You are on page 1of 16

Measurement

S.no Description unit No L B


A Footing
1 F1(2000*2000)
1.1 Excavtion Cum 3 2.50 2.50
1.2 Well Compacted Hardcore Cum 3 2.60 2.60
1.3 Lean Concrete Cum 3 2.60 2.60
1.4 Form work Sqm 3 2.00 2.00
1.5 RC Concrete Cum 3 2.00 2.00
1.6 Rebar Tonn 3
2 F1(2000*2000)
2.1 Excavtion Cum 7 2.30 2.30
2.2 Well Compcated hardcore Cum 7 2.40 2.40
2.3 Lean Concrete Cum 7 2.40 2.40
2.4 Form Work Sqm 7 7.20
2.5 RC Concrete Cum 7 1.80 1.80
2.6 Rebar Tonn 3
B Stump
3 Stump 1(300*300)
3.1 Form work Sqm 3 1.20
3.2 RC Concrete Cum 3 0.30 0.30
Rebar Tonn 3
4 Stump 2(600*600)
4.1 Form work Sqm 3 2.40
4.2 RC Concrete Cum 3 0.60 0.60
Rebar Tonn 3
c FTB
5 FTB 1(300*600)
5.1 Excavtion Cum 1 5.62 1.00
5.2 Lean Concrete Cum 1 10.02 0.50
5.3 Form Work Sqm 1 20.05
5.4 RC Concrete Cum 1 10.02 0.30
5.5 Rebar Tonn 1
6 FTB 2(500*500)
6.1 Excavtion Cum 1 10.25 1.20
6.2 Lean Concrete Cum 1 20.45 0.70
6.3 Form Work Sqm 1 40.90
6.4 RC Concrete Cum 1 20.45 0.50
6.5 Rebar Tonn 1
D Pavilion
7 Raft Foundation
7.1 Excavtion Cum 1 20.35 21.50
7.2 Well Compacted Hardcore Cum 1 20.35 21.50
7.3 Lean Concrete Cum 1 20.35 21.50
7.4 Form work Sqm 1 79.70
7.5 RC Concrete for beam and Slab Cum 1 19.35 20.50
7.6 Dedution 1 Cum -1 10.40 17.65
7.7 Deduction 2 Cum -1 3.55 17.65
Summary of Rc Concrete for foundation Cum 1
Rc concrete for non suspended slab(Around
7.8 pavilion Cum 1 22.35 23.50
Cum -1 19.35 20.50
Summary of Rc Concrete Cum 1
7.9 Rebar Tonn 1
7.1 Back filling Cum 1
E Studio
8.1 Excavtion Cum 1 9.09 16.98
8.2 Well Compacted Hardcore Cum 1 9.09 16.98
8.3 Lean Concrete Cum 1 9.09 16.98
8.4 Form work Sqm 1 48.12
8.5 RC Concrete for beam and Slab Cum 1 8.09 15.98
8.6 Dedution 1 Cum -1 6.39 13.28
Summary of Rc Concrete Cum 1
8.7 Rebar Tonn 1
8.8 Back filling Cum 1
F Link Way
Non Suspended slab
9.1 Well Compacted Hardcore Cum 1 27.50 4.20
9.2 Lean concrete Cum 1 27.50 4.20
9.3 Rc Concrete for slab Cum 1 27.50 4.20
9.4 BRC R7 Sqm 1
G Office
Non Suspended slab
10.1 Well Compacted Hardcore Cum 1 14.87 4.00
10.2 Lean concrete Cum 1 14.87 4.00
10.3 Rc Concrete for slab Cum 1 14.87 4.00
10.4 BRC R7 Sqm 1
Open Area
11.1 Well Compacted Hardcore Cum 1 15.80 1.60
Cum 1 13.60 15.80
Cum 1 12.00 3.15
Cum 1 9.50 3.50
Cum 1 26.50 3.70
Cum
11.2 Lean concrete Cum 1 15.80 1.60
Cum 1 13.60 15.80
Cum 1 12.00 3.15
Cum 1 9.50 3.50
Cum 1 26.50 3.70
Cum
11.3 Rc Concrete for non suspended slab Cum 1 15.80 1.60
Cum 1 13.60 15.80
Cum 1 12.00 3.15
Cum 1 9.50 3.50
Cum 1 26.50 3.70
Summary of RC concrete Cum 1
11.4 BRC R7 Sqm 1

H Water venture
12.1 Excavtion Cum 1 14.80 2.20
Cum 1 1.65 14.80
Cum
12.2 Lean Concrete Cum 1 14.30 2.30
Cum 1 1.65 14.40
Cum
12.3 Well Compacted Hardcore Cum 1 14.30 2.30
Cum 1 1.65 14.40
Cum
12.4 Form work for Slab Sqm 1 34.69
Form work for kerb Sqm 2 34.69
Summary of form work Sqm 1
12.5 RC Concrete for beam and Slab Cum 1 13.80 1.70
Cum 1 1.65 13.80
Cum -1
12.6 Rc concretr for kerb Cum 1 33.51 0.30
Cum -1 33.51 0.08
12.7 Summary of Rc Concrete Cum 1
12.8 Rebar Tonn 1
12.9 Back filling Cum

KIOSK
13.1 Excavation Cum 1 13.05 8.35
13.2 Well Compacted Hardcore Cum 1 1.57 20.25
Cum 1 1.57 9.00
Cum 1 8.20 6.05
Summary Cum
13.3 Lean Concrete Cum 1 1.57 20.25
Cum 1 1.57 9.00
Cum 1 7.90 6.05
Summary Cum
13.4 Form work Sqm 2 40.00
13.5 RC Concrete for beam and Slab Cum 1 1.57 17.64
Cum 1 3.14 7.84
Cum 1 7.90 6.05
Dedution 1 Cum -1
13.6 Summary of Rc Concrete Cum 1
13.7 Rebar Tonn 1
13.8 Back filling Cum 1

Drainage
14.1 Excavtion Cum 1 124.00 1.20
14.2 Lean Concrete Cum 1 124.00 1.20
14.3 Well Compacted Hardcore (base) Cum 1 124.00 1.20
14.4 Hardcore packing on side Cum 1 124.00 0.60
14.5 Form work Sqm 2 124.00
14.6 RC Concrete for beam and Slab Cum 1 124.00 0.60
Dedution 1 Cum -1 124.00 0.30
Summary of Rc Concrete Cum 1
14.7 Rebar Tonn 1

115 mm thk Bondek slab


At Studio Roof Sqm 1 8.39 6.30
At Office roof Sqm 1 11.30 3.00
Summary of bondek slab Sqm 1
BRC R7 for bondek slab Sqm 1
Measurement
D Total qty Remarks

1.20 22.50
0.20 4.06
0.05 1.01
0.50 6.00
0.50 6.00
1.08 180 kg/cum

1.20 44.44
0.20 8.06
0.05 2.02
0.50 25.2
0.50 11.34
2.04 180 kg/cum

0.80 2.88
0.80 0.22
0.04 200 kg/cum

0.80 5.76
0.80 0.86
0.17 200 kg/cum

0.70 3.94
0.05 0.25
0.60 12.03
0.60 1.80
0.36 200 kg/cum

0.60 7.38
0.05 0.72
0.50 20.45
0.50 5.11
1.02 200 kg/cum

0.80 349.99
0.20 87.50
0.05 21.87
0.80 63.76
0.80 317.31
0.40 -73.42
0.40 -25.06
218.82

0.20 105.04
0.20 -79.33
25.71 244.53
48.91 200 kg/cum
131.17

0.80 123.39
0.20 30.85
0.05 7.71
0.80 38.50
0.80 103.34
0.40 -33.93
69.41
13.88
53.98

0.20 23.10
0.05 5.78
0.20 23.10
115.50

0.20 11.90
0.05 2.97
0.20 11.90
59.49

0.20 5.06
0.20 42.98
0.20 7.56
0.20 6.65
0.20 19.61
81.85
0.05 1.26
0.05 10.74
0.05 1.89
0.05 1.66
0.05 4.90
20.46
0.20 5.06
0.20 42.98
0.20 7.56
0.20 6.65
0.20 19.61
81.85
409.26

0.80 26.05
0.80 19.54
45.58
0.05 1.64
0.05 1.19
2.83
0.20 6.58
0.20 4.75
11.33
0.80 27.75
0.35 24.28
52.04
0.80 18.77
0.80 18.22
-6.66 30.32
0.35 3.52
0.15 -0.38
33.47
6.69
15.26

0.80 87.17
0.20 6.36
0.20 2.83
0.20 9.92
19.11
0.05 1.59
0.05 0.71
0.05 2.39
4.69
0.80 64.00
0.80 22.16
0.80 19.69
0.80 38.24 80.09
-24.83
55.26
11.05 200 kg/Cum
31.91

1.20 178.56
0.05 7.44
0.20 29.76
0.30 22.32
1.20 297.60
1.20 89.28
0.90 -33.48
55.80
10.04 180kg/Cum

52.84
33.90
86.74
86.74
Measurement
S.no Description unit No L B D Total qty
A KIOSK ROOF DETAIL
1
1.1 Excavation Cum 1 13.06 8.15 0.80 85.22
1.2 Lean Concrete Cum 1 12.56 7.65 0.05 4.81
1.3 Well Compacted Hardcore Cum 1 12.56 7.65 0.20 19.23
1.4 Form work Sqm 1 12.56 7.65 0.50 48.08
1.5 RC Concrete Cum 1 12.56 7.65 0.80 76.93
1.6 Rebar Tonn 1 13.85
1.7 Back filling

Drainage
Excavation Cum 1 13.05 8.15 0.80 85.13
Lean Concrete Cum 1 12.56 7.65 0.05 4.81
Well Compacted Hardcore Cum 1 12.56 7.65 0.20 19.23
Form work Sqm 1 12.56 7.65 0.50 48.08
RC Concrete Cum 1 12.56 7.65 0.80 76.93
Rebar Tonn 1 13.85
Back filling
Remarks
unit
s.no Items Unit weight(kg/m) Nos Length
FIRST STOREY
A Second STOREY

1 ROOF SB2(RHS250x150x12.5mm)76 Kg
1.1 SB2 kg 76.0 90 5.300
1.2 SB3 kg 78.0 1 2.800
1.3 SB3 kg 78.0 1 2.341
1.4 SB3 kg 78.0 1 1.450
1.5 SB3 kg 78.0 1 2.800

2 SB2(200*100*5mm)RHS
2.1 SB2(2900) kg 16.0 8 2.90
2.2 SB2(5450) kg 16.0 3 5.45
2.3 SB2(6100) kg 16.0 3 6.10
2.4 SB2(4000) kg 16.0 1 4.00
2.5 SB2(3.8) kg 16.0 1 3.80

3 SB3(50*50*4mm)SHS
3.1 SB3(2400) kg 1.0 17 2.4
3.1 SB3(26200) kg 1.0 1 26.2

B ROOF
4 Column(C1 UC203*203*52 Kg)
4.1 C1 (UC203*203*52 Kg) Nos 52.0 10 3.35
4.2 C2 (200*100*6mm) Nos 27.2 8 3.35

5 BeamSB4(UB 152*152*23 Kg/m)


5.1 SB4(6500) Kg 23.0 2 6.5
5.2 SB4(6200) Kg 23.0 4 6.2
5.3 SB4(6300) Kg 23.0 2 6.3

9 Sag Rod(16mm Dia) Nos


9.1 Sag Rod 1(7.04) Nos 1.56 2.0 7.04
9.2 Sag Rod 2(8.01) Nos 1.56 2.0 8.01
9.3 Sag Rod 3(7.434) Nos 1.56 2.0 7.43
9.4 Sag Rod 4(7.32) Nos 1.56 2.0 7.32
9.5 Sag Rod 5(8.26) Nos 1.56 2.0 8.26
9.6 Sag Rod 6(7.7) Nos 1.56 2.0 7.70
9.7 Sag Rod 7(6.9) Nos 1.56 2.0 6.90
9.8 Sag Rod 8(7.89) Nos 1.56 2.0 7.89
9.9 Sag Rod 9(7.3) Nos 1.56 2.0 7.30
Summary of sag rod
10 Metal Roof Sqm 19.7 23.4

B Metal Roof(PITCH)
11 RB1(UB457*152)74 kg/m
11.1 RB1 kg 74.0 2 3.2
11.2 RB1 kg 74.0 2 9.425
11.3 RB1 kg 74.0 2 1.65
11.4 RB1 kg 74.0 2 7.886

12 RB2(UB 203*133)25 kg/m


12.1 RB2 kg 25.0 1 3.2
12.2 RB2 kg 25.0 1 9.425
12.3 RB2 kg 25.0 3 7.886
12.4 RB2 kg 25.0 2 6.15
12.5 RB2 kg 25.0 3 1

13 RB3(305*127)
13.1 RB3 kg 48.0 4 7.886
13.2 RB3 kg 48.0 2 4.5
13.3 RB3 kg 48.0 3 7.886
13.4 RB3 kg 48.0 2 6.15

14 RB4(152*89)16 kg/m
14.1 RB4 kg 16.0 3.00 3.00
14.2 RB5 kg 1 7.886

15 Sag Rod(16mm Dia)


15.1 Sag Rod 1(7.04) Nos 1.56 4.00 5.49
16 Metal Roof (PITCH)
16.1 Metal Roof Sqm 14.73 8.89
17 Steel Column
17.1 SC2(4000mm) kg 22.7 3.00 4.00
17.2 SC3(4000mm) kg 97.0 2.00 4.00
17.3 SC3(6000mm) kg 40.0 4.00 4.00

M20 BOLTS(GR 8.8)


5 NOS Bolt Nos 10.00 12.00
10 Nos Bolt Nos 10.00 34.00
c KIOSK
18 RB8(100*100*3.6mm) 12 kg/m
18.1 RB8(1800) kg 12.0 18.00 1.800
18.2 RB8(1425) kg 12.0 12.00 1.425
18.3 RB8(1500) kg 12.0 2.00 1.500
18.4 RB8(1950) kg 12.0 4.00 1.950
18.5 RB8(2100) kg 12.0 4.00 2.000

19 RB7(356*171)51 kg/m
19.1 RB7(2310) kg 51.0 2.00 2.310
19.2 RB7(1800) kg 51.0 2.00 1.800
19.3 RB7(1500) kg 51.0 2.00 158.000
19.4 RB7(2000) kg 51.0 2.00 2.000
19.5 RB 7(1200) kg 51.0 2.00 2.000
19.6 RB 7(2600) kg 51.0 2.00 2.600
19.7 RB 7(796) kg 51.0 6.00 0.796
19.8 RB 7(800) kg 51.0 12.00 0.800
19.9 RB 7(1000) kg 51.0 6.00 1.000
19.10 RB 7(3600 kg 51.0 1.00 3.600
19.11 RB 7(4700) kg 51.0 1.00 4.700
19.12 RB 7(2100) kg 51.0 2.00 2.100
Summary
20 Steel Column
SC4(219*12mm) kg 61.3 4.00 4.00
21 MS 16 BOLT(GR 8.8)
21.1 4 Nos Bolt Nos 8.00 8.00
21.2 2 Nos Bolt Nos 2.00 1.00
21.3 1 no bolt Nos 1.00 37.00

22 Metal Roof
22.1 Roof on Kiosk Sqm 1.0
Total
weight
(KG) Remarks

36252
218.4
182.598
113.1
218.4
36984.50

371.20
261.60
292.80
64.00
60.80
632.80

40.80
26.20
67.00

33.5
26.8
60.3

299.00
570.40
289.80
1159.20

21.965
24.991
23.194
22.838
25.771
24.024
21.528
24.617
22.776
211.704
460.084
423.409

473.60
1394.90
244.20
1167.13
3279.83

80.00
235.63
591.45
307.50
75.00
1289.58

1514.11
432.00
1135.58
590.40
3672.10

144.00

34.226

130.846

272.400
776.000
640.000
1688.400

120.000
340.000
460.000
388.800
205.200
36.000
93.600
96.000
819.600

235.620
183.600
16116.000
204.000
204.000
265.200
243.576
489.600
306.000
183.600
239.700
214.200
18885.096

980.800

64.000
2.000
37.000
103.000

120.000

You might also like