NJOMBE KIBO TEA FACTORY CIVIL WORKS 263 days 12/19/2016 8:00 12/18/2017 17:00

Early works 186 days 12/19/2016 8:00 9/4/2017 17:00


MOBILIZATION AND SITE ESTABLISHMENT 148 days 12/19/2016 8:00 7/12/2017 17:00
Site establishment 40 days 12/19/2016 8:00 2/10/2017 17:00
Levelling of site office area 28 days 12/19/2016 8:00 1/25/2017 17:00
Delivery of container for site office, storage and ablution 40 days 12/19/2016 8:00 2/10/2017 17:00
Fencing of site office area 21 days 12/19/2016 8:00 1/16/2017 17:00
Earthwork Mobiliation 75 days 12/22/2016 8:00 4/5/2017 17:00
Transport of plants 7 days 12/22/2016 8:00 12/30/2016 17:00
Clearing vegetable soil. 18 days 1/2/2017 8:00 1/25/2017 17:00
Bulk Excavation to formation level, 30 days 1/26/2017 8:00 3/8/2017 17:00
Imported fill materials compaction 36 days 2/15/2017 8:00 4/5/2017 17:00
Fencing 79 days 3/24/2017 8:00 7/12/2017 17:00
Formwork preparation 7 days 3/24/2017 8:00 4/3/2017 17:00
Precast poles 35 days 3/27/2017 8:00 5/12/2017 17:00
Excavation and installation 50 days 5/4/2017 8:00 7/12/2017 17:00
Procurement 130 days 3/7/2017 8:00 9/4/2017 17:00
Steel structure design and drawings 15 days 3/7/2017 8:00 3/27/2017 17:00
Fabrication 75 days 3/28/2017 8:00 7/10/2017 17:00
Shipment, clearing , transport to site 40 days 7/11/2017 8:00 9/4/2017 17:00
Borehole 60 days 2/15/2017 8:00 5/9/2017 17:00
Appointing subcontractor 1 day 2/15/2017 8:00 2/15/2017 17:00
Surveying and report 4 days 3/27/2017 8:00 3/30/2017 17:00
Drilling, testing and approval 10 days 4/11/2017 8:00 4/24/2017 17:00
Pump installation 4 days 5/4/2017 8:00 5/9/2017 17:00
Design 0 days 1/31/2017 8:00 1/31/2017 8:00
Main buiding deisgn 0 days 1/31/2017 8:00 1/31/2017 8:00
Auxillary buildings design 0 days 1/31/2017 8:00 1/31/2017 8:00
Secondary works 191 days 3/29/2017 8:00 12/18/2017 17:00
Construction works 191 days 3/29/2017 8:00 12/18/2017 17:00
Main Building 182 days 3/29/2017 8:00 12/6/2017 17:00
SUBSTRUCTURES (ALL PROVISIONAL) 182 days 3/29/2017 8:00 12/6/2017 17:00
Excavation 21 days 3/29/2017 8:00 4/26/2017 17:00
Excavating Pits; to receive column bases 21 days 3/29/2017 8:00 4/26/2017 17:00
CONCRETE 32 days 4/3/2017 8:00 5/16/2017 17:00
FormworK 30 days 4/5/2017 8:00 5/16/2017 17:00
Column bases 21 days 4/5/2017 8:00 5/3/2017 17:00
Stub Columns 21 days 4/18/2017 8:00 5/16/2017 17:00
REINFORCEMENT 22 days 4/5/2017 8:00 5/4/2017 17:00
Column bases 21 days 4/5/2017 8:00 5/3/2017 17:00
Stub Columns 21 days 4/6/2017 8:00 5/4/2017 17:00
CONCRETE WORKS 32 days 4/3/2017 8:00 5/16/2017 17:00
Blinding concrete 21 days 4/3/2017 8:00 5/1/2017 17:00
Column bases 21 days 4/13/2017 8:00 5/11/2017 17:00
Stub Columns 21 days 4/18/2017 8:00 5/16/2017 17:00
FILL MATERIALS 40 days 4/25/2017 8:00 6/19/2017 17:00
backfill around bases, stub columns 15 days 4/25/2017 8:00 5/15/2017 17:00
Filling in making up levels well rolled and compacted to 25 days 5/16/2017 8:00 6/19/2017 17:00
Main Building superstructure 125 days 6/16/2017 8:00 12/6/2017 17:00
Main building installation 64 days 9/5/2017 8:00 11/30/2017 17:00
Steel erection 35 days 9/5/2017 8:00 10/20/2017 17:00
Roofing sheets 15 days 10/18/2017 8:00 11/7/2017 17:00
Claddings 15 days 11/8/2017 8:00 11/28/2017 17:00
Roof ventilator 7 days 11/8/2017 8:00 11/16/2017 17:00
Sheet metal flashing and gutters 10 days 11/17/2017 8:00 11/30/2017 17:00
FLOOR 30 days 6/20/2017 8:00 7/31/2017 17:00
Concrete Floor 30 days 6/20/2017 8:00 7/31/2017 17:00
Masonry work 125 days 6/16/2017 8:00 12/6/2017 17:00
Block work 28 days 9/14/2017 8:00 10/20/2017 17:00
Plaster work 28 days 9/25/2017 8:00 10/31/2017 17:00
Cement sand plaster on block wall 28 days 9/25/2017 8:00 10/31/2017 17:00
Service works 125 days 6/16/2017 8:00 12/6/2017 17:00
Electrical work 25 days 11/2/2017 8:00 12/6/2017 17:00
plumbing work 50 days 6/16/2017 8:00 8/24/2017 17:00
PAINTWORK 28 days 10/14/2017 8:00 11/21/2017 17:00
Painting to walls 28 days 10/14/2017 8:00 11/21/2017 17:00
FIRE WOOD SHED 32 days 6/29/2017 8:00 8/11/2017 17:00
Excavation for fire wood shed poles 7 days 6/29/2017 8:00 7/7/2017 17:00
Installation of fire wood shed pole 5 days 7/10/2017 8:00 7/14/2017 17:00
Roofing to fire wood shed 10 days 7/17/2017 8:00 7/28/2017 17:00
Fire wood shed finishing works 10 days 7/31/2017 8:00 8/11/2017 17:00
Canteen 82 days 5/30/2017 8:00 9/20/2017 17:00
Substructure 32 days 5/30/2017 8:00 7/12/2017 17:00
Excavation for strip footing and column bases 7 days 5/30/2017 8:00 6/7/2017 17:00
Concrete work to coulumn bases and strip footings 7 days 6/6/2017 8:00 6/14/2017 17:00
Substructure masonry work 10 days 6/15/2017 8:00 6/28/2017 17:00
backfill around footings, trenches and compaction for floo5 days 6/29/2017 8:00 7/5/2017 17:00
Floor concrete slab 5 days 7/6/2017 8:00 7/12/2017 17:00
Superstructure 50 days 7/13/2017 8:00 9/20/2017 17:00
Masonry work 10 days 7/13/2017 8:00 7/26/2017 17:00
Roof work 12 days 7/27/2017 8:00 8/11/2017 17:00
Services 14 days 7/27/2017 8:00 8/15/2017 17:00
Electrical work 14 days 7/27/2017 8:00 8/15/2017 17:00
Plumbing work 14 days 7/27/2017 8:00 8/15/2017 17:00
Plaster work 14 days 8/16/2017 8:00 9/4/2017 17:00
Cement sand plaster on block wall 14 days 8/16/2017 8:00 9/4/2017 17:00
IRONMONGERY/JOINERY WORKS 7 days 9/5/2017 8:00 9/13/2017 17:00
Door, window fittings and hardwood skirting 7 days 9/5/2017 8:00 9/13/2017 17:00
PAINTWORK 12 days 9/5/2017 8:00 9/20/2017 17:00
Painting to walls 12 days 9/5/2017 8:00 9/20/2017 17:00
External works 113 days 7/17/2017 8:00 12/18/2017 17:00
Storm water drainage 35 days 9/12/2017 8:00 10/27/2017 17:00
Hardstand 60 days 9/21/2017 8:00 12/11/2017 17:00
Parking 35 days 7/17/2017 8:00 9/1/2017 17:00
Walkways 43 days 7/26/2017 8:00 9/22/2017 17:00
Weighbridge 40 days 10/5/2017 8:00 11/28/2017 17:00
Gate house 50 days 10/12/2017 8:00 12/18/2017 17:00
Administration Building 69 days 5/9/2017 8:00 8/11/2017 17:00
Substructure 16 days 5/9/2017 8:00 5/30/2017 17:00
Excavation for strip footing and column bases 3 days 5/9/2017 8:00 5/11/2017 17:00
Concrete work to column bases and strip footings 3 days 5/12/2017 8:00 5/16/2017 17:00
Substructure masonry work 3 days 5/17/2017 8:00 5/19/2017 17:00
backfill around footings, trenches and compaction for flo4 days 5/22/2017 8:00 5/25/2017 17:00
Floor concrete slab 3 days 5/26/2017 8:00 5/30/2017 17:00
Superstructure 56 days 5/26/2017 8:00 8/11/2017 17:00
Concrete work to columns 5 days 5/31/2017 8:00 6/6/2017 17:00
Concrete work to roof beam 10 days 6/7/2017 8:00 6/20/2017 17:00
Masonry work 7 days 6/14/2017 8:00 6/22/2017 17:00
Masonry work 7 days 6/14/2017 8:00 6/22/2017 17:00
Building services 40 days 5/26/2017 8:00 7/20/2017 17:00
Electrical work 40 days 5/26/2017 8:00 7/20/2017 17:00
Plumbing work 40 days 5/26/2017 8:00 7/20/2017 17:00
Plaster work 14 days 6/21/2017 8:00 7/10/2017 17:00
Cement sand plaster on block wall 14 days 6/21/2017 8:00 7/10/2017 17:00
IRONMONGERY/JOINERY WORKS 21 days 7/11/2017 8:00 8/8/2017 17:00
Door, window fittings and hardwood skirting 21 days 7/11/2017 8:00 8/8/2017 17:00
PAINTWORK 28 days 7/5/2017 8:00 8/11/2017 17:00
Painting to walls 28 days 7/5/2017 8:00 8/11/2017 17:00
44%
86%
85%
100%
100%
100%
100%
85%
100%
100%
95%
67%
71%
100%
80%
60%
88%
100%
100%
60%
76%
100%
100%
95%
0%
100%
100%
100%
28%
28%
44%
44%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
38%
100%
0%
9%
0%
0%
0%
0%
0%
0%
80%
80%
1%
5%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
38%
100%
100%
100%
100%
100%
100%
12%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
1%
5%
0%
0%
0%
0%
0%
27%
100%
100%
100%
100%
100%
100%
20%
100%
100%
95%
95%
0%
0%
0%
80%
80%
0%
0%
0%
0%