. refer to the VT isolation
procedure on pages 29 & 30).

Schneider GenieEvo 25
GenieEvo
operation

Checking the Vacuum Integrity

Ensure that the unit is in the Remove padlock if fitted, move Insulated bushing shrouds can
Earth On position see page 19. the test access interlock to the be withdrawn from the fascia to
This will allow the test access right and hold it in position, at increase clearances between the
interlock to be moved the same time open the door bushings and earth.
using the hand recess. This
operation will remove the earth Note: The disconnector cannot
star point and provide access to be operated with the test cover
the testing bushings (marked opened.
with phase identification labels).

To test the integrity of the vacuum Once the circuit breaker is in the Upon completion of each test the
bottles the circuit breaker can be open position a test voltage (see exposed terminals must be
opened with the test bushings test voltage table on page 26) is discharged to earth using
accessed. The cable should be applied between each phase appropriate propriety equipment.
and the earth terminal in turn.
earthed at the remote end. Reverse the procedure to return
to the service condition.

Schneider GenieEvo 26
GenieEvo
operation

To test the dielectric withstand test voltage


of each individual phase,
Rated voltage AC test voltage Frequency Duration (d.c test voltage -
perform a power frequency voltage (kV) (Hz) (seconds) current practice)
test, applying 25kV AC (50 or
60Hz) from a high voltage test
13.8 25* 50/60 10 25*
set across the open vacuum
interrupter. A healthy vacuum
interrupter shall withstand this
test connection - circuit breaker
applied test voltage.

Test Phase CB Live terminal Earthed terminal

The adjacent tables detail the L1 - Red Open L1 Earth / Frame


test voltage and connection
points. L2 - Yellow Open L2 Earth / Frame

L3 - Blue Open L3 Earth / Frame

Earth

L1

L2

L3

Warning: During the test X-rays Note: If VTs are fitted to the Note: Please note that the
will be emitted from the
. vacuum panel then they must be isolated test voltage may need to be
bottles. GenieEvo has a 3mm prior to testing (please refer to de-rated in accordance with
thick steel plate, which offers the VT isolation procedure on the cable manufacturers
significant protection from this pages 29 & 30). recommendations.
radiation, however it is
recommended that all personnel
should keep a minimum of 2m
from the unit during test.

Schneider GenieEvo 27
GenieEvo
operation

Lever reset

In the event of an inadvertent operation of the lever rather than having to operate
the disconnector to an unwanted position and back again, the lever reset button
can be used to reset the lever to the locked position as long as the disconnector
has not commenced any operation.

Schneider GenieEvo 28
GenieEvo
operation

Accessing VTs - standard


arrangement

important note: before


accessing VTs (during
commissioning or replacing
fuses) ensure that the panel is
padlocked in the main earth on
position. If the unit is a bus-
section ensure that the unit is
earthed or completely isolated.
See pages 20 & 22 for further
details.

Remove the lower circuit


breaker front cover access
panel for access to the cast
resin MV fuse carrier.

Isolation of VTs - standard arrangement

Ensure that the panel is in the main earth position

With the lower VT chamber


front cover access plate
removed the three VTs can be
isolated via the removal of the
MV fuse.
Remove the dust cap and
utilising an Allen key unscrew in
an anticlockwise direction the
fuse cap and withdraw the fuse.

To re-connect the VTs the


above procedure should be
reversed remembering to
ensure that the unit is in the
main earth on position.

Schneider GenieEvo 29
GenieEvo
operation

Accessing VTs - interlocked


arrangement

important note: before


accessing VTs (during
commissioning, replacing fuses
or for isolation during cable
testing) ensure that the panel is
padlocked in the main earth on
position. If the unit is a bus-
section ensure that the unit is
earthed or completely isolated.
See pages 20 & 22 for further
details. Turn key anti-clockwise to release

Remove padlock if fitted.


Remove the lower circuit
breaker front cover access
panel for access to the cast
resin MV fuse carrier.

Warning: Isolate VT secondary


circuit prior to this operation.
Insert key in to lower cover Turn key clockwise and remove cover

Isolation of VTs - interlocked arrangement

Ensure that the panel is in the main earth position

With the lower VT chamber


front cover access plate
removed the three VTs can be
isolated via the removal of the
MV fuse.
Remove the dust cap and
utilising an Allen key unscrew in
an anticlockwise direction the
fuse cap and withdraw the fuse.

To re-connect the VTs the


above procedure should be
reversed remembering to
ensure that the unit is in the
main earth on position.

Schneider GenieEvo 30
GenieEvo
operation

Optional Accessing of VTs

important note: before


accessing VTs (during
commissioning or replacing service
fuses) ensure that the panel is
padlocked in the main earth on service

position. If the unit is a bus-


section ensure that the unit is
earthed or completely isolated.
See pages 20 & 22 for further
details.

Remove padlock if fitted to the


lower circuit breaker front cover
access panel.

Optional Isolation of VTs

Ensure that the panel is in the main earth position

The spring loaded VT fuse


shutter is lowered to access the
three phase fuse carrier.

VTs can be isolated via the


horizontal withdrawal MV fuse
carrier.

The initial movement of the fuse


carrier isolates the secondary
VT circuit prior to breaking the
MV connection

Schneider GenieEvo 31
GenieEvo
operation

Optional Isolation of VTs

The spring loaded VT fuse isolated


shutter will close automatically.
isolated

Indication of VT isolation is
displayed as shown.

To re-connect the VTs the


above procedure should be
reversed remembering to
ensure that the unit is in the
main earth on position.

Optional Isolation of VTs

Replacing VT Fuses

The MV fuses are fitted to the


fuse carrier via a screw fixing.

The fuses are removed by


simply unscrewing the fuse
from the insert within in the
individual resin end cap.

To replace the MV fuse the


above procedure should be
reversed remembering to
ensure that the contact
spring clip is fitted as shown.

contact spring clip

Schneider GenieEvo 32
GenieEvo
operation

Phase live indication

Each panel has a circuit voltage


presence indication system VIPS
in accordance with IEC 61958.
Each phase has a permanently
illuminated LED lamps which and
test points
The bus section panel has phase
live indication for both the RHS
and LHS busbars. As well as
indicating live busbars these can
be used for phase comparison
purposes between the two
incoming supplies.
Important: this must not be used
to confirm the circuit is dead.
Note: kit reference GEN-A25
phase sequence indicator.
Use IEC 61298 type comparator

If a switchboard is being extended


then all VPIS modules will need to
be identical types. Phase testing
using either a Phisterer or phase
concordance unit can only be
done on identical VPIS blocks.

Schneider GenieEvo 33
GenieEvo
commissioning
Commissioning

All equipment is subject to stringent quality and operational checks prior to despatch, however it is the owners
responsibility to ensure that commissioning tests have been completed to IEC60694. The following is a
resume of these tests. L1b
physical checks L2b
L3b

Remove all packaging and transit 1250A 1250A


labels from the equipment. Check
the data plate details against the
specification. Check the operation
of the circuit breaker, test
access and various interlocks.

functional checks Earth


L1
Check operation of auxiliary switch
contacts and remote indication in L2
accordance with the schematic L3
diagram. Confirm the phase
relationship of the neon indicator
sockets.

Check the pick up voltage of


auxiliary coils if fitted. Closing coils
should operate between 85% and
L1a
110% of the rated voltage. Opening L2a
L3a
coils should operate between 70% L1b
and 110% of the rated voltage. L2b
L3b
note: all voltages should be applied 2500A 2500A
instantaneously unless otherwise
specified

protection and control system

Refer to Sepam commissioning


guide or relay manufacturers
data.
Earth
high voltage withstand test to
BS/IEC
L1
Connect the H. V. test set and
carry out the withstand tests in L2
accordance with the following
tables. L3

note: ensure VTs are disconnected


prior to carrying out any HV pressure
tests
L3a
L2a
L1a

Schneider GenieEvo 34
GenieEvo
commissioning

test voltages

Rated voltage AC test voltage Frequency Duration (d.c test voltage -


(kV) (Hz) (minutes) current practice)
3.6 8 50 1 (AC) 15 (DC) 7.5

7.2 16 50 1 (AC) 15 (DC) 15

12 23 50 1 (AC) 15 (DC) 25

13.8 32 50 1 (AC) 15 (DC) 32

test connection - circuit breaker

Test number CB / Switch Live terminals Earthed terminals

1 closed L1,L2,L3 frame

2 closed L1,L2 L3, frame

3 closed L2,L3 L1, frame

4 closed L3,L1 L2, frame

5 open L1a,L2a,L3a L1b,L2b,L3b, frame

6 open L1b,L2b,L3b L1a,L2a,L3a, frame

note: ensure VTs are disconnected


prior to carrying out any HV pressure
tests

The following tests should also be carried out. If additional information and/or assistance is required please
consult us.

- primary injection

- secondary injection

- CT spill test

- CT polarity test

- relay secondary injection

- relay timing and functionality tests

- integrity check of vacuum interrupter

Schneider GenieEvo 35
GenieEvo
maintenance

routine maintenance Routine maintenance will the substation and equipment


recommendations to depend on the conditions to will be necessary to establish
BS6626:1985 which the unit is subjected and the conditions to which the
to the relevant codes and units are subjected to
practice. Periodic inspection of

ideal conditions standard conditions aggressive conditions

Disconnector enclosure no attention no attention no attention


mechanism no attention no attention every 10 years
housing no attention every 10 years every 5 years
vacuum bottle every 10 years every 10 years every 10 years
protection system every 10 years every 10 years every 10 years
Environmental conditions

ideal conditions environmental conditions


Unit installed and commissioned in accordance with the manufacturers instructions
Indoors, completely protected from the weather.
Humidity below 40% and no dripping water.
Minimal dust and air circulation.
Ambient temperature between -50 o C and +40 o C.
No contact with any chemical agents (eg. salt).
No infestation of any animal life (eg. insects).
No contact with any plant life (eg. mould).
No earth movements.
No damage to the unit of any kind.

operational conditions
No mal-operation of any kind.
No abnormally high number of operations - refer to the graph.
No abnormally high number of faults - refer to the graph.
No over-voltage or over-current (above rating).

standard conditions environmental conditions


Unit installed and commissioned in accordance with the manufacturers conditions.
Humidity below 60%.
Unit may be indoors or outdoors within enclosures, but must not be subjected to regular
extremes of weather eg. heavy rain storms, dust storms, heavy snow and ice, flooding,
temperature cycles greater than 40 o C or less than -5 o C, dense coastal fog or acid rain.
No regular or thick covering of debris.
No contact with any chemical agents (eg. salt).
No infestation of animal or plant life.
No earth movements.
No damage to the unit of any kind.

operational conditions
No mal-operation of any kind.
No abnormally high number of operations - refer to the graph.
No abnormally high number of faults - refer to the graph.
No over-voltage or over-current (above rating).

aggressive conditions Any environmental or operational conditions which do not satisfy either of the above two
descriptions must be deemed aggressive.

note: local legislation may dictate maintenance be carried out with greater frequency, irrespective of site conditions.
Please contact your local Merlin Gerin representative for further details.

Schneider GenieEvo 36
GenieEvo
maintenance

Maintenance

general operation housing

For circuit breaker panels check Check all external fixings, labels
the electrical protection system. and earth connections are present
and tight.
Check the operation of the unit
and all mechanical interlocks. Check inside the MV cable box,
busbar system LV cabinet and pilot
cable box for heavy deposits of
dust, ingress of
water or contamination by animal or
plant life.

Clean the units thoroughly and


touch up paint work as necessary.

De-mounting Mechanism

It is possible to de-mount the In the unlikely event of a


circuit breaker from the housing mechanism failure, please contact
without breaking down the Schneider customer services.
switchboard arrangement.

A separate method statement


and video is available detailing
this process if required.

Expected life

We can confirm that the life


expectancy of GenieEvo, if
correctly maintained, shall be 25
years minimum.

Schneider GenieEvo 37
GenieEvo
endurance characteristic

GENIEEvo
Prospective Endurance Characteristic

100000

10000
NUMBER OF OPERATIONS

1000

100

10

1
1 10 100 1000 10000 25kA 100000
CURRENT INTERRUPTED ( A)

After sales support customer services Services & Projects

For technical support on current products please For the following services please contact
contact our customer services department: Services & Projects:

Tel: +44 (0) 113 290 3651 Spares and managed spares contracts
Maintenance and service contracts
Fax: +44 (0) 113 290 3710 Retrofit
Installation
Email: GB-MV-CustomerServices@gb.schneider- Testing and commissioning
electric.com System design
Training

Out of hours telephone technical support Tel: +44 (0) 113 290 3634

Tel: +44(0) 7771 724 090 or Fax: +44 (0) 113 290 3777

Tel: +44(0) 7775 587 448

This service is available between 5pm and 8am,


weekdays, all days weekends and national holidays

Schneider GenieEvo 38
GenieEvo

This page is left intentionally blank

Schneider GenieEvo 39
Publication number MVP 5320 v4

Schneider Electric Ltd, 123 Jack Lane, Leeds LS10 1BS