You are on page 1of 79

1 2 3 4 5 6 7 8

This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A

B B

3P3W, AC22kV, 2500A, 25kA/3s, 50Hz

-QB -QB
VCB VCB
M 2500A M 2500A

P2 -BC P2 -BC

-BU

C P1 P1 C

-QE -QE -QE


-BV -BV

-BU -BU

CONNECT TO JC04 BY POWER CABLE


D D
PANEL NUMBER =JC01 =JC02 =JC03
BUS COUPLER PANEL INCOMING PANEL(433) METERING PANEL( TUC43)
MAIN LABEL
MAIN SWITCH VD4/P 24.25.25.P275 VD4/P 24.25.25.P275 -
1200-1600-2000-2500/1/1/1A 1200-1600-2000-2500/1/1/1A -
CURRENT TRANSFORMER
C1: CL0.5, 30VA@2500A C1: CL0.5, 30VA@2500A
C2: CL5P20, 30VA@2500A C2: CL5P20, 30VA@2500A
C3: CL5P20, 30VA@2500A C3: CL5P20, 30VA@2500A

CABLE CT
EARTHING SWITCH ST2 ST2 ST2
HV FUSE 2A 2A
SURGE ARRESTER
23 0.11 23 0.11 0.11
V3 V3 V3 V3 V3
VOLTAGE TRANSFORMER CL0.5 CL0.5/3P
30VA 30VA/30VA

CAP VOLTAGE DIVIDER 1 1 1


E DAMPING RESISTOR
PROTECTION REU615 E
REF615
27,59,81LSD
DEVICES 50/51,50/51N,50BF,74,86
7PA30: 74

MEASURING AMMETER AMMETER VOLTMETER+VS


INSTRUMENTS

COMMUNICATION RJ45/IEC61850 RJ45/IEC61850


POWER CABLE SIZE 2x1C-630mm/phase 2x1C-630mm/phase 2x1C-630mm/phase

F PROJECT NO.: DRAWING NO.: 1YUX200119/SLD DRAWING REV.: R1 DATE: 03/03/14 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation SLD SCALE: 1 : 1.8
A1 CHANGED CT POLARITY 03/03/14 CUSTOMER: SINGLE LINE DIAGRAM START: 12/12/2013
TOJI
A0 FIRST ISSUED 13/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=J0B+SLD/A01
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: A02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A

B B

3P3W, AC22kV, 2500A, 25kA/3s, 50Hz

-QB -QB -QB -QB


VCB VCB VCB VCB
M 630A M 630A M 630A M 630A

P1 -BC P1 -BC P1 -BC P1 -BC

P2 P2 P2 P2
C C
-FA

-QE -QE -QE -QE

-BU -BU -BU -BU

D CONNECT TO JC03 BY POWER CABLE


D
PANEL NUMBER =JC04 =JC05 =JC06 =JC07 =JC08
BUS RISER PANEL OUTGOING PANEL OUTGOING PANEL OUTGOING PANEL OUTGOING PANEL
MAIN LABEL
MAIN SWITCH - VD4/P 24.06.25.P210 VD4/P 24.06.25.P210 VD4/P 24.06.25.P210 VD4/P 24.06.25.P210
400-600/1/1A 400-600/1/1A 400-600/1/1A 400-600/1/1A
CURRENT TRANSFORMER
C1: CL0.5, 15VA C1: CL0.5, 15VA C1: CL0.5, 15VA C1: CL0.5, 15VA
C2: CL5P20, 15VA C2: CL5P20, 15VA C2: CL5P20, 15VA C2: CL5P20, 15VA

CABLE CT
EARTHING SWITCH ST2 ST2 ST2 ST2
HV FUSE
SURGE ARRESTER MWD20

VOLTAGE TRANSFORMER

CAP VOLTAGE DIVIDER 1 1 1 1


E DAMPING RESISTOR
PROTECTION
E
REF615 REF615 REF615 REF615
DEVICES 50/51,50/51N,50BF,74,86,79 50/51,50/51N,50BF,74,86,79 50/51,50/51N,50BF,74,86,79 50/51,50/51N,50BF,74,86,79

MEASURING AMMETER AMMETER AMMETER AMMETER


INSTRUMENTS

COMMUNICATION RJ45/IEC61850 RJ45/IEC61850 RJ45/IEC61850 RJ45/IEC61850


POWER CABLE SIZE 2x1C-630mm/phase 2x3C-240mm/phase 2x3C-240mm/phase 2x3C-240mm/phase 2x3C-240mm/phase

F PROJECT NO.: DRAWING NO.: 1YUX200119/SLD DRAWING REV.: R1 DATE: 03/03/14 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation SLD SCALE: 1 : 1.8
CUSTOMER: SINGLE LINE DIAGRAM START: 12/12/2013
TOJI
A0 FIRST ISSUED 13/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=J0B+SLD/A02
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: =J0C+/A00
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=JC01+WLV =JC02+WLV =JC03+WLV REMARK
-XH 1 -XH 1 -XH 1 AC CONTROL INTERNAL SIDE EXTERNAL SIDE

-XH 3 -XH 3 -XH 3 SUPPLY


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

-XJ 1 -XJ 1 -XJ 1


DC CONTROL
A -XJ 3 -XJ 3 -XJ 3 SUPPLY A

-XI1 3 -XI1 1

-XI1 8 -XI1 2
VOLTAGE PROTECTION
-XI1 3 -XI1 3

-XI1 8 -XI1 4

-XI1 11 -XI1 12

-XI1 14 -XI1 13

50BF CIRCUIT
-XI1 1 -XI1 27
B B
-XI1 6 -XI1 28

-XI2 3 -XI2 1

-XI2 4 -XI2 2

-XI2 3 -XI2 3

-XI2 4 -XI2 4

BUS BAR ES INTERLOCK


-XI3 1 -XI3 1

-XI3 2 -XI3 2
C -XI3 1 -XI3 2 C

-XI6 9 -XI6 1

-XI6 10 -XI6 3

FOR INTERLOCKING CIRCUIT


-XI6 1 -XI6 9

-XI6 3 -XI6 10

D D

-XI4 1 -XI4 1 -XI4 1

-XI4 5 -XI4 5 -XI4 5

-XI4 7 -XI4 7 -XI4 7

-XI4 9 -XI4 9 -XI4 9


E E
-XI4 11 -XI4 11 -XI4 11
ALARM CIRCUIT
-XI4 13 -XI4 13 -XI4 13

-XI4 15 -XI4 15 -XI4 15

-XI4 17 -XI4 17 -XI4 17

-XI4 19 -XI4 19 -XI4 19

-XI4 21 -XI4 21 -XI4 21

F PROJECT NO.: DRAWING NO.: 1YUX200119/LP DRAWING REV.: R1 DATE: 26/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation INTERCONNECTION DIAGRAM SCALE: 1 : 1.2
A1 REVISED AS CUSTOMER COMMENT 26/12/13 CUSTOMER: INTERNAL INTERLOOPING CIRCUIT START: 12/12/2013
TOJI
A0 FIRST ISSUED 13/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=J0E+LP/G01
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: G02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
REMARK
=JC02+WLV =JC03+WLV =JC04+WLV =JC05+WLV =JC06+WLV =JC07+WLV =JC08+WLV
-XH 1 -XH 1 -XH 1 -XH 1 -XH 1 AC CONTROL INTERNAL SIDE EXTERNAL SIDE

-XH 3 -XH 3 -XH 3 -XH 3 -XH 3 SUPPLY


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

-XJ 1 -XJ 1 -XJ 1 -XJ 1 -XJ 1


DC CONTROL
A -XJ 3 -XJ 3 -XJ 3 -XJ 3 -XJ 3 SUPPLY A

-XI1 11 -XI1 11 -XI1 11 -XI1 11 -XI1 11


GATHERING 50BF SIGNAL FROM
-XI1 14 -XI1 14 -XI1 14 -XI1 14 -XI1 14
EACH PANELS

-XI1 29 -XI1 1

-XI1 30 -XI1 6

-XI1 31 -XI1 1

-XI1 32 -XI1 6
50BF TRIP SIGNAL
B TO EACH PANELS
B
-XI1 33 -XI1 1

-XI1 34 -XI1 6

-XI1 35 -XI1 1

-XI1 36 -XI1 6

-XI2 5 -XI2 3

-XI2 6 -XI2 4

-XI2 7 -XI2 3

-XI2 8 -XI2 4
C BUS BAR ES INTERLOCK C
-XI2 9 -XI2 3

-XI2 10 -XI2 4

-XI2 11 -XI2 3

-XI2 12 -XI2 4

-XI3 3 -XI3 1

-XI3 2 -XI3 2

-XI3 1 -XI3 1

-XI3 2 -XI3 2

-XI3 4 -XI3 1
D D

-XI5 1 -XI5 1 -XI5 1 -XI5 1 -XI5 1

-XI5 3 -XI5 3 -XI5 3 -XI5 3 -XI5 3

-XI5 5 -XI5 5 -XI5 5 -XI5 5 -XI5 5 LOAD SHEDDING


CIRCUIT
-XI5 7 -XI5 7 -XI5 7 -XI5 7 -XI5 7

-XI5 9 -XI5 9 -XI5 9 -XI5 9 -XI5 9

-XI4 1 -XI4 1 -XI4 1 -XI4 1 -XI4 1

-XI4 5 -XI4 5 -XI4 5 -XI4 5 -XI4 5


E E
-XI4 7 -XI4 7 -XI4 7 -XI4 7 -XI4 7

-XI4 9 -XI4 9 -XI4 9 -XI4 9 -XI4 9

-XI4 11 -XI4 11 -XI4 11 -XI4 11 -XI4 11


ALARM CIRCUIT
-XI4 13 -XI4 13 -XI4 13 -XI4 13 -XI4 13

-XI4 15 -XI4 15 -XI4 15 -XI4 15 -XI4 15

-XI4 17 -XI4 17 -XI4 17 -XI4 17 -XI4 17

-XI4 19 -XI4 19 -XI4 19 -XI4 19 -XI4 19

-XI4 21 -XI4 21 -XI4 21 -XI4 21 -XI4 21

F PROJECT NO.: DRAWING NO.: 1YUX200119/LP DRAWING REV.: R1 DATE: 26/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation INTERCONNECTION DIAGRAM SCALE: 1 : 1.2
A1 REVISED AS CUSTOMER COMMENT 26/12/13 CUSTOMER: INTERNAL INTERLOOPING CIRCUIT START: 12/12/2013
TOJI
A0 FIRST ISSUED 13/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=J0E+LP/G02
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: =JC01+/A00
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

R 3P3W, AC22kV, 2500A, 25kA/3s, 50Hz


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

Y
A B A

+CB-QB
VD4/P
2500A
+CCB +CCB +CCB
-BC1 -BC2 -BC3
P2 P2 P2
3x1200-1600-2000-2500/1/1/1A

CORE3:CL5P20
B TO SHEET A04 B
30VA@2500/1A

CORE2:CL5P20
TO SHEET A03
30VA@2500/1A

CORE1:CL0.5
C TO SHEET A02 C
30VA@2500/1A

+LVD
-PU
P1 P1 P1
1
R:L1

1
Y:L2
D D

1
B:L3

E:PE
-QE -GND

E E

L1 L2 L3

F PROJECT NO.: DRAWING NO.: 1YUX200119/BC DRAWING REV.: R2 DATE: 03/03/14 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation BUS COUPLER PANEL=JC01 SCALE: 1: 1
A1 CHANGED CT POLARITY 03/03/14 CUSTOMER: POWER CIRCUIT START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC01+WLV/A01
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: A02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CURRENT TRANSFORMER
3x1200-1600-2000-2500/1/1/1A
CORE1:CL0.5 , 30VA@2500/1A,
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

-GND
A A

-XA1 1 -XA1 2 -XA1 3 -XA1 4

+CCB-BC1 1S5 +CCB-BC2 1S5 +CCB-BC3 1S5


1S4 1S4 1S4
1S3 1S3 1S3
1S2 1S2 1S2

B 1S1 1S1 1S1 B

METAL JUMPER

-XA1 5 -XA1 6 -XA1 7

-XA1 8 -XA1 9 -XA1 10 -XA1 11

C -XA1 12 -XA1 13 -XA1 14 C

-XA1 15 -XA1 16 -XA1 17 -XA1 18

17 17 17

+LVD-PA1 A +LVD-PA2 A +LVD-PA3 A


D 0-1200/1600/2000A (x1.2) 0-1200/1600/2000A (x1.2) 0-1200/1600/2000A (x1.2) D
18 18 18

REMOVE THIS JUMPER WHEN A1700 IS CONNECTED

-XA1 19 -XA1 20 -XA1 21 -XA1 22

E E

=EXT

CONNECT TO A1700 ON EXTERNAL MEASUREMENT PANEL

F PROJECT NO.: DRAWING NO.: 1YUX200119/BC DRAWING REV.: R2 DATE: 03/03/14 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation BUS COUPLER PANEL=JC01 SCALE: 1: 1
A1 REVISED AS CUSTOMER COMMENT 26/12/13 CUSTOMER: POWER CIRCUIT START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC01+WLV/A02
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: A03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CURRENT TRANSFORMER
3x1200-1600-2000-2500/1/1/1A
CORE2:CL5P20 , 30VA@2500/1A,
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

-GND
A A

-XA2 1 -XA2 2 -XA2 3 -XA2 4

+CCB-BC1 2S5 +CCB-BC2 2S5 +CCB-BC3 2S5


2S4 2S4 2S4
2S3 2S3 2S3
2S2 2S2 2S2

B 2S1 2S1 2S1 B


METAL JUMPER

-XA2 5 -XA2 6 -XA2 7

-XA2 8 -XA2 9 -XA2 10 -XA2 11

-XA2 12 -XA2 13 -XA2 14


RECOMMANDED SETTING VALUE OF CURRENT RELAY
-% LEVEL: SHOULD BE SET TO ENSURE THAT -XA2 15 -XA2 16 -XA2 17 -XA2 18
WHEN THE CURRENT FLOW THROUGH THE CB OVER 2200A,
C FAN WILL BE OPERATED C
-FAULT DELAY: 3 Second Y1 Y2 Y3 Y4
-ON DELAY: 4 Second -BR
5-100mA

0.05-1A

0.5-10A

/N99/3.D
CURRENT RELAY

MONITORED CURRENT CIRCUIT

COM
M
D D
-XA2 19

1 RD 3 YE 5 BU 7 BK

+LVD-XM1 L1 L2 L3 N

L1 L2 L3 N
2 RD 4 YE 6 BU 8 BK

E E
-X120 7 9 11 13
+LVD IL1 IL2 IL3 N
-AR30
/N01/1.A
IL1 IL2 IL3 Io

N N N Io

-X120 8 10 12 14

F PROJECT NO.: DRAWING NO.: 1YUX200119/BC DRAWING REV.: R2 DATE: 03/03/14 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation BUS COUPLER PANEL=JC01 SCALE: 1: 1
CUSTOMER: POWER CIRCUIT START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC01+WLV/A03
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: A04
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CURRENT TRANSFORMER
3x1200-1600-2000-2500/1/1/1A
CORE3:CL5P20 , 30VA@2500/1A,
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
-GND

-XA3 1 -XA3 2 -XA3 3 -XA3 4

+CCB-BC1 3S5 +CCB-BC2 3S5 +CCB-BC3 3S5


3S4 3S4 3S4
3S3 3S3 3S3
B 3S2 3S2 3S2 B
3S1 3S1 3S1

METAL JUMPER

-XA3 5 -XA3 6 -XA3 7

C -XA3 8 -XA3 9 -XA3 10 -XA3 11


C
-XA3 12 -XA3 13 -XA3 14

-XA3 15 -XA3 16 -XA3 17 -XA3 18

D =EXT D

SPARE

E E

F PROJECT NO.: DRAWING NO.: 1YUX200119/BC DRAWING REV.: R2 DATE: 03/03/14 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation BUS COUPLER PANEL=JC01 SCALE: 1: 1
CUSTOMER: POWER CIRCUIT START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC01+WLV/A04
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: G01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
POWER SUPPLY FOR PROTECTION, CONTROL AND INDICATOR CIRCUIT
FOR CONTROL FOR INDICATOR FOR PROTECTION
220VDC 220VDC 220VDC
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
PREVIOUS NEXT PANEL
PANEL

-XJ 1 -XJ 1 -XJ 1

-XJ 3 -XJ 3 -XJ 3

B B

220VDC 220VDC
-XJ 2 -XJ 4

C C

1 3 13 21 1 3 13 21 1 3 13 21
-FB1 -FB2 -FB3
S282-UC K6 2 4 14 22 S282-UC K6 2 4 14 22 S282-UC K6 2 4 14 22
6A 6A 6A
/X01/2.C

/X01/2.C

/X01/3.C
D D

E E
-DC_L1+

-DC_L2+

-DC_L3+
-DC_L1-

-DC_L2-

-DC_L3-
/M04/1.A

/M07/1.A

/M08/1.A
/M04/1.F

/M07/1.F

/M08/1.F

F PROJECT NO.: DRAWING NO.: 1YUX200119/BC DRAWING REV.: R2 DATE: 03/03/14 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation BUS COUPLER PANEL=JC01 SCALE: 1: 1
CUSTOMER: DC VOLTAGE SUPPLY CIRCUITS START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC01+WLV/G01
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: G02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
LIGHTING AND HEATING CIRCUIT

LIGHTING SPACE HEATER HEATER ON I/L (WHITE) FAN CONTROL CIRCUIT CB CHARGER CIRCUIT

220VAC, 50Hz 220VAC, 50Hz 220VAC, 50Hz 220VAC, 50Hz 220VAC, 50Hz
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
PREVIOUS NEXT PANEL
PANEL

-XH 1 -XH 1 -XH 1

-XH 3 -XH 3 -XH 3

B B
220VAC, 50Hz -XH 2 -XH 4 220VAC, 50Hz

1 3 13 21
-FB5
S202-C6 2 4 14 22
6A
/X01/3.C

C C

1 3 13 21
-FB4
S202-K1.6 2 4 14 22
1.6A

/X01/3.C
-XH 5 -XH 6 -XH 7
15 1
-KC1
-KT /M07/8.E 2
1 /N99/5.D
-S101
D 2 D
16 18
A1 -XH 14 -XM 1 -XM 2

-XH 12 -BR
2 /N99/3.D
Z1/1

SUPPLY VOLTAGE
+CB +CB
-EF 2 3 -EF /M01/1.A
/N99/1.D /N99/1.D
+CB -XB 25
A1 -QB 2
1 1 X1
S231 Z1/2
+CCF +CB +LVD 1 -BS1
E -EL A2 E
-EH2 -EH1 -H20 1 1
2 2 X2
100W 50W WHITE
A2
-XH 13
-MS M
X1
+LVD
-H24 -XB 35
X2 /M01/1.D
AMBER
-XH 8 -XH 9 -XH 10 -XH 11

F PROJECT NO.: DRAWING NO.: 1YUX200119/BC DRAWING REV.: R2 DATE: 03/03/14 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation BUS COUPLER PANEL=JC01 SCALE: 1: 1
CUSTOMER: AC VOLTAGE SUPPLY CIRCUITS START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC01+WLV/G02
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: M01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-VD4 CN
DOC. No: 1YH8122104 -GND
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

/M04/2.C

/M04/8.C
/M08/5.B

/M08/6.B

/M07/1.B

/M07/2.B
/M04/5.E

/M04/1.E

/M04/2.E

/M04/5.E

/M04/5.E
/G02/7.E

/X02/5.B

/X02/4.B

/X02/6.B

/X02/1.B
/X03/5.E

/X01/4.E

/X03/2.E

/X03/3.E

/X03/2.E

/X01/4.E

/X03/3.E

/X03/4.E
A A
-XB
+CB 24 26 25 4 5 32 27 2 31 41 23 8 11 6 29 28 9 7 1 40 52 12 49 10 57 55
-QB

CB DISCHARGED

CB CHARGED

CB OPENED

CB CLOSED
B -BS2 -BS1 B
4 2 2
-BT2
3 1 0 I 13 23 33 43 53
1

-BB1 -BB2 -BB3 14 24 34 44 54


-MS 13 21 31 43 53 13 21 31 41 53 13 21 31 41 53
M P
14 22 32 44 54 14 22 32 42 54 14 22 32 42 54

POSITION
SERVICE
-BT1 13 23 33 43 53

C 14 24 34 44 54 C

TEST
POSITION
-RL1 -MC -MO1

D -XB 34 36 35 20 14 15 42 13 37 3 30 33 18 22 21 16 39 38 19 17 50 51 53 54 47 48 58 56 D
/M08/5.C

/X03/5.E

/G02/7.E

/M04/5.F

/M04/5.F

/X01/4.F

/X02/5.B

/X02/4.B

/X03/2.E

/M04/1.F

/M04/2.D

/X02/6.B

/M08/6.C

/M08/6.C

/M07/1.C

/M07/2.C

/X03/3.E

/X03/2.E

/X01/4.F

/M08/7.C

/M08/7.C

/X02/1.B

/X03/4.E

/X03/3.E

/M04/8.D

/X03/4.E
CIRCUIT BREAKER CIRCUIT BREAKER CIRCUIT BREAKER TRUCK INTERLOCK

DESIG. DESCRIPTION REMARK DESIG. DESCRIPTION REMARK DESIG. DESCRIPTION REMARK EARTHING SWITCH MECHANICAL INTERLOCK WITH CB.-TRUCK
RL1 CLOSING BLOCK MAGNET BS1 SPRING CHARGING MOTOR CONTACT BT2 LIMIT SWITCH (TEST POSITION) a) C.B. TRUNCK IN TEST-POSITION: EARTHING SWITCH CAN BE OPERATED
E MO1 FIRST OPENING RELEASE BS2 SPRING CHARGED/DISCHARGED CONTACT BT1 LIMIT SWITCH (SERVICE POSITION)
E
b) EARTHING SWITCH OPEN-POSITION: C.B.-TRUCK CAN BE MOVED
MC CLOSING RELEASE BB1-3 C.B. AUXILIARY SWITCH XB 58 POLE SOCKET INTO SERVICE-POSITION
MS SPRING CHARGING MOTOR XB2..11 CB. INTERNAL POLE PLUG/SOCKET
MU UNDERVOLTAGE RELEASE OPTION
RL2 TRUCK RACK BLOCKING MAGNET OPTION

INTERNAL WIRING / CROSS REFERENCE THE DIAGRAM INDICATES THE FOLLOWING CONDITION: -VACUUM C.B. TRUNK IN SERVICE POSITION -VACUUM CIRCUIT BREAKER OPEN -C.B. SPRING DISCHARGED

CODE: -QB PN: VD4/P -Z - W NAME: VACUUM CIRCUIT BREAKER TYPE: VD4 FUNCTION: NON-STANDARD SECONDARY CONTROL WIRING (7NO-7NC) TECHNICAL DATA: REFER TO SINGLE LINE DIAGRAM
F PROJECT NO.: DRAWING NO.: 1YUX200119/BC DRAWING REV.: R2 DATE: 03/03/14 F
PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation BUS COUPLER PANEL=JC01 SCALE: 1: 1
CUSTOMER: VD4 INTERNAL WIRING START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC01+WLV/M01
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: M02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

EARTHING SWITCH FOR UNIGEAR ZS1


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
L1 L2 L3

+CCB-QE

/M04/5.C
/M07/4.B

/M09/4.B

/X03/2.B

/X01/5.E
20 22 24 26 28
-BE1
21 23 25 27 29

/M07/4.B

/M09/3.B
/M04/8.E

/X03/1.B

/X03/2.B

/X01/5.E
B B

G 40 42 44 46 48
-BE2
-RL3
H 41 43 45 47 49

C C

D D

EARTHING SWITCH INTERLOCK

DESIG. DESCRIPTION REMARK EARTHING SWITCH MECHANICAL INTERLOCK WITH CB.-TRUCK


BE1 EARTHING SWITCH OPENED a) C.B. TRUCK IN TEST-POSITION: EARTHING SWITCH CAN BE OPERATED
E BE2 EARTHING SWITCH CLOSED
E
b) EARTHING SWITCH OPEN-POSITION: C.B.-TRUCK CAN BE MOVED
RL3 EARTHING SWITCH CLOSING COIL OPTION INTO SERVICE-POSITION

INTERNAL WIRING / CROSS REFERENCE THE DIAGRAM INDICATES THE FOLLOWING CONDITION: EARTHING SWITCH OFF AND CRANK NOT INSERTED

CODE: -QE PN: NAME: EARTHING SWITCH TYPE: FUNCTION: STANDARD SECONDARY CONTROL WIRING (5NO-5NC) TECHNICAL DATA: REFER TO SINGLE LINE DIAGRAM
F PROJECT NO.: DRAWING NO.: 1YUX200119/BC DRAWING REV.: R2 DATE: 03/03/14 F
PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation BUS COUPLER PANEL=JC01 SCALE: 1: 1
CUSTOMER: ES - INTERNAL WIRING START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC01+WLV/M02
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: M04
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CIRCUIT BREAKER CLOSING AND TRIPING CIRCUIT
CIRCUIT BREAKER OPENING CONTROL CLOSING INTERLOCKING CB CLOSING CONTROL EARTHING SWITCH INTERLOCKING

SPARE F27/59 SUPERVISORY REMOTE LOCAL 50/51;50N/51N, EXT. TRIP CB IN SERVICE CB IN TEST SPARE SUPERVISORY REMOTE LOCAL CLOSING COMMAND VOL. INDICATOR SUPPLY BLOCKING COIL
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

50BF TRIP

A A
-DC_L1+ XK 2

/G01/2.E XK 1 XK 3 XK 4 XK 5
XI2 1
-JUMPER XI3 3
5 3 1 11 9 7
1 2 1 2 1 2
XI2 2 1 2 1 2 1 2
-JUMPER
-X100 16 15
+LVD 6 +LVD 4 +LVD 2 XI2 3 +LVD 12 +LVD 10 +LVD 8
-SS1 -SS1 -SS1 +LVD =JC03 XI2 1 -SS1 -SS1 -SS1 XI3 4

BUSBAR ES OPENED
SUPERVISORY REMOTE -AR30 SUPERVISORY REMOTE

Rint
LOCAL PO3 1 LOCAL XI3 5
/N99/3.A /N99/3.A /N99/2.A /N01/1.A /N99/3.A /N99/3.A /N99/3.A
XI1 1 XI1 2 XI1 3 XI1 4 XI1 5 -K501 -X100 6 -JUMPER
B =JC02 =JC03 2 XI2 9 XI2 10 XI2 11
B
17 +LVD
3 -X100 XI2 2
PO1 -AR30 XI3 6
XI1 27 XI1 3 /N01/1.A
+LVD XI2 4
4
3 -X100 19
-SOT -X100 7
-KBF2 -PO2 /M07/1.E +LVD
3
/M02/5.B
4 RED -AR30

TCS1

ES OPENED
PO3 +CCB 22 4
XI1 28 XI1 4 /N01/1.A +LVD
-QE -BE1
-SOC
23 /M07/2.E
-X100 18 /M01/8.A
XI1 6 XI1 7 XI1 8 XI1 9 XI1 10 GREEN
+CB -XB 57
XI2 5 XI2 12 XI2 13 XI2 14
C / CB LOCK+ -QB C
M05/4.A
53
XK 13
-BT2
/M01/4.A / CB LOCK-
CB IN TEST 54
-XB 23 M05/4.F
+CB
6
-QB XI2
-XB 58
7 /M01/8.D
21 XI2
-BB2 XK 14
XI2 8
22
D -X100 21 NO D
+LVD +LVD
-XB

/N99/7.A

/N99/8.A
33
/M01/4.D TCS & LOCKOUT -AR30 -PU
/N01/1.A
PO4
/A01/6.C

x1 -R1 x2 XK 15 P1 P3
-X100 22
33kOhm 5W
+LVD 110V 220V
XK 12 XK 11
-PU
XK 17
/A01/6.C
COM
/M01/4.A /M01/4.A
+CB -XB 31 -XB 41 /M01/8.A /M01/8.A XK 16
+CB -XB 10 -XB 49 /M01/3.A CB CLOSING RELEASE
-QB
+CB -XB 4 +CCB
E
13 -QB E
-BB2 43 43 -QB 0V -QE
CB FIRST OPENING /M02/3.A
14 -BT1 -BT2 P2
RELEASE

/N99/8.A
CB CLOSING 44 44 G
BLOCKING MAGNET -MC
-MO1 -RL3
-RL1 H
-XB 30
/M01/4.D -XB 20 -XB 14
/M01/2.D /M01/3.D
XK 6 XK 7 XK 8 XK 9 XK 10
-DC_L1-
/G01/2.E
F PROJECT NO.: DRAWING NO.: 1YUX200119/BC DRAWING REV.: R2 DATE: 03/03/14 F
PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation BUS COUPLER PANEL=JC01 SCALE: 1: 1
A1 REVISED AS CUSTOMER COMMENT 26/12/13 CUSTOMER: CLOSING & TRIPPING CIRCUITS START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC01+WLV/M04
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: M05
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CIRCUIT BREAKER CLOSING INTERLOCKING CIRCUIT

CIRCUIT BREAKER CLOSING INTERLOCKING SIGNALS


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
M04/4.C / CB LOCK+

-XI6 1 -XI6 2

431 CIRCUIT BREAKER OPENED


=431
B B

-XI6 6
=JC02
XI6 9 -XI6 7 -XI6 8

433 CIRCUIT BREAKER OPENED


31
C BB1 C
32

412 CIRCUIT BREAKER OPENED

432 CIRCUIT BREAKER OPENED


=412 =432
XI6 10

D D

-XI6 3 -XI6 4 -XI6 5

E E

M04/4.C / CB LOCK-

F PROJECT NO.: DRAWING NO.: 1YUX200119/BC DRAWING REV.: R2 DATE: 03/03/14 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation BUS COUPLER PANEL=JC01 SCALE: 1: 1
CUSTOMER: CLOSING INTERLOCKING CIRCUIT START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC01+WLV/M05
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: M07
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
POSITION INDICATOR 50BF CIRCUIT CB STATUS FAN CIRCUIT
LAMP INDICATOR CIRCUIT BREAKER EARTHING SWITCH FAN START CIRCUIT

CB OPENED CB CLOSED CB OPENED CB CLOSED ES OPENED ES CLOSED 50BF CB OPENED CB CLOSED


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
-DC_L2+
/G01/4.E -XK1 1 -XK1 2 -XK1 3 -XK1 4 -XK1 5

3
+LVD 1 2

-SS5
4
ON
/N99/3.C

/M01/5.A /M01/5.A /M02/5.B /M02/5.B


B B
+CB -XB 6
+CB -XB 29
+CCB
-QB -QB -QE -X100 8
/M02/3.A
13 21
20 40 +LVD -XK1 17
-BE1 -BE2 -AR30 PO2
-BB3 -BB3 /N01/1.A
21 41
14 22
9 15
-X100
-BR
-XB 16 -XB 39
/N99/3.D
/M01/5.D /M01/5.D

C C

16 18
-XK1 8 -XK1 10 -XK1 12 -XK1 14

D -XK1 9 -XK1 11 -XK1 13 -XK1 15 -XK1 16


D

A1

-KT
/N99/5.D

A1
3 2
3 2 -KC1
A1 A1 A1 A2
X1 X1
+LVD-P1 -KBF1 -KCB1 -KCB2
+LVD-SOT +LVD-SOC +LVD-P2
A2 A2 A2
/M04/3.B X2 /M04/7.B X2
E 1 A2 E
RED GREEN 1

1 2 /X02/2.B 1 2 /X02/6.B 1 2 /X03/6.E 1 2 /G02/6.D


3 4 /X02/2.B 3 4 /X02/7.B 3 4 /X03/7.E 3 4
5 6 /X01/6.C 5 6 /X03/6.E 5 6 /X03/7.E 5 6
13 14 13 14 /X03/6.E 13 14 /X03/7.E 13 14
-DC_L2- -XK1 6 -XK1 7
/G01/4.E
F PROJECT NO.: DRAWING NO.: 1YUX200119/BC DRAWING REV.: R2 DATE: 03/03/14 F
PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation BUS COUPLER PANEL=JC01 SCALE: 1: 1
CUSTOMER: INDICATOR CIRCUIT & 50BF SIGNAL START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC01+WLV/M07
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: M08
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PROTECTION AND CONTROL UNIT BINANY INPUT

POWER FOR RELAY CONTROL MODE CB SPRING STATUS CB STATUS


CB SPRING CHARGED CB CLOSED CB OPENED CB IN TEST CB IN SERVICE
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
-DC_L3+ L3+ / M09/1.A
/G01/5.E -XK2 1 -XK2 2 -XK2 3 -XK2 4 -XK2 5 -XK2 6 -XK2 7 -XK2 8 -XK2 9

/M01/1.A /M01/5.A
B B
+CB -XB 24
+CB -XB 11

-QB -QB
13 15 17
1 2 1 2 1 2 4 53 41 13 13
-BS2 -BB2 -BB2 -BT2 -BT1
+LVD 14 +LVD 16 +LVD 18
3 54 42 14 14
-SS1 -SS1 -SS1
LOCAL REMOTE SUPERVISORY
/N99/3.A /N99/4.A /N99/4.A
-XB 34 -XB 21 -XB 22 -XB 50 -XB 51
/M01/1.D /M01/5.D /M01/5.D /M01/7.D /M01/7.D

C C

-XK2 16 -XK2 17 -XK2 18 -XK2 19 -XK2 20 -XK2 21 -XK2 22 -XK2 23

D -GND D

-GND -X100 1 -X110 1 -X110 3 -X110 5 -X110 7 -X110 8 -X110 10 -X110 11 -X110 13
+LVD +LVD
-AR30 -AR30
+

+
/N01/1.A /N01/1.A
BI1 BI2 BI3 BI4 BI5 BI6 BI7 BI8
- - - - - - - -

-X110 2 -X110 4 -X110 6 -X110 9 -X110 12


-X100 2
E E
L3- / M09/1.E

-XK2 13 -XK2 14 -XK2 15

-DC_L3-
/G01/5.E
F PROJECT NO.: DRAWING NO.: 1YUX200119/BC DRAWING REV.: R2 DATE: 03/03/14 F
PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation BUS COUPLER PANEL=JC01 SCALE: 1: 1
A1 REVISED AS CUSTOMER COMMENT 26/12/13 CUSTOMER: RELAY INPUT SIGNALS START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC01+WLV/M08
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: M09
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PROTECTION AND CONTROL UNIT BINANY INPUT

ES STATUS
SPARE ES CLOSED ES OPENED EXTERNAL TRIP
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
L3+
/M08/8.A -XK2 10 -XK2 11 -XK2 12

/M02/5.B /M02/5.B
B B
+CCB +CCB
-QE -QE
42 24
-BE2 -BE1
43 25

C C

-XK2 24 -XK2 25 -XK2 26 -XK2 27

D D
-X120 1 -X120 3 -X120 4 -X120 5
+LVD +LVD
-AR30 -AR30
+

+
/N01/1.A /N01/1.A
BI1 BI2 BI3 BI4
- - - -

-X120 2 -X120 6

E E
L3-
/M08/8.E

F PROJECT NO.: DRAWING NO.: 1YUX200119/BC DRAWING REV.: R2 DATE: 03/03/14 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation BUS COUPLER PANEL=JC01 SCALE: 1: 1
CUSTOMER: RELAY INPUT SIGNALS START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC01+WLV/M09
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: N01
1 2 3 4 5 6 7 8
F
E
B

C
A

D
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A0
PAGE REV.
1
1

FIRST ISSUE
FEEDER PROTECTION RELAY
+LVD-AR30

REF615
ANALOG INPUT AND BI MODULE
BINARY INPUT 1 (+) /M09/2.D -X120 1
BINARY INPUT 1, 2 & 3 (-) /M09/2.E 2
BI1

DESCRIPTION
BINARY INPUT 2 (+) /M09/3.D 3 BI2

2
2

BINARY INPUT 3 (+) /M09/4.D 4 BI3


BINARY INPUT 4 (+) /M09/5.D 5
(-) /M09/5.E 6
BI4
COM /A03/3.E 7
L1 /A03/3.F 8
IL1
COM /A03/4.E 9
L2 /A03/4.F 10
IL2
COM /A03/5.E 11
L3 /A03/5.F 12
IL3
N /A03/6.E 13
COM /A03/6.F 14
Io

3
3

DATE
19/12/13
MAIN MODULE +
AUXILIARY VOLTAGE SUPPLY (+) INPUT /M08/3.D -X100 1
- Uaux
(-) INPUT /M08/3.E 2
IRF, COMMON /X01/5.C 3
IRF

CUSTOMER:
CLOSED; IRF, OR Uaux DISCONNECTED /X01/4.C 4

PROJECT NO.:
CLOSED; NO IRF, AND Uaux CONNECTED /X01/5.C 5

PROJECT TITLE:

DESIGNED: HNX
POWER OUTPUT CONTACT 1, NO /M04/7.B 6 PO1
/M04/7.B 7
POWER OUTPUT CONTACT 2, NO /M07/5.B 8 PO2
/M07/5.C 9

4
4

SIGNAL OUTPUT CONTACT 1, COMMON /X01/5.C 10


NC /X01/5.C 11
SO1
NO /X01/5.C 12
SIGNAL OUTPUT CONTACT 2, NO /X01/6.C 13
/X01/6.C 14
SO2

CHECKED: DLQ
POWER OUTPUT CONTACT 3, NO /M04/4.B 16
/M04/4.B 17
PO3
(TCS RESISTOR) /M04/4.B 15

TOJI
POWER OUTPUT CONTACT 3, NO (TCS1 INPUT) /M04/4.B 19
/M04/4.C 18 TCS1
(TCS RESISTOR) 20
/M04/5.D 22
POWER OUTPUT CONTACT 4, NO /M04/5.D 21
PO4

110kV Nhat tan Substation

5
5

POWER OUTPUT CONTACT 4, NO (TCS2 INPUT) 23

APPROVED: DLQ
24 TCS2

BIO MODULE
BINARY INPUT 1 (+) /M08/3.D -X110 1
(-) /M08/3.E 2
BI1
BINARY INPUT 2 (+) /M08/4.D 3
(-) /M08/4.E 4
BI2
BINARY INPUT 3 (+) /M08/5.D 5
DRAWING TITLE:
BINARY INPUT 3 & 4 (-) /M08/5.E 6
BI3

BINARY INPUT 4 (+) /M08/5.D 7 BI4

6
6

BINARY INPUT 5 (+) /M08/6.D 8


BINARY INPUT 5 & 6 (-) /M08/6.E 9
BI5

BINARY INPUT 6 (+) /M08/6.D 10 BI6


BUS COUPLER PANEL=JC01

BINARY INPUT 7 (+) /M08/7.D 11


BINARY INPUT 7 & 8 (-) /M08/7.E 12
BI7
DRAWING NO.: 1YUX200119/BC

REF615 - A/I + Binary I/O Board

BINARY INPUT 8 (+) /M08/7.D 13 BI8


SIGNAL OUTPUT CONTACT 1, COMMON /X03/7.B 14
NC /X03/7.B 16 SO1
TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559

NO /X03/7.B 15
SIGNAL OUTPUT CONTACT 2, COMMON /X03/7.B 17
SO2
7
7

NC /X03/7.B 19
NO /X03/7.B 18
ABB XIAMEN SWITCHGEAR CO.,LTD

SIGNAL OUTPUT CONTACT 3, COMMON /X03/6.B 20


NC /X03/6.B 22 SO3
NO /X03/6.B 21
SIGNAL OUTPUT CONTACT 4, NO /X03/6.B 23
/X03/6.B 24
SO4
CONT.:
SHEET:

COMMUNICATION MODULE
DRAWING REV.: R2

ETHERNET RJ-45 -X1 LAN


8
8

SCALE:
LANGUAGE:
DATE: 03/03/14

N99
==SWG1=JC01+WLV/N01
START: 12/12/2013
1: 1
ENG
F
E
B

C
A

D
1 2 3 4 5 6 7 8

/M04/8.D

/M04/7.D

/M04/8.D
/M04/8.E

/M04/8.E
+LVD-SS1
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

CONTROL
CONTROL MODE
A NO COM NC P1 P2 P3 A
1 2
REMOTE 1 3 5 7 9 11 13 15 17 19 21 23 +LVD 110V 0V 220V
-PU
LOCAL SUPER. AUXILIARY VOLTAGE
2 4 6 8 10 12 14 16 18 20 22 24
VOLTAGE INDICATOR

/M04/3.B

/M04/3.B

/M04/2.B

/M04/7.B

/M04/6.B

/M04/6.B

/M08/3.B

/M08/4.B

/M08/5.B

/X01/6.E

/X01/6.E

/X01/6.E
SALZER 1 LOCAL
2 REMOTE
B 3 SUPERVISORY B

+LVD-SS5
FAN MODE

1 2
1 3 5 7

2 4 6 8
/M07/8.B

NORMAL HANDLE
C C

1 OFF
2 ON

-GND
/G02/6.D

/G02/4.D

/M07/8.D
/M07/8.C
/G02/5.D

/G02/4.D
/G02/5.E
D D
Z1/1 2
+CB GND A1 A2 15 A1 15
-EF Z1/1 1 1 -BR -KT
2 3 CURRENT RELAY TIMER RELAY
SUPPLY VOLTAGE
S231 /A03/2.C /G02/4.D
x1 U1 Z2 /G02/5.D /M07/7.D
MONITORED CURRENT CIRCUIT
-VR /M07/8.C
x2 Z1 U2
5-100mA

0.5-10A
0.05-1A
COM

1
E Z1/2 2 3 E
M Y1 Y2 Y3 Y4 16 18 A2 16 18
FAN FOR VCB
/A03/3.D

/A03/2.C

/A03/3.C

/A03/3.C

/A03/3.C

/M07/8.C

/M07/8.C

/M07/8.E

/G02/4.D

/G02/4.D
Z1/2 1
/G02/6.E

/G02/4.E

F PROJECT NO.: DRAWING NO.: 1YUX200119/BC DRAWING REV.: R2 DATE: 03/03/14 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation BUS COUPLER PANEL=JC01 SCALE: 1: 1
A1 REVISED AS CUSTOMER COMMENT 26/12/13 CUSTOMER: CROSS REFERENCE START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC01+WLV/N99
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: X01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
ALARM WIRING CIRCUIT TO REMOTE CONTROL PANEL
COMMON AC/DC SUPPLY CIRCUIT BRIDGE
INTERNAL RELAY
O/C & E/F TRIP 50BF
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

MCB OFF SPARE FAULTY TCS ALARM TERMINALS

A =PREV =NEXT A

-XI4 1 -XI4 1 COMMON -XI4 1

-XI4 5 -XI4 5 AC/DC CIRCUIT MCB OFF -XI4 5

-XI4 7 VT CIRCUIT FAIL -XI4 7 -XI4 7

-XI4 9 INTERNAL RELAY FAULT -XI4 9 -XI4 9

-XI4 11 OC/EF OPERATED -XI4 11 -XI4 11

-XI4 13 TCS ALARM -XI4 13 -XI4 13

-XI4 15 50BF -XI4 15 -XI4 15


B B
-XI4 17 -XI4 17 -XI4 17

-XI4 19 -XI4 19 -XI4 19

-XI4 21 -XI4 21 -XI4 21

-XI4 6 -XI4 8 -XI4 10 -XI4 12 -XI4 14 -XI4 16 -XI4 18 -XI4 20 -XI4 22

-X100 3 -X100 10 -X100 13


5
+LVD -KBF1
-AR30 IRF SO1 SO2 /M07/5.E 6
21 21 21 21 21 /N01/1.A
C PREVIOUS PANEL -FB1 -FB2 -FB3 -FB4 -FB5 4 5 -X100 11 12 14
NEXT PANEL C
/G01/2.C 22 /G01/4.C 22 /G01/5.C 22 /G02/7.C 22 /G02/2.C 22 -X100 -X100

-XI4 2 -XI4 3 -XI4 4

TO REMOTE CONTROL PANEL

CIRCUIT BREAKER EARTH SWITCH CONTROL MODE


COMMON CB CLOSED CB OPENED ES CLOSED ES OPENED LOCAL REMOTE SUPERVISORY

D D

XC1 1 XC1 6 XC1 7 XC1 8 XC1 9 XC1 10 XC1 11 XC1 12

/M01/3.A /M01/6.A /M02/6.B /M02/6.B


-XB 5 -XB 7 +CCB +CCB
+CB +CB -QE -QE
E -QB -QB E
48 28 20 22 24
13 53 1 2 1 2 1 2

-BE2 -BE1
-BB1 -BB3
49 29 +LVD 19 +LVD 21 +LVD 23
14 54
-SS1 -SS1 -SS1
LOCAL REMOTE SUPERVISORY
/N99/4.A /N99/4.A /N99/4.A
-XB 15 -XB 17
/M01/3.D /M01/6.D

XC1 2 XC1 3 XC1 4 XC1 5

F PROJECT NO.: DRAWING NO.: 1YUX200119/BC DRAWING REV.: R2 DATE: 03/03/14 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation BUS COUPLER PANEL=JC01 SCALE: 1: 1
A1 REVISED AS CUSTOMER COMMENT 26/12/13 CUSTOMER: SIGNALS TO REMOTE CONTROL PANEL START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC01+WLV/X01
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: X02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
BUSBAR ES INTERLOCK 50BF SIGNALS FOR CIRCUIT BREAKER CLOSING INTERLOCKING CIRCUIT

TO INC. SPARE TO JC02 TO 431 TO 412 TO 432 SPARE

CB IN TEST 50BF 50BF CB OPENED CB OPENED CB OPENED CB OPENED CB OPENED


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
-XI3 1 -XI1 11 -XI1 15

-XI1 12 -XI1 16
-XI6 9 -XI6 11 -XI6 13 -XI6 15 -XI6 17

/M01/7.A
+CB -XB 52
/M01/4.A /M01/3.A /M01/5.A
-QB +CB -XB 2
+CB -XB 32
+CB -XB 8

23 -QB -QB -QB


1 3 1 3
B -BT2 -KBF1 -KBF1 31 21 31
B
24 /M07/5.E 2 /M07/5.E 4 -KCB1 -KCB1
-BB1 -BB1 -BB2 2 4
/M07/6.E /M07/6.E
32 22 32
-XB 53
/M01/7.D
-XB 13 -XB 42 -XB 18
/M01/3.D /M01/3.D /M01/5.D

-XI1 13 -XI1 17

-XI6 10 -XI6 12 -XI6 14 -XI6 16 -XI6 18


C -XI3 2 -XI1 14 -XI1 18
C

D D

E E

F PROJECT NO.: DRAWING NO.: 1YUX200119/BC DRAWING REV.: R2 DATE: 03/03/14 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation BUS COUPLER PANEL=JC01 SCALE: 1: 1
CUSTOMER: SIGNALS FOR INTERLOCKING AND INTERTRIPPING START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC01+WLV/X02
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: X03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
EARTHING SWITCH SPARE CONTACT RELAY OUTPUTS FOR SPARE

EARTHING SWITCH EARTHING SWITCH EARTHING SWITCH


ES CLOSED ES OPENED ES CLOSED SPARE PROTECTION TRIP SPARE SPARE
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
-XC2 1 -XC2 3 -XC2 5 -XR1 1 -XR1 3 -XR1 5 -XR1 7

/M02/5.B /M02/6.B /M02/6.B

+CCB +CCB +CCB


-QE -QE -QE
-X110 20 -X110 23 -X110 14 -X110 17
44 26 46
+LVD +LVD
B -BE2 -BE1 -BE2 SO4 B
-AR30 SO3 -AR30 SO1 SO2
45 27 47 /N01/1.A /N01/1.A

-X110 22 21 -X110 24 -X110 16 15 -X110 19 18

C -XC2 2 -XC2 4 -XC2 6 -XR1 2 -XR1 4 -XR1 6 -XR1 8


C

CIRCUIT BREAKER SPARE CONTACT

CB CLOSED CB CLOSED CB CLOSED CB IN SERVICE CB IN TEST CB IN SERVICE CB SPRING DISCHARGED CB OPENED CB OPENED CB CLOSED CB CLOSED CB CLOSED CB CLOSED

D D
-XC3 1 -XC3 3 -XC3 5 -XC3 7 -XC3 10 -XC3 12 -XC3 14 -XC3 16 -XC3 18 -XC3 20 -XC3 22 -XC3 24

/M01/4.A /M01/6.A /M01/5.A /M01/7.A /M01/8.A /M01/1.A


+CB -XB 27
+CB -XB 9
+CB -XB 28
+CB -XB 12
+CB -XB 55
+CB -XB 26

-QB -QB -QB -QB -QB -QB


43 41 31 33 33 53 2 5 13 1 3 5 13

E -BB1 -BB3 -BB3 -BT1 -BT2 -BT1 -BS2 E


-KCB1 -KCB1 -KCB2 -KCB2 -KCB2 -KCB2
44 42 32 34 34 54 1 6 14 2 4 6 14
/M07/6.E /M07/6.E /M07/7.E /M07/7.E /M07/7.E /M07/7.E

-XB 37 -XB 19 -XB 38 -XB 48 -XB 47 -XB 56 -XB 36


/M01/4.D /M01/6.D /M01/5.D /M01/8.D /M01/7.D /M01/8.D /M01/1.D

-XC3 2 -XC3 4 -XC3 6 -XC3 8 -XC3 9 -XC3 11 -XC3 13 -XC3 15 -XC3 17 -XC3 19 -XC3 21 -XC3 23 -XC3 25

F PROJECT NO.: DRAWING NO.: 1YUX200119/BC DRAWING REV.: R2 DATE: 03/03/14 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation BUS COUPLER PANEL=JC01 SCALE: 1: 1
CUSTOMER: SPARE CONTACTS START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC01+WLV/X03
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: =JC02+/A00
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

R 3P3W, AC22kV, 2500A, 25kA/3s, 50Hz


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

Y
A B A

+CB-QB
VD4/P
+CCB +CCB +CCB
-BC1 -BC2 -BC3 2500A
P2 P2 P2
3x1200-1600-2000-2500/1/1/1A

CORE3:CL5P20
TO SHEET A04
B 30VA@2500/1A B

CORE2:CL5P20
30VA@2500/1A
TO SHEET A03

CORE1:CL0.5
TO SHEET A02
C 30VA@2500/1A C

+LVD
P1 P1 P1 -PU

1
R:L1

1
Y:L2
D D

1
B:L3

E:PE
-QE -GND
+CCF -FF -BV
-BV L1 A N 1n 1a 1
E E
L2 2A A N 1n 1a 2

L3 2A A N 1n 1a 3

2A 4

L1 L2 L3

F PROJECT NO.: DRAWING NO.: 1YUX200119/IN DRAWING REV.: R2 DATE: 03/03/14 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation INCOMING PANEL=JC02 SCALE: 1: 1
A1 CHANGED CT POLARITY 03/03/14 CUSTOMER: POWER CIRCUIT START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC02+WLV/A01
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: A02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CURRENT TRANSFORMER
3x1200-1600-2000-2500/1/1/1A
CORE1:CL0.5 , 30VA@2500/1A,
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

-GND
A A

-XA1 1 -XA1 2 -XA1 3 -XA1 4

+CCB-BC1 1S5 +CCB-BC2 1S5 +CCB-BC3 1S5


1S4 1S4 1S4
1S3 1S3 1S3
1S2 1S2 1S2

B 1S1 1S1 1S1 B

METAL JUMPER

-XA1 5 -XA1 6 -XA1 7

-XA1 8 -XA1 9 -XA1 10 -XA1 11

C -XA1 12 -XA1 13 -XA1 14 C

-XA1 15 -XA1 16 -XA1 17 -XA1 18

17 17 17

+LVD-PA1 A +LVD-PA2 A +LVD-PA3 A


D 0-1200/1600/2000A (x1.2) 0-1200/1600/2000A (x1.2) 0-1200/1600/2000A (x1.2) D
18 18 18

REMOVE THIS JUMPER WHEN A1700 IS CONNECTED

-XA1 19 -XA1 20 -XA1 21 -XA1 22

E E

=EXT

CONNECT TO A1700 ON EXTERNAL MEASUREMENT PANEL

F PROJECT NO.: DRAWING NO.: 1YUX200119/IN DRAWING REV.: R2 DATE: 03/03/14 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation INCOMING PANEL=JC02 SCALE: 1: 1
A1 REVISED AS CUSTOMER COMMENT 26/12/13 CUSTOMER: POWER CIRCUIT START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC02+WLV/A02
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: A03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CURRENT TRANSFORMER
3x1200-1600-2000-2500/1/1/1A
CORE2:CL5P20 , 30VA@2500/1A,
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

-GND
A A

-XA2 1 -XA2 2 -XA2 3 -XA2 4

+CCB-BC1 2S5 +CCB-BC2 2S5 +CCB-BC3 2S5


2S4 2S4 2S4
2S3 2S3 2S3
2S2 2S2 2S2

B 2S1 2S1 2S1 B


METAL JUMPER

-XA2 5 -XA2 6 -XA2 7

-XA2 8 -XA2 9 -XA2 10 -XA2 11

-XA2 12 -XA2 13 -XA2 14


RECOMMANDED SETTING VALUE OF CURRENT RELAY
-% LEVEL: SHOULD BE SET TO ENSURE THAT -XA2 15 -XA2 16 -XA2 17 -XA2 18
WHEN THE CURRENT FLOW THROUGH THE CB OVER 2200A,
C FAN WILL BE OPERATED C
-FAULT DELAY: 3 Second Y1 Y2 Y3 Y4
-ON DELAY: 4 Second -BR
5-100mA

0.05-1A

0.5-10A

/N99/4.E
CURRENT RELAY REMOVE THIS LINK WHEN CONNECT TO EXTERNAL

MONITORED CURRENT CIRCUIT

COM
M
D D
-XA2 19

=EXT
E E

CONNECT TO OVERCURRENT PROTECTION

F PROJECT NO.: DRAWING NO.: 1YUX200119/IN DRAWING REV.: R2 DATE: 03/03/14 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation INCOMING PANEL=JC02 SCALE: 1: 1
CUSTOMER: POWER CIRCUIT START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC02+WLV/A03
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: A04
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CURRENT TRANSFORMER
3x1200-1600-2000-2500/1/1/1A
CORE3:CL5P20 , 30VA@2500/1A,
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
-GND

-XA3 1 -XA3 2 -XA3 3 -XA3 4

+CCB-BC1 3S5 +CCB-BC2 3S5 +CCB-BC3 3S5


3S4 3S4 3S4
3S3 3S3 3S3
B 3S2 3S2 3S2 B
3S1 3S1 3S1

METAL JUMPER

-XA3 5 -XA3 6 -XA3 7

C -XA3 8 -XA3 9 -XA3 10 -XA3 11


C
-XA3 12 -XA3 13 -XA3 14

-XA3 15 -XA3 16 -XA3 17 -XA3 18

D =EXT D

CONNECT TO DIFFERENTIAL PROTECTION 87T

E E

F PROJECT NO.: DRAWING NO.: 1YUX200119/IN DRAWING REV.: R2 DATE: 03/03/14 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation INCOMING PANEL=JC02 SCALE: 1: 1
CUSTOMER: POWER CIRCUIT START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC02+WLV/A04
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: A05
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted. SECONDARY VOLTAGE TRANSFORMER CIRCUIT

A A
+CCF 1n 1n 1n
-BV

1a 1a 1a

-XU15

-XU15

-XU15

-XU15
4 3 2 1

B -XV1 15 14 13 12 B

-FB10
5 3 1 S203-C6
6A
13 21
6 4 2

14 22

/X01/4.C
-XV1 11 10 9

C VOLTAGE TEST C
TERMINAL 7 5 3 1
+LVD BK BU YE RD
-XM2

BK BU YE RD
8 6 4 2

D D

-XV1 -XV1 -XV1 -XV1


8 6 4 2

7 5 3 1
-XV1 -XV1 -XV1 -XV1

MEASUREMENT VOLTAGE CIRCUIT


E E

F PROJECT NO.: DRAWING NO.: 1YUX200119/IN DRAWING REV.: R2 DATE: 03/03/14 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation INCOMING PANEL=JC02 SCALE: 1: 1
CUSTOMER: POWER CIRCUIT START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC02+WLV/A05
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: G01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
POWER SUPPLY FOR PROTECTION, CONTROL AND INDICATOR CIRCUIT
FOR CONTROL FOR INDICATOR
220VDC 220VDC
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
PREVIOUS NEXT PANEL
PANEL

-XJ 1 -XJ 1 -XJ 1

-XJ 3 -XJ 3 -XJ 3

B B

220VDC 220VDC
-XJ 2 -XJ 4

C C

1 3 13 21 1 3 13 21
-FB1 -FB2
S282-UC K6 2 4 14 22 S282-UC K6 2 4 14 22
6A 6A
/X01/2.C

/X01/2.C
D D

E E
-DC_L1+

-DC_L2+
-DC_L1-

-DC_L2-
/M04/1.A

/M06/1.A
/M04/1.F

/M06/1.F

F PROJECT NO.: DRAWING NO.: 1YUX200119/IN DRAWING REV.: R2 DATE: 03/03/14 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation INCOMING PANEL=JC02 SCALE: 1: 1
CUSTOMER: DC VOLTAGE SUPPLY CIRCUITS START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC02+WLV/G01
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: G02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
LIGHTING AND HEATING CIRCUIT

LIGHTING SPACE HEATER HEATER ON I/L (WHITE) FAN CONTROL CIRCUIT CB CHARGER CIRCUIT

220VAC, 50Hz 220VAC, 50Hz 220VAC, 50Hz 220VAC, 50Hz 220VAC, 50Hz
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
PREVIOUS NEXT PANEL
PANEL

-XH 1 -XH 1 -XH 1

-XH 3 -XH 3 -XH 3

B B
220VAC, 50Hz -XH 2 -XH 4 220VAC, 50Hz

1 3 13 21
-FB5
S202-C6 2 4 14 22
6A
/X01/3.C

C C

1 3 13 21
-FB4
S202-K1.6 2 4 14 22
1.6A

/X01/3.C
-XH 5 -XH 6 -XH 7
15 1
-KC1
-KT /M06/8.E 2
1 /N99/6.E
-S101
D 2 D
16 18
A1 -XH 14 -XM 1 -XM 2

-XH 12 -BR
2 /N99/4.E
Z1/1

SUPPLY VOLTAGE
+CB +CB
-EF 2 3 -EF /M01/1.A
/N99/4.B /N99/4.B
+CB -XB 25
A1 -QB 2
1 1 X1
S231 Z1/2
+CCF +CB +LVD 1 -BS1
E -EL A2 E
-EH2 -EH1 -H20 1 1
2 2 X2
100W 50W WHITE
A2
-XH 13
-MS M
X1
+LVD
-H24 -XB 35
X2 /M01/1.D
AMBER
-XH 8 -XH 9 -XH 10 -XH 11

F PROJECT NO.: DRAWING NO.: 1YUX200119/IN DRAWING REV.: R2 DATE: 03/03/14 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation INCOMING PANEL=JC02 SCALE: 1: 1
CUSTOMER: AC VOLTAGE SUPPLY CIRCUITS START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC02+WLV/G02
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: M01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-VD4 CN
DOC. No: 1YH8122104 -GND
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

/M04/3.C

/M04/8.C
/M06/1.B

/M06/2.B
/M04/6.E

/M04/1.E

/M04/2.E

/M04/5.E

/M04/5.E
/G02/7.E
/X03/4.B

/X03/4.B

/X02/1.B
/X03/5.E

/X01/4.E

/X02/5.E

/X03/1.E

/X02/4.E

/X02/5.E

/X03/2.E

/X03/2.E

/X01/4.E

/X03/3.E

/X03/4.E
A A
-XB
+CB 24 26 25 4 5 32 27 2 31 41 23 8 11 6 29 28 9 7 1 40 52 12 49 10 57 55
-QB

CB DISCHARGED

CB CHARGED

CB OPENED

CB CLOSED
B -BS2 -BS1 B
4 2 2
-BT2
3 1 0 I 13 23 33 43 53
1

-BB1 -BB2 -BB3 14 24 34 44 54


-MS 13 21 31 43 53 13 21 31 41 53 13 21 31 41 53
M P
14 22 32 44 54 14 22 32 42 54 14 22 32 42 54

POSITION
SERVICE
-BT1 13 23 33 43 53

C 14 24 34 44 54 C

TEST
POSITION
-RL1 -MC -MO1

D -XB 34 36 35 20 14 15 42 13 37 3 30 33 18 22 21 16 39 38 19 17 50 51 53 54 47 48 58 56 D
/X03/4.B

/X03/5.E

/G02/7.E

/M04/5.F

/M04/6.F

/X01/4.F

/X02/5.E

/X02/4.E

/X03/1.E

/M04/1.E

/M04/3.D

/X02/5.E

/X03/4.B

/X03/4.B

/M06/1.C

/M06/2.C

/X03/2.E

/X03/2.E

/X01/4.F

/X03/5.B

/X03/5.B

/X02/1.B

/X03/3.E

/X03/3.E

/M04/8.C

/X03/4.E
CIRCUIT BREAKER CIRCUIT BREAKER CIRCUIT BREAKER TRUCK INTERLOCK

DESIG. DESCRIPTION REMARK DESIG. DESCRIPTION REMARK DESIG. DESCRIPTION REMARK EARTHING SWITCH MECHANICAL INTERLOCK WITH CB.-TRUCK
RL1 CLOSING BLOCK MAGNET BS1 SPRING CHARGING MOTOR CONTACT BT2 LIMIT SWITCH (TEST POSITION) a) C.B. TRUNCK IN TEST-POSITION: EARTHING SWITCH CAN BE OPERATED
E MO1 FIRST OPENING RELEASE BS2 SPRING CHARGED/DISCHARGED CONTACT BT1 LIMIT SWITCH (SERVICE POSITION)
E
b) EARTHING SWITCH OPEN-POSITION: C.B.-TRUCK CAN BE MOVED
MC CLOSING RELEASE BB1-3 C.B. AUXILIARY SWITCH XB 58 POLE SOCKET INTO SERVICE-POSITION
MS SPRING CHARGING MOTOR XB2..11 CB. INTERNAL POLE PLUG/SOCKET
MU UNDERVOLTAGE RELEASE OPTION
RL2 TRUCK RACK BLOCKING MAGNET OPTION

INTERNAL WIRING / CROSS REFERENCE THE DIAGRAM INDICATES THE FOLLOWING CONDITION: -VACUUM C.B. TRUNK IN SERVICE POSITION -VACUUM CIRCUIT BREAKER OPEN -C.B. SPRING DISCHARGED

CODE: -QB PN: VD4/P -Z - W NAME: VACUUM CIRCUIT BREAKER TYPE: VD4 FUNCTION: NON-STANDARD SECONDARY CONTROL WIRING (7NO-7NC) TECHNICAL DATA: REFER TO SINGLE LINE DIAGRAM
F PROJECT NO.: DRAWING NO.: 1YUX200119/IN DRAWING REV.: R2 DATE: 03/03/14 F
PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation INCOMING PANEL=JC02 SCALE: 1: 1
CUSTOMER: VD4 INTERNAL WIRING START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC02+WLV/M01
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: M02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

EARTHING SWITCH FOR UNIGEAR ZS1


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
L1 L2 L3

+CCB-QE

/M04/5.C
/M06/4.B

/X03/1.B
/X02/7.E

/X01/5.E
20 22 24 26 28
-BE1
21 23 25 27 29

/M06/4.B
/M04/8.E

/X03/2.B

/X03/1.B

/X03/2.B

/X01/5.E
B B

G 40 42 44 46 48
-BE2
-RL3
H 41 43 45 47 49

C C

D D

EARTHING SWITCH INTERLOCK

DESIG. DESCRIPTION REMARK EARTHING SWITCH MECHANICAL INTERLOCK WITH CB.-TRUCK


BE1 EARTHING SWITCH OPENED a) C.B. TRUNCK IN TEST-POSITION: EARTHING SWITCH CAN BE OPERATED
E BE2 EARTHING SWITCH CLOSED
E
b) EARTHING SWITCH OPEN-POSITION: C.B.-TRUCK CAN BE MOVED
RL3 EARTHING SWITCH CLOSING COIL OPTION INTO SERVICE-POSITION

INTERNAL WIRING / CROSS REFERENCE THE DIAGRAM INDICATES THE FOLLOWING CONDITION: EARTHING SWITCH OFF AND CRANK NOT INSERTED

CODE: -QE PN: NAME: EARTHING SWITCH TYPE: FUNCTION: STANDARD SECONDARY CONTROL WIRING (5NO-5NC) TECHNICAL DATA: REFER TO SINGLE LINE DIAGRAM
F PROJECT NO.: DRAWING NO.: 1YUX200119/IN DRAWING REV.: R2 DATE: 03/03/14 F
PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation INCOMING PANEL=JC02 SCALE: 1: 1
CUSTOMER: ES - INTERNAL WIRING START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC02+WLV/M02
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: M03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-VT TRUCK FOR UNIGEAR ZS1


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

(IN CABLE COMPARTMENT AND WITH FUSE INDICATOR)

/X01/4.C
/X03/6.B
A A

+CCF L1 L2 L3 8 6
-BV

1 3
-BF1
2 4

-FF 1 3
B -BF2 B
A A A 2 4
-BV
N N N
E 1 3
-BF3
2 4
1n 1n 1n

C 1a 1a 1a C

D 1 2 3 4 9 10 D

/A05/4.B

/A05/4.B

/A05/4.B

/A05/4.B

/X03/6.B

/X01/4.C
VOLTAGE TRANSFOMER TRUCK

DESIG. DESCRIPTION REMARK


E E
FF HIGH VOLTAGE FUSE
XU15 58 POLE PLUG/SOCKET
BV VOLTAGE TRANSFORMER
E EARTHING CONNECTION WIRE

INTERNAL WIRING / CROSS REFERENCE THE DIAGRAM INDICATES THE FOLLOWING CONDITION: -VT TRUNK IN SERVICE POSITION
F PROJECT NO.: DRAWING NO.: 1YUX200119/IN DRAWING REV.: R2 DATE: 03/03/14 F
PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation INCOMING PANEL=JC02 SCALE: 1: 1
CUSTOMER: VT TRUCK INTERNAL WIRING START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC02+WLV/M03
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: M04
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CIRCUIT BREAKER CLOSING AND TRIPING CIRCUIT

CIRCUIT BREAKER OPENING CONTROL CLOSING INTERLOCKING CB CLOSING CONTROL EARTHING SWITCH INTERLOCKING

50BF TRIP EXTERNAL RELAY F27/59 SUPERVISORY REMOTE LOCAL TCS RELAY CB IN SERVICE CB IN TEST SPARE FOR EXTERNAL RELAY SUPERVISORY REMOTE LOCAL VOL. INDICATOR POWER SUPPLY BLOCKING COIL
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

-DC_L1+ XK 2
A A
/G01/2.E XK 1 XK 3 XK 4 XK 5

REMOVE THIS JUMPER WHEN INTERLOCKING WAS CONNECTED


XI2 1
=110KV XI3 3
1 2
5 1 2
3 1 2
1 INTERLOCKING WITH 1 2
11 1 2
9 1 2
7

ES OPENED
1
110kV EARTH SWITH -JUMPER

-JUMPER
+LVD 6 +LVD 4 +LVD 2 +LVD-BM1 TCS RELAY - 7PA30 +LVD 12 +LVD 10 +LVD 8
-SS1 -SS1 -SS1 -SS1 -SS1 -SS1 XI3 4

REMOVE THIS JUMPER WHEN INTERLOCKING WAS CONNECTED


/N100/2.B
SUPERVISORY REMOTE LOCAL SUPERVISORY REMOTE LOCAL
/N99/3.A /N99/3.A /N99/3.A /N99/3.A
XI3 5
/N99/2.A /N99/3.A
-K6-1 XI2 2
XI1 1 XI1 2 XI1 3 XI1 4 XI1 5 =110KV
XI2 9 XI2 10 XI2 11
XI2 3

DISCONNECTOR OPENED
=RELAY =JC03 =JC03
B
3 =RELAY B
XI2

-JUMPER
3
OPENING & TRIPPING SIGNAL

XI1 1

BUSBAR ES OPENED
INTERLOCKING WITH
-K1 -K2
EXTERNAL RELAY

+LVD 4 3 110kV DISCONNECTOR

CLOSING SIGNAL
1

EXTERNAL RELAY
-SOT 3
/M06/1.E
-K501
-KBF2 2 -PO1 4
RED
/M07/2.D -K3 XI2 4 4
XI1 2 +LVD
XI3 6
XI2 4 -SOC
/M02/5.B /M06/2.E /M01/8.A
XI1 6 XI1 7 XI1 8 XI1 9 XI1 10 GREEN -XB 57

ES OPENED
12 4 8 2 +CCB 22 +CB
-QE -BE1 XI2 12 XI2 13 XI2 14
-QB
23
C 53 C
XK 13 -BT2

REMOVE THIS JUMPER WHEN INTERLOCKING CONNECTED


XI2 5
/M01/4.A / CB LOCK+ 54
+CB -XB 23
M05/4.A CB IN TEST
-QB / CB LOCK- -XB 58
M05/4.F /M01/8.D
21 6
XI2
-BB2 XK 14
XI2 7
22

-JUMPER
CB OPENED
SPARE FOR LOCKOUT FUNCTION NO

-XB 33 +LVD
D D

/N99/8.A
/M01/4.D XI2 8 -PU
/A01/6.C
6
XK 15 +LVD-BM1 P3
TCS /N100/2.B
XK 12 XK 11 FAIL
-K3-1 +LVD 220V
-PU COM
/M01/4.A /M01/4.A 10 14 /A01/6.C
+CB -XB 31 -XB 41 XK 16
XK 17
-QB
13 /M01/8.A /M01/8.A /M01/3.A +CCB
-BB2 0V -QE
+CB -XB 10 -XB 49
+CB -XB 4
E 14 43 43 P2 /M02/3.A E
-QB -QB

/N99/8.A
CB FIRST OPENING -BT1 -BT2 G
-MO1 RELEASE 44 44 -RL3
-MC H
CB CLOSING
-XB 30 -RL1 CB CLOSING
BLOCKING
/M01/4.D RELEASE
MAGNET
-XB 20 -XB 14
/M01/2.D /M01/3.D
XK 6 XK 7 XK 8 XK 9 XK 10
-DC_L1-
/G01/2.E
F PROJECT NO.: DRAWING NO.: 1YUX200119/IN DRAWING REV.: R2 DATE: 03/03/14 F
PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation INCOMING PANEL=JC02 SCALE: 1: 1
A1 REVISED AS CUSTOMER COMMENT 26/12/13 CUSTOMER: CLOSING & TRIPPING CIRCUITS START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC02+WLV/M04
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: M05
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CIRCUIT BREAKER CLOSING INTERLOCKING CIRCUIT

CIRCUIT BREAKER CLOSING INTERLOCKING SIGNALS


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
M04/4.C / CB LOCK+

-XI6 1 -XI6 2

431 CIRCUIT BREAKER OPENED


=431
B B

-XI6 6
=JC01

BUS COUPLER CIRCUIT BREAKER OPENED


XI6 9 -XI6 7 -XI6 8

31
C BB1 C
32

412 CIRCUIT BREAKER OPENED

432 CIRCUIT BREAKER OPENED


=412 =432
XI6 10

D D

-XI6 3 -XI6 4 -XI6 5

E E

M04/4.C / CB LOCK-

F PROJECT NO.: DRAWING NO.: 1YUX200119/IN DRAWING REV.: R2 DATE: 03/03/14 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation INCOMING PANEL=JC02 SCALE: 1: 1
CUSTOMER: CLOSING INTERLOCKING CIRCUIT START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC02+WLV/M05
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: M06
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
POSITION INDICATOR 50BF CIRCUIT CB STATUS FAN CIRCUIT
LAMP INDICATOR CIRCUIT BREAKER EARTHING SWITCH FAN START CIRCUIT

CB OPENED CB CLOSED CB OPENED CB CLOSED ES OPENED ES CLOSED CB OPENED CB CLOSED


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
-L21+ / M07/1.A
-L22+ / M07/1.B
-DC_L2+
/G01/4.E -XK1 1 -XK1 2 -XK1 3 -XK1 4
3
+LVD 1 2

-SS5
4
-XK1 5 ON
/N99/8.C

/M01/5.A /M01/5.A /M02/5.B /M02/5.B


B B
+CB -XB 6
+CB -XB 29
+CCB
-QB -QB -QE
/M02/3.A 20 40
13 21 -XK1 17
-BE1 -BE2
-BB3 -BB3
21 41
14 22
15
=RELAY
-BR
-XB 16 -XB 39
/N99/4.E

EXTERNAL RELAY
/M01/5.D /M01/5.D

50BF SIGNAL
C C

16 18
-XK1 8 -XK1 10 -XK1 12 -XK1 14

D -XK1 9 -XK1 11 -XK1 13 -XK1 15 -XK1 16


D

A1

-KT
/N99/6.E

A1
3 2
3 2 -KC1
A1 A1 A1 A2
X1 X1
+LVD-P1 -KBF1 -KCB1 -KCB2
+LVD-SOT +LVD-SOC +LVD-P2
A2 A2 A2
/M04/3.B X2 /M04/7.B X2
E 1 A2 E
RED GREEN 1

1 2 /M07/2.B 1 2 /X02/6.E 1 2 /X03/6.E -L2- / M07/1.E


3 4 /X02/2.B 3 4 /X02/6.E 3 4 /X03/6.E
1 2 /G02/6.D
5 6 /X01/6.C 5 6 /X03/5.E 5 6 /X03/7.E
3 4
13 14 /X02/2.B 13 14 /X03/6.E 13 14 /X03/7.E
5 6
-XK1 6 -XK1 7
-DC_L2- 13 14
/G01/4.E
F PROJECT NO.: DRAWING NO.: 1YUX200119/IN DRAWING REV.: R2 DATE: 03/03/14 F
PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation INCOMING PANEL=JC02 SCALE: 1: 1
CUSTOMER: INDICATOR CIRCUIT & 50BF CIRCUIT START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC02+WLV/M06
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: M07
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
GATHERING BREAKER FAILURE SIGNALS FROM ALL PANEL ON SAME SECTION BUSBAR

BREAKER FAILURE SIGNAL FROM OTHER PANELS


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
-L21+ / M06/8.A
-XI1 11 -XI1 12

-L22+ / M06/8.A

=JC05 =JC06 =JC07 =JC08 =JC01


B B
-XI1 11 -XI1 11 -XI1 11 -XI1 11 -XI1 11
1
-XI1 12 -XI1 12 -XI1 12 -XI1 12 -XI1 12
-KBF1 1 1 1 1 1
2
/M06/5.E
-KBF1 2
-KBF1 2
-KBF1 2
-KBF1 2
-KBF1 2

-XI1 13 -XI1 13 -XI1 13 -XI1 13 -XI1 13

-XI1 14 -XI1 14 -XI1 14 -XI1 14 -XI1 14

C C

-XI1 14 -XI1 13

D D

A1 A1 A1
-KBF2 -KBF3 -KBF4
A2 A2 A2

-L2- / M06/8.E
E E
1 2 /M04/1.B 1 2 /X02/4.B 1 2 /X02/5.B
3 4 /X02/3.B 3 4 /X02/4.B 3 4 /X02/5.B
5 6 /X02/3.B 5 6 /X02/4.B 5 6 /X02/6.B
13 14 13 14 13 14

F PROJECT NO.: DRAWING NO.: 1YUX200119/IN DRAWING REV.: R2 DATE: 03/03/14 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation INCOMING PANEL=JC02 SCALE: 1: 1
CUSTOMER: 50BF CIRCUIT FOR ALL SECTION BUSBAR START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC02+WLV/M07
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: N99
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

/M04/8.D

/M04/8.D

/M04/8.D
/M04/8.E
+LVD-SS1
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

CONTROL
CONTROL MODE
A NO COM NC P1 P2 P3 A
1 2
REMOTE 1 3 5 7 9 11 13 15 17 19 21 23 +LVD 110V 0V 220V
-PU
LOCAL SUPER. AUXILIARY VOLTAGE
2 4 6 8 10 12 14 16 18 20 22 24
VOLTAGE INDICATOR

/M04/3.A

/M04/3.A

/M04/2.A

/M04/7.A

/M04/6.A

/M04/6.A

/X03/7.B

/X03/8.B

/X03/8.B

/X01/6.E

/X01/6.E

/X01/6.E
SALZER 1 LOCAL
2 REMOTE
B 3 SUPERVISORY B
-GND

/G02/6.D

/G02/4.D
Z1/1 2
+CB GND +LVD-SS5
-EF Z1/1 1 1 FAN MODE
2 3

S231 1 2
x1 U1 Z2 1 3 5 7

C -VR C
x2 Z1 U2 2 4 6 8

/M06/8.B
NORMAL HANDLE
1
Z1/2 2 3
FAN FOR VCB
Z1/2 1 1 OFF
2 ON

/G02/6.E

/G02/4.E
D D

/M06/8.D
/M06/8.C
/G02/5.D

/G02/4.D
/G02/5.E
A1 A2 15 A1 15
-BR -KT
CURRENT RELAY SUPPLY VOLTAGE TIMER RELAY
/A03/2.C /G02/4.D
/G02/5.D /M06/7.D
MONITORED CURRENT CIRCUIT
/M06/8.C
E E
5-100mA

0.5-10A
0.05-1A
COM

M Y1 Y2 Y3 Y4 16 18 A2 16 18
/A03/3.D

/A03/2.C

/A03/3.C

/A03/3.C

/A03/3.C

/M06/8.C

/M06/8.C

/M06/8.E

/G02/4.D

/G02/4.D
F PROJECT NO.: DRAWING NO.: 1YUX200119/IN DRAWING REV.: R2 DATE: 03/03/14 F
PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation INCOMING PANEL=JC02 SCALE: 1: 1
A1 REVISED AS CUSTOMER COMMENT 26/12/13 CUSTOMER: CROSS REFERENCE START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC02+WLV/N99
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: N100
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A

/M04/5.D
/M04/3.A

/X01/6.C
1 6 5
+LVD 7PA30
-BM1

B B
-K1-1 -K2-1 -K6-1

ALARM CONTACTS
150-400ms

VOLTAGE CONTROL MODULE

VOLTAGE CONTROL MODULE

TIME CONTROL MODULE


-K4-1

SUPERVISION MODULE
-K1 -K2 -K4 -K5 -K5-1 FRONT
GREED LED

R -K3-1 -K3-2

DROP OFF

DROP OFF
C -K6 C

PICK UP
CB' COIL
-K3
ALARM RELAY
C

12 4 8 10 14 9 13 2
/M04/3.C

/M04/4.C

/M04/4.C

/M04/5.E

/M04/5.E

/X01/5.C

/X01/6.C

/M04/4.C
D D

E E

F PROJECT NO.: DRAWING NO.: 1YUX200119/IN DRAWING REV.: R2 DATE: 03/03/14 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation INCOMING PANEL=JC02 SCALE: 1: 1
CUSTOMER: CROSS REFERENCE START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC02+WLV/N100
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: X01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
ALARM WIRING CIRCUIT TO REMOTE CONTROL PANEL
COMMON AC/DC SUPPLY CIRCUIT VT CIRCUIT FAIL BRIDGE TCS ALARM BRIDGE
50BF
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

MCB OFF TERMINALS TERMINALS

A =PREV =NEXT A

-XI4 1 -XI4 1 COMMON -XI4 1

-XI4 5 -XI4 5 AC/DC CIRCUIT MCB OFF -XI4 5

-XI4 7 VT CIRCUIT FAIL -XI4 7 -XI4 7

-XI4 9 INTERNAL RELAY FAULT -XI4 9 -XI4 9

-XI4 11 OC/EF OPERATED -XI4 11 -XI4 11

-XI4 13 TCS ALARM -XI4 13 -XI4 13

-XI4 15 50BF -XI4 15 -XI4 15


B B
-XI4 17 -XI4 17 -XI4 17

-XI4 19 -XI4 19 -XI4 19

-XI4 21 -XI4 21 -XI4 21

-XI4 6 -XI4 10 -XI4 12 -XI4 14 -XI4 16 -XI4 18 -XI4 20 -XI4 22

-XI4 8 FUSE BLOWN


/M03/6.A 5
5
-XU15 6 -KBF1
+CCF +LVD-BM1 /M06/5.E 6
1 /N100/2.B
21 21 21 21 -BV
21 -K3-2
PREVIOUS PANEL -FB1 -FB2 -FB4 -FB5 -BF NEXT PANEL C
C -FB10 2
/G01/2.C 22 /G01/4.C 22 /G02/7.C 22 /G02/2.C 22
/A05/4.B 22 9 13
-XU15 10
/M03/6.D
-XI4 2 -XI4 3 -XI4 4

TO REMOTE CONTROL PANEL

CIRCUIT BREAKER EARTH SWITCH CONTROL MODE

COMMON CB CLOSED CB OPENED ES CLOSED ES OPENED LOCAL REMOTE SUPERVISORY

D D

XC1 1 XC1 6 XC1 7 XC1 8 XC1 9 XC1 10 XC1 11 XC1 12

/M01/3.A /M01/6.A /M02/6.B /M02/6.B


-XB 5 -XB 7 +CCB +CCB
+CB +CB -QE -QE
E -QB -QB E
48 28 20 22 24
13 53 1 2 1 2 1 2

-BE2 -BE1
-BB1 -BB3
49 29 +LVD 19 +LVD 21 +LVD 23
14 54
-SS1 -SS1 -SS1
LOCAL REMOTE SUPERVISORY
/N99/4.A /N99/4.A /N99/4.A
-XB 15 -XB 17
/M01/3.D /M01/6.D

XC1 2 XC1 3 XC1 4 XC1 5

F PROJECT NO.: DRAWING NO.: 1YUX200119/IN DRAWING REV.: R2 DATE: 03/03/14 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation INCOMING PANEL=JC02 SCALE: 1: 1
A1 REVISED AS CUSTOMER COMMENT 26/12/13 CUSTOMER: SIGNALS TO REMOTE CONTROL PANEL START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC02+WLV/X01
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: X02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
BUSBAR ES INTERLOCK 50BF SIGNAL TO UPSTREAM 50BF SIGNALS
TO 110kV CB SPARE SPARE TO JC01 TO JC05 TO JC06 TO JC07 TO JC08 SPARE SPARE SPARE
CB IN TEST 50BF SIGNAL 50BF SIGNAL 50BF 50BF 50BF 50BF 50BF 50BF 50BF 50BF
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
-XI3 1 -XI1 15 -XI1 19 -XI1 23 -XI1 27 -XI1 29 -XI1 31 -XI1 33 -XI1 35 -XI1 37 -XI1 39 -XI1 41

-XI1 16 -XI1 20 -XI1 24

/M01/7.A
+CB -XB 52

-QB
23 3 5 1 3 5 1 3 5
B -BT2 3 13 B
-KBF1 -KBF1 -KBF2 4
-KBF2 6
-KBF3 2
-KBF3 4
-KBF3 6
-KBF4 2
-KBF4 4
-KBF4 6
24
/M07/2.D /M07/2.D /M07/3.D /M07/3.D /M07/3.D /M07/4.D /M07/4.D /M07/4.D
/M06/5.E 4 /M06/5.E 14

-XB 53
/M01/7.D

-XI1 17 -XI1 21 -XI1 25

C -XI3 2 -XI1 18 -XI1 22 -XI1 26 -XI1 28 -XI1 30 -XI1 32 -XI1 34 -XI1 36 -XI1 38 -XI1 40 -XI1 42
C

FOR CIRCUIT BREAKER CLOSING INTERLOCKING CIRCUIT TO INTERLOCKING WITH 110KV SIDE
TO JC01 TO 431 TO 412 TO 432

CB OPENED CB OPENED CB OPENED CB OPENED CB OPENED ES OPENED

D D
-XI6 9 -XI6 11 -XI6 13 -XI6 15 -XI6 17 -XI6 19

/M02/5.B
/M01/4.A /M01/3.A /M01/5.A
+CCB
+CB -XB 2
+CB -XB 32
+CB -XB 8
-QE
-QB -QB -QB
1 3 24
31 21 31 -KCB1 -KCB1 -BE1
-BB1 -BB1 -BB2 /M06/6.E 2 /M06/6.E 4 25
E 32 22 32 E

-XB 13 -XB 42 -XB 18


/M01/3.D /M01/3.D /M01/5.D

-XI6 10 -XI6 12 -XI6 14 -XI6 16 -XI6 18 -XI6 20

F PROJECT NO.: DRAWING NO.: 1YUX200119/IN DRAWING REV.: R2 DATE: 03/03/14 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation INCOMING PANEL=JC02 SCALE: 1: 1
CUSTOMER: SIGNALS FOR INTERLOCKING AND INTERTRIPPING START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC02+WLV/X02
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: X03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
EARTHING SWITCH SPARE CONTACT CIRCUIT BREAKER SPARE CONTACT VT FUSE STATUS CONTROL MODE

ES CLOSED ES OPENED ES CLOSED ES CLOSED CB SPR .CHARGED CB CLOSED CB OPENED CB IN TEST CB IN SERVICE FUSE NORMAL
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
-XC2 1 -XC2 3 -XC2 5 -XC2 7

-XC3 26 -XC3 28 -XC3 33 -XC3 35

/M01/1.A /M01/5.A /M03/6.A


/M02/5.B /M02/6.B /M02/6.B /M02/5.B
+CB-XB 24 -XB 11
+CCF-XU15 8
+CCB +CCB +CCB +CCB -QB +CB -BV
-QE -QE -QE -QE -QB
13 15 17
4 53 41 13 13 1 1 2 1 2 1 2
44 26 46 42
B -BS2 -BB2 -BB2 -BT2 -BT1 -BF B
-BE2 -BE1 -BE2 -BE2 +LVD 14 +LVD 16 +LVD 18
3 54 42 14 14 2
45 27 47 43 -SS1 -SS1 -SS1
LOCAL REMOTE SUPERVISORY
/N99/3.A /N99/4.A /N99/4.A
-XB 34 -XB 21 -XB 22 -XB 50 -XB 51 -XU15 9
/M01/1.D /M01/5.D /M01/5.D /M01/7.D /M01/7.D /M03/6.D

-XC3 27 -XC3 29 -XC3 30 -XC3 31 -XC3 32 -XC3 34 -XC3 36 -XC3 37 -XC3 38

C -XC2 2 -XC2 4 -XC2 6 -XC2 8


C

CIRCUIT BREAKER SPARE CONTACT

CB CLOSED CB CLOSED CB CLOSED CB IN SERVICE CB IN TEST CB IN SERVICE CB SPRING DISCHARGED CB OPENED CB OPENED CB CLOSED CB CLOSED CB CLOSED CB CLOSED

D D
-XC3 1 -XC3 3 -XC3 5 -XC3 7 -XC3 10 -XC3 12 -XC3 14 -XC3 16 -XC3 18 -XC3 20 -XC3 22 -XC3 24

/M01/4.A /M01/6.A /M01/5.A /M01/7.A /M01/8.A /M01/1.A


+CB -XB 27
+CB -XB 9
+CB -XB 28
+CB -XB 12
+CB -XB 55
+CB -XB 26

-QB -QB -QB -QB -QB -QB


43 41 31 33 33 53 2 5 13 1 3 5 13

E -BB1 -BB3 -BB3 -BT1 -BT2 -BT1 -BS2 E


-KCB1 -KCB1 -KCB2 -KCB2 -KCB2 -KCB2
44 42 32 34 34 54 1 6 14 2 4 6 14
/M06/6.E /M06/6.E /M06/7.E /M06/7.E /M06/7.E /M06/7.E

-XB 37 -XB 19 -XB 38 -XB 48 -XB 47 -XB 56 -XB 36


/M01/4.D /M01/6.D /M01/5.D /M01/8.D /M01/7.D /M01/8.D /M01/1.D

-XC3 2 -XC3 4 -XC3 6 -XC3 8 -XC3 9 -XC3 11 -XC3 13 -XC3 15 -XC3 17 -XC3 19 -XC3 21 -XC3 23 -XC3 25

F PROJECT NO.: DRAWING NO.: 1YUX200119/IN DRAWING REV.: R2 DATE: 03/03/14 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation INCOMING PANEL=JC02 SCALE: 1: 1
A1 REVISED AS CUSTOMER COMMENT 26/12/13 CUSTOMER: SPARE CONTACTS START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC02+WLV/X03
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: =JC03+/A00
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

R 3P3W, AC22kV, 2500A, 25kA/3s, 50Hz


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

Y
A B A

+CB
-BV

-FF -BV
L1 A N 1n 1a 11

L2 2A A N 1n 1a 12
B B
L3 2A A N 1n 1a 13

2A 14

2n 2a 8

2n 2a 10

2n 2a 20

C 21 C

+LVD
-PU

1
D R:L1 D

1
Y:L2

1
B:L3

E E
-QE E:PE
-GND

L1 L2 L3
F PROJECT NO.: DRAWING NO.: 1YUX200119/VT DRAWING REV.: R1 DATE: 26/12/13 F
PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation METERING PANEL=JC03 SCALE: 1: 1
CUSTOMER: POWER CIRCUIT START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC03+WLV/A01
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: A02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted. SECONDARY VOLTAGE TRANSFORMER CIRCUIT

A A
+CB 2n 2n 2n 1n 1n 1n
-BV

2a 2a 2a 1a 1a 1a

-XU15

-XU15

-XU15

-XU15

-XU15

-XU15

-XU15

-XU15
21 20 10 8 14 13 12 11

B -XV2 15 14 13 12 -XV1 15 14 13 12
B
-FB11 -FB10
13 21 5 3 1 S203-C6 5 3 1 S203-C6
6A 6A
14 22 13 21
6 4 2 6 4 2

/M06/4.B

/X01/3.C
17
14 22
+LVD-PV V

/M06/3.B

/X01/4.C
-XV2 11 10 9 -XV1 11 10 9 0-30kV
18

VOLTAGE TEST VOLTAGE TEST


C TERMINAL 7 5 3 1 TERMINAL 7 5 3 1 C
+LVD BK BU YE RD +LVD BK BU YE RD +LVD-SV 2 8
-XM3 -XM2 /N99/2.A
1 3 5
BK BU YE RD BK BU YE RD
L1 L2 L3
8 6 4 2 8 6 4 2

D D
-X130 18 17 16 15 14 13 12 11
-XV2 -XV2 -XV2 -XV2 -XV1 -XV1 -XV1 -XV1
8 6 4 2 8 6 4 2
+LVD N U N U N U N U
-AR27 Uo U3 U2 U1
/N01/1.A
U12B
U N REU615 VOLTAGE INPUT (60-120V)
-X130 9 10

-XV2 -XV2 -XV2 -XV2 -XV1 -XV1 -XV1 -XV1


7 5 3 1 7 5 3 1
E E
VOLTAGES FOR PROTECTION VOLTAGES FOR MEASUREMENT

F PROJECT NO.: DRAWING NO.: 1YUX200119/VT DRAWING REV.: R1 DATE: 26/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation METERING PANEL=JC03 SCALE: 1: 1
CUSTOMER: POWER CIRCUIT START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC03+WLV/A02
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: G01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
POWER SUPPLY FOR PROTECTION, CONTROL AND INDICATOR CIRCUIT
FOR CONTROL FOR PROTECTION
220VDC 220VDC
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
PREVIOUS NEXT PANEL
PANEL

-XJ 1 -XJ 1 -XJ 1

-XJ 3 -XJ 3 -XJ 3

B B

220VDC 220VDC
-XJ 2 -XJ 4

C C

1 3 13 21 1 3 13 21
-FB1 -FB3
S282-UC K6 2 4 14 22 S282-UC K6 2 4 14 22
6A 6A
/X01/2.C

/X01/2.C
D D

E E
-DC_L1+

-DC_L3+
-DC_L1-

-DC_L3-
/M03/1.A

/M06/1.A
/M03/1.F

/M06/1.F

F PROJECT NO.: DRAWING NO.: 1YUX200119/VT DRAWING REV.: R1 DATE: 26/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation METERING PANEL=JC03 SCALE: 1: 1
CUSTOMER: DC VOLTAGE SUPPLY CIRCUITS START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC03+WLV/G01
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: G02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
LIGHTING AND HEATING CIRCUIT

LIGHTING SPACE HEATER HEATER ON I/L (WHITE)

220VAC, 50Hz 220VAC, 50Hz 220VAC, 50Hz


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
PREVIOUS NEXT PANEL
PANEL

-XH 1 -XH 1 -XH 1

-XH 3 -XH 3 -XH 3

B B
220VAC, 50Hz -XH 2 -XH 4 220VAC, 50Hz

1 3 13 21
-FB5
C S202-C6 2 4 14 22 C
6A
/X01/3.C

-XH 5 -XH 6 -XH 7

1
-S101
D 2 D

A1
1 1 X1
+CCF +CB +LVD
E -EL E
-EH2 -EH1 -H20
2 2 X2
100W 50W WHITE
A2

-XH 8 -XH 9 -XH 10

F PROJECT NO.: DRAWING NO.: 1YUX200119/VT DRAWING REV.: R1 DATE: 26/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation METERING PANEL=JC03 SCALE: 1: 1
CUSTOMER: AC VOLTAGE SUPPLY CIRCUITS START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC03+WLV/G02
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: M01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-VT TRUCK FOR UNIGEAR ZS1 (CB Compartment)


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

/M06/7.B

/M06/2.B

/X01/4.C
/X03/2.E

/X03/3.E

/X03/4.E
A A

+CB -XU15 56 52 49 57 L1 L2 L3 26 5
-BV

1 3
-BF1
-XU 1 4 2 7 2 4

-FF 1 3
B -BF2 B
-BT2
13 23 33 43 53 A A A 2 4
-BV
14 24 34 44 54
N N N
E 1 3
-XU 6 5 -BF3
POSITION
SERVICE

2 4
-BT1 13 23
1n 1n 1n 2n 2n 2n

14 24
C 1a 1a 1a 2a 2a 2a C

-XU 11 17
TEST
POSITION

15 8 13
-XU 16 -XU 3

33 43 53

34 44 54

-X 14 12 18

D -XU15 50 51 53 54 55 58 11 12 13 14 8 10 20 21 25 4 D
/M06/7.C

/M06/7.C

/X03/2.E

/X03/2.E

/X03/3.E

/X03/4.E

/A02/6.B

/A02/6.B

/A02/6.B

/A02/6.B

/A02/5.B

/A02/5.B

/A02/5.B

/A02/5.B

/M06/2.B

/X01/4.C
VOLTAGE TRANSFOMER TRUCK VOLTAGE TRANSFOMER TRUCK

DESIG. DESCRIPTION REMARK DESIG. DESCRIPTION REMARK


E FF HIGH VOLTAGE FUSE BT2 LIMIT SWITCH (TEST POSITION)
E
XU15 58 POLE PLUG/SOCKET BT1 LIMIT SWITCH (SERVICE POSITION)
BV VOLTAGE TRANSFORMER E EARTHING CONNECTION WIRE
FB60 MINI-CIRCUIT BREAKER OPTION
MU UNDERVOLTAGE RELEASE
BF FUSE BLOWN IND. CONTACT

INTERNAL WIRING / CROSS REFERENCE THE DIAGRAM INDICATES THE FOLLOWING CONDITION: -VT TRUNK IN SERVICE POSITION

F PROJECT NO.: DRAWING NO.: 1YUX200119/VT DRAWING REV.: R1 DATE: 26/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation METERING PANEL=JC03 SCALE: 1: 1
CUSTOMER: VT TRUCK INTERNAL WIRING START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC03+WLV/M01
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: M02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

EARTHING SWITCH FOR UNIGEAR ZS1


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
L1 L2 L3

+CCB-QE

/M03/1.C

/M03/3.C

/M06/8.B

/X03/2.B

/X01/5.E
20 22 24 26 28
-BE1
21 23 25 27 29

/M03/2.C

/M06/8.B
/M03/8.E

/X03/1.B

/X03/2.B

/X01/5.E
B B

G 40 42 44 46 48
-BE2
-RL3
H 41 43 45 47 49

C C

D D

EARTHING SWITCH INTERLOCK

DESIG. DESCRIPTION REMARK EARTHING SWITCH MECHANICAL INTERLOCK WITH CB.-TRUCK


BE1 EARTHING SWITCH OPENED a) C.B. TRUNCK IN TEST-POSITION: EARTHING SWITCH CAN BE OPERATED
BE2 EARTHING SWITCH CLOSED b) EARTHING SWITCH OPEN-POSITION: C.B.-TRUCK CAN BE MOVED
E RL3 EARTHING SWITCH CLOSING COIL OPTION
E
INTO SERVICE-POSITION

INTERNAL WIRING / CROSS REFERENCE THE DIAGRAM INDICATES THE FOLLOWING CONDITION: EARTHING SWITCH OFF AND CRANK NOT INSERTED

CODE: -QE PN: NAME: EARTHING SWITCH TYPE: FUNCTION: STANDARD SECONDARY CONTROL WIRING (5NO-5NC) TECHNICAL DATA: REFER TO SINGLE LINE DIAGRAM

F PROJECT NO.: DRAWING NO.: 1YUX200119/VT DRAWING REV.: R1 DATE: 26/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation METERING PANEL=JC03 SCALE: 1: 1
CUSTOMER: ES - INTERNAL WIRING START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC03+WLV/M02
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: M03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
POSITION INDICATOR ES INTERLOCKING CIRCUIT

ES POSITION INDICATOR EARTH SWITCH OPEN INTERLOCK VOLTAGE INDICATOR EARTH SWITCH CLOSING INTERLOCK

ES OPENED ES CLOSED ES OPENED POWER SUPPLY BLOCKING COIL


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
-DC_L1+
/G01/2.E XK 1 XK 2 XK 3 XK 4 XK 5

XI3 4
XI3 1

=JC01 =JC08
-XI3 1 -XI3 2

23 23
-BT2 -BT2
B 24 24 B

/M02/5.B /M02/5.B /M02/5.B -XI3 2 -XI3 1

+CCB +CCB =JC02 =JC07


-QE -QE -XI3 2 -XI3 1
/M02/3.A 20 40 22
-BE1 -BE2 -BE1 23 23
21 41 23 -BT2 -BT2
24 24

C -XI3 1 -XI3 2 C
XI3 5
=JC06
XI3 2 -XI3 2 -JUMPER

/N99/6.B
23 XI3 6
-BT2
-XK 9 -XK 10 -XK 11 P3
24 -XK 12
+LVD 220V
-PU NO
-XI3 1
/A01/6.D +LVD
D =JC05 -PU D
/A01/6.D
-XI3 1

0V
23
P2
-BT2

/N99/6.B
COM
3 2 24
-XK 13
+LVD-P2 A1 A1 A1 -XI3 2
/M02/4.B
1
-K501 -K502 -K503
A2 A2 A2 +CCB
E XI3 3 -QE E

G
1 2 /X02/1.B 1 2 /X02/2.B 1 2 /X02/3.B -RL3
3 4 /X02/2.B 3 4 /X02/3.B 3 4 /X02/4.B H
5 6 /X02/2.B 5 6 /X02/3.B 5 6 /X02/4.B
13 14 13 14 13 14 /X02/4.B

XK 6 XK 7 XK 8
-DC_L1-
/G01/2.E
F PROJECT NO.: DRAWING NO.: 1YUX200119/VT DRAWING REV.: R1 DATE: 26/12/13 F
PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation METERING PANEL=JC03 SCALE: 1: 1
CUSTOMER: ES CONTROL CIRCUITS START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC03+WLV/M03
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: M06
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PROTECTION AND CONTROL UNIT BINANY INPUT
POWER FOR RELAY FUSE NOMAL WD1 VT MCB ON WD2 VT MCB ON SPARE VT TRUCK POSITION EARTHING SWITCH POSITION

220VDC IN TEST IN SERVICE ES OPENED ES CLOSED


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
-DC_L3+ L3+ /
/G01/5.E M07/3.A
-XK2 1 -XK2 2 -XK2 3 -XK2 4 -XK2 5 -XK2 6 -XK2 7 -XK2 8 -XK2 9 -XK2 10

/M01/7.D
+CB -XU15 25

-BV
1 /M01/2.A /M02/5.B /M02/5.B
B B
-BF -XU15 56
+CCB
2 +CB -QE
13 13 -BV /M02/3.A
-FB10 -FB11 13 13 24 42
-XU15 26 14 14
/M01/7.A /A02/6.B /A02/5.B -BT2 -BT1 -BE1 -BE2
14 14 25 43

-XU15 50 51
/M01/2.D /M01/2.D

C C

-XK2 13 -XK2 14 -XK2 15 -XK2 16 -XK2 17 -XK2 18 -XK2 19 -XK2 20 -XK2 21 -XK2 22 -XK2 23 -XK2 24
-GND

-GND -X100 1 -X130 1 -X130 3 -X130 5 -X130 7 -X110 1 -X110 3 -X110 5 -X110 7 -X110 8 -X110 10 -X110 11 -X110 13
+LVD +LVD
-AR27 -AR27
+

+
/N01/1.A /N01/1.A
D BI1 BI2 BI3 BI4 BI1 BI2 BI3 BI4 BI5 BI6 BI7 BI8 D
- - - - - - - - - - - -

-X130 2 -X130 4 -X130 6 -X130 8 -X110 2 -X110 4 -X110 6 -X110 9 -X110 12


-X100 2

E E

-XK2 11 -XK2 12
-DC_L3- L3- /
/G01/5.E M07/3.B

F PROJECT NO.: DRAWING NO.: 1YUX200119/VT DRAWING REV.: R1 DATE: 26/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation METERING PANEL=JC03 SCALE: 1: 1
CUSTOMER: RELAY INPUT SIGNAL START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC03+WLV/M06
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: M07
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
LOAD SHEDDING CIRCUIT

4 STAGE LOAD SHEDDING


STAGE 1 STAGE 2 STAGE 3 STAGE 4
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
L3+
/M06/8.A XI5 11

L3-
/M06/8.F

B B
-X110 14 -X110 17 -X110 20 -X110 23
+LVD +LVD +LVD +LVD
-AR27 SO1 -AR27 SO2 -AR27 SO3 -AR27 SO4
/N01/1.A /N01/1.A /N01/1.A /N01/1.A

-X110 16 15 -X110 19 18 -X110 22 21 -X110 24

C XI5 2 XI5 4 XI5 6 XI5 8 XI5 10


C

=PREV =NEXT
-XI5 1 XI5 1 -XI5 1

D D
-XI5 3 XI5 3 -XI5 3

-XI5 5 XI5 5 -XI5 5

E -XI5 7 XI5 7 -XI5 7


E

-XI5 9 XI5 9 -XI5 9

LOAD SHEDDING WIRING BAR

PREVIOUS PANEL NEXT PANEL

F PROJECT NO.: DRAWING NO.: 1YUX200119/VT DRAWING REV.: R1 DATE: 26/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation METERING PANEL=JC03 SCALE: 1: 1
CUSTOMER: LOAD SHEDDING CIRCUITS START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC03+WLV/M07
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: N01
1 2 3 4 5 6 7 8
F
E
B

C
A

D
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A0
PAGE REV.
FEEDER PROTECTION RELAY
REU615

1
1

+LVD-AR27

ANALOG INPUT AND BI MODULE

FIRST ISSUE
BINARY INPUT 1 (+) /M06/2.D -X130 1
(-) /M06/2.D 2
BI1
BINARY INPUT 2 (+) /M06/3.D 3
(-) /M06/3.D 4
BI2
BINARY INPUT 3 (+) /M06/4.D 5
(-) /M06/4.D 6
BI3
BINARY INPUT 4 (+) /M06/4.D 7
(-) /M06/4.D 8
BI4

DESCRIPTION
U12B /A02/2.E 9
N /A02/2.E 10
U12B

2
2

U1 /A02/4.D 11
N /A02/4.D 12
U1
U2 /A02/3.D 13
N /A02/3.D 14
U2
U3 /A02/3.D 15
N /A02/3.D 16
U3
Uo /A02/2.D 17
N /A02/2.D 18
U0

MAIN MODULE +
AUXILIARY VOLTAGE SUPPLY (+) INPUT /M06/1.D -X100 1

3
3

- Uaux

DATE
(-) INPUT /M06/1.D 2

19/12/13
IRF, COMMON /X01/5.C 3
CLOSED; IRF, OR Uaux DISCONNECTED /X01/5.C 4 IRF
CLOSED; NO IRF, AND Uaux CONNECTED /X01/5.C 5
POWER OUTPUT CONTACT 1, NO /X02/6.B 6 PO1
/X02/6.B 7
PO2

CUSTOMER:
POWER OUTPUT CONTACT 2, NO /X02/7.B 8

PROJECT NO.:
/X02/7.B 9

PROJECT TITLE:

DESIGNED: HNX
SIGNAL OUTPUT CONTACT 1, COMMON /X01/8.C 10
NC /X01/7.C 11
SO1
NO /X01/8.C 12
SIGNAL OUTPUT CONTACT 2, NO /X03/6.B 13
SO2

4
4

/X03/6.B 14
POWER OUTPUT CONTACT 3, NO /X03/7.A 16
/X03/7.B 17
PO3
(TCS RESISTOR) /X03/7.A 15
POWER OUTPUT CONTACT 3, NO (TCS1 INPUT) /X03/7.B 19

CHECKED: DLQ
/X03/7.C 18 TCS1
(TCS RESISTOR) /X03/8.A 20
/X03/8.B 22

TOJI
POWER OUTPUT CONTACT 4, NO /X03/8.A 21
PO4
POWER OUTPUT CONTACT 4, NO (TCS2 INPUT) /X03/8.B 23
/X03/8.C 24 TCS2

110kV Nhat tan Substation

5
5

BIO MODULE

APPROVED: DLQ
BINARY INPUT 1 (+) /M06/5.D -X110 1
(-) /M06/5.D 2
BI1
BINARY INPUT 2 (+) /M06/5.D 3
(-) /M06/5.D 4
BI2
BINARY INPUT 3 (+) /M06/6.D 5
BINARY INPUT 3 & 4 (-) /M06/6.D 6
BI3

BINARY INPUT 4 (+) /M06/6.D 7 BI4


BINARY INPUT 5 (+) /M06/7.D 8
DRAWING TITLE:
BINARY INPUT 5 & 6 (-) /M06/7.D 9
BI5

BINARY INPUT 6 (+) /M06/7.D 10 BI6

6
6

BINARY INPUT 7 (+) /M06/8.D 11


BINARY INPUT 7 & 8 (-) /M06/8.D 12
BI7
METERING PANEL=JC03

BINARY INPUT 8 (+) /M06/8.D 13 BI8


SIGNAL OUTPUT CONTACT 1, COMMON /M07/3.B 14
SO1
DRAWING NO.: 1YUX200119/VT

NC /M07/3.C 16
REU615 - A/I + Binary I/O Board

NO /M07/3.C 15
SIGNAL OUTPUT CONTACT 2, COMMON /M07/4.B 17
NC /M07/4.C 19 SO2
NO /M07/4.C 18
TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559

SIGNAL OUTPUT CONTACT 3, COMMON /M07/5.B 20


NC /M07/5.C 22 SO3
7
7

NO /M07/5.C 21
SIGNAL OUTPUT CONTACT 4, NO /M07/5.B 23
SO4
ABB XIAMEN SWITCHGEAR CO.,LTD

/M07/5.C 24

COMMUNICATION MODULE
CONT.:

ETHERNET RJ-45 LAN


SHEET:

-X1
DRAWING REV.: R1

8
8

SCALE:
LANGUAGE:
DATE: 26/12/13

N99
==SWG1=JC03+WLV/N01
START: 12/12/2013
1: 1
ENG
F
E
B

C
A

D
1 2 3 4 5 6 7 8
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A

/M03/8.D

/M03/8.D

/M03/6.D

/M03/6.D
+LVD-SV
VOLTMETER SELECTOR
SWITCH
0 1 1 3 5 7 NO COM NC P1 P2 P3
2 +LVD 110V 0V 220V
3 -PU
2 4 6 8 AUXILIARY VOLTAGE
B B
VOLTAGE INDICATOR

/A02/7.C

/A02/7.C

/A02/7.C

/A02/7.C
NORMAL HANDLE
M220-61312-003M1

0 OFF
1 RS (L1L2)
2 ST (L2L3)
3 TR (L3L1)

C C

1 3 5

2 V 8

D D

E E

F PROJECT NO.: DRAWING NO.: 1YUX200119/VT DRAWING REV.: R1 DATE: 26/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation METERING PANEL=JC03 SCALE: 1: 1
CUSTOMER: CROSS REFERENCE START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC03+WLV/N99
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: X01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
ALARM WIRING CIRCUIT TO REMOTE CONTROL PANEL
COMMON AC/DC SUPPLY CIRCUIT VT CIRCUIT BRIDGE VOLTAGE
INTERNAL RELAY
PROTECTION TRIP
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

MCB OFF FAIL FAULTY TERMINALS

A =PREV =NEXT A

-XI4 1 -XI4 1 COMMON -XI4 1

-XI4 5 -XI4 5 AC/DC CIRCUIT MCB OFF -XI4 5

-XI4 7 VT CIRCUIT FAIL -XI4 7 -XI4 7

-XI4 9 INTERNAL RELAY FAULT -XI4 9 -XI4 9

-XI4 11 OC/EF OPERATED -XI4 11 -XI4 11

-XI4 13 TCS ALARM -XI4 13 -XI4 13

-XI4 15 50BF -XI4 15 -XI4 15


B B
-XI4 17 AUTO RECLOSED OPERATED -XI4 17 -XI4 17

-XI4 19 LOAD SHEDDING OPERATED -XI4 19 -XI4 19

-XI4 21 VOLTAGE PROTECTION OPERATED -XI4 21 -XI4 21

-XI4 6 -XI4 10 -XI4 12 -XI4 14 -XI4 16 -XI4 18 -XI4 20


-XI4 22
-XI4 8 FUSE BLOWN
/M01/8.A -X100 3
-X100 10
-XU15 5
+LVD
3
+LVD
+CB -AR27 IRF
21 21 21 21 21 /N01/1.A
-AR27 SO1
-BV -BF /N01/1.A
C PREVIOUS PANEL -FB1 -FB3 -FB5 -FB11 -FB10 4 4 5
NEXT PANEL C
/G01/2.C 22 /G01/5.C 22 /G02/2.C 22 /A02/5.B 22 /A02/6.B 22 -X100 11 12
-XU15 4 -X100
/M01/8.D

-XI4 2 -XI4 3 -XI4 4

TO REMOTE CONTROL PANEL

EARTH SWITCH CONTROL MODE

COMMON ES CLOSED ES OPENED REMOTE

D D

XC1 1 XC1 6 XC1 7 XC1 8 XC1 9 XC1 10

/M02/6.B /M02/6.B
+CCB +CCB
-QE -QE
E 48 28
E
-BE2 -BE1
49 29

XC1 2 XC1 3 XC1 4 XC1 5

F PROJECT NO.: DRAWING NO.: 1YUX200119/VT DRAWING REV.: R1 DATE: 26/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation METERING PANEL=JC03 SCALE: 1: 1
CUSTOMER: SIGNALS TO REMOTE CONTROL PANEL START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC03+WLV/X01
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: X02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SIGNALS FOR INTERTRIPPING AND INTERLOCKING
EARTH SWITCH INTERPANEL INTERLOCKING TO INCOMING PANEL TO BUS SECTION PANEL
TO =JC01 TO =JC02 TO =JC05 TO =JC06 TO =JC07 TO =JC08 SPARE SPARE SPARE SPARE
27/59 27/59
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
-XI2 1 -XI2 3 -XI2 5 -XI2 7 -XI2 9 -XI2 11 -XI2 13 -XI2 15 -XI2 17 -XI2 19 -XI1 1 -XI1 3

-X100 6 -X100 8
+LVD +LVD
B 1 3 5 1 3 5 1 3 5 13
-AR27 PO1 -AR27 PO2 B
/N01/1.A /N01/1.A
-K501 -K501 -K501 -K502 -K502 -K502 -K503 -K503 -K503 -K503 7 9
/M03/3.E
2
/M03/3.E
4
/M03/3.E
6
/M03/3.E
2
/M03/3.E
4
/M03/3.E
6
/M03/4.E
2
/M03/4.E
4
/M03/4.E
6
/M03/4.E
14 -X100 -X100

C C
-XI2 2 -XI2 4 -XI2 6 -XI2 8 -XI2 10 -XI2 12 -XI2 14 -XI2 16 -XI2 18 -XI2 20 -XI1 2 -XI1 4

D D

E E

F PROJECT NO.: DRAWING NO.: 1YUX200119/VT DRAWING REV.: R1 DATE: 26/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation METERING PANEL=JC03 SCALE: 1: 1
CUSTOMER: SIGNALS FOR INTERLOCKING & INTERTRIPPING START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC03+WLV/X02
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: X03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
EARTHING SWITCH SPARE CONTACT RELAY OUTPUTS SPARE CONTACT

EARTHING SWITCH EARTHING SWITCH EARTHING SWITCH


ES CLOSED ES OPENED ES CLOSED SPARE SPARE SPARE
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
-XR1 1 -XR1 3 -XR1 5

-XC2 1 -XC2 3 -XC2 5


-X100 16 15 -X100 21 20
+LVD +LVD
-AR27 -AR27

Rint

Rint
/M02/5.B /M02/6.B /M02/6.B PO3 PO4
-X100 13 /N01/1.A /N01/1.A
+CCB +CCB +CCB
+LVD
-QE -QE -QE
-AR27 SO2 -X100 17 -X100 22
44 26 46 /N01/1.A
B -BE2 -BE1 -BE2 B
-X100 14
45 27 47
-X100 19 -X100 23
+LVD +LVD
-AR27 -AR27

TCS1

TCS2
/N01/1.A
PO3 /N01/1.A
PO4

-X100 18 -X100 24

-XC2 2 -XC2 4 -XC2 6


-XR1 2 -XR1 4 -XR1 6
C C

VT SPARE CONTACT

VT TRUCK VT TRUCK VT TRUCK VT TRUCK


TEST POSITION SERVICE POSITION TEST POSITION TEST POSITION

D -XC3 4 -XC3 6
D
-XC3 1

/M01/2.A /M01/3.A /M01/3.A


+CB -XU15 52
+CB -XU15 49
+CB -XU15 57

-BV -BV -BV


23 23 33 53
-BT2 -BT1 -BT2 -BT2
E 24 24 34 54 E

-XU15 53 54 -XU15 55 -XU15 58


/M01/2.D /M01/3.D /M01/3.D /M01/3.D

-XC3 2 -XC3 3 -XC3 5 -XC3 7

F PROJECT NO.: DRAWING NO.: 1YUX200119/VT DRAWING REV.: R1 DATE: 26/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation METERING PANEL=JC03 SCALE: 1: 1
CUSTOMER: SPARE CONTACTS START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC03+WLV/X03
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: =JC04+/A00
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

R 3P3W, AC22kV, 2500A, 25kA/3s, 50Hz


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

Y
A B A

B B

C C

-FA1 -FA2 -FA3


Ur=25kV Ur=25kV Ur=25kV
D Uc=20kV Uc=20kV Uc=20kV D

E E

L1 L2 L3

F PROJECT NO.: DRAWING NO.: 1YUX200119/BR DRAWING REV.: R0 DATE: 19/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation BUS RISER PANEL=JC04 SCALE: 1: 1
CUSTOMER: POWER CIRCUIT START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC04+WLV/A01
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: G01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
POWER SUPPLY FOR PROTECTION, CONTROL AND INDICATOR CIRCUIT
BRIGDE TERMINAL
220VDC
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
PREVIOUS NEXT PANEL
PANEL

-XJ 1 -XJ 1 -XJ 1

-XJ 3 -XJ 3 -XJ 3

B B

220VDC 220VDC
-XJ 2 -XJ 4

C C

D D

E E

F PROJECT NO.: DRAWING NO.: 1YUX200119/BR DRAWING REV.: R0 DATE: 19/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation BUS RISER PANEL=JC04 SCALE: 1: 1
CUSTOMER: DC VOLTAGE SUPPLY CIRCUITS START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC04+WLV/G01
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: G02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
LIGHTING AND HEATING CIRCUIT

LIGHTING SPACE HEATER HEATER ON I/L (WHITE)

220VAC, 50Hz 220VAC, 50Hz 220VAC, 50Hz


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
PREVIOUS NEXT PANEL
PANEL

-XH 1 -XH 1 -XH 1

-XH 3 -XH 3 -XH 3

B B
220VAC, 50Hz -XH 2 -XH 4

1 3 13 21
-FB5
C S202-C6 2 4 14 22 C
6A
/X01/2.C

-XH 5 -XH 6 -XH 7

1
-S101
D 2 D

A1
1 1 X1
+CCF +CB +LVD
E -EL E
-EH2 -EH1 -H20
2 2 X2
100W 50W WHITE
A2

-XH 8 -XH 9 -XH 10

F PROJECT NO.: DRAWING NO.: 1YUX200119/BR DRAWING REV.: R0 DATE: 19/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation BUS RISER PANEL=JC04 SCALE: 1: 1
CUSTOMER: AC VOLTAGE SUPPLY CIRCUITS START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC04+WLV/G02
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: X01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
ALARM WIRING CIRCUIT TO REMOTE CONTROL PANEL
COMMON AC/DC SUPPLY CIRCUIT BRIDGE
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

MCB OFF SPARE TERMINALS

A =PREV =NEXT A

-XI4 1 -XI4 1 COMMON -XI4 1

-XI4 5 -XI4 5 AC/DC CIRCUIT MCB OFF -XI4 5

-XI4 7 VT CIRCUIT FAIL -XI4 7 -XI4 7

-XI4 9 INTERNAL RELAY FAULT -XI4 9 -XI4 9

-XI4 11 OC/EF OPERATED -XI4 11 -XI4 11

-XI4 13 TCS ALARM -XI4 13 -XI4 13

-XI4 15 50BF -XI4 15 -XI4 15


B B
-XI4 17 AUTO RECLOSED OPERATED -XI4 17 -XI4 17

-XI4 19 LOAD SHEDDING OPERATED -XI4 19 -XI4 19

-XI4 21 VOLTAGE PROTECTION OPERATED -XI4 21 -XI4 21

-XI4 6 -XI4 8 -XI4 10 -XI4 12 -XI4 14 -XI4 16 -XI4 18 -XI4 20

-XI4 22

21

C PREVIOUS PANEL -FB5 NEXT PANEL C


/G02/2.C 22

-XI4 2 -XI4 3 -XI4 4

D D

E E

F PROJECT NO.: DRAWING NO.: 1YUX200119/BR DRAWING REV.: R0 DATE: 19/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation BUS RISER PANEL=JC04 SCALE: 1: 1
CUSTOMER: SIGNALS TO REMOTE CONTROL PANEL START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC04+WLV/X01
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: =JC05+/A00
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

R 3P3W, AC22kV, 2500A, 25kA/3s, 50Hz


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

Y
A B A

+CB-QB
VD4/P
630A
+CCB +CCB +CCB
-BC1 -BC2 -BC3
P1 P1 P1
3x400-600/1/1A

B B
CORE1: CL0.5
15VA@400/1A
TO SHEET A02
15VA@600/1A

CORE2:CL5P20
15VA@400/1A
TO SHEET A03
15VA@600/1A

C C
P2 P2 P2

+LVD
-PU

1
R:L1

1
Y:L2
D D

1
B:L3

E:PE
-QE -GND

E E

L1 L2 L3

F PROJECT NO.: DRAWING NO.: 1YUX200119/OUT DRAWING REV.: R1 DATE: 26/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation OUTGOING PANEL=JC05, JC06, JC07, JC08 SCALE: 1: 1
CUSTOMER: POWER CIRCUIT START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC05+WLV/A01
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: A02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CURRENT TRANSFORMER
3x400-600/1/1A
CORE1: CL0.5 , 15VA@400/1A , 15VA@600/1A
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
-GND

-XA1 1 -XA1 2 -XA1 3 -XA1 4

1S3 1S3 1S3


+CCB-BC1 +CCB-BC2 +CCB-BC3
1S2 1S2 1S2
B B
1S1 1S1 1S1

METAL JUMPER

-XA1 5 -XA1 6 -XA1 7

-XA1 8 -XA1 9 -XA1 10 -XA1 11

C C

17 17 17

A A A
+LVD-PA1 18 +LVD-PA2 18 +LVD-PA3 18
0-400/600A (x1.2) 0-400/600A (x1.2) 0-400/600A (x1.2)

REMOVE THIS JUMPER WHEN A1700 IS CONNECTED


D D

-XA1 12 -XA1 13 -XA1 14 -XA1 15

=EXT

E E

CONNECT TO A1700 ON EXTERNAL MEASUREMENT PANEL

F PROJECT NO.: DRAWING NO.: 1YUX200119/OUT DRAWING REV.: R1 DATE: 26/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation OUTGOING PANEL=JC05, JC06, JC07, JC08 SCALE: 1: 1
A1 REVISED AS CUSTOMER COMMENT 26/12/13 CUSTOMER: POWER CIRCUIT START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC05+WLV/A02
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: A03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CURRENT TRANSFORMER

3x400-600/1/1A
CORE2:CL5P20 , 15VA@400/1A , 15VA@600/1A
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A -GND A

-XA2 1 -XA2 2 -XA2 3 -XA2 4

2S3 2S3 2S3


+CCB-BC1 +CCB-BC2 +CCB-BC3
2S2 2S2 2S2
2S1 2S1 2S1
B B
METAL JUMPER

-XA2 5 -XA2 6 -XA2 7

-XA2 8 -XA2 9 -XA2 10 -XA2 11

C C
1 RD 3 YE 5 BU 7 BK

+LVD-XM1 L1 L2 L3 N

L1 L2 L3 N
2 RD 4 YE 6 BU 8 BK

D D

-X120 7 9 11 13
+LVD IL1 IL2 IL3 N
-AR30
/N01/1.A
IL1 IL2 IL3 Io

N N N Io

-X120 8 10 12 14
E E

F PROJECT NO.: DRAWING NO.: 1YUX200119/OUT DRAWING REV.: R1 DATE: 26/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation OUTGOING PANEL=JC05, JC06, JC07, JC08 SCALE: 1: 1
CUSTOMER: POWER CIRCUIT START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC05+WLV/A03
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: G01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
POWER SUPPLY FOR PROTECTION, CONTROL AND INDICATOR CIRCUIT
FOR CONTROL FOR INDICATOR FOR PROTECTION
220VDC 220VDC 220VDC
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
PREVIOUS NEXT PANEL
PANEL

-XJ 1 -XJ 1 -XJ 1

-XJ 3 -XJ 3 -XJ 3

B B

220VDC 220VDC
-XJ 2 -XJ 4

C C

1 3 13 21 1 3 13 21 1 3 13 21
-FB1 -FB2 -FB3
S282-UC K6 2 4 14 22 S282-UC K6 2 4 14 22 S282-UC K6 2 4 14 22
6A 6A 6A
/X01/2.C

/X01/2.C

/X01/3.C
D D

E E
-DC_L1+

-DC_L2+

-DC_L3+
-DC_L1-

-DC_L2-

-DC_L3-
/M04/1.A

/M05/1.A

/M07/1.A
/M04/1.F

/M05/1.F

/M07/1.F

F PROJECT NO.: DRAWING NO.: 1YUX200119/OUT DRAWING REV.: R1 DATE: 26/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation OUTGOING PANEL=JC05, JC06, JC07, JC08 SCALE: 1: 1
CUSTOMER: DC VOLTAGE SUPPLY CIRCUITS START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC05+WLV/G01
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: G02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
LIGHTING AND HEATING CIRCUIT

LIGHTING SPACE HEATER HEATER ON I/L (WHITE) CB CHARGER CIRCUIT

220VAC, 50Hz 220VAC, 50Hz 220VAC, 50Hz 220VAC, 50Hz


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
PREVIOUS NEXT PANEL
PANEL

-XH 1 -XH 1 -XH 1

-XH 3 -XH 3 -XH 3

B B
220VAC, 50Hz -XH 2 -XH 4

1 3 13 21
-FB5
C S202-C6 2 4 14 22 C
6A
/X01/3.C

1 3 13 21
-FB4
-XH 5 -XH 6 -XH 7 S202-K1.6 2 4 14 22
1.6A

/X01/3.C
1
-S101
D 2 D

-XM 1 -XM 2

/M01/1.A
A1 -XB 25
1 1 +CB
X1
+CCF +CB +LVD -QB 2
E -EL E
-EH2 -EH1 -H20 -BS1
2 2 X2
100W 50W WHITE
A2 1

-MS M

-XB 35
-XH 8 -XH 9 -XH 10
/M01/1.D

F PROJECT NO.: DRAWING NO.: 1YUX200119/OUT DRAWING REV.: R1 DATE: 26/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation OUTGOING PANEL=JC05, JC06, JC07, JC08 SCALE: 1: 1
CUSTOMER: AC VOLTAGE SUPPLY CIRCUITS START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC05+WLV/G02
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: M01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-VD4 CN
DOC. No: 1YH8122104 -GND
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

/M04/2.C

/M04/8.C
/M07/5.B

/M07/6.B

/M05/1.B

/M05/2.B
/M04/5.E

/M04/1.E

/M04/2.E

/M04/5.E

/M04/5.E
/G02/6.E

/X02/1.B
/X03/7.E

/X01/4.E

/X03/3.E

/X03/2.E

/X03/1.E

/X03/5.E

/X03/4.E

/X03/4.E

/X01/4.E

/X03/5.E

/X03/6.E
A A
-XB
+CB 24 26 25 4 5 32 27 2 31 41 23 8 11 6 29 28 9 7 1 40 52 12 49 10 57 55
-QB

CB DISCHARGED

CB CHARGED

CB OPENED

CB CLOSED
B -BS2 -BS1 B
4 2 2
-BT2
3 1 0 I 13 23 33 43 53
1

-BB1 -BB2 -BB3 14 24 34 44 54


-MS 13 21 31 43 53 13 21 31 41 53 13 21 31 41 53
M P
14 22 32 44 54 14 22 32 42 54 14 22 32 42 54

POSITION
SERVICE
-BT1 13 23 33 43 53

C 14 24 34 44 54 C

TEST
POSITION
-RL1 -MC -MO1

D -XB 34 36 35 20 14 15 42 13 37 3 30 33 18 22 21 16 39 38 19 17 50 51 53 54 47 48 58 56 D
/M07/5.C

/X03/7.E

/G02/6.F

/M04/5.F

/M04/5.F

/X01/4.F

/X03/3.E

/X03/2.E

/X03/2.E

/X03/1.E

/M04/1.F

/M04/2.D

/X03/5.E

/M07/6.C

/M07/6.C

/M05/1.C

/M05/2.C

/X03/4.E

/X03/4.E

/X01/4.F

/M07/7.C

/M07/7.C

/X02/1.B

/X03/6.E

/X03/5.E

/M04/8.D

/X03/6.E
CIRCUIT BREAKER CIRCUIT BREAKER CIRCUIT BREAKER TRUCK INTERLOCK

DESIG. DESCRIPTION REMARK DESIG. DESCRIPTION REMARK DESIG. DESCRIPTION REMARK EARTHING SWITCH MECHANICAL INTERLOCK WITH CB.-TRUCK
RL1 CLOSING BLOCK MAGNET BS1 SPRING CHARGING MOTOR CONTACT BT2 LIMIT SWITCH (TEST POSITION) a) C.B. TRUNCK IN TEST-POSITION: EARTHING SWITCH CAN BE OPERATED
E MO1 FIRST OPENING RELEASE BS2 SPRING CHARGED/DISCHARGED CONTACT BT1 LIMIT SWITCH (SERVICE POSITION)
E
b) EARTHING SWITCH OPEN-POSITION: C.B.-TRUCK CAN BE MOVED
MC CLOSING RELEASE BB1-3 C.B. AUXILIARY SWITCH XB 58 POLE SOCKET INTO SERVICE-POSITION
MS SPRING CHARGING MOTOR XB2..11 CB. INTERNAL POLE PLUG/SOCKET
MU UNDERVOLTAGE RELEASE OPTION
RL2 TRUCK RACK BLOCKING MAGNET OPTION

INTERNAL WIRING / CROSS REFERENCE THE DIAGRAM INDICATES THE FOLLOWING CONDITION: -VACUUM C.B. TRUNK IN SERVICE POSITION -VACUUM CIRCUIT BREAKER OPEN -C.B. SPRING DISCHARGED

CODE: -QB PN: VD4/P -Z - W NAME: VACUUM CIRCUIT BREAKER TYPE: VD4 FUNCTION: NON-STANDARD SECONDARY CONTROL WIRING (7NO-7NC) TECHNICAL DATA: REFER TO SINGLE LINE DIAGRAM
F PROJECT NO.: DRAWING NO.: 1YUX200119/OUT DRAWING REV.: R1 DATE: 26/12/13 F
PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation OUTGOING PANEL=JC05, JC06, JC07, JC08 SCALE: 1: 1
CUSTOMER: VD4 INTERNAL WIRING START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC05+WLV/M01
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: M02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

EARTHING SWITCH FOR UNIGEAR ZS1


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
L1 L2 L3

+CCB-QE

/M04/5.C
/M05/4.B

/M08/4.B

/X03/2.B

/X01/5.E
20 22 24 26 28
-BE1
21 23 25 27 29

/M05/4.B

/M08/3.B
/M04/8.E

/X03/1.B

/X03/2.B

/X01/5.E
B B

G 40 42 44 46 48
-BE2
-RL3
H 41 43 45 47 49

C C

D D

EARTHING SWITCH INTERLOCK

DESIG. DESCRIPTION REMARK EARTHING SWITCH MECHANICAL INTERLOCK WITH CB.-TRUCK


BE1 EARTHING SWITCH OPENED a) C.B. TRUCK IN TEST-POSITION: EARTHING SWITCH CAN BE OPERATED
E BE2 EARTHING SWITCH CLOSED
E
b) EARTHING SWITCH OPEN-POSITION: C.B.-TRUCK CAN BE MOVED
RL3 EARTHING SWITCH CLOSING COIL OPTION INTO SERVICE-POSITION

INTERNAL WIRING / CROSS REFERENCE THE DIAGRAM INDICATES THE FOLLOWING CONDITION: EARTHING SWITCH OFF AND CRANK NOT INSERTED

CODE: -QE PN: NAME: EARTHING SWITCH TYPE: FUNCTION: STANDARD SECONDARY CONTROL WIRING (5NO-5NC) TECHNICAL DATA: REFER TO SINGLE LINE DIAGRAM
F PROJECT NO.: DRAWING NO.: 1YUX200119/OUT DRAWING REV.: R1 DATE: 26/12/13 F
PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation OUTGOING PANEL=JC05, JC06, JC07, JC08 SCALE: 1: 1
CUSTOMER: ES - INTERNAL WIRING START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC05+WLV/M02
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: M04
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CIRCUIT BREAKER CLOSING AND TRIPING CIRCUIT

CIRCUIT BREAKER OPENING CONTROL CLOSING INTERLOCKING CB CLOSING CONTROL EARTHING SWITCH INTERLOCKING

SPARE SUPERVISORY REMOTE LOCAL 50/51;50N/51N, EXT. TRIP CB IN SERVICE CB IN TEST SPARE SUPERVISORY REMOTE LOCAL CLOSING COMMAND VOL. INDICATOR SUPPLY BLOCKING COIL
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

50BF TRIP

A A
-DC_L1+ XK 2

/G01/2.E XK 1 XK 3 XK 4 XK 5
XI2 1
-JUMPER XI3 3
5 3 1 11 9 7
1 2 1 2 1 2
XI2 2 1 2 1 2 1 2
-JUMPER
-X100 16 15
+LVD 6 +LVD 4 +LVD 2 XI2 3 +LVD 12 +LVD 10 +LVD 8
-SS1 -SS1 -SS1 +LVD =JC03 XI2 5 -SS1 -SS1 -SS1 XI3 4

BUSBAR ES OPENED
SUPERVISORY REMOTE -AR30 SUPERVISORY REMOTE

Rint
LOCAL PO3 5 LOCAL XI3 5
/N99/3.A /N99/3.A /N99/2.A /N01/1.A /N99/3.A /N99/3.A /N99/3.A
-K501 -X100 6 -JUMPER
B =JC02 XI1 1 XI1 2 XI1 3 XI1 4 XI1 5 6 XI2 9 XI2 10 XI2 11
+LVD B
-X100 17
3 XI2 6 -AR30
PO1 XI3 6
XI1 29 /N01/1.A
+LVD XI2 4
4
5 -X100 19
-SOT -X100 7
-KBF2 /M05/1.E +LVD
3
/M02/5.B
6 RED -AR30

TCS1

ES OPENED
PO3 +CCB 22 4
XI1 30 /N01/1.A +LVD
-QE -BE1
-SOC
23 /M05/2.E
-X100 18 /M01/8.A
XI1 6 XI1 7 XI1 8 XI1 9 XI1 10 GREEN
+CB -XB 57
XI2 12 XI2 13 XI2 14
C -QB C
XI2 5
XI2 6 53
XK 13
-BT2
/M01/4.A -JUMPER
CB IN TEST 54
+CB -XB 23
7
-QB XI2
-XB 58
XI2 8 /M01/8.D
21
-BB2 XK 14
22 -X100 21
D +LVD NO D
-AR30 +LVD

/N99/7.A

/N99/8.A
-XB 33 TCS & LOCKOUT PO4
/N01/1.A -PU
/M01/4.D
/A01/6.C

x1 -R1 x2 XK 15 -X100 22 P1 P3

33kOhm 5W
+LVD 110V 220V
XK 12 XK 11
-PU
XK 17
/A01/6.C
COM
/M01/4.A /M01/4.A
+CB -XB 31 -XB 41 /M01/8.A /M01/8.A /M01/3.A CB CLOSING RELEASE XK 16

-QB +CB -XB 10 -XB 49


+CB -XB 4
13 -QB -QB +CCB
E 43 43 0V E
-BB2 -QE
CB FIRST OPENING /M02/3.A
14 -BT1 -BT2 P2
RELEASE

/N99/8.A
CB CLOSING 44 44 -MC G
BLOCKING MAGNET
-MO1 -RL3
-RL1 H
-XB 30 -XB 14
/M01/4.D -XB 20 /M01/3.D
/M01/2.D
XK 6 XK 7 XK 8 XK 9 XK 10
-DC_L1-
/G01/2.E
F PROJECT NO.: DRAWING NO.: 1YUX200119/OUT DRAWING REV.: R1 DATE: 26/12/13 F
PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation OUTGOING PANEL=JC05, JC06, JC07, JC08 SCALE: 1: 1
A1 REVISED AS CUSTOMER COMMENT 26/12/13 CUSTOMER: CLOSING & TRIPPING CIRCUITS START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC05+WLV/M04
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: M05
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
POSITION INDICATION 50BF SIGNAL
LAMP INDICATOR CIRCUIT BREAKER EARTHING SWITCH

CB OPENED CB CLOSED CB OPENED CB CLOSED ES OPENED ES CLOSED 50BF


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
-DC_L2+
/G01/4.E -XK1 1 -XK1 2 -XK1 3 -XK1 4 -XK1 5

/M01/5.A /M01/5.A /M02/5.B /M02/5.B


B B
+CB -XB 6
+CB -XB 29
+CCB
-QB -QB -QE -X100 8
/M02/3.A
13 21
20 40 +LVD
-BE1 -BE2 -AR30 PO2
-BB3 -BB3 /N01/1.A
21 41
14 22
-X100 9

-XB 16 -XB 39
/M01/5.D /M01/5.D

C C

-XK1 8 -XK1 10 -XK1 12 -XK1 14

-XK1 9 -XK1 11 -XK1 13 -XK1 15 -XK1 16

D D

A1

3 2
-KBF1
3 2 A2

X1 X1 +LVD-P1 1 2 /X02/2.B
+LVD-P2
+LVD-SOT +LVD-SOC 3 4 /X02/2.B
/M04/3.B X2 /M04/7.B X2 1 5 6 /X01/6.C
E 1 E
RED GREEN 13 14

-XK1 6 -XK1 7
-DC_L2-
/G01/4.E
F PROJECT NO.: DRAWING NO.: 1YUX200119/OUT DRAWING REV.: R1 DATE: 26/12/13 F
PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation OUTGOING PANEL=JC05, JC06, JC07, JC08 SCALE: 1: 1
CUSTOMER: INDICATOR CIRCUIT & 50BF SIGNAL START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC05+WLV/M05
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: M07
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PROTECTION AND CONTROL UNIT BINANY INPUT

POWER FOR RELAY CONTROL MODE CB SPRING STATUS CB STATUS


CB SPRING CHARGED CB CLOSED CB OPENED CB IN TEST CB IN SERVICE
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
-DC_L3+ L3+ / M08/1.A
/G01/5.E -XK2 1 -XK2 2 -XK2 3 -XK2 4 -XK2 5 -XK2 6 -XK2 7 -XK2 8 -XK2 9

/M01/1.A /M01/5.A
B B
+CB -XB 24
+CB -XB 11

13 15 17
-QB -QB
1 2 1 2 1 2

4 53 41 13 13
+LVD 14 +LVD 16 +LVD 18
-BS2 -BB2 -BB2 -BT2 -BT1
-SS1 -SS1 -SS1
3 54 42 14 14
LOCAL REMOTE SUPERVISORY
/N99/3.A /N99/4.A /N99/4.A
-XB 34 -XB 21 -XB 22 -XB 50 -XB 51
/M01/1.D /M01/5.D /M01/5.D /M01/7.D /M01/7.D

C C

-XK2 16 -XK2 17 -XK2 18 -XK2 19 -XK2 20 -XK2 21 -XK2 22 -XK2 23

D -GND D

-GND -X100 1 -X110 1 -X110 3 -X110 5 -X110 7 -X110 8 -X110 10 -X110 11 -X110 13
+LVD +LVD
-AR30 -AR30
+

+
/N01/1.A /N01/1.A
BI1 BI2 BI3 BI4 BI5 BI6 BI7 BI8
- - - - - - - -

-X110 2 -X110 4 -X110 6 -X110 9 -X110 12


-X100 2
E E
L3- / M08/1.E

-XK2 13 -XK2 14 -XK2 15


-DC_L3-
/G01/5.E
F PROJECT NO.: DRAWING NO.: 1YUX200119/OUT DRAWING REV.: R1 DATE: 26/12/13 F
PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation OUTGOING PANEL=JC05, JC06, JC07, JC08 SCALE: 1: 1
A1 REVISED AS CUSTOMER COMMENT 26/12/13 CUSTOMER: RELAY INPUT SIGNALS START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC05+WLV/M07
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: M08
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PROTECTION AND CONTROL UNIT BINANY INPUT

AUTO RECLOSE MODE ES STATUS

ON ES CLOSED ES OPENED
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
L3+
/M07/8.A -XK2 10 -XK2 11 -XK2 12

/M02/5.B /M02/5.B
B B
+CCB +CCB
3
-QE -QE
1 2
42 24
+LVD 4 -BE2 -BE1
-SS3 43 25
ON
/N99/8.B

C C

-XK2 24 -XK2 25 -XK2 26

D D
-X120 1 -X120 3 -X120 4
+LVD
-AR30
+

/N01/1.A
BI1 BI2 BI3
- - -

-X120 2

E E
L3-
/M07/8.E

F PROJECT NO.: DRAWING NO.: 1YUX200119/OUT DRAWING REV.: R1 DATE: 26/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation OUTGOING PANEL=JC05, JC06, JC07, JC08 SCALE: 1: 1
A1 REVISED AS CUSTOMER COMMENT 26/12/13 CUSTOMER: RELAY INPUT SIGNALS START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC05+WLV/M08
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: M09
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
LOAD SHEDDING CIRCUIT

4 STAGE LOAD SHEDDING


STAGE 1 STAGE 2 STAGE 3 STAGE 4 COMMON
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A

=PREV LOAD SHEDDING WIRING BAR =NEXT


-XI5 1 -XI5 1 -XI5 1

-XI5 3 -XI5 3 -XI5 3

B B

-XI5 5 -XI5 5 -XI5 5

-XI5 7 -XI5 7 -XI5 7

C -XI5 9 -XI5 9 -XI5 9 C

-XI5 2 -XI5 4 -XI5 6 -XI5 8 -XI5 10

PREVIOUS PANEL NEXT PANEL


2 4 6 8
1 2 3 4

+LVD-SS4 1
/N99/7.C
D D
-X120 5
+LVD
-AR30
+

/N01/1.A
BI4
-

-X120 6

E E

F PROJECT NO.: DRAWING NO.: 1YUX200119/OUT DRAWING REV.: R1 DATE: 26/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation OUTGOING PANEL=JC05, JC06, JC07, JC08 SCALE: 1: 1
CUSTOMER: LOAD SHEDDING CIRCUIT START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC05+WLV/M09
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: N01
1 2 3 4 5 6 7 8
F
E
B

C
A

D
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A0
PAGE REV.
1
1

FIRST ISSUE
FEEDER PROTECTION RELAY
+LVD-AR30

REF615
ANALOG INPUT AND BI MODULE
BINARY INPUT 1 (+) /M08/2.D -X120 1
BINARY INPUT 1, 2 & 3 (-) /M08/2.E 2
BI1

DESCRIPTION
BINARY INPUT 2 (+) /M08/3.D 3 BI2

2
2

BINARY INPUT 3 (+) /M08/4.D 4 BI3


BINARY INPUT 4 (+) /M09/4.D 5
(-) /M09/4.E 6
BI4
COM /A03/3.D 7
L1 /A03/3.E 8
IL1
COM /A03/4.D 9
L2 /A03/4.E 10
IL2
COM /A03/5.D 11
L3 /A03/5.E 12
IL3
N /A03/5.D 13
COM /A03/5.E 14
Io

3
3

DATE
19/12/13
MAIN MODULE +
AUXILIARY VOLTAGE SUPPLY (+) INPUT /M07/3.D -X100 1
- Uaux
(-) INPUT /M07/3.E 2
IRF, COMMON /X01/5.C 3
IRF

CUSTOMER:
CLOSED; IRF, OR Uaux DISCONNECTED /X01/4.C 4

PROJECT NO.:
CLOSED; NO IRF, AND Uaux CONNECTED /X01/5.C 5

PROJECT TITLE:

DESIGNED: HNX
POWER OUTPUT CONTACT 1, NO /M04/7.B 6 PO1
/M04/7.B 7
POWER OUTPUT CONTACT 2, NO /M05/5.B 8 PO2
/M05/5.C 9

4
4

SIGNAL OUTPUT CONTACT 1, COMMON /X01/5.C 10


NC /X01/5.C 11
SO1
NO /X01/5.C 12
SIGNAL OUTPUT CONTACT 2, NO /X01/6.C 13
/X01/6.C 14
SO2

CHECKED: DLQ
POWER OUTPUT CONTACT 3, NO /M04/4.B 16
/M04/4.B 17
PO3
(TCS RESISTOR) /M04/4.B 15

TOJI
POWER OUTPUT CONTACT 3, NO (TCS1 INPUT) /M04/4.B 19
/M04/4.C 18 TCS1
(TCS RESISTOR) 20
/M04/5.D 22
POWER OUTPUT CONTACT 4, NO /M04/5.D 21
PO4

110kV Nhat tan Substation

5
5

POWER OUTPUT CONTACT 4, NO (TCS2 INPUT) 23

APPROVED: DLQ
24 TCS2

BIO MODULE
BINARY INPUT 1 (+) /M07/3.D -X110 1
(-) /M07/3.E 2
BI1
BINARY INPUT 2 (+) /M07/4.D 3
(-) /M07/4.E 4
BI2
BINARY INPUT 3 (+) /M07/5.D 5
DRAWING TITLE:
BINARY INPUT 3 & 4 (-) /M07/5.E 6
BI3

BINARY INPUT 4 (+) /M07/5.D 7 BI4

6
6

BINARY INPUT 5 (+) /M07/6.D 8


BINARY INPUT 5 & 6 (-) /M07/6.E 9
BI5

BINARY INPUT 6 (+) /M07/6.D 10 BI6


BINARY INPUT 7 (+) /M07/7.D 11
BINARY INPUT 7 & 8 (-) /M07/7.E 12
BI7
REF615 - A/I + Binary I/O Board
DRAWING NO.: 1YUX200119/OUT

BINARY INPUT 8 (+) /M07/7.D 13 BI8


SIGNAL OUTPUT CONTACT 1, COMMON /X01/7.C 14
NC /X01/7.C 16 SO1
OUTGOING PANEL=JC05, JC06, JC07, JC08

TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559

NO /X01/7.C 15
SIGNAL OUTPUT CONTACT 2, COMMON /X01/7.C 17
SO2
7
7

NC /X01/7.C 19
NO /X01/7.C 18
ABB XIAMEN SWITCHGEAR CO.,LTD

SIGNAL OUTPUT CONTACT 3, COMMON /X03/6.B 20


NC /X03/6.B 22 SO3
NO /X03/6.B 21
SIGNAL OUTPUT CONTACT 4, NO /X03/6.B 23
/X03/6.B 24
SO4
CONT.:
SHEET:

COMMUNICATION MODULE
DRAWING REV.: R1

ETHERNET RJ-45 -X1 LAN


8
8

SCALE:
LANGUAGE:
DATE: 26/12/13

N99
==SWG1=JC05+WLV/N01
START: 12/12/2013
1: 1
ENG
F
E
B

C
A

D
1 2 3 4 5 6 7 8

/M04/8.D

/M04/7.D

/M04/8.D
/M04/8.E

/M04/8.E
+LVD-SS1
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

CONTROL
CONTROL MODE
A NO COM NC P1 P2 P3 A
1 2
REMOTE 1 3 5 7 9 11 13 15 17 19 21 23 +LVD 110V 0V 220V
-PU
LOCAL SUPER. AUXILIARY VOLTAGE
2 4 6 8 10 12 14 16 18 20 22 24
VOLTAGE INDICATOR

/M04/3.B

/M04/3.B

/M04/2.B

/M04/7.B

/M04/6.B

/M04/6.B

/M07/3.B

/M07/4.B

/M07/5.B

/X01/6.E

/X01/6.E

/X01/6.E
SALZER 1 LOCAL
+LVD-SS3
2 REMOTE AUTO RECLOSE
AUTO RECLOSE
B 3 SUPERVISORY B
1 2
1 3 5 7
OFF ON
2 4 6 8

/M08/2.B
SALZER 1 OFF
2 ON
C C

+LVD-SS4
LOAD SHEDDING LOAD SHEDDING

2 3
OFF F1 1 3 5 7
1 4
F2 2 4 6 8
5
D F3 D

F4
SALZER 1 OFF
2 F1
3 F2
4 F3
5 F4

E E

F PROJECT NO.: DRAWING NO.: 1YUX200119/OUT DRAWING REV.: R1 DATE: 26/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation OUTGOING PANEL=JC05, JC06, JC07, JC08 SCALE: 1: 1
A1 REVISED AS CUSTOMER COMMENT 26/12/13 CUSTOMER: CROSS REFERENCE START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC05+WLV/N99
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: X01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
ALARM WIRING CIRCUIT TO REMOTE CONTROL PANEL
COMMON AC/DC SUPPLY CIRCUIT BRIDGE
INTERNAL RELAY AUTO RECLOSE LOAD SHEDDING
O/C & E/F TRIP 50BF
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

MCB OFF SPARE FAULTY TCS ALARM OPERATED OPERATED TERMINALS

A =PREV =NEXT A

-XI4 1 -XI4 1 COMMON -XI4 1

-XI4 5 -XI4 5 AC/DC CIRCUIT MCB OFF -XI4 5

-XI4 7 VT CIRCUIT FAIL -XI4 7 -XI4 7

-XI4 9 INTERNAL RELAY FAULT -XI4 9 -XI4 9

-XI4 11 OC/EF OPERATED -XI4 11 -XI4 11

-XI4 13 TCS ALARM -XI4 13 -XI4 13

-XI4 15 50BF -XI4 15 -XI4 15


B B
-XI4 17 AUTO RECLOSED OPERATED -XI4 17 -XI4 17

-XI4 19 LOAD SHEDDING OPERATED -XI4 19 -XI4 19

-XI4 21 VOLTAGE PROTECTION OPERATED -XI4 21 -XI4 21

-XI4 6 -XI4 8 -XI4 10 -XI4 12 -XI4 14 -XI4 16 -XI4 18 -XI4 20

-XI4 22
-X100 3 -X100 10 -X100 13 -X110 14 -X110 17
5
+LVD -KBF1 +LVD
-AR30 IRF SO1 SO2 /M05/5.E 6 -AR30 SO1 SO2
21 21 21 21 21 /N01/1.A /N01/1.A
C PREVIOUS PANEL -FB1 -FB2 -FB3 -FB4 -FB5 4 5 -X100 11 12 14 16 15 19 18
NEXT PANEL C
/G01/2.C 22 /G01/4.C 22 /G01/5.C 22 /G02/6.C 22 /G02/2.C 22 -X100 -X100 -X110 -X110

-XI4 2 -XI4 3 -XI4 4

TO REMOTE CONTROL PANEL

CIRCUIT BREAKER EARTH SWITCH CONTROL MODE


COMMON CB CLOSED CB OPENED ES CLOSED ES OPENED LOCAL REMOTE SUPERVISORY

D D

XC1 1 XC1 6 XC1 7 XC1 8 XC1 9 XC1 10 XC1 11 XC1 12

/M01/3.A /M01/6.A /M02/6.B /M02/6.B


-XB 5 -XB 7 +CCB +CCB
+CB +CB -QE -QE
E -QB -QB E
48 28 20 22 24
13 53 1 2 1 2 1 2

-BE2 -BE1
-BB1 -BB3
49 29 +LVD 19 +LVD 21 +LVD 23
14 54
-SS1 -SS1 -SS1
LOCAL REMOTE SUPERVISORY
/N99/4.A /N99/4.A /N99/4.A
-XB 15 -XB 17
/M01/3.D /M01/6.D

XC1 2 XC1 3 XC1 4 XC1 5

F PROJECT NO.: DRAWING NO.: 1YUX200119/OUT DRAWING REV.: R1 DATE: 26/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation OUTGOING PANEL=JC05, JC06, JC07, JC08 SCALE: 1: 1
A1 REVISED AS CUSTOMER COMMENT 26/12/13 CUSTOMER: SIGNALS TO REMOTE CONTROL PANEL START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC05+WLV/X01
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: X02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
BUSBAR ES INTERLOCK 50BF SIGNALS
TO INC. SPARE

CB IN TEST 50BF 50BF


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
-XI3 1 -XI1 11 -XI1 15

-XI1 12 -XI1 16

/M01/7.A
+CB -XB 52

-QB
23 1 3
B -BT2 -KBF1 -KBF1 B
24 /M05/5.E 2 /M05/5.E 4

-XB 53
/M01/7.D

-XI1 13 -XI1 17

C -XI3 2 -XI1 14 -XI1 18


C

D D

E E

F PROJECT NO.: DRAWING NO.: 1YUX200119/OUT DRAWING REV.: R1 DATE: 26/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation OUTGOING PANEL=JC05, JC06, JC07, JC08 SCALE: 1: 1
CUSTOMER: SIGNALS FOR INTERLOCKING AND INTERTRIPPING START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC05+WLV/X02
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: X03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
EARTHING SWITCH SPARE CONTACT RELAY OUTPUTS FOR SPARE

EARTHING SWITCH EARTHING SWITCH EARTHING SWITCH


ES CLOSED ES OPENED ES CLOSED SPARE PROTECTION TRIP
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A
-XC2 1 -XC2 3 -XC2 5 -XR1 1 -XR1 3

/M02/5.B /M02/6.B /M02/6.B

+CCB +CCB +CCB


-QE -QE -QE
-X110 20 -X110 23
44 26 46
+LVD
B -BE2 -BE1 -BE2 SO4 B
-AR30 SO3
45 27 47 /N01/1.A

-X110 22 21 -X110 24

C -XC2 2 -XC2 4 -XC2 6 -XR1 2 -XR1 4


C

CIRCUIT BREAKER SPARE CONTACT

CB CLOSED CB OPENED CB CLOSED CB OPENED CB CLOSED CB CLOSED CB OPENED CB IN SERVICE CB IN TEST CB IN SERVICE CB SPRING DISCHARGED

D D
-XC3 1 -XC3 4 -XC3 6 -XC3 8 -XC3 10 -XC3 12 -XC3 14 -XC3 17 -XC3 19

/M01/4.A /M01/4.A /M01/3.A /M01/6.A /M01/5.A /M01/5.A /M01/7.A /M01/8.A /M01/1.A


+CB -XB 2
+CB -XB 27
+CB -XB 32
+CB -XB 9
+CB -XB 28
+CB -XB 8
+CB -XB 12
+CB -XB 55
+CB -XB 26

-QB -QB -QB -QB -QB -QB -QB -QB -QB


53 31 43 21 41 31 31 33 33 53 2

E -BB1 -BB1 -BB1 -BB1 -BB3 -BB3 -BB2 -BT1 -BT2 -BT1 -BS2 E
54 32 44 22 42 32 32 34 34 54 1

-XB 3 -XB 13 -XB 37 -XB 42 -XB 19 -XB 38 -XB 18 -XB 48 -XB 47 -XB 56 -XB 36
/M01/4.D /M01/3.D /M01/4.D /M01/3.D /M01/6.D /M01/5.D /M01/5.D /M01/8.D /M01/7.D /M01/8.D /M01/1.D

-XC3 2 -XC3 3 -XC3 5 -XC3 7 -XC3 9 -XC3 11 -XC3 13 -XC3 15 -XC3 16 -XC3 18 -XC3 20

F PROJECT NO.: DRAWING NO.: 1YUX200119/OUT DRAWING REV.: R1 DATE: 26/12/13 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
110kV Nhat tan Substation OUTGOING PANEL=JC05, JC06, JC07, JC08 SCALE: 1: 1
CUSTOMER: SPARE CONTACTS START: 12/12/2013
TOJI
A0 FIRST ISSUE 19/12/13 ABB XIAMEN SWITCHGEAR CO.,LTD SHEET: ==SWG1=JC05+WLV/X03
PAGE REV. DESCRIPTION DATE DESIGNED: HNX CHECKED: DLQ APPROVED: DLQ TEL: (+86) 592 602 6033 , TELEFAX: (+86) 592 603 0505-8559 CONT.: =TP01+/F01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

BUSCOUPLER PANEL
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A

50BF SIGNALS FROM OTHERS

CB OPEN CMD FROM LOCAL


AND
SELECTOR SWITCH IN LOCAL
PROTECTION RELAY -X110-S02 OR
OPENING CB

CB OPEN CMD FROM REMOTE


EXTERNAL TRIP -X120-BI4 AND
B SELECTOR SWITCH IN REMOTE B
ES CLOSED -X120-BI2
3I> PHLPTOC

ES OPENED -X120-BI3 CB OPENING EXE -X100-PO3


3I>> PHHPTOC OR

CB CLOSED -X110-BI5
3I>>> PHIPTOC
LOCKOUT
OR
F86
CB OPENED -X110-BI6
3Io> EFLPTOC
PROTECTION TRIP -X110-SO4
CB IN TEST -X110-BI7
3Io>> EFHPTOC OR
PROTECTION TRIP -X100-SO1
CB IN SERVICE -X110-BI8
3Io>>> EFIPTOC

C AND CB CLOSE ENABLE -X100-PO4 C

BUSBAR ES OPENED
CB SPRING CHARGED -X110-BI4
TCS (74) TCSSCBR FEEDER ES OPENED AND

CB IN SERVICE OR CB CLOSE ENABLE


TCS ALARM -X100-SO2

CB IN TEST AND CLOSING CB


CB CONTROL
SELECTOR SWITCH IN LOCAL -X110-BI1 FUNCTION
CBXCBR1
OR CB CLOSING EXE -X100-PO1

SELECTOR SWITCH IN REMOTE -X110-BI2


CB CLOSE CMD FROM LOCAL
OR
D SELECTOR SWITCH IN SUPER. -X110-BI3
AND D
50BF CCBRBRF 50BF TRIP -X100-PO2 SELECTOR SWITCH IN LOCAL
OR CB CLOSING CMD
RELAY SELF CHECK RELAY FAULTY -X100-IRF CB CLOSE CMD FROM REMOTE
AND
SELECTOR SWITCH IN REMOTE

-X110-S01

E -X110-S03 E
-X120-BI1

F F
PROJECT NO.: DRAWING NO.: 1YUX200091 DRAWING TITLE: LANGUAGE: ENG
PROJECT TITLE: CUSTOMER: SCALE: 1 : 1.2
TOJI LOGIC DIAGRAM DATE: 12/12/2013
A0 FIRST ISSUED 13/06/13 110kV Nhat tan Substation APPROVED: DLQ CHECKED: DLQ SHEET: ==SWG1=LG+GA/LG02
REV. DESCRIPTION DATE DESIGNED: HNX DRAWN:
ABB VIETNAM MANUFACTURING
TEL: (+84) (241) 3748 530, TELEFAX: (+84) (241) 3748 531 CONT.: LG03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A

24kV OUTGOING WITHOUT VT FEEDER

50BF SIGNALS FROM OTHERS

CB OPEN CMD FROM LOCAL


B B
AND
SELECTOR SWITCH IN LOCAL
PROTECTION RELAY LOAD SHEDDING -X110-S02 OR
OPENING CB

CB OPEN CMD FROM REMOTE


LOAD SHEDDING -X120-BI4 AND
SELECTOR SWITCH IN REMOTE
ES CLOSED -X120-BI2
3I> PHLPTOC

OR CB OPENING EXE -X100-PO3


ES OPENED -X120-BI3
3I>> PHHPTOC OR

CB CLOSED -X110-BI5
3I>>> PHIPTOC
LOCKOUT
OR
F86
CB OPENED -X110-BI6
3Io> EFLPTOC
C PROTECTION TRIP -X110-SO4 C
CB IN TEST -X110-BI7
3Io>> EFHPTOC OR
PROTECTION TRIP -X100-SO1
CB IN SERVICE -X110-BI8
3Io>>> EFIPTOC

AND CB CLOSE ENABLE -X100-PO4

BUSBAR ES OPENED
CB SPRING CHARGED -X110-BI4
TCS (74) TCSSCBR FEEDER ES OPENED AND

CB IN SERVICE OR CB CLOSE ENABLE


TCS ALARM -X100-SO2
D D
CB IN TEST AND CLOSING CB
CB CONTROL
SELECTOR SWITCH IN LOCAL -X110-BI1 FUNCTION
CBXCBR1
OR CB CLOSING EXE -X100-PO1

SELECTOR SWITCH IN REMOTE -X110-BI2


CB CLOSE CMD FROM LOCAL
OR
AND
SELECTOR SWITCH IN SUPER. -X110-BI3
50BF CCBRBRF 50BF TRIP -X100-PO2 SELECTOR SWITCH IN LOCAL
OR CB CLOSING CMD
RELAY SELF CHECK RELAY FAULTY -X100-IRF CB CLOSE CMD FROM REMOTE
AUTORECLOSE CMD

AND
SELECTOR SWITCH IN REMOTE
RESET LOCKOUT

E E
AR OPERATED -X110-S01

AUTORECLOSE SW IN ON -X120-BI1 F79 DARREC1

-X110-S03
-X120-BI1

F F
PROJECT NO.: DRAWING NO.: 1YUX200057 DRAWING TITLE: LANGUAGE: ENG
PROJECT TITLE: CUSTOMER: SCALE: 1 : 1.2
TOJI LOGIC DIAGRAM DATE: 12/12/2013
A0 FIRST ISSUED 09/05/12 110kV Nhat tan Substation APPROVED: DLQ CHECKED: DLQ SHEET: ==SWG1=LG+GA/LG03
REV. DESCRIPTION DATE DESIGNED: HNX DRAWN:
ABB VIETNAM MANUFACTURING
TEL: (+84) (241) 3748 530, TELEFAX: (+84) (241) 3748 531 CONT.: LG05
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

METERING PANEL
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

A A

PROTECTION RELAY

VT FUSE NORMAL -X130-BI1


AND
B VT WD2 MCB ON -X130-BI3 B
BLOCK
VT WD1 MCB ON -X130-BI2

-X130-BI4
U> PHPTOV1
-X110-BI1

-X110-BI2 U>> PHPTOV2

-X110-BI3
U>>> PHPTOV3

-X110-BI4
U< PHPTUV1 27/59 -X100-PO1

OR
U<< PHPTUV2
C 27/59 -X100-PO2
C
U<<< PHPTUV3 BUSBAR VOLTAGE IS LIVE

27/59 -X100-S01
INCOMER CB TRUCK IN TEST

CB IN TEST -X110-BI5 OUTGOINGS FEEDER CB TRUCK IN TEST ES CLOSE ENABLE


AND
-X100-PO2
CB IN SERVICE -X110-BI6 LBS SWITCH OPENED

ES OPENED -X110-BI7 VT TRUCK IN TEST

ES CLOSED -X110-BI8

D 81LSH (1) LSHDPFRQ1 LOAD SHEDDING STG 1 -X110-S01 D


81LSH (2) LSHDPFRQ2 LOAD SHEDDING STG 2 -X110-S02

81LSH (3) LSHDPFRQ3 LOAD SHEDDING STG 3 -X110-S03

81LSH (4) LSHDPFRQ4 LOAD SHEDDING STG 4 -X110-S04

RELAY SELF CHECK RELAY FAULTY -X100-IRF

-X100-S02

E -X100-PO3 E
-X100-S01

-X100-S01

F F
PROJECT NO.: DRAWING NO.: 1YUX200091 DRAWING TITLE: LANGUAGE: ENG
PROJECT TITLE: CUSTOMER: SCALE: 1 : 1.2
TOJI LOGIC DIAGRAM DATE: 12/12/2013
A0 FIRST ISSUED 13/06/13 110kV Nhat tan Substation APPROVED: DLQ CHECKED: DLQ SHEET: ==SWG1=LG+GA/LG05
REV. DESCRIPTION DATE DESIGNED: HNX DRAWN:
ABB VIETNAM MANUFACTURING
TEL: (+84) (241) 3748 530, TELEFAX: (+84) (241) 3748 531 CONT.:
1 2 3 4 5 6 7 8