You are on page 1of 18

PROPOSED EXTENSION OF 11 STOREY NEW OFFICE BUILDING COMPLETE

WITH 2 1/2 FLOOR SUB BASEMENT CAR PARK FOR PETRONAS CARIGALI
SDN. BHD. ON LOT TL.017503249 AT KOTA KINABALU, SABAH.

DESIGN CALCULATION
FOR
FIRE PROTECTION SYSTEM:
SPRINKLER SYSTEM
PROPOSED EXTENSION OF 11 STOREY NEW OFFICE BUILDING COMPLETE
WITH 2 1/2 FLOOR SUB BASEMENT CAR PARK FOR PETRONAS CARIGALI
SDN. BHD. ON LOT TL.017503249 AT KOTA KINABALU, SABAH.

1) NUMBER OF INSTALLATION VALVE REQUIRED

a. Office Area
i) Floor area for sprinklered area;

Floor Area (sq.m)

Ground Floor until Level 10 10,401 sq.m

ii) Hazard Class : Ordinary Hazard I (office)

iii) Designed coverage per sprinklered head : 12 sq.m

*the ceiling void is assumed to be exceeding 800 mm, thus the upright and
pendant type sprinkler are co-exist throughout.

iv) Total number of sprinkler's point = Total Area / Coverage per point X 2

= 1,734 points

v) As complying to regulations, every installation valve should feed not more than
1000 sprinkler points, thus;

Required Installation Valve = sprinkler's head / 1000

= 1.7335

= 2 installation valves

b. Car Park Area


i) Floor area for sprinklered area;

Floor Area (sq.m)

Ground Floor until Level 10 3,779 sq.m

ii) Hazard Class : Ordinary Hazard III (carpark)

iii) Designed coverage per sprinklered head : 12 sq.m

iv) Total number of sprinkler's point = Total Area / Coverage per point

= 630 points
v) As complying to regulations, every installation valve should feed not more than
1000 sprinkler points, thus;

Required Installation Valve = sprinkler's head / 1000

= 0.629833

= 1 installation valve
PROPOSED EXTENSION OF 11 STOREY NEW OFFICE BUILDING COMPLETE
WITH 2 1/2 FLOOR SUB BASEMENT CAR PARK FOR PETRONAS CARIGALI
SDN. BHD. ON LOT TL.017503249 AT KOTA KINABALU, SABAH.

2) PUMP SELECTION

i) Office Area

Hazard Class : Ordinary Hazard I

Pump Selection Criteria (B.S. 5306:Part 2:1990) :

a) pressure head(bar) = 2.7 Bar


(recommeded)

b) flow rate = 1360 L/min


= 299 igpm

ii) Car Park Area

Hazard Class : Ordinary Hazard III

Pump Selection Criteria (B.S. 5306:Part 2:1990) :

a) pressure head(bar) = 2.5 Bar


(recommeded)

b) flow rate = 2250 L/min


= 495 igpm

3) TANK CAPACITY

i) Material : Hot Dipped Galvanized Metal Tank

ii) Nominal Capacity : 145 cu.metre

iii) Effective Capacity : 135 cu.metre

iv) Tank's Dimension : width 4880 mm


height 2440 mm
length 12200 mm

DESIGN REFERENCE

i) GUIDE TO FIRE PROTECTION IN MALAYSIA


ii)The Loss Preventive Council : Rules For Automatics Sprinkler Installations
Pre-calculate of sprinkler

Statement of distribution pipe losses between the various


design points and the installation valves
Hazard Group : Ordinary Hazard Design, Flow Rate 1000 L/min

Name & Address : 11 Storey New Office Building

Run of Pipe size Pipe length No. of turn Equivalent pipe Total equivalent Pressure loss at design flow rate
distribution pipe length of turns length of pipe
from valves Pipe losses Static head gain Difference
to (letter) mm m m m mbar mbar mbar

Office Area

point A 65 3.1 0 0 3.1 108.5


(Level 10) 80 7.2 0 0 7.2 115.2
100 20.45 5 15 35.45 155.98
150 93.4 7 21 114.4 74.36
200 0 0 0 0 0
Total 454.04
0
454.04

point B 65 0 0 0 0 0
(Level 10) 80 6.4 1 3 9.4 150.4
100 31.012 5 15 46.012 202.4528
150 93.4 7 21 114.4 74.36
200 0 0 0 0 0
Total 427.2128
0
427.2128

Page 5
Pre-calculate of sprinkler

Car Park Area

point C 60 0 0 0 0 0
(Basement 4) 80 9.7 2 6 15.7 251.2
100 0 0 0 0 0
150 50.218 5 15 65.218 42.3917
200 0 0 0 0 0
Total 293.5917
588.6
-295.0083

point D 65 6.9 1 3 9.9 346.5


(Basement 4) 80 26.1 1 3 29.1 465.6
100 0 0 0 0 0
150 50.218 7 21 71.218 46.2917
200 0 0 0 0 0
Total 858.3917
588.6
269.7917

Page 6
PROPOSED EXTENSION OF 11 STOREY NEW OFFICE BUILDING COMPLETE WITH
2 1/2 FLOOR SUB BASEMENT CAR PARK FOR PETRONAS CARIGALI SDN. BHD. ON
LOT TL.017503249 AT KOTA KINABALU, SABAH.

DESIGN CALCULATION
FOR
FIRE PROTECTION SYSTEM : HOSE REEL
PROPOSED EXTENSION OF 11 STOREY NEW OFFICE BUILDING COMPLETE
WITH 2 1/2 FLOOR SUB BASEMENT CAR PARK FOR PETRONAS CARIGALI SDN.
BHD. ON LOT TL.017503249 AT KOTA KINABALU, SABAH.

1) HOSE REEL PUMP SELECTION CALCULATION / ESTIMATION

1 Tank location : Basement 1 Floor

2 Pump location : Basement 1 Floor

3 Furthest point of hose reel : Roof Level

4 Static height : 50 m / 164 ft

5 Pressure require at further/ highest hose reel : 29 psi / 67 ft


reel

6 Flow rate : 26 igpm / 32 usgpm

7 Length of pipe from pump head to furthest : 94.6 m / 310 ft


hose reel

8 Equivalent length of straight pipe fitting


a 2 Elbow : 5 ft x 6 Nos. = 30 ft
b 2 Gate valve : 2 ft x 1 Nos. = 2 ft
c 2 Tee : 10 ft x 10 Nos. = 100 ft
d 2 Check Valve : 17 ft x 1 Nos. = 17 ft

9 Total equivalent length ( as calculated from 8. ) = 149 ft

10 Total length of pipe 310 ft + 149 ft = 459 ft

11 Friction loss :
f = 0.2083 (100/c)1.852 q1.852 / dh4.8655

Where : f = Friction head loss in feet of water per 100 feet of pipe
(ftH20 / 100 ft pipe)
c = Hazen-Williams roughness constant,
120 , for G.I pipe.
q = volumetric flow (gal/min)
dh = inside hydraulic diameter, 2 inches.

Therefore,

f = 3.071 ft / 100 ft

Friction loss : 459 ft x 3.071 /100 ft = 14.11 ft

Total pressure required at pump head : 164 ft + 67 ft + 14.11 ft


= 245 ft
Safety Factor in consideration (+15%) : 282 ft

Pump Selection : 26 igpm @ 282 ft


usgpm
PROPOSED EXTENSION OF 11 STOREY NEW OFFICE BUILDING COMPLETE
WITH 2 1/2 FLOOR SUB BASEMENT CAR PARK FOR PETRONAS CARIGALI
SDN. BHD. ON LOT TL.017503249 AT KOTA KINABALU, SABAH.

DESIGN CALCULATION
FOR
FIRE PROTECTION SYSTEM : WET RISER
PROPOSED EXTENSION OF 11 STOREY NEW OFFICE BUILDING COMPLETE
WITH 2 1/2 FLOOR SUB BASEMENT CAR PARK FOR PETRONAS CARIGALI
SDN. BHD. ON LOT TL.017503249 AT KOTA KINABALU, SABAH.

1) WET RISER PRE-DESIGN

1.1) Pump Selection

i) Tank's location : Basement 1 Floor

ii) Pump's location : Basement 1 Floor

iii) Further point of landing valve : Roof floor

iv) Static height (building height) : 50 m/ 164 ft

v) Pressure required at furthest landing valve : 95psi@ 219 ft

vi) Flow Rate : 330 igpm or 396 usgpm

vii) Length of pipe : 94.6 meters


(from pump head to furthest point) or 310.288 ft

viii) Equivalent length of pipe fittings :

a. 6" elbow : 10ft X 4 nos = 40 ft


b. 6" gate valve : 4ft X 1 nos = 4 ft
c. 6" tee : 10ft X 14 nos = 140 ft
a. 6" check valve : 50ft X 1 nos = 50 ft

ix) Total equivalent length (as calculated from 8.) : 234 ft

x) Total length of pipe (vii) + (viii): = 544 ft

xi) Friction loss :

f = 0.2083 (100/c)1.852 q1.852 / dh4.8655


where
f = friction head loss in feet of water per 100 feet of pipe (fth20/100 ft pipe)
c = Hazen-Williams roughness constant ( 120 , for G.I. pipe)
q = volume flow (gal/min), usgpm
dh = inside hydraulic diameter ( 6 inches )

thus, f = 0.2083 (100/c)1.852 q1.852 / dh4.8655 = 1.574 ft /100 ft

Friction loss for pipe : 544 X 1.574/100 = 9

xii) Total pressure required at pump head (iv)+(v)+(xii): 392 ft


(+10% safety factor) : 431.2 ft
xiii) Pump selection : 330 igpm @ 431 ft

1.2) Tank Capacity

i) Material : Hot Dipped Galvanized Metal Tank

ii) Nominal Capacity : 54 cu.metre 11878 igpm

iii) Effective Capacity : 51 cu.metre 11218 igpm

iv) Tank's Dimension : width 3660 mm


height 3050 mm
length 4880 mm

DESIGN REFERENCE

i) GUIDE TO FIRE PROTECTION IN MALAYSIA


PROPOSED EXTENSION OF 11 STOREY NEW OFFICE BUILDING COMPLETE
WITH 2 1/2 FLOOR SUB BASEMENT CAR PARK FOR PETRONAS CARIGALI
SDN. BHD. ON LOT TL.017503249 AT KOTA KINABALU, SABAH.

DESIGN CALCULATION
FOR
FIRE PROTECTION SYSTEM : PRESSURIZATION
SYSTEM
PROPOSED EXTENSION OF 11 STOREY NEW OFFICE BUILDING COMPLETE
WITH 2 1/2 FLOOR SUB BASEMENT CAR PARK FOR PETRONAS CARIGALI SDN.
BHD. ON LOT TL.017503249 AT KOTA KINABALU, SABAH.

1) LIFT LOBBY PRESSURIZATION PRE-DESIGN


A) Pressurisation Fan ( PFLL - 1)
i) Total double leaf door along the shaft : 12 nos

ii) Total single leaf door along the shaft : 32 nos

iii) Design condition : 4 doors opened


(10% or minimum 2 doors of total doors)

iv) Closed door : 40 doors

v) a) Single leaf opening inward


Door's leakage based on 50Pa pressure differential : 210 CMH (cu.m/hr)
(MS 1472)

b) Single leaf opening outward


Door's leakage based on 50Pa pressure differential : 420 CMH (cu.m/hr)
(MS 1472)

c) Double leaf opening inward


Door's leakage based on 50Pa pressure differential : 630 CMH (cu.m/hr)
(MS 1472)

d) Lift landing door opening


Door's leakage based on 50Pa pressure differential : 274 CMH (cu.m/hr)
(MS 1472) ( Refer d.1 )

d.1) Equation : Q_d= (Q_cF)/n Equation (14) of sub-section 5.3.2.3 of


MS 1472

Q_d= (0.0496
(50)^(1/2) 2.6
m^3/s)/16
Q_d=0.05699 m^3/s=205 m^3/hr (CMH)

vi) Air leakage through closed door : (assume all comprised of a similar type)

a) Double leaf opening inward 12 X 630


= 7560 CMH

b) Lift landing door opening = CMH X No. Landings X No. Lift


= 274 X 14 X 1
= 3836 CMH
vii) Estimation of air flow past the estimated open door :

Area of door = 2 m X 1.6 m = 3.2 sq.m


Air flow through (based on 1m/s) = 11520 CMH
Total air quantity (opened doors) = 23040 CMH

viii) Minimum air volume required : 34436 CMH

ix) Add 10% leakage factor : 37880 CMH

x) The airflow of fan selected : 37880 CMH


or
22280 CFM

ix) Add 10% leakage factor : 24508 CMH

x) The airflow of fan selected : 24508 CMH


or
14415 CFM

2) STAIRCASE PRESSURIZATION PRE-DESIGN


A) Pressurisation Fan ( PIL - 1)
i) Total double leaf door along the shaft : 0 nos

ii) Total single leaf door along the shaft : 17 nos

iii) Design condition : 2 doors opened (minimum)

iv) Closed door : 15 doors

v) Door's leakage based on 50Pa pressure differential : 210 CMH (cu.m/hr)


(MS 1472)

vi) Air leakage through closed door : 15 X 210


= 3150 CMH

vii) Estimation of air flow past 2 opened door :

Area of door = 2 m X 0.8 m = 1.6 sq.m


Air flow through (based on 1m/s) = 5760 CMH
Total air quantity (2 doors) = 11520 CMH

viii) Minimum air volume required : 14670 CMH

ix) Add 10% leakage factor : 16137 CMH

x) The airflow of fan selected : 16137 CMH


or
9491 CFM
B) Pressurisation Fan ( PFL - 2)
i) Total double leaf door along the shaft : 0 nos

ii) Total single leaf door along the shaft : 12 nos

iii) Design condition : 2 doors opened (minimum)

iv) Closed door : 10 doors

v) Door's leakage based on 50Pa pressure differential : 210 CMH (cu.m/hr)


(MS 1472)

vi) Air leakage through closed door : 10 X 210


= 2100 CMH

vii) Estimation of air flow past 2 opened door :

Area of door = 2 m X 0.8 m = 1.6 sq.m


Air flow through (based on 1m/s) = 5760 CMH
Total air quantity (2 doors) = 11520 CMH

viii) Minimum air volume required : 13620 CMH

ix) Add 10% leakage factor : 14982 CMH

x) The airflow of fan selected : 14982 CMH


or
8812 CFM

C) Pressurisation Fan ( PFL - 3)


i) Total double leaf door along the shaft : 0 nos

ii) Total single leaf door along the shaft : 12 nos

iii) Design condition : 2 doors opened (minimum)

iv) Closed door : 10 doors

v) Door's leakage based on 50Pa pressure differential : 210 CMH (cu.m/hr)


(MS 1472)

vi) Air leakage through closed door : 10 X 210


= 2100 CMH

vii) Estimation of air flow past 2 opened door :

Area of door = 2 m X 0.8 m = 1.6 sq.m


Air flow through (based on 1m/s) = 5760 CMH
Total air quantity (2 doors) = 11520 CMH
viii) Minimum air volume required : 13620 CMH

ix) Add 10% leakage factor : 14982 CMH

x) The airflow of fan selected : 14982 CMH


or
8812 CFM

You might also like