You are on page 1of 1

Structural Steel Fabrication Checklist

Project: <Project>
Structure: <Structure>
Client: <Client>
DrawingNumber: <Number>
Date: <MM/DD/YYYY>

Item Reference Satisfactory Unsatisfactory Comments


Materials
Steelinspectedforsurface
condition:twist,straightness,etc.
Sectionscheckedfordimension Drawing
acc.drawings
Materialsspecificationsasshown Drawing
Fabrication
Connectionsasperdetailsand Drawing
location
Boltholescleanandtosize
Onlyapprovedweldersused
WeldsidentifiedperwelderID
Weldsinspectedfordimension,
shape,location,defects,etc.
Weldsrepairedasrequired
CleaningandPainting
Sharpedges,burns,weldspatter
removed
Oilandgreaseremovedpriorto
finalclean
Steelcleanedandpaintedasper
specifications
Finalshopcoatappliedaspercolor
Marking
Eachmembermarkedforerection Scope
perscope
Eachmemberapprovedby Scope
inspectorpriortoshipment
Notes:

Inspector: Date:

You might also like