PRELIMINARES
LIMPIEZA Y DESBROCE DEL TERRENO (MANUAL) M2 1,007.13 0.87 876.20 1,007.13 1,007.13 876.20 876.20 100.00% -
REPLANTEO Y NIVELACIN M2 1,007.13 0.99 997.06 1,007.13 1,007.13 997.06 997.06 100.00% -
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE CIMIENTOS Y PLINTOS M3 720.42 7.64 5,504.01 720.42 720.42 5,504.01 5,504.01 100.00% -
SUB-BASE CLASE 3 M3 318.80 16.01 5,103.99 318.80 318.80 5,103.99 5,103.99 100.00% -
EXCAVACIN A MQUINA M3 864.50 2.29 1,979.71 864.50 864.50 1,979.71 1,979.71 100.00% -
RELLENO COMPACTADO A MQUINA CON MATERIAL IMPORTADO M3 475.48 11.08 5,268.32 475.48 475.48 5,268.32 5,268.32 100.00% -
TRANSPORTE DE MATERIAL DE EXCAVACIN. TRANSPORTE LIBRE 1 M3-KM 8,645.04 0.25 2,161.26 8,645.04 8,645.04 2,161.26 2,161.26 100.00% -
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 15,885.62 0.25 3,971.41 15,885.62 15,885.62 3,971.41 3,971.41 100.00% -
ESTRUCTURA DE HORMIGN ARMADO
ACERO DE REFUERZO EN VARILLAS CORRUGADAS FY=4200 KG/CM2 KG 57,983.04 2.05 118,865.23 57,983.04 57,983.04 118,865.23 118,865.23 100.00% -
HORMIGN F'C= 210 KG/CM2 EN VIGAS DE CIMENTACIN M3 161.67 242.51 39,206.59 161.67 161.67 39,206.59 39,206.59 100.00% -
HORMIGN F'C= 210 KG/CM2 EN COLUMNAS M3 56.60 229.35 12,981.21 56.60 56.60 12,981.21 12,981.21 100.00% -
HORMIGN F'C= 210 KG/CM2 EN LOSA M3 149.98 208.33 31,245.33 149.98 149.98 31,245.33 31,245.33 100.00% -
IMPERMEABILIZACIN DE TERRAZA CON LMINA ASFLTICA M2 630.00 16.13 10,161.90 630.00 630.00 10,161.90 10,161.90 100.00% -
HORMIGN F'C= 140 KG/CM2 EN REPLANTILLOS M3 35.97 108.46 3,901.31 35.97 35.97 3,901.31 3,901.31 100.00% -
HORMIGN F'C= 210 KG/CM2 EN VIGAS M3 52.39 233.94 12,256.12 52.39 52.39 12,256.12 12,256.12 100.00% -
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 34,560.50 0.25 8,640.13 34,560.50 34,560.50 8,640.13 8,640.13 100.00% -
MALLA ELECTROSOLDADA R-126 (4.10) M2 659.48 5.65 3,726.06 659.48 659.48 3,726.06 3,726.06 100.00% -
ALIVIANAMIENTO DE BLOQUE CEMENTO DE 40CMX20CMX20CM U 8,132.00 0.58 4,716.56 7,850.00 7,850.00 4,553.00 4,553.00 96.53% 282.00 282.00 163.56
GEOTEXTIL NT 2000 M2 189.84 3.95 749.87 189.84 189.84 749.87 749.87 100.00% -
GEOMALLA BIAXIAL BX1100 M2 189.84 5.40 1,025.14 189.84 189.84 1,025.14 1,025.14 100.00% -
JUNTA ESTRUCTURAL DE CONSTRUCCIN M 6.00 10.65 63.90 - 0.00% -
CONTRAPISO HORMIGN ARMADO FC`210KG/CM2 (E=10CM, PIEDR M2 654.16 30.25 19,788.34 654.16 654.16 19,788.34 19,788.34 100.00% -
MAMPOSTERIA
MAMPOSTERA DE BLOQUE DE 15CM M2 1,112.87 17.65 19,642.16 1,010.36 1,010.36 17,832.86 17,832.86 90.79% 102.51 102.51 1,809.30
MAMPOSTERA DE BLOQUE DE 10CM M2 138.41 15.15 2,096.91 138.41 138.41 2,096.91 2,096.91 100.00% -
HORMIGN FC=210 KG/CM2 EN CONTORNO DE VENTANAS (ALFEI M3 4.18 228.43 954.84 4.18 4.18 954.84 954.84 100.00% -
HORMIGN FC=210KG/CM2 EN DINTELES Y RIOSTRAS M 23.60 15.28 360.61 23.60 23.60 360.61 360.61 100.00% -
ENLUCIDOS
ENLUCIDO VERTICAL INTERIOR. M2 2,502.56 6.70 16,767.15 1,877.75 1,877.75 12,580.93 12,580.93 75.03% 624.81 624.81 4,186.23
ENLUCIDO VERTICAL EXTERIOR M2 1,453.74 9.85 14,319.34 1,453.74 - 1,453.74 14,319.34 0.00 14,319.34 100.00% -
EMPASTE INTERIOR DE PAREDES M2 1,212.27 4.18 5,067.29 1,212.27 1,212.27 5,067.29 5,067.29 100.00% -
ENLUCIDO PALETEADO FINO DE FILOS Y FAJAS M 1,374.56 3.37 4,632.27 1,374.56 1,374.56 4,632.27 4,632.27 100.00% -
PISOS
CERMICA DE PISO ALTO TRFICO ANTIDESLIZANTE M2 1,496.25 28.80 43,092.00 1,247.77 1,247.77 35,935.78 35,935.78 83.39% 248.48 248.48 7,156.22
MASILLADO Y ALISADO DE PISOS M2 1,593.88 7.13 11,364.36 1,247.64 1,247.64 8,895.67 8,895.67 78.28% 346.24 346.24 2,468.69
BARREDERAS DE CERMICA H=10CM M 697.99 5.43 3,790.09 544.22 544.22 2,955.11 2,955.11 77.97% 153.77 153.77 834.97
PORCELANATO EN MESN M2 24.64 36.10 889.50 6.24 6.24 225.26 225.26 25.32% 18.40 18.40 664.24
CARPINTERIA METALICA
VENTANA DE ALUMINIO Y VIDRIO 6MM CORREDIZA M2 241.32 80.28 19,373.17 - - 0.00% 241.32 241.32 19,373.17
MALLA ANTIMOSQUITO M2 60.33 11.98 722.75 - - 0.00% -
PUERTA METLICA DE TOL, TUBO RECT. DE 50X25X2MM, Y VIDRIO M2 13.20 126.24 1,666.37 - - 0.00% -
PUERTA DE TOL 1/20", MARCO Y ESTRUCTURA DE 25*50*1,5 CON M2 9.06 128.15 1,161.04 - - 0.00% -
PANEL DE ACERO INOXIDABLE M2 90.74 99.22 9,003.22 - - 0.00% 84.74 84.74 8,407.90
PASAMANO DE ACERO INOXIDABLE M2 54.62 138.33 7,555.58 - - 0.00% 0.49 0.49 67.78
HOJA 2 DE 546
BARRA ANTIPNICO PARA PUERTAS U 11.00 193.17 2,124.87 11.00 11.00 2,124.87 2,124.87 100.00% -
PASAMANO DE ACERO INOXIDABLE PARA BAO DE DISCAPACITADO M 1.60 59.87 95.79 - - 0.00% -
RECUBRIMIENTOS
CIELO RASO FALSO DE ESTRUCTURA DE ALUMINIO PREPINTADO AL M2 858.58 21.96 18,854.42 858.58 858.58 18,854.42 18,854.42 100.00% -
PINTURA DE CAUCHO LTEX VINILO ACRLICO INTERIOR M2 1,212.66 5.58 6,766.64 1,212.66 - 1,212.66 6,766.64 0.00 6,766.64 100.00% -
PINTURA ELASTOMRICA EXTERIORES M2 1,453.74 5.71 8,300.86 1,439.29 1,439.29 8,218.35 8,218.35 99.01% 14.45 14.45 82.51
CUBIERTA DE POLICARBONATO ALVEOLAR 8MM (INCLUYE ESTRUCT M2 265.61 100.17 26,606.15 265.61 - 265.61 26,606.16 0.00 26,606.16 100.00% -
CERMICA EN PAREDES M2 180.78 25.37 4,586.39 180.78 180.78 4,586.39 4,586.39 100.00% -
INSTALACIONES HIDROSANITARIAS (BLOQUE 1 DE 12M)
SISTEMA DE AGUA POTABLE
PUNTO DE AGUA PVC ROSCABLE1/2" PTO 19.00 19.92 378.48 17.00 17.00 338.64 338.64 89.47% 2.00 2.00 39.84
PUNTO DE AGUA PVC ROSCABLE3/4" PTO 10.00 18.22 182.20 10.00 10.00 182.20 182.20 100.00% -
PUNTO DE AGUA PVC ROSCABLE1" PTO 19.00 38.70 735.30 19.00 19.00 735.30 735.30 100.00% -
TUBERA PVC ROSCABLE 1/2" M 18.40 2.64 48.58 6.60 6.60 17.42 17.42 35.87% 11.80 11.80 31.15
TUBERA PVC ROSCABLE 3/4" M 16.70 3.42 57.11 11.60 11.60 39.67 39.67 69.47% 5.10 5.10 17.44
TUBERA PVC ROSCABLE 1" M 2.00 8.07 16.14 1.20 1.20 9.68 9.68 60.00% 0.80 0.80 6.46
TUBERA PVC ROSCABLE 1 1/4" M 19.30 11.68 225.42 19.30 - 19.30 225.42 0.00 225.42 100.00% -
TUBERA PVC ROSCABLE 1 1/2" M 13.10 10.51 137.68 - - 0.00% 13.10 13.10 137.68
TUBERA PVC ROSCABLE 2" M 33.20 14.12 468.78 16.83 16.83 237.64 237.64 50.69% 16.37 16.37 231.14
VLVULA DE CONTROL ROSCADA DIAM 1/2" U 19.00 8.88 168.72 - - 0.00% 19.00 19.00 168.72
HOJA 3 DE 546
VLVULA DE CONTROL ROSCADA DIAM 3/4" U 10.00 16.89 168.90 4.00 4.00 67.56 67.56 40.00% 6.00 6.00 101.34
VLVULA DECONTROL ROSCADA DIAM 1" U 19.00 22.52 427.88 - - 0.00% 19.00 19.00 427.88
VLVULA DECONTROL ROSCADA DIAM 1" U 3.00 28.70 86.10 3.00 3.00 86.10 86.10 100.00% -
VLVULA DE CONTROL ROSCADA DIAM 1 1/2" U 5.00 38.34 191.70 - - 0.00% 5.00 5.00 191.70
VLVULA DE CONTROL ROSCADA DIAM 2" U 4.00 44.55 178.20 4.00 4.00 178.20 178.20 100.00% -
COLUMNA DE PVC DE 2" M 7.00 14.84 103.88 7.00 7.00 103.88 103.88 100.00% -
SISTEMA DE AGUA RESIDUALES
CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO U 2.00 98.94 197.88 2.00 2.00 197.88 197.88 100.00% -
DESAGES PVC 50 MM. TIPO B(INCLUYE ACCESORIOS) PTO 26.00 8.21 213.46 26.00 26.00 213.46 213.46 100.00% -
DESAGES PVC 75 MM. TIPO B (INCLUYE ACCESORIOS) PTO 16.00 11.58 185.28 10.00 10.00 115.80 115.80 62.50% 6.00 6.00 69.48
DESAGES PVC 110MM TIPO B (INCLUYE ACCESORIOS) PTO 19.00 9.55 181.45 19.00 19.00 181.45 181.45 100.00% -
SUMIDERO DE PISO DE 2" INCLUYE REJILLA U 1.00 12.64 12.64 1.00 1.00 12.64 12.64 100.00% -
SUMIDERO DE PISO DE 3" INCLUYE REJILLA U 12.00 18.22 218.64 10.00 10.00 182.20 182.20 83.33% 2.00 2.00 36.44
TUBERA DE 75 DE PVC TIPO B M 6.00 6.93 41.58 6.00 6.00 41.58 41.58 100.00% -
TUBERA DE 110 MM PVC TIPO B M 9.00 11.51 103.59 9.00 9.00 103.59 103.59 100.00% -
TUBERA DE 160 DE PVC TIPO B M 12.00 18.89 226.68 - - 0.00% 12.00 12.00 226.68
REGISTRO INSPECCIN Y LIMPIEZA PVC, 160MM PTO 2.00 76.48 152.96 - - 0.00% 2.00 2.00 152.96
BAJANTES DE TUBERA PVC TIPO B DE 110 MM M 9.00 9.52 85.68 9.00 9.00 85.68 85.68 100.00% -
VENTILACIN
PUNTO DE VENTILACION DE 75MM TIPO A PTO 2.00 16.51 33.02 2.00 2.00 33.02 33.02 100.00% -
TUBERA DE 75 DE PVC TIPO B M 8.50 6.93 58.91 8.50 8.50 58.91 58.91 99.99% -
TAPON REJILLA U 2.00 22.69 45.38 2.00 2.00 45.38 45.38 100.00% -
AGUAS LLUVIAS
BAJANTES DE TUBERA PVC TIPO B DE 110 MM M 8.50 9.52 80.92 8.50 8.50 80.92 80.92 100.00% -
CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO U 6.00 98.94 593.64 6.00 6.00 593.64 593.64 100.00% -
SUMIDERO DE CUBIERTA DE 75MM INCLUYE REJILLA CUPULA U 6.00 20.88 125.28 6.00 6.00 125.28 125.28 100.00% -
SUMIDERO DE CUBIERTA DE 110MM INCLUYE REJILLA CUPULA U 8.00 24.93 199.44 8.00 8.00 199.44 199.44 100.00% -
TUBERA DE 75 DE PVC TIPO B M 18.00 6.93 124.74 18.00 18.00 124.74 124.74 100.00% -
TUBERA DE 110 MM PVC TIPO B M 74.00 11.51 851.74 71.21 71.21 819.63 819.63 96.23% 2.79 2.79 32.11
DESAGES PVC 75 MM. TIPO B (INCLUYE ACCESORIOS) PTO 6.00 11.58 69.48 6.00 6.00 69.48 69.48 100.00% -
DESAGES PVC 110MM TIPO B (INCLUYE ACCESORIOS) PTO 9.00 9.55 85.95 9.00 9.00 85.95 85.95 100.00% -
APARATOS SANITARIOS
INODORO BLANCO CON FLUXMETRO U 19.00 246.56 4,684.64 19.00 19.00 4,684.64 4,684.64 100.00% -
LAVAMANOS PARA EMPOTRAR BLANCO (508MMX445 MM) CON GRIF U 14.00 147.69 2,067.66 14.00 14.00 2,067.66 2,067.66 100.00% -
FREGADERO DE ACERO INOXIDABLE 1 POZO CON ESCURRIDOR INC. U 4.00 224.20 896.80 - - 0.00% 4.00 4.00 896.80
LAVAMANOS DE PEDESTAL CORTO CON LLAVE TEMPORIZADA U 1.00 118.37 118.37 1.00 1.00 118.37 118.37 100.00% -
URINARIO CON LLAVE PRESSMATIC U 10.00 151.99 1,519.90 10.00 10.00 1,519.90 1,519.90 100.00% -
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE ZANJAS M3 21.64 6.52 141.09 - - 0.00% 21.64 21.64 141.09
INSTALACIONES ELECTRICAS
PUNTO DE ILUMINACIN 120V PTO 174.00 33.84 5,888.16 169.00 169.00 5,718.96 5,718.96 97.13% -
INTERRUPTOR SIMPLE U 7.00 4.15 29.05 - - 0.00% 2.00 2.00 8.30
INTERRUPTOR DOBLE U 10.00 4.79 47.90 - - 0.00% -
CONMUTADOR SIMPLE U 8.00 5.31 42.48 - - 0.00% -
CONMUTADOR DOBLE U 4.00 11.94 47.76 - - 0.00% 4.00 4.00 47.76
SENSOR DE MOVIMIENTO 180 U 6.00 37.22 223.32 - - 0.00% 2.00 2.00 74.44
SENSOR DE MOVIMIENTO 360 U 6.00 37.72 226.32 - - 0.00% -
LUMINARIA FLUORESCENTE 3X32W EMPOTRABLE U 74.00 69.22 5,122.28 72.00 72.00 4,983.84 4,983.84 97.30% 2.00 2.00 138.44
OJO DE BUEY CON FLUORESCENTE COMPACTA 1X26W U 32.00 27.07 866.24 32.00 32.00 866.24 866.24 100.00% -
HOJA 4 DE 546
LUMINARIA APLIQUE DE PARED INTERIOR /EXTERIOR 1X26W U 4.00 33.87 135.48 4.00 4.00 135.48 135.48 100.00% -
LUMINARIA TIPO PLAFON 2X26W U 66.00 25.18 1,661.88 61.00 61.00 1,535.98 1,535.98 92.42% 5.00 5.00 125.90
PUNTO TOMACORRIENTE NORMAL DOBLE 127V PARED O TECHO PTO 107.00 40.49 4,332.43 60.00 60.00 2,429.40 2,429.40 56.07% 47.00 47.00 1,903.03
PUNTO TOMACORRIENTE NORMAL DOBLE 127V PISO PTO 8.00 80.75 646.00 7.00 7.00 565.25 565.25 87.50% 1.00 1.00 80.75
PUNTO TOMACORRIENTE ESPECIAL 127V PTO 25.00 100.69 2,517.25 3.00 3.00 302.07 302.07 12.00% 22.00 22.00 2,215.18
PUNTO TOMACORRIENTE ESPECIAL 220V BIFSICO PTO 5.00 92.94 464.70 - - 0.00% 5.00 5.00 464.70
PUNTO SECADOR DE MANOS PTO 8.00 63.39 507.12 8.00 8.00 507.12 507.12 100.00% -
PUNTO EXTRACTOR DE BAO PTO 4.00 22.07 88.28 4.00 4.00 88.28 88.28 100.00% -
PUNTO TOMACORRIENTE REGULADO DOBLE 127V PARED O TECHO PTO 25.00 42.78 1,069.50 - - 0.00% 25.00 25.00 1,069.50
PUNTO PARA TOMACORRIENTE REGULADO DOBLE 127V PISO PTO 4.00 63.39 253.56 - - 0.00% 4.00 4.00 253.56
PUNTO DE TOMACORRIENTE ESPECIAL REGULADO 127V PTO 4.00 40.44 161.76 - - 0.00% 4.00 4.00 161.76
CENTRO DE CARGA TRIFASICO 6 ESPACIOS U 2.00 73.53 147.06 - - 0.00% 2.00 2.00 147.06
CENTRO DE CARGA TRIFASICO 12 ESPACIOS U 3.00 116.41 349.23 - - 0.00% 3.00 3.00 349.23
CENTRO DE CARGA TRIFASICO 20 ESPACIOS U 4.00 171.53 686.12 2.00 2.00 343.06 343.06 50.00% 2.00 2.00 343.06
CENTRO DE CARGA TRIFASICO 30 ESPACIOS U 1.00 205.83 205.83 1.00 1.00 205.83 205.83 100.00% -
BREAKER ENCHUFABLE 1P - 16 A U 22.00 6.28 138.16 - - 0.00% -
BREAKER ENCHUFABLE 1P - 20 A U 59.00 6.28 370.52 - - 0.00% -
BREAKER ENCHUFABLE 2P - 20 A U 18.00 16.08 289.44 - - 0.00% 18.00 18.00 289.44
BREAKER ENCHUFABLE 3P - 20 A U 5.00 33.23 166.15 - - 0.00% 5.00 5.00 166.15
BREAKER ENCHUFABLE 3P - 30A U 5.00 33.23 166.15 - - 0.00% 5.00 5.00 166.15
INTERRUPTOR TERMOMAGNETICO 3P-15-20-30-40-50-60A CAJA M U 5.00 61.37 306.85 - - 0.00% 5.00 5.00 306.85
CAJA DE PASO 10X10 U 20.00 11.76 235.20 20.00 20.00 235.20 235.20 100.00% -
CONECTOR Y CLAVIJA PARA AIRES ACONDICIONADOS INTERIORES U 21.00 42.15 885.15 - - 0.00% 21.00 21.00 885.15
CAJA IP65 PARA AIRES ACONDICIONADOS EXTERIORES 20X20X15 ( U 5.00 30.21 151.05 - - 0.00% 5.00 5.00 151.05
ALIMENTADOR 1X#12(F)+1X#12(N) AWG THHN M 100.00 1.72 172.00 - - 0.00% 100.00 100.00 172.00
ALIMENTADOR 1X#12(F)+1X#12(N)+1X#14(T) AWG THHN M 100.00 2.28 228.00 - - 0.00% 100.00 100.00 228.00
ALIMENTADOR 1X#10(F)+1X#10(N)+1X#14(T) AWG THHN M 53.00 3.82 202.46 - - 0.00% -
ALIMENTADOR 2X#12(F)+1X#14(T) AWG THHN M 320.00 2.28 729.60 - - 0.00% -
ALIMENTADOR 2X#10(F)+1X#14(T) AWG THHN M 103.00 3.04 313.12 - - 0.00% 103.00 103.00 313.12
ALIMENTADOR 3X#8(F)+1X#8(N)+1X#10(T) AWG TTU M 75.00 8.93 669.75 - - 0.00% -
FUNDA BX 1" M 50.00 5.81 290.50 - - 0.00% 50.00 50.00 290.50
CABLE CONCENTRICO 2X14 AWG M 500.00 1.63 815.00 - - 0.00% 500.00 500.00 815.00
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 1/2" M 50.00 2.82 141.00 - - 0.00% 50.00 50.00 141.00
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 1" M 50.00 5.57 278.50 - - 0.00% 50.00 50.00 278.50
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 1 1/ M 50.00 9.32 466.00 - - 0.00% 50.00 50.00 466.00
HOJA 5 DE 546
SUMNISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 2" M 50.00 11.99 599.50 - - 0.00% 50.00 50.00 599.50
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 3" M 50.00 38.41 1,920.50 - - 0.00% 50.00 50.00 1,920.50
CONDUCTOR THHN FLEX #14 AWG M 100.00 0.74 74.00 - - 0.00% 100.00 100.00 74.00
CONDUCTOR THHN FLEX #12 AWG M 100.00 1.09 109.00 - - 0.00% 100.00 100.00 109.00
CONDUCTOR THHN FLEX #10 AWG M 100.00 1.36 136.00 - - 0.00% 100.00 100.00 136.00
CABLE FLEXIBLE 6 AWG M 100.00 2.80 280.00 - - 0.00% 100.00 100.00 280.00
CABLE FLEXIBLE 4 AWG M 100.00 3.74 374.00 - - 0.00% 100.00 100.00 374.00
CABLE FLEXIBLE 2 AWG M 100.00 5.50 550.00 - - 0.00% 100.00 100.00 550.00
INSTALACIONES MECNICAS (BLOQUE 1 DE 12 AULAS / LAB. CCNN)
SUMINISTRO E INSTALACION SPLIT CONSOLA TIPO PISO/TECHO 36 U 2.00 1,607.97 3,215.94 - - 0.00% 2.00 2.00 3,215.94
SUMINISTRO E INSTALACIN UNIDAD TIPO FAN COIL 36000 BTU/H U 1.00 1,162.52 1,162.52 - - 0.00% 1.00 1.00 1,162.52
VENTILADOR DE EXTRACCIN EN LNEA, 825 CFM, @ 0.5" WG, 1/3 U 2.00 934.60 1,869.20 - - 0.00% 2.00 2.00 1,869.20
VENTILADOR DE EXTRACCIN CUADRADO IN-LINE, 525 CFM @ 0.35" U 2.00 659.97 1,319.94 - - 0.00% 2.00 2.00 1,319.94
DUCTO DE TOL GALVANIZADO SIN AISLAMIENTO KG 245.22 6.61 1,620.90 - - 0.00% 245.22 245.22 1,620.90
MANGA FLEXIBLE DIAM. 4" CON AISLAMIENTO M 20.00 5.13 102.60 - - 0.00% 20.00 20.00 102.60
LOUVER DE SALIDA DE 12"X8" U 4.00 57.25 229.00 - - 0.00% 4.00 4.00 229.00
DIFUSOR DE SUMINISTRO 8" X 8" DE 4 VIAS U 13.00 27.83 361.79 - - 0.00% 13.00 13.00 361.79
DUCTO DE TOL GALVANIZADO CON AISLAMIENTO KG 180.00 8.12 1,461.60 - - 0.00% 180.00 180.00 1,461.60
TERMOSTATO DIGITAL PROGRAMABLE DE UNA ETAPA U 1.00 61.50 61.50 - - 0.00% 1.00 1.00 61.50
REJILLA DE EXTRACCIN DE 6"X6 INCLUYE CAJA DE ACOPLES U 36.00 30.12 1,084.32 - - 0.00% 36.00 36.00 1,084.32
REJILLA DE RETORNO 18"X12" INCLUYE CAJA DE ACOPLES U 2.00 67.39 134.78 - - 0.00% 2.00 2.00 134.78
VENTILADOR HELICOIDAL DE TECHO DE 48" 60 W, 110 V, 60 HZ, 1 P U 17.00 190.73 3,242.41 - - 0.00% -
CONTROL DE VENTILADOR DE TECHO DE 3 VELOCIDADES. U 9.00 18.55 166.95 - - 0.00% -
MANGA FLEXIBLE DIAM. 8" CON AISLAMIENTO M 15.00 6.18 92.70 - - 0.00% 15.00 15.00 92.70
TUBERA DE COBRE ACR 5/8, INCLUYE AISLAMIENTO M 60.50 17.32 1,047.86 - - 0.00% 60.50 60.50 1,047.86
TUBERA DE COBRE ACR 3/8, INCLUYE AISLAMIENTO M 60.50 11.52 696.96 - - 0.00% 60.50 60.50 696.96
CABLE DE CONTROL 4X#12, INCLUYE CANALIZACIN EMT 3/4" M 72.50 5.80 420.50 - - 0.00% 72.50 72.50 420.50
CABLE DE CONTROL 4X#16, INCLUYE TUBERA EMT 3/4" U 20.00 5.07 101.40 - - 0.00% 20.00 20.00 101.40
CABLE DE CONTROL 2X#14, INCLUYE TUBERA EMT 3/4" M 83.87 4.81 403.41 - - 0.00% 83.87 83.87 403.41
TUBERIA DE DRENAJE DE 1" M 7.83 3.47 27.17 - - 0.00% 7.83 7.83 27.17
TUBERA DE DRENAJE 3/4" M 28.34 2.87 81.34 - - 0.00% 28.34 28.34 81.34
GAS REFRIGERANTE R-410A LB 4.00 11.18 44.72 - - 0.00% 4.00 4.00 44.72
SUMINISTRO E INSTALACIN UNIDAD TIPO FAN COIL 48000 BTU/H U 1.00 2,071.58 2,071.58 - - 0.00% 1.00 1.00 2,071.58
INSTALACIONES ELECTRONICAS
SISTEMA DE CABLEADO ESTRUCTURADO DATOS Y VOZ
PUNTO SIMPLE VOZ Y/O DATOS CAT 6A CERTIFICADO PTO 24.00 109.14 2,619.36 - - 0.00% 12.00 12.00 1,309.68
ACCESS POINT 1 PUERTO GIGA U 2.00 374.63 749.26 - - 0.00% -
PUNTO PARA SALIDA HDMI U 10.00 35.90 359.00 - - 0.00% -
ADMINISTRADOR HORIZONTAL 1U U 4.00 21.88 87.52 - - 0.00% 4.00 4.00 87.52
PATCH CORD CAT 6A 7FT (3M) U 24.00 13.25 318.00 - - 0.00% -
PATCH CORD CAT 6A 3FT(1M) U 24.00 8.42 202.08 - - 0.00% -
PATCH PANEL 24 PUERTOS CAT 6A INCLUYE JACKS U 2.00 363.61 727.22 - - 0.00% 1.00 1.00 363.61
BANDEJA TIPO ESCALERILLA GALVANIZADA 200X100MM INCLUYE TA M 90.00 26.53 2,387.70 12.00 12.00 318.36 318.36 13.33% 78.00 78.00 2,069.34
SWITCH DE CAPA 2, 48 PUERTOS 10/100/1000 MBPS 4SFP U 1.00 1,881.18 1,881.18 - - 0.00% 1.00 1.00 1,881.18
PATCH CORD FIBRA PTICA 1M U 2.00 16.36 32.72 - - 0.00% -
TRANSEIVER DE FIBRA A ETHERNET 1GB U 2.00 346.59 693.18 - - 0.00% -
TELFONO IP SIMPLES PARA ESCRITORIO U 1.00 135.01 135.01 - - 0.00% -
RACK DE PARED 24 UR CERRADO U 1.00 504.08 504.08 - - 0.00% 1.00 1.00 504.08
ODF-12 PUERTOS FIBRA PTICA DISTRIBUCIN FRAME U 1.00 313.19 313.19 - - 0.00% -
HOJA 6 DE 546
PASAMANO DE ACERO INOXIDABLE PARA BAO DE DISCAPACITADO M 1.60 59.87 95.79 - - 0.00% -
RECUBRIMIENTOS
CIELO RASO FALSO DE ESTRUCTURA DE ALUMINIO PREPINTADO AL M2 949.60 21.96 20,853.22 949.60 949.60 20,853.22 20,853.22 100.00% -
PINTURA DE CAUCHO LTEX VINILO ACRLICO INTERIOR M2 970.30 5.58 5,414.27 970.30 970.30 5,414.27 5,414.27 100.00% -
PINTURA ELASTOMRICA EXTERIORES M2 2,201.52 5.71 12,570.68 1,439.29 1,439.29 8,218.35 8,218.35 65.38% 762.23 762.23 4,352.33
CUBIERTA DE POLICARBONATO ALVEOLAR 8MM (INCLUYE ESTRUCT M2 280.80 100.17 28,127.74 271.43 271.43 27,189.15 27,189.15 96.66% 9.37 9.37 938.59
CERMICA EN PAREDES M2 161.70 25.37 4,102.33 161.70 161.70 4,102.33 4,102.33 100.00% -
INSTALACIONES HIDROSANITARIAS (BLOQUE 2 DE 12M)
SISTEMA DE AGUA POTABLE
PUNTO DE AGUA PVC ROSCABLE1/2" PTO 19.00 19.92 378.48 15.00 15.00 298.80 298.80 78.95% 4.00 4.00 79.68
PUNTO DE AGUA PVC ROSCABLE3/4" PTO 10.00 18.22 182.20 10.00 10.00 182.20 182.20 100.00% -
PUNTO DE AGUA PVC ROSCABLE1" PTO 19.00 38.70 735.30 19.00 19.00 735.30 735.30 100.00% -
TUBERA PVC ROSCABLE 1/2" M 21.10 2.64 55.70 6.60 6.60 17.42 17.42 31.28% 14.50 14.50 38.28
TUBERA PVC ROSCABLE 3/4" M 16.80 3.42 57.46 11.60 11.60 39.67 39.67 69.04% 5.20 5.20 17.78
TUBERA PVC ROSCABLE 1" M 5.00 8.07 40.35 1.20 1.20 9.68 9.68 24.00% 3.80 3.80 30.67
TUBERA PVC ROSCABLE 1 1/4" M 19.30 11.68 225.42 19.30 19.30 225.42 225.42 100.00% -
TUBERA PVC ROSCABLE 1 1/2" M 13.10 10.51 137.68 - - 0.00% 13.10 13.10 137.68
TUBERA PVC ROSCABLE 2" M 34.20 14.12 482.90 16.83 16.83 237.64 237.64 49.21% 17.37 17.37 245.26
VLVULA DE CONTROL ROSCADA DIAM 1/2" U 19.00 8.88 168.72 - - 0.00% 19.00 19.00 168.72
VLVULA DE CONTROL ROSCADA DIAM 3/4" U 12.00 16.89 202.68 4.00 4.00 67.56 67.56 33.33% 8.00 8.00 135.12
VLVULA DECONTROL ROSCADA DIAM 1" U 19.00 22.52 427.88 - - 0.00% 19.00 19.00 427.88
VLVULA DECONTROL ROSCADA DIAM 1" U 1.00 28.70 28.70 1.00 1.00 28.70 28.70 100.00% -
VLVULA DE CONTROL ROSCADA DIAM 1 1/2" U 2.00 38.34 76.68 - - 0.00% 2.00 2.00 76.68
VLVULA DE CONTROL ROSCADA DIAM 2" U 4.00 44.55 178.20 4.00 4.00 178.20 178.20 100.00% -
COLUMNA DE PVC DE 2" M 7.00 14.84 103.88 7.00 7.00 103.88 103.88 100.00% -
SISTEMA DE AGUA RESIDUALES
CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO U 2.00 98.94 197.88 2.00 2.00 197.88 197.88 100.00% -
DESAGES PVC 50 MM. TIPO B(INCLUYE ACCESORIOS) PTO 26.00 8.21 213.46 26.00 26.00 213.46 213.46 100.00% -
DESAGES PVC 75 MM. TIPO B (INCLUYE ACCESORIOS) PTO 16.00 11.58 185.28 10.00 10.00 115.80 115.80 62.50% 6.00 6.00 69.48
DESAGES PVC 110MM TIPO B (INCLUYE ACCESORIOS) PTO 19.00 9.55 181.45 19.00 19.00 181.45 181.45 100.00% -
SUMIDERO DE PISO DE 2" INCLUYE REJILLA U 1.00 12.64 12.64 1.00 1.00 12.64 12.64 100.00% -
SUMIDERO DE PISO DE 3" INCLUYE REJILLA U 12.00 18.22 218.64 10.00 10.00 182.20 182.20 83.33% 2.00 2.00 36.44
TUBERA DE 75 DE PVC TIPO B M 6.00 6.93 41.58 6.00 6.00 41.58 41.58 100.00% -
TUBERA DE 110 MM PVC TIPO B M 9.00 11.51 103.59 9.00 9.00 103.59 103.59 100.00% -
TUBERA DE 160 DE PVC TIPO B M 12.00 18.89 226.68 - - 0.00% 12.00 12.00 226.68
HOJA 9 DE 546
REGISTRO INSPECCIN Y LIMPIEZA PVC, 160MM PTO 2.00 76.48 152.96 - - 0.00% 2.00 2.00 152.96
BAJANTES DE TUBERA PVC TIPO B DE 110 MM M 9.00 9.52 85.68 9.00 9.00 85.68 85.68 100.00% -
VENTILACIN
PUNTO DE VENTILACION DE 75MM TIPO A PTO 2.00 16.51 33.02 2.00 2.00 33.02 33.02 100.00% -
TUBERA DE 75 DE PVC TIPO B M 8.50 6.93 58.91 8.50 8.50 58.91 58.91 99.99% -
TAPON REJILLA U 2.00 22.69 45.38 2.00 2.00 45.38 45.38 100.00% -
AGUAS LLUVIAS
BAJANTES DE TUBERA PVC TIPO B DE 110 MM M 8.50 9.52 80.92 8.50 8.50 80.92 80.92 100.00% -
CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO U 4.00 98.94 395.76 4.00 4.00 395.76 395.76 100.00% -
SUMIDERO DE CUBIERTA DE 75MM INCLUYE REJILLA CUPULA U 6.00 20.88 125.28 6.00 6.00 125.28 125.28 100.00% -
SUMIDERO DE CUBIERTA DE 110MM INCLUYE REJILLA CUPULA U 8.00 24.93 199.44 8.00 8.00 199.44 199.44 100.00% -
TUBERA DE 75 DE PVC TIPO B M 18.00 6.93 124.74 18.00 18.00 124.74 124.74 100.00% -
TUBERA DE 110 MM PVC TIPO B M 74.00 11.51 851.74 74.00 74.00 851.74 851.74 100.00% -
DESAGES PVC 75 MM. TIPO B (INCLUYE ACCESORIOS) PTO 6.00 11.58 69.48 6.00 6.00 69.48 69.48 100.00% -
DESAGES PVC 110MM TIPO B (INCLUYE ACCESORIOS) PTO 9.00 9.55 85.95 9.00 9.00 85.95 85.95 100.00% -
APARATOS SANITARIOS
INODORO BLANCO CON FLUXMETRO U 19.00 246.56 4,684.64 19.00 19.00 4,684.64 4,684.64 100.00% -
LAVAMANOS PARA EMPOTRAR BLANCO (508MMX445 MM) CON GRIF U 14.00 147.69 2,067.66 14.00 14.00 2,067.66 2,067.66 100.00% -
LAVAMANOS DE PEDESTAL CORTO CON LLAVE TEMPORIZADA U 1.00 118.37 118.37 1.00 1.00 118.37 118.37 100.00% -
FREGADERO DE ACERO INOXIDABLE 1 POZO CON ESCURRIDOR INC. U 4.00 224.20 896.80 - - 0.00% 4.00 4.00 896.80
URINARIO CON LLAVE PRESSMATIC U 10.00 151.99 1,519.90 10.00 10.00 1,519.90 1,519.90 100.00% -
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE ZANJAS M3 21.64 6.52 141.09 - - 0.00% 21.64 21.64 141.09
INSTALACIONES ELECTRICAS
PUNTO DE ILUMINACIN 120V PTO 172.00 33.84 5,820.48 169.00 169.00 5,718.96 5,718.96 98.26% 3.00 3.00 101.52
INTERRUPTOR SIMPLE U 7.00 4.15 29.05 - - 0.00% 2.00 2.00 8.30
INTERRUPTOR DOBLE U 10.00 4.79 47.90 - - 0.00% -
CONMUTADOR SIMPLE U 8.00 5.31 42.48 - - 0.00% -
CONMUTADOR DOBLE U 4.00 11.94 47.76 - - 0.00% 4.00 4.00 47.76
SENSOR DE MOVIMIENTO 180 U 6.00 37.22 223.32 - - 0.00% 2.00 2.00 74.44
SENSOR DE MOVIMIENTO 360 U 6.00 37.72 226.32 - - 0.00% -
LUMINARIA FLUORESCENTE 3X32W EMPOTRABLE U 72.00 69.22 4,983.84 72.00 72.00 4,983.84 4,983.84 100.00% -
OJO DE BUEY CON FLUORESCENTE COMPACTA 1X26W U 32.00 27.07 866.24 32.00 32.00 866.24 866.24 100.00% -
LUMINARIA APLIQUE DE PARED INTERIOR /EXTERIOR 1X26W U 4.00 33.87 135.48 4.00 4.00 135.48 135.48 100.00% -
LUMINARIA TIPO PLAFON 2X26W U 66.00 25.18 1,661.88 61.00 61.00 1,535.98 1,535.98 92.42% 5.00 5.00 125.90
PUNTO TOMACORRIENTE NORMAL DOBLE 127V PARED O TECHO PTO 99.00 40.49 4,008.51 60.00 60.00 2,429.40 2,429.40 60.61% 39.00 39.00 1,579.11
PUNTO TOMACORRIENTE NORMAL DOBLE 127V PISO PTO 8.00 80.75 646.00 - - 0.00% 8.00 8.00 646.00
PUNTO TOMACORRIENTE ESPECIAL 127V PTO 29.00 100.69 2,920.01 3.00 3.00 302.07 302.07 10.34% 26.00 26.00 2,617.94
PUNTO TOMACORRIENTE ESPECIAL 220V BIFSICO PTO 2.00 92.94 185.88 - - 0.00% 2.00 2.00 185.88
PUNTO SECADOR DE MANOS PTO 8.00 63.39 507.12 8.00 8.00 507.12 507.12 100.00% -
PUNTO EXTRACTOR DE BAO PTO 4.00 22.07 88.28 4.00 4.00 88.28 88.28 100.00% -
PUNTO TOMACORRIENTE REGULADO DOBLE 127V PARED O TECHO PTO 22.00 42.78 941.16 - - 0.00% 22.00 22.00 941.16
PUNTO DE TOMACORRIENTE ESPECIAL REGULADO 127V PTO 2.00 40.44 80.88 - - 0.00% 2.00 2.00 80.88
CENTRO DE CARGA TRIFASICO 6 ESPACIOS U 2.00 73.53 147.06 - - 0.00% 2.00 2.00 147.06
CENTRO DE CARGA TRIFASICO 12 ESPACIOS U 3.00 116.41 349.23 - - 0.00% 3.00 3.00 349.23
CENTRO DE CARGA TRIFASICO 20 ESPACIOS U 5.00 171.53 857.65 2.00 2.00 343.06 343.06 40.00% 3.00 3.00 514.59
BREAKER ENCHUFABLE 1P - 16 A U 22.00 6.28 138.16 - - 0.00% -
BREAKER ENCHUFABLE 1P - 20 A U 58.00 6.28 364.24 - - 0.00% -
BREAKER ENCHUFABLE 2P - 20 A U 15.00 16.08 241.20 - - 0.00% -
HOJA 10 DE 546
SUMINISTRO E INSTALACION SPLIT CONSOLA TIPO PISO/TECHO 36 U 2.00 1,607.97 3,215.94 - - 0.00% 2.00 2.00 3,215.94
VENTILADOR DE EXTRACCIN TIPO HONGO, 825 CFM, @ 0.5" WG, 1 U 2.00 982.25 1,964.50 - - 0.00% 2.00 2.00 1,964.50
VENTILADOR DE EXTRACCIN CUADRADO IN-LINE, 525 CFM @ 0.35" U 2.00 659.97 1,319.94 - - 0.00% 2.00 2.00 1,319.94
DUCTO DE TOL GALVANIZADO SIN AISLAMIENTO KG 232.44 6.61 1,536.43 - - 0.00% 232.44 232.44 1,536.43
MANGA FLEXIBLE DIAM. 4" CON AISLAMIENTO M 20.00 5.13 102.60 - - 0.00% 20.00 20.00 102.60
LOUVER DE SALIDA DE 12"X8" U 4.00 57.25 229.00 - - 0.00% 4.00 4.00 229.00
REJILLA DE EXTRACCIN DE 6"X6 INCLUYE CAJA DE ACOPLES U 36.00 30.12 1,084.32 - - 0.00% 36.00 36.00 1,084.32
VENTILADOR HELICOIDAL DE TECHO DE 48" 60 W, 110 V, 60 HZ, 1 P U 21.00 190.73 4,005.33 - - 0.00% -
CONTROL DE VENTILADOR DE TECHO DE 3 VELOCIDADES. U 11.00 18.55 204.05 - - 0.00% -
HOJA 11 DE 546
TUBERA DE COBRE ACR 5/8, INCLUYE AISLAMIENTO M 38.90 17.32 673.75 - - 0.00% 38.90 38.90 673.75
TUBERA DE COBRE ACR 3/8, INCLUYE AISLAMIENTO M 38.90 11.52 448.13 - - 0.00% 38.90 38.90 448.13
CABLE DE CONTROL 2X#14, INCLUYE TUBERA EMT 3/4" M 103.55 4.81 498.08 - - 0.00% 103.55 103.55 498.08
CABLE DE CONTROL 4X#12, INCLUYE CANALIZACIN EMT 3/4" M 38.90 5.80 225.62 - - 0.00% 38.90 38.90 225.62
TUBERIA DE DRENAJE DE 1" M 3.61 3.47 12.53 - - 0.00% 3.61 3.61 12.53
TUBERA DE DRENAJE 3/4" M 17.80 2.87 51.09 - - 0.00% 17.80 17.80 51.09
GAS REFRIGERANTE R-410A LB 5.00 11.18 55.90 - - 0.00% 5.00 5.00 55.90
INSTALACIONES ELECTRONICAS (BLOQUE 12A (2))
SISTEMA DE CABLEADO ESTRUCTURADO DATOS Y VOZ
PUNTO SIMPLE VOZ Y/O DATOS CAT 6A CERTIFICADO PTO 14.00 109.14 1,527.96 - - 0.00% 2.00 2.00 218.28
PUNTO PARA SALIDA HDMI U 11.00 35.90 394.90 - - 0.00% -
ADMINISTRADOR HORIZONTAL 1U U 3.00 21.88 65.64 - - 0.00% 3.00 3.00 65.64
PATCH CORD CAT 6A 7FT (3M) U 14.00 13.25 185.50 - - 0.00% -
PATCH CORD CAT 6A 3FT(1M) U 14.00 8.42 117.88 - - 0.00% -
PATCH PANEL 24 PUERTOS CAT 6A INCLUYE JACKS U 1.00 363.61 363.61 - - 0.00% -
BANDEJA TIPO ESCALERILLA GALVANIZADA 200X100MM INCLUYE TA M 90.00 26.53 2,387.70 12.00 12.00 318.36 318.36 13.33% 78.00 78.00 2,069.34
SWITCH CAPA 2 10/100/1000 24 PUERTOS 4SFP U 1.00 1,960.98 1,960.98 - - 0.00% -
PATCH CORD FIBRA PTICA 1M U 2.00 16.36 32.72 - - 0.00% -
TRANSEIVER DE FIBRA A ETHERNET 1GB U 2.00 346.59 693.18 - - 0.00% -
RACK DE PARED 18UR U 1.00 455.08 455.08 - - 0.00% -
ODF-12 PUERTOS FIBRA PTICA DISTRIBUCIN FRAME U 1.00 313.19 313.19 - - 0.00% -
CABLE FUTP CAT 6A BLINDADO M 364.00 2.30 837.20 - - 0.00% -
TUBERA EMT DE 3/4" Y ACCESORIOS M 210.00 5.37 1,127.70 - - 0.00% 210.00 210.00 1,127.70
TUBERA EMT DE 1" Y ACCESORIOS M 50.00 6.15 307.50 - - 0.00% 50.00 50.00 307.50
SISTEMA DE SEGURIDAD (INTRUSIN)
CONTACTOS MAGNTICOS INSTALADOS U 4.00 5.65 22.60 - - 0.00% 4.00 4.00 22.60
TECLADO ALFANUMRICO U 1.00 52.27 52.27 - - 0.00% 1.00 1.00 52.27
CENTRAL DE SEGURIDAD DE 16 ZONAS INCLUYE TECLADO LCD U 1.00 548.68 548.68 - - 0.00% 1.00 1.00 548.68
SIRENA 15W BLINDADA U 1.00 51.18 51.18 - - 0.00% 1.00 1.00 51.18
DETECTOR DE MOVIMIENTO DOBLE TECNOLOGA U 5.00 22.77 113.85 - - 0.00% 5.00 5.00 113.85
CABLE UTP CAT 5E M 220.00 0.74 162.80 - - 0.00% 220.00 220.00 162.80
CABLEADO 2X14 AWG M 15.00 2.06 30.90 - - 0.00% 15.00 15.00 30.90
TUBERA EMT 1/2" Y ACCESORIOS M 100.00 3.19 319.00 - - 0.00% 100.00 100.00 319.00
TUBERA EMT DE 3/4" Y ACCESORIOS M 10.00 5.37 53.70 - - 0.00% 10.00 10.00 53.70
PUNTO DE RED DE SEGURIDAD PTO 12.00 34.99 419.88 - - 0.00% 12.00 12.00 419.88
SISTEMA DE CCTV
CMARA IP TIPO BULLET POE, 1.3 MP U 3.00 161.41 484.23 - - 0.00% 3.00 3.00 484.23
SISTEMA DE DETECCIN TEMPRANA DE INCENDIOS
MDULO DE CONTROL U 2.00 69.35 138.70 - - 0.00% -
DETECTOR DE HUMO FOTOELCTRICO U 13.00 73.70 958.10 - - 0.00% 1.00 1.00 73.70
ESTACIN MANUAL DE INCENDIOS U 1.00 72.56 72.56 - - 0.00% -
AVISO DE SALIDA CON ILUMINACIN LED U 27.00 35.69 963.63 - - 0.00% 27.00 27.00 963.63
LUZ ESTROBOSCPICA CON SIRENA U 11.00 76.34 839.74 - - 0.00% -
MDULO DE AISLAMIENTO U 2.00 92.86 185.72 - - 0.00% 1.00 1.00 92.86
MODULO DE MONITOREO U 4.00 79.94 319.76 - - 0.00% 4.00 4.00 319.76
LUZ DE EMERGENCIA AUTNOMA U 23.00 30.74 707.02 - - 0.00% 23.00 23.00 707.02
CABLEADO ANTIFLAMA 2 X 16 AWG M 375.00 1.13 423.75 - - 0.00% 375.00 375.00 423.75
FUENTE DE ALIMENTACIN 24 V/8A U 2.00 433.97 867.94 - - 0.00% -
TUBERA EMT DE 3/4" Y ACCESORIOS M 140.00 5.37 751.80 - - 0.00% 140.00 140.00 751.80
HOJA 12 DE 546
PUNTO DE RED DE INCENDIOS PTO 35.00 33.19 1,161.65 - - 0.00% 35.00 35.00 1,161.65
SISTEMA DE SONORIZACIN
PARLANTE PARA TECHO 8W, 8" Y 100V U 14.00 70.56 987.84 - - 0.00% 14.00 14.00 987.84
CABLEADO 2X14 AWG M 156.00 2.06 321.36 - - 0.00% 156.00 156.00 321.36
TUBERA EMT 1/2" Y ACCESORIOS M 140.00 3.19 446.60 - - 0.00% 140.00 140.00 446.60
PUNTO DE SONIDO PTO 14.00 36.85 515.90 - - 0.00% 14.00 14.00 515.90
BLOQUE EDUCACIN INICIAL: AULAS + EQUIPOS
PRELIMINARES
LIMPIEZA Y DESBROCE DEL TERRENO (MANUAL) M2 256.56 0.87 223.21 256.56 256.56 223.21 223.21 100.00% -
REPLANTEO Y NIVELACIN M2 256.56 0.99 253.99 256.56 256.56 253.99 253.99 100.00% -
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE CIMIENTOS Y PLINTOS M3 126.59 7.64 967.15 126.59 126.59 967.15 967.15 100.00% -
SUB-BASE CLASE 3 M3 30.60 16.01 489.91 30.60 30.60 489.91 489.91 100.00% -
EXCAVACIN A MQUINA M3 151.91 2.29 347.87 151.91 151.91 347.87 347.87 100.00% -
RELLENO COMPACTADO A MQUINA CON MATERIAL IMPORTADO M3 80.78 11.08 895.04 80.78 80.78 895.04 895.04 100.00% -
TRANSPORTE DE MATERIAL DE EXCAVACIN. TRANSPORTE LIBRE 1 M3-KM 1,519.13 0.25 379.78 1,519.13 1,519.13 379.78 379.78 100.00% -
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 2,227.68 0.25 556.92 2,227.68 2,227.68 556.92 556.92 100.00% -
ESTRUCTURA DE HORMIGN ARMADO
ACERO DE REFUERZO EN VARILLAS CORRUGADAS FY=4200 KG/CM2 KG 9,197.63 2.05 18,855.14 9,197.63 9,197.63 18,855.14 18,855.14 100.00% -
HORMIGN CICLPEO F'C=210 KG/CM (INCLUYE ENCOFRADO)H.S M3 7.46 121.30 904.90 7.46 7.46 904.90 904.90 100.00% -
HORMIGN F'C= 210 KG/CM2 EN VIGAS DE CIMENTACIN M3 25.65 242.51 6,220.38 24.58 24.58 5,960.89 5,960.89 95.83% -
HORMIGN F'C= 210 KG/CM2 EN CADENAS M3 6.29 184.96 1,163.40 5.61 5.61 1,037.63 1,037.63 89.19% -
HORMIGN F'C= 210 KG/CM2 EN COLUMNAS M3 11.42 229.35 2,619.18 10.94 10.94 2,509.09 2,509.09 95.80% 0.48 0.48 110.09
HORMIGN F'C= 210 KG/CM2 EN LOSA M3 26.03 208.33 5,422.83 26.03 26.03 5,422.83 5,422.83 100.00% -
IMPERMEABILIZACIN DE TERRAZA CON LMINA ASFLTICA M2 210.92 16.13 3,402.14 210.92 210.92 3,402.14 3,402.14 100.00% -
HORMIGN F'C= 140 KG/CM2 EN REPLANTILLOS M3 6.13 108.46 664.86 6.13 6.13 664.86 664.86 100.00% -
HORMIGN F'C= 210 KG/CM2 EN VIGAS M3 18.56 233.94 4,341.93 18.54 18.54 4,337.25 4,337.25 99.89% 0.02 0.02 4.68
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 9,791.28 0.25 2,447.82 9,791.28 9,791.28 2,447.82 2,447.82 100.00% -
MALLA ELECTROSOLDADA R-126 (4.10) M2 227.08 5.65 1,283.00 227.08 227.08 1,283.00 1,283.00 100.00% -
ALIVIANAMIENTO DE BLOQUE CEMENTO DE 40CMX20CMX20CM U 1,374.00 0.58 796.92 1,362.00 1,362.00 789.96 789.96 99.13% 12.00 12.00 6.96
GEOTEXTIL NT 2000 M2 30.00 3.95 118.50 30.00 30.00 118.50 118.50 100.00% -
GEOMALLA BIAXIAL BX1100 M2 30.00 5.40 162.00 30.00 30.00 162.00 162.00 100.00% -
CONTRAPISO HORMIGN ARMADO FC`210KG/CM2 (E=10CM, PIEDR M2 213.75 30.25 6,465.94 213.75 213.75 6,465.94 6,465.94 100.00% -
OTROS
MESN DE HORMIGN ARMADO FC=210KG/CM2, A=0,60 M 1.40 49.77 69.68 1.40 1.40 69.68 69.68 100.00% -
HOJA 13 DE 546
MAMPOSTERIA
MAMPOSTERA DE BLOQUE DE 15CM M2 165.30 17.65 2,917.55 165.30 165.30 2,917.55 2,917.55 100.00% -
MAMPOSTERA DE BLOQUE DE 10CM M2 17.88 15.15 270.88 17.88 17.88 270.88 270.88 100.00% -
HORMIGN F'C= 210 KG/CM2 EN CADENAS M3 1.98 184.96 366.22 0.71 0.71 131.32 131.32 35.86% 1.27 1.27 234.90
HORMIGN FC=210 KG/CM2 EN CONTORNO DE VENTANAS (ALFEI M3 2.60 228.43 593.92 2.60 2.60 593.92 593.92 100.00% -
HORMIGN FC=210KG/CM2 EN DINTELES Y RIOSTRAS M 25.20 15.28 385.06 25.20 25.20 385.06 385.06 100.00% -
ENLUCIDOS
ENLUCIDO VERTICAL INTERIOR. M2 118.47 6.70 793.75 118.47 118.47 793.75 793.75 100.00% -
EMPASTE INTERIOR DE PAREDES M2 305.46 4.18 1,276.82 271.00 271.00 1,132.78 1,132.78 88.72% 34.46 34.46 144.04
ENLUCIDO PALETEADO FINO DE FILOS Y FAJAS M 201.00 3.37 677.37 201.00 201.00 677.37 677.37 100.00% -
PISOS
CERMICA DE PISO ALTO TRFICO ANTIDESLIZANTE M2 213.75 28.80 6,156.00 213.75 213.75 6,156.00 6,156.00 100.00% -
MASILLADO DE LOSA INCLUYE IMPERMEABILIZANTE M2 221.85 8.04 1,783.67 221.76 221.76 1,782.95 1,782.95 99.96% 0.09 0.09 0.72
BARREDERAS DE CERMICA H=10CM M 69.02 5.43 374.78 69.02 69.02 374.78 374.78 100.00% -
PORCELANATO EN MESN M2 1.40 36.10 50.54 1.40 1.40 50.54 50.54 100.00% -
CARPINTERIA METALICA
VENTANA DE ALUMINIO Y VIDRIO 6MM CORREDIZA M2 42.16 80.28 3,384.60 - - 0.00% 42.16 42.16 3,384.60
PUERTA DE MDF, CON MIRILLA VERTICAL, MARCO METLICO Y PI M2 13.86 203.41 2,819.26 - - 0.00% 10.08 10.08 2,050.37
RECUBRIMIENTOS
CIELO RASO FALSO DE ESTRUCTURA DE ALUMINIO PREPINTADO AL M2 203.92 21.96 4,478.08 203.92 203.92 4,478.08 4,478.08 100.00% -
PINTURA DE CAUCHO LTEX VINILO ACRLICO INTERIOR M2 118.47 5.58 661.06 118.47 118.47 661.06 661.06 100.00% -
PINTURA ELASTOMRICA EXTERIORES M2 186.99 5.71 1,067.71 186.99 186.99 1,067.71 1,067.71 100.00% -
CERMICA EN PAREDES M2 60.90 25.37 1,545.03 59.18 59.18 1,501.40 1,501.40 97.18% 1.72 1.72 43.64
INSTALACIONES ELECTRONICAS
SISTEMA DE CABLEADO ESTRUCTURADO DATOS Y VOZ
PUNTO SIMPLE VOZ Y/O DATOS CAT 6A CERTIFICADO PTO 2.00 109.14 218.28 - - 0.00% -
PUNTO PARA SALIDA HDMI U 2.00 35.90 71.80 - - 0.00% -
ADMINISTRADOR HORIZONTAL 1U U 3.00 21.88 65.64 - - 0.00% 3.00 3.00 65.64
PATCH CORD CAT 6A 7FT (3M) U 2.00 13.25 26.50 - - 0.00% -
PATCH CORD CAT 6A 3FT(1M) U 2.00 8.42 16.84 - - 0.00% -
PATCH PANEL 24 PUERTOS CAT 6A INCLUYE JACKS U 1.00 363.61 363.61 - - 0.00% -
BANDEJA TIPO ESCALERILLA GALVANIZADA 200X100MM INCLUYE TA M 18.00 26.53 477.54 - - 0.00% 18.00 18.00 477.54
SWITCH CAPA 2 10/100/1000 24 PUERTOS 4SFP U 1.00 1,960.98 1,960.98 - - 0.00% -
PATCH CORD FIBRA PTICA 1M U 2.00 16.36 32.72 - - 0.00% -
TRANSEIVER DE FIBRA A ETHERNET 1GB U 2.00 346.59 693.18 - - 0.00% -
RACK DE PARED 18UR U 1.00 455.08 455.08 - - 0.00% -
ODF-12 PUERTOS FIBRA PTICA DISTRIBUCIN FRAME U 1.00 313.19 313.19 - - 0.00% -
CABLE FUTP CAT 6A BLINDADO M 50.00 2.30 115.00 - - 0.00% -
TUBERA EMT DE 3/4" Y ACCESORIOS M 25.00 5.37 134.25 - - 0.00% 25.00 25.00 134.25
TUBERA EMT DE 1" Y ACCESORIOS M 15.00 6.15 92.25 - - 0.00% 15.00 15.00 92.25
SISTEMA DE SEGURIDAD (INTRUSIN)
SISTEMA DE CCTV
CMARA IP TIPO DOMO POE, 1.3 MP U 2.00 161.41 322.82 - - 0.00% 2.00 2.00 322.82
CMARA IP TIPO BULLET POE, 1.3 MP U 1.00 161.41 161.41 - - 0.00% 1.00 1.00 161.41
SISTEMA DE DETECCIN TEMPRANA DE INCENDIOS
MDULO DE CONTROL U 1.00 69.35 69.35 - - 0.00% -
DETECTOR DE HUMO FOTOELCTRICO U 2.00 73.70 147.40 - - 0.00% -
ESTACIN MANUAL DE INCENDIOS U 2.00 72.56 145.12 - - 0.00% -
AVISO DE SALIDA CON ILUMINACIN LED U 3.00 35.69 107.07 - - 0.00% 3.00 3.00 107.07
HOJA 14 DE 546
CENTRO DE CARGA TRIFASICO 30 ESPACIOS U 1.00 205.83 205.83 1.00 1.00 205.83 205.83 100.00% -
BREAKER ENCHUFABLE 1P - 16 A U 4.00 6.28 25.12 - - 0.00% -
BREAKER ENCHUFABLE 1P - 20 A U 11.00 6.28 69.08 - - 0.00% -
BREAKER ENCHUFABLE 1P - 40 A U 2.00 6.28 12.56 - - 0.00% -
BREAKER ENCHUFABLE 2P - 20 A U 4.00 16.08 64.32 - - 0.00% 4.00 4.00 64.32
BREAKER ENCHUFABLE 3P - 20 A U 2.00 33.23 66.46 - - 0.00% 2.00 2.00 66.46
BREAKER ENCHUFABLE 3P - 50 A U 2.00 33.23 66.46 - - 0.00% -
INTERRUPTOR TERMOMAGNETICO 3P-15-20-30-40-50-60A CAJA M U 1.00 61.37 61.37 - - 0.00% 1.00 1.00 61.37
INTERRUPTOR TERMOMAGNETICO 3P-15-20-30-40-50-60A CAJA M U 2.00 61.37 122.74 - - 0.00% 2.00 2.00 122.74
INTERRUPTOR TERMOMAGNETICO 3P-15-20-30-40-50-60A CAJA M U 2.00 61.37 122.74 - - 0.00% 2.00 2.00 122.74
CAJA DE PASO 10X10 U 20.00 11.76 235.20 20.00 20.00 235.20 235.20 100.00% -
CONECTOR Y CLAVIJA PARA AIRES ACONDICIONADOS INTERIORES U 4.00 42.15 168.60 - - 0.00% 4.00 4.00 168.60
CAJA IP65 PARA AIRES ACONDICIONADOS EXTERIORES 20X20X15 ( U 4.00 30.21 120.84 - - 0.00% 4.00 4.00 120.84
ALIMENTADOR 1X#12(F)+1X#12(N) AWG THHN M 100.00 1.72 172.00 - - 0.00% 100.00 100.00 172.00
ALIMENTADOR 1X#12(F)+1X#12(N)+1X#14(T) AWG THHN M 100.00 2.28 228.00 - - 0.00% 100.00 100.00 228.00
ALIMENTADOR 1X#8(F)+1X#8(N)+1X#10(T) AWG THHN M 100.00 4.72 472.00 - - 0.00% -
FUNDA BX 1" M 50.00 5.81 290.50 - - 0.00% 50.00 50.00 290.50
CABLE CONCENTRICO 2X14 AWG M 200.00 1.63 326.00 - - 0.00% 200.00 200.00 326.00
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 3/4" M 50.00 4.11 205.50 - - 0.00% 50.00 50.00 205.50
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 1 1/ M 50.00 9.32 466.00 - - 0.00% 50.00 50.00 466.00
SUMNISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 2" M 50.00 11.99 599.50 - - 0.00% 50.00 50.00 599.50
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 3" M 50.00 38.41 1,920.50 - - 0.00% 50.00 50.00 1,920.50
CONDUCTOR THHN FLEX #14 AWG M 100.00 0.74 74.00 - - 0.00% 100.00 100.00 74.00
CONDUCTOR THHN FLEX #12 AWG M 100.00 1.09 109.00 - - 0.00% 100.00 100.00 109.00
CONDUCTOR THHN FLEX #10 AWG M 100.00 1.36 136.00 - - 0.00% 100.00 100.00 136.00
CABLE FLEXIBLE 8 AWG M 100.00 1.98 198.00 - - 0.00% 100.00 100.00 198.00
CABLE FLEXIBLE 6 AWG M 100.00 2.80 280.00 - - 0.00% 100.00 100.00 280.00
CABLE FLEXIBLE 4 AWG M 100.00 3.74 374.00 - - 0.00% 100.00 100.00 374.00
CABLE FLEXIBLE 2 AWG M 100.00 5.50 550.00 - - 0.00% 100.00 100.00 550.00
INSTALACIONES HIDROSANITARIAS
SISTEMA DE AGUA POTABLE
PUNTO DE AGUA PVC ROSCABLE1/2" PTO 14.00 19.92 278.88 13.00 13.00 258.96 258.96 92.86% 1.00 1.00 19.92
TUBERA PVC ROSCABLE 1/2" M 11.30 2.64 29.83 1.93 1.93 5.10 5.10 17.08% 9.37 9.37 24.74
TUBERA PVC ROSCABLE 3/4" M 1.80 3.42 6.16 1.80 1.80 6.16 6.16 99.94% -
TUBERA PVC ROSCABLE 1" M 6.50 8.07 52.46 6.00 6.00 48.42 48.42 92.30% 0.50 0.50 4.04
TUBERA PVC ROSCABLE 1 1/4" M 5.50 11.68 64.24 5.07 5.07 59.22 59.22 92.18% 0.43 0.43 5.02
VLVULA DE CONTROL ROSCADA DIAM 1/2" U 12.00 8.88 106.56 1.00 1.00 8.88 8.88 8.33% 11.00 11.00 97.68
VLVULA DE CONTROL ROSCADA DIAM 3/4" U 1.00 16.89 16.89 1.00 1.00 16.89 16.89 100.00% -
VLVULA DECONTROL ROSCADA DIAM 1" U 1.00 22.52 22.52 1.00 1.00 22.52 22.52 100.00% -
VLVULA DECONTROL ROSCADA DIAM 1" U 2.00 28.70 57.40 1.00 1.00 28.70 28.70 50.00% 1.00 1.00 28.70
SISTEMA DE AGUA RESIDUALES
CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO U 1.00 98.94 98.94 1.00 1.00 98.94 98.94 100.00% -
DESAGES PVC 50 MM. TIPO B(INCLUYE ACCESORIOS) PTO 8.00 8.21 65.68 8.00 8.00 65.68 65.68 100.00% -
DESAGES PVC 75 MM. TIPO B (INCLUYE ACCESORIOS) PTO 2.00 11.58 23.16 2.00 2.00 23.16 23.16 100.00% -
DESAGES PVC 110MM TIPO B (INCLUYE ACCESORIOS) PTO 4.00 9.55 38.20 4.00 4.00 38.20 38.20 100.00% -
SUMIDERO DE PISO DE 3" INCLUYE REJILLA U 2.00 18.22 36.44 2.00 2.00 36.44 36.44 100.00% -
TUBERA DE 50MM DE PVC TIPO B M 3.00 3.65 10.95 3.00 3.00 10.95 10.95 100.00% -
TUBERA DE 110 MM PVC TIPO B M 6.00 11.51 69.06 6.00 6.00 69.06 69.06 100.00% -
AGUAS LLUVIAS
HOJA 16 DE 546
BAJANTES DE TUBERA PVC TIPO B DE 110 MM M 8.00 9.52 76.16 8.00 8.00 76.16 76.16 100.00% -
CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO U 2.00 98.94 197.88 2.00 2.00 197.88 197.88 100.00% -
SUMIDERO DE CUBIERTA DE 110MM INCLUYE REJILLA CUPULA U 2.00 24.93 49.86 2.00 2.00 49.86 49.86 100.00% -
TUBERA DE 110 MM PVC TIPO B M 12.00 11.51 138.12 12.00 12.00 138.12 138.12 100.00% -
DESAGES PVC 110MM TIPO B (INCLUYE ACCESORIOS) PTO 2.00 9.55 19.10 2.00 2.00 19.10 19.10 100.00% -
APARATOS SANITARIOS
INODORO TANQUE BAJO UNA PIEZA INCLUYE ACCESORIOS U 4.00 106.95 427.80 4.00 4.00 427.80 427.80 100.00% -
LAVAMANOS PARA EMPOTRAR BLANCO (508MMX445 MM) CON GRIF U 4.00 147.69 590.76 4.00 4.00 590.76 590.76 100.00% -
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE ZANJAS M3 6.05 6.52 39.45 - - 0.00% 6.05 6.05 39.45
BLOQUE EDUCACIN INICIAL 2
PRELIMINARES
LIMPIEZA Y DESBROCE DEL TERRENO (MANUAL) M2 256.56 0.87 223.21 256.56 256.56 223.21 223.21 100.00% -
REPLANTEO Y NIVELACIN M2 256.56 0.99 253.99 256.56 256.56 253.99 253.99 100.00% -
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE CIMIENTOS Y PLINTOS M3 126.59 7.64 967.15 126.59 126.59 967.15 967.15 100.00% -
SUB-BASE CLASE 3 M3 30.60 16.01 489.91 30.60 30.60 489.91 489.91 100.00% -
EXCAVACIN A MQUINA M3 151.91 2.29 347.87 151.91 151.91 347.87 347.87 100.00% -
RELLENO COMPACTADO A MQUINA CON MATERIAL IMPORTADO M3 80.78 11.08 895.04 80.78 - 80.78 895.04 0.00 895.04 100.00% -
TRANSPORTE DE MATERIAL DE EXCAVACIN. TRANSPORTE LIBRE 1 M3-KM 1,519.13 0.25 379.78 1,519.13 1,519.13 379.78 379.78 100.00% -
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 2,227.68 0.25 556.92 2,227.68 2,227.68 556.92 556.92 100.00% -
ESTRUCTURA DE HORMIGN ARMADO
ACERO DE REFUERZO EN VARILLAS CORRUGADAS FY=4200 KG/CM2 KG 9,197.63 2.05 18,855.14 9,197.63 9,197.63 18,855.14 18,855.14 100.00% -
HORMIGN CICLPEO F'C=210 KG/CM (INCLUYE ENCOFRADO)H.S M3 7.46 121.30 904.90 7.46 7.46 904.90 904.90 100.00% -
HORMIGN F'C= 210 KG/CM2 EN VIGAS DE CIMENTACIN M3 25.65 242.51 6,220.38 24.58 24.58 5,960.89 5,960.89 95.83% -
HORMIGN F'C= 210 KG/CM2 EN CADENAS M3 6.29 184.96 1,163.40 5.61 5.61 1,037.63 1,037.63 89.19% -
HORMIGN F'C= 210 KG/CM2 EN COLUMNAS M3 11.42 229.35 2,619.18 10.94 10.94 2,509.09 2,509.09 95.80% 0.48 0.48 110.09
HORMIGN F'C= 210 KG/CM2 EN LOSA M3 26.03 208.33 5,422.83 26.03 26.03 5,422.83 5,422.83 100.00% -
IMPERMEABILIZACIN DE TERRAZA CON LMINA ASFLTICA M2 220.00 16.13 3,548.60 220.00 220.00 3,548.60 3,548.60 100.00% -
HORMIGN F'C= 140 KG/CM2 EN REPLANTILLOS M3 6.13 108.46 664.86 6.13 6.13 664.86 664.86 100.00% -
HORMIGN F'C= 210 KG/CM2 EN VIGAS M3 18.56 233.94 4,341.93 18.54 18.54 4,337.25 4,337.25 99.89% 0.02 0.02 4.68
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 10,063.68 0.25 2,515.92 10,063.68 10,063.68 2,515.92 2,515.92 100.00% -
MALLA ELECTROSOLDADA R-126 (4.10) M2 227.08 5.65 1,283.00 227.08 227.08 1,283.00 1,283.00 100.00% -
ALIVIANAMIENTO DE BLOQUE CEMENTO DE 40CMX20CMX20CM U 1,374.00 0.58 796.92 1,362.00 1,362.00 789.96 789.96 99.13% 12.00 12.00 6.96
GEOTEXTIL NT 2000 M2 30.00 3.95 118.50 30.00 30.00 118.50 118.50 100.00% -
HOJA 17 DE 546
GEOMALLA BIAXIAL BX1100 M2 30.00 5.40 162.00 30.00 30.00 162.00 162.00 100.00% -
CONTRAPISO HORMIGN ARMADO FC`210KG/CM2 (E=10CM, PIEDR M2 213.75 30.25 6,465.94 213.75 213.75 6,465.94 6,465.94 100.00% -
OTROS
MESN DE HORMIGN ARMADO FC=210KG/CM2, A=0,60 M 1.40 49.77 69.68 1.40 1.40 69.68 69.68 100.00% -
MAMPOSTERIA
MAMPOSTERA DE BLOQUE DE 15CM M2 165.30 17.65 2,917.55 165.30 165.30 2,917.55 2,917.55 100.00% -
MAMPOSTERA DE BLOQUE DE 10CM M2 17.88 15.15 270.88 17.88 17.88 270.88 270.88 100.00% -
HORMIGN F'C= 210 KG/CM2 EN CADENAS M3 1.98 184.96 366.22 0.71 0.71 131.32 131.32 35.86% 1.27 1.27 234.90
HORMIGN FC=210 KG/CM2 EN CONTORNO DE VENTANAS (ALFEI M3 2.60 228.43 593.92 2.60 2.60 593.92 593.92 100.00% -
HORMIGN FC=210KG/CM2 EN DINTELES Y RIOSTRAS M 25.20 15.28 385.06 25.20 25.20 385.06 385.06 100.00% -
ENLUCIDOS
ENLUCIDO VERTICAL INTERIOR. M2 118.47 6.70 793.75 118.47 118.47 793.75 793.75 100.00% -
EMPASTE INTERIOR DE PAREDES M2 305.46 4.18 1,276.82 271.00 271.00 1,132.78 1,132.78 88.72% 34.46 34.46 144.04
ENLUCIDO PALETEADO FINO DE FILOS Y FAJAS M 201.00 3.37 677.37 201.00 201.00 677.37 677.37 100.00% -
PISOS
CERMICA DE PISO ALTO TRFICO ANTIDESLIZANTE M2 213.75 28.80 6,156.00 213.75 213.75 6,156.00 6,156.00 100.00% -
MASILLADO DE LOSA INCLUYE IMPERMEABILIZANTE M2 221.85 8.04 1,783.67 221.76 221.76 1,782.95 1,782.95 99.96% 0.09 0.09 0.72
BARREDERAS DE CERMICA H=10CM M 69.02 5.43 374.78 69.02 69.02 374.78 374.78 100.00% -
PORCELANATO EN MESN M2 1.40 36.10 50.54 1.40 1.40 50.54 50.54 100.00% -
CARPINTERIA METALICA
VENTANA DE ALUMINIO Y VIDRIO 6MM CORREDIZA M2 42.16 80.28 3,384.60 - - 0.00% 42.16 42.16 3,384.60
PUERTA DE MDF, CON MIRILLA VERTICAL, MARCO METLICO Y PI M2 13.86 203.41 2,819.26 - - 0.00% 10.08 10.08 2,050.37
RECUBRIMIENTOS
CIELO RASO FALSO DE ESTRUCTURA DE ALUMINIO PREPINTADO AL M2 203.92 21.96 4,478.08 203.92 203.92 4,478.08 4,478.08 100.00% -
PINTURA DE CAUCHO LTEX VINILO ACRLICO INTERIOR M2 118.47 5.58 661.06 118.47 118.47 661.06 661.06 100.00% -
PINTURA ELASTOMRICA EXTERIORES M2 186.99 5.71 1,067.71 186.99 186.99 1,067.71 1,067.71 100.00% -
CERMICA EN PAREDES M2 60.90 25.37 1,545.03 59.18 59.18 1,501.40 1,501.40 97.18% 1.72 1.72 43.64
INSTALACIONES ELECTRONICAS
SISTEMA DE CABLEADO ESTRUCTURADO DATOS Y VOZ
PUNTO SIMPLE VOZ Y/O DATOS CAT 6A CERTIFICADO PTO 2.00 109.14 218.28 - - 0.00% -
PUNTO PARA SALIDA HDMI U 2.00 35.90 71.80 - - 0.00% -
PATCH CORD CAT 6A 7FT (3M) U 2.00 13.25 26.50 - - 0.00% -
PATCH CORD CAT 6A 3FT(1M) U 2.00 8.42 16.84 - - 0.00% -
BANDEJA TIPO ESCALERILLA GALVANIZADA 200X100MM INCLUYE TA M 18.00 26.53 477.54 - - 0.00% 18.00 18.00 477.54
CABLE FUTP CAT 6A BLINDADO M 40.00 2.30 92.00 - - 0.00% -
TUBERA EMT DE 3/4" Y ACCESORIOS M 25.00 5.37 134.25 - - 0.00% 25.00 25.00 134.25
TUBERA EMT DE 1" Y ACCESORIOS M 15.00 6.15 92.25 - - 0.00% -
SISTEMA DE SEGURIDAD (INTRUSIN)
SISTEMA DE CCTV
SISTEMA DE DETECCIN TEMPRANA DE INCENDIOS
MDULO DE CONTROL U 1.00 69.35 69.35 - - 0.00% -
DETECTOR DE HUMO FOTOELCTRICO U 2.00 73.70 147.40 - - 0.00% -
ESTACIN MANUAL DE INCENDIOS U 2.00 72.56 145.12 - - 0.00% -
AVISO DE SALIDA CON ILUMINACIN LED U 3.00 35.69 107.07 - - 0.00% 3.00 3.00 107.07
LUZ ESTROBOSCPICA CON SIRENA U 2.00 76.34 152.68 - - 0.00% -
MDULO DE AISLAMIENTO U 1.00 92.86 92.86 - - 0.00% -
MODULO DE MONITOREO U 2.00 79.94 159.88 - - 0.00% 2.00 2.00 159.88
LUZ DE EMERGENCIA AUTNOMA U 4.00 30.74 122.96 - - 0.00% 4.00 4.00 122.96
CABLEADO ANTIFLAMA 2 X 16 AWG M 25.00 1.13 28.25 - - 0.00% -
HOJA 18 DE 546
INODORO TANQUE BAJO UNA PIEZA INCLUYE ACCESORIOS U 4.00 106.95 427.80 4.00 4.00 427.80 427.80 100.00% -
DUCHA CROMADA, INCLUYE LLAVE Y ACCESORIOS U 2.00 20.34 40.68 2.00 2.00 40.68 40.68 100.00% -
LAVAMANOS COLECTIVO CON CERMICA M 1.00 38.67 38.67 - - 0.00% 1.00 1.00 38.67
LAVAMANOS PARA EMPOTRAR BLANCO (508MMX445 MM) CON GRIF U 4.00 147.69 590.76 4.00 4.00 590.76 590.76 100.00% -
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE ZANJAS M3 6.05 6.52 39.45 - - 0.00% 6.05 6.05 39.45
BLOQUE EDUCACIN INICIAL 3
PRELIMINARES
LIMPIEZA Y DESBROCE DEL TERRENO (MANUAL) M2 256.56 0.87 223.21 256.56 256.56 223.21 223.21 100.00% -
REPLANTEO Y NIVELACIN M2 256.56 0.99 253.99 256.56 256.56 253.99 253.99 100.00% -
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE CIMIENTOS Y PLINTOS M3 126.59 7.64 967.15 126.59 126.59 967.15 967.15 100.00% -
SUB-BASE CLASE 3 M3 30.60 16.01 489.91 30.60 30.60 489.91 489.91 100.00% -
EXCAVACIN A MQUINA M3 151.91 2.29 347.87 151.91 151.91 347.87 347.87 100.00% -
RELLENO COMPACTADO A MQUINA CON MATERIAL IMPORTADO M3 80.78 11.08 895.04 80.78 80.78 895.04 895.04 100.00% -
TRANSPORTE DE MATERIAL DE EXCAVACIN. TRANSPORTE LIBRE 1 M3-KM 1,519.13 0.25 379.78 1,519.13 1,519.13 379.78 379.78 100.00% -
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 2,227.68 0.25 556.92 2,227.68 2,227.68 556.92 556.92 100.00% -
ESTRUCTURA DE HORMIGN ARMADO
ACERO DE REFUERZO EN VARILLAS CORRUGADAS FY=4200 KG/CM2 KG 9,197.63 2.05 18,855.14 9,197.63 9,197.63 18,855.14 18,855.14 100.00% -
HORMIGN CICLPEO F'C=210 KG/CM (INCLUYE ENCOFRADO)H.S M3 7.46 121.30 904.90 7.46 7.46 904.90 904.90 100.00% -
HORMIGN F'C= 210 KG/CM2 EN VIGAS DE CIMENTACIN M3 25.65 242.51 6,220.38 24.58 24.58 5,960.89 5,960.89 95.83% -
HORMIGN F'C= 210 KG/CM2 EN CADENAS M3 6.29 184.96 1,163.40 5.61 5.61 1,037.63 1,037.63 89.19% -
HORMIGN F'C= 210 KG/CM2 EN COLUMNAS M3 11.42 229.35 2,619.18 10.94 10.94 2,509.09 2,509.09 95.80% 0.48 0.48 110.09
HORMIGN F'C= 210 KG/CM2 EN LOSA M3 26.03 208.33 5,422.83 26.03 26.03 5,422.83 5,422.83 100.00% -
IMPERMEABILIZACIN DE TERRAZA CON LMINA ASFLTICA M2 210.92 16.13 3,402.14 210.92 210.92 3,402.14 3,402.14 100.00% -
HORMIGN F'C= 140 KG/CM2 EN REPLANTILLOS M3 6.13 108.46 664.86 6.13 6.13 664.86 664.86 100.00% -
HORMIGN F'C= 210 KG/CM2 EN VIGAS M3 18.56 233.94 4,341.93 18.54 18.54 4,337.25 4,337.25 99.89% 0.02 0.02 4.68
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 9,791.28 0.25 2,447.82 9,791.28 9,791.28 2,447.82 2,447.82 100.00% -
MALLA ELECTROSOLDADA R-126 (4.10) M2 227.08 5.65 1,283.00 227.08 227.08 1,283.00 1,283.00 100.00% -
ALIVIANAMIENTO DE BLOQUE CEMENTO DE 40CMX20CMX20CM U 1,374.00 0.58 796.92 1,362.00 1,362.00 789.96 789.96 99.13% 12.00 12.00 6.96
GEOTEXTIL NT 2000 M2 30.00 3.95 118.50 30.00 30.00 118.50 118.50 100.00% -
GEOMALLA BIAXIAL BX1100 M2 30.00 5.40 162.00 30.00 30.00 162.00 162.00 100.00% -
CONTRAPISO HORMIGN ARMADO FC`210KG/CM2 (E=10CM, PIEDR M2 213.75 30.25 6,465.94 213.75 213.75 6,465.94 6,465.94 100.00% -
OTROS
MESN DE HORMIGN ARMADO FC=210KG/CM2, A=0,60 M 1.40 49.77 69.68 1.40 1.40 69.68 69.68 100.00% -
HOJA 21 DE 546
MAMPOSTERIA
MAMPOSTERA DE BLOQUE DE 15CM M2 165.30 17.65 2,917.55 165.30 165.30 2,917.55 2,917.55 100.00% -
MAMPOSTERA DE BLOQUE DE 10CM M2 17.88 15.15 270.88 17.88 17.88 270.88 270.88 100.00% -
HORMIGN F'C= 210 KG/CM2 EN CADENAS M3 1.98 184.96 366.22 0.71 0.71 131.32 131.32 35.86% 1.27 1.27 234.90
HORMIGN FC=210 KG/CM2 EN CONTORNO DE VENTANAS (ALFEI M3 2.60 228.43 593.92 2.60 2.60 593.92 593.92 100.00% -
HORMIGN FC=210KG/CM2 EN DINTELES Y RIOSTRAS M 25.20 15.28 385.06 25.20 25.20 385.06 385.06 100.00% -
ENLUCIDOS
ENLUCIDO VERTICAL INTERIOR. M2 118.47 6.70 793.75 118.47 118.47 793.75 793.75 100.00% -
EMPASTE INTERIOR DE PAREDES M2 305.46 4.18 1,276.82 271.00 271.00 1,132.78 1,132.78 88.72% 34.46 34.46 144.04
ENLUCIDO PALETEADO FINO DE FILOS Y FAJAS M 201.00 3.37 677.37 201.00 201.00 677.37 677.37 100.00% -
PISOS
CERMICA DE PISO ALTO TRFICO ANTIDESLIZANTE M2 213.75 28.80 6,156.00 213.75 213.75 6,156.00 6,156.00 100.00% -
MASILLADO DE LOSA INCLUYE IMPERMEABILIZANTE M2 221.85 8.04 1,783.67 221.76 221.76 1,782.95 1,782.95 99.96% 0.09 0.09 0.72
BARREDERAS DE CERMICA H=10CM M 69.02 5.43 374.78 69.02 69.02 374.78 374.78 100.00% -
PORCELANATO EN MESN M2 1.40 36.10 50.54 1.40 1.40 50.54 50.54 100.00% -
CARPINTERIA METALICA
VENTANA DE ALUMINIO Y VIDRIO 6MM CORREDIZA M2 42.16 80.28 3,384.60 - - 0.00% 42.16 42.16 3,384.60
PUERTA DE MDF, CON MIRILLA VERTICAL, MARCO METLICO Y PI M2 13.86 203.41 2,819.26 - - 0.00% 10.08 10.08 2,050.37
RECUBRIMIENTOS
CIELO RASO FALSO DE ESTRUCTURA DE ALUMINIO PREPINTADO AL M2 203.92 21.96 4,478.08 203.92 203.92 4,478.08 4,478.08 100.00% -
PINTURA DE CAUCHO LTEX VINILO ACRLICO INTERIOR M2 118.47 5.58 661.06 118.47 118.47 661.06 661.06 100.00% -
PINTURA ELASTOMRICA EXTERIORES M2 186.99 5.71 1,067.71 186.99 186.99 1,067.71 1,067.71 100.00% -
CERMICA EN PAREDES M2 60.90 25.37 1,545.03 59.18 59.18 1,501.40 1,501.40 97.18% 1.72 1.72 43.64
INSTALACIONES ELECTRONICAS
SISTEMA DE CABLEADO ESTRUCTURADO DATOS Y VOZ
PUNTO SIMPLE VOZ Y/O DATOS CAT 6A CERTIFICADO PTO 2.00 109.14 218.28 - - 0.00% -
PUNTO PARA SALIDA HDMI U 2.00 35.90 71.80 - - 0.00% -
PATCH CORD CAT 6A 7FT (3M) U 2.00 13.25 26.50 - - 0.00% -
PATCH CORD CAT 6A 3FT(1M) U 2.00 8.42 16.84 - - 0.00% -
BANDEJA TIPO ESCALERILLA GALVANIZADA 200X100MM INCLUYE TA M 18.00 26.53 477.54 - - 0.00% 18.00 18.00 477.54
CABLE FUTP CAT 6A BLINDADO M 40.00 2.30 92.00 - - 0.00% -
TUBERA EMT DE 3/4" Y ACCESORIOS M 25.00 5.37 134.25 - - 0.00% 25.00 25.00 134.25
TUBERA EMT DE 1" Y ACCESORIOS M 15.00 6.15 92.25 - - 0.00% -
SISTEMA DE SEGURIDAD (INTRUSIN)
CONTACTOS MAGNTICOS INSTALADOS U 4.00 5.65 22.60 - - 0.00% 4.00 4.00 22.60
TECLADO ALFANUMRICO U 2.00 52.27 104.54 - - 0.00% 2.00 2.00 104.54
CENTRAL DE SEGURIDAD DE 16 ZONAS INCLUYE TECLADO LCD U 1.00 548.68 548.68 - - 0.00% 1.00 1.00 548.68
SIRENA 15W BLINDADA U 1.00 51.18 51.18 - - 0.00% 1.00 1.00 51.18
DETECTOR DE MOVIMIENTO DOBLE TECNOLOGA U 2.00 22.77 45.54 - - 0.00% 2.00 2.00 45.54
CABLE UTP CAT 5E M 45.00 0.74 33.30 - - 0.00% 45.00 45.00 33.30
CABLEADO 2X14 AWG M 12.00 2.06 24.72 - - 0.00% 12.00 12.00 24.72
TUBERA EMT 1/2" Y ACCESORIOS M 40.00 3.19 127.60 - - 0.00% 40.00 40.00 127.60
TUBERA EMT DE 3/4" Y ACCESORIOS M 7.00 5.37 37.59 - - 0.00% 7.00 7.00 37.59
PUNTO DE RED DE SEGURIDAD PTO 10.00 34.99 349.90 - - 0.00% 10.00 10.00 349.90
SISTEMA DE CCTV
SISTEMA DE DETECCIN TEMPRANA DE INCENDIOS
MDULO DE CONTROL U 1.00 69.35 69.35 - - 0.00% -
DETECTOR DE HUMO FOTOELCTRICO U 2.00 73.70 147.40 - - 0.00% -
ESTACIN MANUAL DE INCENDIOS U 2.00 72.56 145.12 - - 0.00% -
HOJA 22 DE 546
AVISO DE SALIDA CON ILUMINACIN LED U 3.00 35.69 107.07 - - 0.00% 3.00 3.00 107.07
LUZ ESTROBOSCPICA CON SIRENA U 2.00 76.34 152.68 - - 0.00% -
MDULO DE AISLAMIENTO U 1.00 92.86 92.86 - - 0.00% -
MODULO DE MONITOREO U 2.00 79.94 159.88 - - 0.00% 2.00 2.00 159.88
LUZ DE EMERGENCIA AUTNOMA U 4.00 30.74 122.96 - - 0.00% 4.00 4.00 122.96
CABLEADO ANTIFLAMA 2 X 16 AWG M 25.00 1.13 28.25 - - 0.00% -
FUENTE DE ALIMENTACIN 24 V/8A U 1.00 433.97 433.97 - - 0.00% -
TUBERA EMT DE 3/4" Y ACCESORIOS M 25.00 5.37 134.25 - - 0.00% 25.00 25.00 134.25
PUNTO DE RED DE INCENDIOS PTO 11.00 33.19 365.09 - - 0.00% 11.00 11.00 365.09
SISTEMA DE SONORIZACIN
PARLANTE PARA TECHO 8W, 8" Y 100V U 3.00 70.56 211.68 - - 0.00% 3.00 3.00 211.68
CABLEADO 2X14 AWG M 40.00 2.06 82.40 - - 0.00% 40.00 40.00 82.40
PUNTO DE SONIDO PTO 3.00 36.85 110.55 - - 0.00% 3.00 3.00 110.55
TUBERA EMT 1/2" Y ACCESORIOS M 15.00 3.19 47.85 - - 0.00% 15.00 15.00 47.85
INSTALACIONES MECANICAS
VENTILADOR DE EXTRACCIN DE TIPO PLAFON DE 100 CFM, @ 0.25 U 4.00 182.22 728.88 - - 0.00% -
TUBERIA DE DRENAJE DE 4" CON ACSESORIOS U 2.60 6.11 15.89 - - 0.00% -
INSTALACIONES ELECTRICAS
PUNTO DE ILUMINACIN 120V PTO 31.00 33.84 1,049.04 29.00 29.00 981.36 981.36 93.55% 2.00 2.00 67.68
INTERRUPTOR SIMPLE U 2.00 4.15 8.30 2.00 2.00 8.30 8.30 100.00% -
INTERRUPTOR DOBLE U 2.00 4.79 9.58 2.00 2.00 9.58 9.58 100.00% -
CONMUTADOR SIMPLE U 2.00 5.31 10.62 2.00 2.00 10.62 10.62 100.00% -
CONMUTADOR DOBLE U 1.00 11.94 11.94 - - 0.00% 1.00 1.00 11.94
SENSOR DE MOVIMIENTO 180 U 1.00 37.22 37.22 - - 0.00% 1.00 1.00 37.22
SENSOR DE MOVIMIENTO 360 U 3.00 37.72 113.16 - - 0.00% -
LUMINARIA FLUORESCENTE 3X32W EMPOTRABLE U 16.00 69.22 1,107.52 16.00 16.00 1,107.52 1,107.52 100.00% -
OJO DE BUEY CON FLUORESCENTE COMPACTA 1X26W U 8.00 27.07 216.56 8.00 8.00 216.56 216.56 100.00% -
LUMINARIA APLIQUE DE PARED INTERIOR /EXTERIOR 1X26W U 2.00 33.87 67.74 - - 0.00% 2.00 2.00 67.74
LUMINARIA TIPO PLAFON 2X26W U 5.00 25.18 125.90 5.00 5.00 125.90 125.90 100.00% -
PUNTO TOMACORRIENTE NORMAL DOBLE 127V PARED O TECHO PTO 15.00 40.49 607.35 10.00 10.00 404.90 404.90 66.67% 5.00 5.00 202.45
PUNTO TOMACORRIENTE ESPECIAL 127V PTO 4.00 100.69 402.76 2.00 2.00 201.38 201.38 50.00% 2.00 2.00 201.38
PUNTO TOMACORRIENTE ESPECIAL 220V BIFSICO PTO 4.00 92.94 371.76 - - 0.00% 4.00 4.00 371.76
PUNTO TOMACORRIENTE REGULADO DOBLE 127V PARED O TECHO PTO 4.00 42.78 171.12 - - 0.00% 4.00 4.00 171.12
PUNTO DE TOMACORRIENTE ESPECIAL REGULADO 127V PTO 3.00 40.44 121.32 - - 0.00% 3.00 3.00 121.32
PUNTO DUCHA ELCTRICA PTO 2.00 94.68 189.36 - - 0.00% 2.00 2.00 189.36
HOJA 23 DE 546
CENTRO DE CARGA TRIFASICO 6 ESPACIOS U 1.00 73.53 73.53 - - 0.00% 1.00 1.00 73.53
CENTRO DE CARGA TRIFASICO 12 ESPACIOS U 1.00 116.41 116.41 - - 0.00% 1.00 1.00 116.41
CENTRO DE CARGA TRIFASICO 20 ESPACIOS U 1.00 171.53 171.53 1.00 1.00 171.53 171.53 100.00% -
BREAKER ENCHUFABLE 1P - 16 A U 4.00 6.28 25.12 - - 0.00% -
BREAKER ENCHUFABLE 1P - 20 A U 11.00 6.28 69.08 - - 0.00% -
BREAKER ENCHUFABLE 1P - 40 A U 2.00 6.28 12.56 - - 0.00% -
BREAKER ENCHUFABLE 2P - 20 A U 4.00 16.08 64.32 - - 0.00% 4.00 4.00 64.32
INTERRUPTOR TERMOMAGNETICO 3P-15-20-30-40-50-60A CAJA M U 2.00 61.37 122.74 - - 0.00% 2.00 2.00 122.74
INTERRUPTOR TERMOMAGNETICO 3P-15-20-30-40-50-60A CAJA M U 1.00 61.37 61.37 - - 0.00% 1.00 1.00 61.37
INTERRUPTOR TERMOMAGNETICO 3P-15-20-30-40-50-60A CAJA M U 1.00 61.37 61.37 - - 0.00% 1.00 1.00 61.37
CAJA DE PASO 10X10 U 20.00 11.76 235.20 20.00 20.00 235.20 235.20 100.00% -
CONECTOR Y CLAVIJA PARA AIRES ACONDICIONADOS INTERIORES U 4.00 42.15 168.60 - - 0.00% 4.00 4.00 168.60
CAJA IP65 PARA AIRES ACONDICIONADOS EXTERIORES 20X20X15 ( U 4.00 30.21 120.84 - - 0.00% 4.00 4.00 120.84
ALIMENTADOR 1X#12(F)+1X#12(N) AWG THHN M 100.00 1.72 172.00 - - 0.00% 100.00 100.00 172.00
ALIMENTADOR 1X#12(F)+1X#12(N)+1X#14(T) AWG THHN M 100.00 2.28 228.00 - - 0.00% 100.00 100.00 228.00
ALIMENTADOR 1X#8(F)+1X#8(N)+1X#10(T) AWG THHN M 100.00 4.72 472.00 - - 0.00% -
FUNDA BX 1" M 50.00 5.81 290.50 - - 0.00% 50.00 50.00 290.50
CABLE CONCENTRICO 2X14 AWG M 200.00 1.63 326.00 - - 0.00% 200.00 200.00 326.00
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 3/4" M 50.00 4.11 205.50 - - 0.00% 50.00 50.00 205.50
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 1 1/ M 50.00 9.32 466.00 - - 0.00% 50.00 50.00 466.00
SUMNISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 2" M 50.00 11.99 599.50 - - 0.00% 50.00 50.00 599.50
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 3" M 50.00 38.41 1,920.50 - - 0.00% 50.00 50.00 1,920.50
CONDUCTOR THHN FLEX #14 AWG M 100.00 0.74 74.00 - - 0.00% 100.00 100.00 74.00
CONDUCTOR THHN FLEX #12 AWG M 100.00 1.09 109.00 - - 0.00% 100.00 100.00 109.00
CONDUCTOR THHN FLEX #10 AWG M 100.00 1.36 136.00 - - 0.00% 100.00 100.00 136.00
CABLE FLEXIBLE 8 AWG M 100.00 1.98 198.00 - - 0.00% 100.00 100.00 198.00
CABLE FLEXIBLE 6 AWG M 100.00 2.80 280.00 - - 0.00% 100.00 100.00 280.00
CABLE FLEXIBLE 4 AWG M 100.00 3.74 374.00 - - 0.00% 100.00 100.00 374.00
CABLE FLEXIBLE 2 AWG M 10.00 5.50 55.00 - - 0.00% 10.00 10.00 55.00
INSTALACIONES HIDROSANITARIAS
SISTEMA DE AGUA POTABLE
PUNTO DE AGUA PVC ROSCABLE1/2" PTO 14.00 19.92 278.88 13.00 13.00 258.96 258.96 92.86% 1.00 1.00 19.92
TUBERA PVC ROSCABLE 1/2" M 4.20 2.64 11.09 1.93 1.93 5.10 5.10 45.94% 2.27 2.27 5.99
TUBERA PVC ROSCABLE 3/4" M 1.00 3.42 3.42 1.00 1.00 3.42 3.42 100.00% -
TUBERA PVC ROSCABLE 1" M 9.70 8.07 78.28 6.00 6.00 48.42 48.42 61.85% 3.70 3.70 29.86
TUBERA PVC ROSCABLE 1 1/4" M 3.00 11.68 35.04 3.00 3.00 35.04 35.04 100.00% -
VLVULA DE CONTROL ROSCADA DIAM 1/2" U 1.00 8.88 8.88 1.00 1.00 8.88 8.88 100.00% -
VLVULA DE CONTROL ROSCADA DIAM 3/4" U 1.00 16.89 16.89 1.00 1.00 16.89 16.89 100.00% -
VLVULA DECONTROL ROSCADA DIAM 1" U 1.00 22.52 22.52 1.00 1.00 22.52 22.52 100.00% -
VLVULA DECONTROL ROSCADA DIAM 1" U 2.00 28.70 57.40 1.00 1.00 28.70 28.70 50.00% 1.00 1.00 28.70
SISTEMA DE AGUA RESIDUALES
CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO U 1.00 98.94 98.94 1.00 1.00 98.94 98.94 100.00% -
DESAGES PVC 50 MM. TIPO B(INCLUYE ACCESORIOS) PTO 8.00 8.21 65.68 8.00 8.00 65.68 65.68 100.00% -
DESAGES PVC 75 MM. TIPO B (INCLUYE ACCESORIOS) PTO 2.00 11.58 23.16 2.00 2.00 23.16 23.16 100.00% -
DESAGES PVC 110MM TIPO B (INCLUYE ACCESORIOS) PTO 4.00 9.55 38.20 4.00 4.00 38.20 38.20 100.00% -
SUMIDERO DE PISO DE 3" INCLUYE REJILLA U 2.00 18.22 36.44 2.00 2.00 36.44 36.44 100.00% -
TUBERA DE 50MM DE PVC TIPO B M 3.00 3.65 10.95 3.00 3.00 10.95 10.95 100.00% -
TUBERA DE 110 MM PVC TIPO B M 6.00 11.51 69.06 - - 0.00% 6.00 6.00 69.06
AGUAS LLUVIAS
HOJA 24 DE 546
BAJANTES DE TUBERA PVC TIPO B DE 110 MM M 8.00 9.52 76.16 8.00 8.00 76.16 76.16 100.00% -
CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO U 2.00 98.94 197.88 2.00 2.00 197.88 197.88 100.00% -
SUMIDERO DE CUBIERTA DE 110MM INCLUYE REJILLA CUPULA U 2.00 24.93 49.86 2.00 2.00 49.86 49.86 100.00% -
TUBERA DE 110 MM PVC TIPO B M 12.00 11.51 138.12 12.00 12.00 138.12 138.12 100.00% -
DESAGES PVC 110MM TIPO B (INCLUYE ACCESORIOS) PTO 2.00 9.55 19.10 2.00 2.00 19.10 19.10 100.00% -
APARATOS SANITARIOS
INODORO TANQUE BAJO UNA PIEZA INCLUYE ACCESORIOS U 4.00 106.95 427.80 4.00 4.00 427.80 427.80 100.00% -
DUCHA CROMADA, INCLUYE LLAVE Y ACCESORIOS U 2.00 20.34 40.68 2.00 2.00 40.68 40.68 100.00% -
LAVAMANOS COLECTIVO CON CERMICA U 1.00 38.67 38.67 - - 0.00% 1.00 1.00 38.67
LAVAMANOS PARA EMPOTRAR BLANCO (508MMX445 MM) CON GRIF U 4.00 147.69 590.76 4.00 4.00 590.76 590.76 100.00% -
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE ZANJAS M3 6.05 6.52 39.45 - - 0.00% 6.05 6.05 39.45
SALA DE PROFESORES
PRELIMINARES
LIMPIEZA Y DESBROCE DEL TERRENO (MANUAL) M2 256.56 0.87 223.21 256.56 256.56 223.21 223.21 100.00% -
REPLANTEO Y NIVELACIN M2 256.56 0.99 253.99 256.56 256.56 253.99 253.99 100.00% -
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE CIMIENTOS Y PLINTOS M3 126.59 7.64 967.15 126.59 126.59 967.15 967.15 100.00% -
SUB-BASE CLASE 3 M3 30.60 16.01 489.91 30.60 30.60 489.91 489.91 100.00% -
EXCAVACIN A MQUINA M3 151.91 2.29 347.87 151.91 151.91 347.87 347.87 100.00% -
RELLENO COMPACTADO A MQUINA CON MATERIAL IMPORTADO M3 80.78 11.08 895.04 80.78 80.78 895.04 895.04 100.00% -
TRANSPORTE DE MATERIAL DE EXCAVACIN. TRANSPORTE LIBRE 1 M3-KM 1,519.13 0.25 379.78 1,519.13 1,519.13 379.78 379.78 100.00% -
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 2,227.68 0.25 556.92 2,227.68 2,227.68 556.92 556.92 100.00% -
ESTRUCTURA DE HORMIGN ARMADO
ACERO DE REFUERZO EN VARILLAS CORRUGADAS FY=4200 KG/CM2 KG 9,197.63 2.05 18,855.14 9,197.63 9,197.63 18,855.14 18,855.14 100.00% -
HORMIGN CICLPEO F'C=210 KG/CM (INCLUYE ENCOFRADO)H.S M3 7.46 121.30 904.90 7.46 7.46 904.90 904.90 100.00% -
HORMIGN F'C= 210 KG/CM2 EN VIGAS DE CIMENTACIN M3 25.65 242.51 6,220.38 25.65 25.65 6,220.38 6,220.38 100.00% -
HORMIGN F'C= 210 KG/CM2 EN CADENAS M3 6.29 184.96 1,163.40 6.29 6.29 1,163.40 1,163.40 100.00% -
HORMIGN F'C= 210 KG/CM2 EN COLUMNAS M3 11.42 229.35 2,619.18 11.42 11.42 2,619.18 2,619.18 100.00% -
HORMIGN F'C= 210 KG/CM2 EN LOSA M3 26.03 208.33 5,422.83 26.03 26.03 5,422.83 5,422.83 100.00% -
IMPERMEABILIZACIN DE TERRAZA CON LMINA ASFLTICA M2 210.92 16.13 3,402.14 210.92 210.92 3,402.14 3,402.14 100.00% -
HORMIGN F'C= 140 KG/CM2 EN REPLANTILLOS M3 6.13 108.46 664.86 6.13 6.13 664.86 664.86 100.00% -
HORMIGN F'C= 210 KG/CM2 EN VIGAS M3 18.56 233.94 4,341.93 18.56 18.56 4,341.93 4,341.93 100.00% -
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 9,791.28 0.25 2,447.82 9,791.28 9,791.28 2,447.82 2,447.82 100.00% -
MALLA ELECTROSOLDADA R-126 (4.10) M2 227.08 5.65 1,283.00 218.07 218.07 1,232.09 1,232.09 96.03% 9.01 9.01 50.91
HOJA 25 DE 546
ALIVIANAMIENTO DE BLOQUE CEMENTO DE 40CMX20CMX20CM U 1,374.00 0.58 796.92 1,374.00 1,374.00 796.92 796.92 100.00% -
GEOTEXTIL NT 2000 M2 30.00 3.95 118.50 30.00 30.00 118.50 118.50 100.00% -
GEOMALLA BIAXIAL BX1100 M2 30.00 5.40 162.00 30.00 30.00 162.00 162.00 100.00% -
CONTRAPISO HORMIGN ARMADO FC`210KG/CM2 (E=10CM, PIEDR M2 213.75 30.25 6,465.94 213.75 213.75 6,465.94 6,465.94 100.00% -
OTROS
MESN DE HORMIGN ARMADO FC=210KG/CM2, A=0,60 M 1.40 49.77 69.68 1.40 1.40 69.68 69.68 100.00% -
MAMPOSTERIA
MAMPOSTERA DE BLOQUE DE 15CM M2 165.30 17.65 2,917.55 165.30 165.30 2,917.55 2,917.55 100.00% -
MAMPOSTERA DE BLOQUE DE 10CM M2 17.88 15.15 270.88 17.88 17.88 270.88 270.88 100.00% -
HORMIGN F'C= 210 KG/CM2 EN CADENAS M3 1.98 184.96 366.22 1.98 1.98 366.22 366.22 100.00% -
HORMIGN FC=210 KG/CM2 EN CONTORNO DE VENTANAS (ALFEI M3 2.60 228.43 593.92 2.60 2.60 593.92 593.92 100.00% -
HORMIGN FC=210KG/CM2 EN DINTELES Y RIOSTRAS M 25.20 15.28 385.06 25.20 25.20 385.06 385.06 100.00% -
ENLUCIDOS
ENLUCIDO VERTICAL INTERIOR. M2 118.47 6.70 793.75 118.47 118.47 793.75 793.75 100.00% -
EMPASTE INTERIOR DE PAREDES M2 305.46 4.18 1,276.82 305.46 305.46 1,276.82 1,276.82 100.00% -
ENLUCIDO PALETEADO FINO DE FILOS Y FAJAS M 201.00 3.37 677.37 201.00 201.00 677.37 677.37 100.00% -
PISOS
CERMICA DE PISO ALTO TRFICO ANTIDESLIZANTE M2 213.75 28.80 6,156.00 213.75 - 213.75 6,156.00 0.00 6,156.00 100.00% -
MASILLADO DE LOSA INCLUYE IMPERMEABILIZANTE M2 221.85 8.04 1,783.67 206.18 206.18 1,657.68 1,657.68 92.94% 15.67 15.67 125.99
BARREDERAS DE CERMICA H=10CM M 69.02 5.43 374.78 69.02 69.02 374.78 374.78 100.00% -
PORCELANATO EN MESN M2 1.40 36.10 50.54 1.40 1.40 50.54 50.54 100.00% -
CARPINTERIA METALICA
VENTANA DE ALUMINIO Y VIDRIO 6MM CORREDIZA M2 42.16 80.28 3,384.60 - - 0.00% 42.16 42.16 3,384.60
PUERTA DE MDF, CON MIRILLA VERTICAL, MARCO METLICO Y PI M2 13.86 203.41 2,819.26 - - 0.00% 1.05 1.05 213.58
RECUBRIMIENTOS
CIELO RASO FALSO DE ESTRUCTURA DE ALUMINIO PREPINTADO AL M2 203.92 21.96 4,478.08 196.29 196.29 4,310.53 4,310.53 96.26% 7.63 7.63 167.55
PINTURA DE CAUCHO LTEX VINILO ACRLICO INTERIOR M2 118.47 5.58 661.06 118.47 118.47 661.06 661.06 100.00% -
PINTURA ELASTOMRICA EXTERIORES M2 186.99 5.71 1,067.71 186.99 186.99 1,067.71 1,067.71 100.00% -
CERMICA EN PAREDES M2 60.90 25.37 1,545.03 23.15 23.15 587.32 587.32 38.01% 37.75 37.75 957.72
INSTALACIONES ELECTRONICAS
SISTEMA DE CABLEADO ESTRUCTURADO DATOS Y VOZ
PUNTO SIMPLE VOZ Y/O DATOS CAT 6A CERTIFICADO PTO 2.00 109.14 218.28 - - 0.00% -
PUNTO PARA SALIDA HDMI U 2.00 35.90 71.80 - - 0.00% -
PATCH CORD CAT 6A 7FT (3M) U 2.00 13.25 26.50 - - 0.00% -
PATCH CORD CAT 6A 3FT(1M) U 2.00 8.42 16.84 - - 0.00% -
BANDEJA TIPO ESCALERILLA GALVANIZADA 200X100MM INCLUYE TA M 18.00 26.53 477.54 18.00 18.00 477.54 477.54 100.00% -
CABLE FUTP CAT 6A BLINDADO M 40.00 2.30 92.00 - - 0.00% -
TUBERA EMT DE 3/4" Y ACCESORIOS M 25.00 5.37 134.25 - - 0.00% 25.00 25.00 134.25
TUBERA EMT DE 1" Y ACCESORIOS M 15.00 6.15 92.25 - - 0.00% -
SISTEMA DE SEGURIDAD (INTRUSIN)
CONTACTOS MAGNTICOS INSTALADOS U 4.00 5.65 22.60 - - 0.00% 4.00 4.00 22.60
TECLADO ALFANUMRICO U 2.00 52.27 104.54 - - 0.00% 2.00 2.00 104.54
CENTRAL DE SEGURIDAD DE 16 ZONAS INCLUYE TECLADO LCD U 1.00 548.68 548.68 - - 0.00% 1.00 1.00 548.68
SIRENA 15W BLINDADA U 1.00 51.18 51.18 - - 0.00% 1.00 1.00 51.18
DETECTOR DE MOVIMIENTO DOBLE TECNOLOGA U 2.00 22.77 45.54 - - 0.00% 2.00 2.00 45.54
CABLE UTP CAT 5E M 45.00 0.74 33.30 - - 0.00% 45.00 45.00 33.30
CABLEADO 2X14 AWG M 12.00 2.06 24.72 - - 0.00% 12.00 12.00 24.72
TUBERA EMT 1/2" Y ACCESORIOS M 40.00 3.19 127.60 - - 0.00% 40.00 40.00 127.60
TUBERA EMT DE 3/4" Y ACCESORIOS M 7.00 5.37 37.59 - - 0.00% 7.00 7.00 37.59
HOJA 26 DE 546
PUNTO DE RED DE SEGURIDAD PTO 10.00 34.99 349.90 - - 0.00% 10.00 10.00 349.90
SISTEMA DE CCTV
SISTEMA DE DETECCIN TEMPRANA DE INCENDIOS
MDULO DE CONTROL U 1.00 69.35 69.35 - - 0.00% -
DETECTOR DE HUMO FOTOELCTRICO U 2.00 73.70 147.40 - - 0.00% -
ESTACIN MANUAL DE INCENDIOS U 2.00 72.56 145.12 - - 0.00% -
AVISO DE SALIDA CON ILUMINACIN LED U 3.00 35.69 107.07 - - 0.00% 3.00 3.00 107.07
LUZ ESTROBOSCPICA CON SIRENA U 2.00 76.34 152.68 - - 0.00% -
MDULO DE AISLAMIENTO U 1.00 92.86 92.86 - - 0.00% -
MODULO DE MONITOREO U 2.00 79.94 159.88 - - 0.00% 2.00 2.00 159.88
LUZ DE EMERGENCIA AUTNOMA U 4.00 30.74 122.96 - - 0.00% 4.00 4.00 122.96
CABLEADO ANTIFLAMA 2 X 16 AWG M 25.00 1.13 28.25 - - 0.00% -
FUENTE DE ALIMENTACIN 24 V/8A U 1.00 433.97 433.97 - - 0.00% -
TUBERA EMT DE 3/4" Y ACCESORIOS M 25.00 5.37 134.25 - - 0.00% 25.00 25.00 134.25
PUNTO DE RED DE INCENDIOS PTO 11.00 33.19 365.09 - - 0.00% 11.00 11.00 365.09
SISTEMA DE SONORIZACIN
PARLANTE PARA TECHO 8W, 8" Y 100V U 3.00 70.56 211.68 - - 0.00% 3.00 3.00 211.68
CABLEADO 2X14 AWG M 40.00 2.06 82.40 - - 0.00% 40.00 40.00 82.40
PUNTO DE SONIDO PTO 3.00 36.85 110.55 - - 0.00% 3.00 3.00 110.55
TUBERA EMT 1/2" Y ACCESORIOS M 15.00 3.19 47.85 - - 0.00% 15.00 15.00 47.85
INSTALACIONES MECANICAS
VENTILADOR DE EXTRACCIN DE TIPO PLAFON DE 100 CFM, @ 0.25 U 4.00 182.22 728.88 - - 0.00% 4.00 4.00 728.88
TUBERIA DE DRENAJE DE 4" CON ACSESORIOS U 2.60 6.11 15.89 - - 0.00% -
INSTALACIONES ELECTRICAS
PUNTO DE ILUMINACIN 120V PTO 31.00 33.84 1,049.04 31.00 31.00 1,049.04 1,049.04 100.00% -
INTERRUPTOR SIMPLE U 2.00 4.15 8.30 - - 0.00% -
INTERRUPTOR DOBLE U 2.00 4.79 9.58 - - 0.00% 2.00 2.00 9.58
CONMUTADOR SIMPLE U 2.00 5.31 10.62 - - 0.00% -
CONMUTADOR DOBLE U 1.00 11.94 11.94 - - 0.00% 1.00 1.00 11.94
SENSOR DE MOVIMIENTO 180 U 1.00 37.22 37.22 - - 0.00% 1.00 1.00 37.22
SENSOR DE MOVIMIENTO 360 U 3.00 37.72 113.16 - - 0.00% 3.00 3.00 113.16
LUMINARIA FLUORESCENTE 3X32W EMPOTRABLE U 16.00 69.22 1,107.52 16.00 16.00 1,107.52 1,107.52 100.00% -
OJO DE BUEY CON FLUORESCENTE COMPACTA 1X26W U 8.00 27.07 216.56 8.00 8.00 216.56 216.56 100.00% -
LUMINARIA APLIQUE DE PARED INTERIOR /EXTERIOR 1X26W U 2.00 33.87 67.74 2.00 2.00 67.74 67.74 100.00% -
LUMINARIA TIPO PLAFON 2X26W U 5.00 25.18 125.90 - - 0.00% -
HOJA 27 DE 546
PUNTO TOMACORRIENTE NORMAL DOBLE 127V PARED O TECHO PTO 15.00 40.49 607.35 15.00 15.00 607.35 607.35 100.00% -
PUNTO TOMACORRIENTE ESPECIAL 127V PTO 4.00 100.69 402.76 3.00 3.00 302.07 302.07 75.00% 1.00 1.00 100.69
PUNTO TOMACORRIENTE ESPECIAL 220V BIFSICO PTO 4.00 92.94 371.76 - - 0.00% 4.00 4.00 371.76
PUNTO TOMACORRIENTE REGULADO DOBLE 127V PARED O TECHO PTO 4.00 42.78 171.12 - - 0.00% 4.00 4.00 171.12
PUNTO DE TOMACORRIENTE ESPECIAL REGULADO 127V PTO 3.00 40.44 121.32 - - 0.00% 3.00 3.00 121.32
PUNTO DUCHA ELCTRICA PTO 2.00 94.68 189.36 - - 0.00% 2.00 2.00 189.36
CENTRO DE CARGA TRIFASICO 6 ESPACIOS U 1.00 73.53 73.53 - - 0.00% 1.00 1.00 73.53
CENTRO DE CARGA TRIFASICO 12 ESPACIOS U 1.00 116.41 116.41 - - 0.00% 1.00 1.00 116.41
CENTRO DE CARGA TRIFASICO 20 ESPACIOS U 1.00 171.53 171.53 - - 0.00% 1.00 1.00 171.53
BREAKER ENCHUFABLE 1P - 16 A U 4.00 6.28 25.12 - - 0.00% -
BREAKER ENCHUFABLE 1P - 20 A U 11.00 6.28 69.08 - - 0.00% -
BREAKER ENCHUFABLE 1P - 40 A U 2.00 6.28 12.56 - - 0.00% -
BREAKER ENCHUFABLE 2P - 20 A U 4.00 16.08 64.32 - - 0.00% 4.00 4.00 64.32
INTERRUPTOR TERMOMAGNETICO 3P-15-20-30-40-50-60A CAJA M U 2.00 61.37 122.74 - - 0.00% 2.00 2.00 122.74
INTERRUPTOR TERMOMAGNETICO 3P-15-20-30-40-50-60A CAJA M U 1.00 61.37 61.37 - - 0.00% 1.00 1.00 61.37
INTERRUPTOR TERMOMAGNETICO 3P-15-20-30-40-50-60A CAJA M U 1.00 61.37 61.37 - - 0.00% 1.00 1.00 61.37
CAJA DE PASO 10X10 U 20.00 11.76 235.20 20.00 20.00 235.20 235.20 100.00% -
CONECTOR Y CLAVIJA PARA AIRES ACONDICIONADOS INTERIORES U 4.00 42.15 168.60 - - 0.00% -
CAJA IP65 PARA AIRES ACONDICIONADOS EXTERIORES 20X20X15 ( U 4.00 30.21 120.84 - - 0.00% 4.00 4.00 120.84
ALIMENTADOR 1X#12(F)+1X#12(N) AWG THHN M 100.00 1.72 172.00 - - 0.00% 100.00 100.00 172.00
ALIMENTADOR 1X#12(F)+1X#12(N)+1X#14(T) AWG THHN M 100.00 2.28 228.00 - - 0.00% 100.00 100.00 228.00
ALIMENTADOR 1X#8(F)+1X#8(N)+1X#10(T) AWG THHN M 100.00 4.72 472.00 - - 0.00% 100.00 100.00 472.00
FUNDA BX 1" M 50.00 5.81 290.50 - - 0.00% 50.00 50.00 290.50
CABLE CONCENTRICO 2X14 AWG M 200.00 1.63 326.00 - - 0.00% 200.00 200.00 326.00
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 3/4" M 50.00 4.11 205.50 - - 0.00% 50.00 50.00 205.50
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 1 1/ M 50.00 9.32 466.00 - - 0.00% 50.00 50.00 466.00
SUMNISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 2" M 50.00 11.99 599.50 - - 0.00% 50.00 50.00 599.50
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 3" M 50.00 38.41 1,920.50 - - 0.00% 50.00 50.00 1,920.50
CONDUCTOR THHN FLEX #14 AWG M 100.00 0.74 74.00 - - 0.00% 100.00 100.00 74.00
CONDUCTOR THHN FLEX #12 AWG M 100.00 1.09 109.00 - - 0.00% 100.00 100.00 109.00
CONDUCTOR THHN FLEX #10 AWG M 100.00 1.36 136.00 - - 0.00% 100.00 100.00 136.00
CABLE FLEXIBLE 8 AWG M 100.00 1.98 198.00 - - 0.00% 100.00 100.00 198.00
CABLE FLEXIBLE 6 AWG M 100.00 2.80 280.00 - - 0.00% 100.00 100.00 280.00
CABLE FLEXIBLE 4 AWG M 100.00 3.74 374.00 - - 0.00% 100.00 100.00 374.00
CABLE FLEXIBLE 2 AWG M 10.00 5.50 55.00 - - 0.00% 10.00 10.00 55.00
INSTALACIONES HIDROSANITARIAS
SISTEMA DE AGUA POTABLE
PUNTO DE AGUA PVC ROSCABLE1/2" PTO 14.00 19.92 278.88 5.00 5.00 99.60 99.60 35.71% 9.00 9.00 179.28
TUBERA PVC ROSCABLE 1/2" M 11.30 2.64 29.83 - - 0.00% 11.30 11.30 29.83
TUBERA PVC ROSCABLE 3/4" M 1.80 3.42 6.16 1.80 1.80 6.16 6.16 99.94% -
TUBERA PVC ROSCABLE 1" M 6.50 8.07 52.46 - - 0.00% 6.50 6.50 52.46
TUBERA PVC ROSCABLE 1 1/4" M 5.50 11.68 64.24 - - 0.00% 5.50 5.50 64.24
VLVULA DE CONTROL ROSCADA DIAM 1/2" U 12.00 8.88 106.56 1.00 1.00 8.88 8.88 8.33% 11.00 11.00 97.68
VLVULA DE CONTROL ROSCADA DIAM 3/4" U 1.00 16.89 16.89 - - 0.00% 1.00 1.00 16.89
VLVULA DECONTROL ROSCADA DIAM 1" U 1.00 22.52 22.52 - - 0.00% 1.00 1.00 22.52
VLVULA DECONTROL ROSCADA DIAM 1" U 2.00 28.70 57.40 - - 0.00% 2.00 2.00 57.40
SISTEMA DE AGUA RESIDUALES
CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO U 1.00 98.94 98.94 1.00 1.00 98.94 98.94 100.00% -
DESAGES PVC 50 MM. TIPO B(INCLUYE ACCESORIOS) PTO 8.00 8.21 65.68 3.00 3.00 24.63 24.63 37.50% 5.00 5.00 41.05
HOJA 28 DE 546
DESAGES PVC 75 MM. TIPO B (INCLUYE ACCESORIOS) PTO 2.00 11.58 23.16 - - 0.00% 2.00 2.00 23.16
DESAGES PVC 110MM TIPO B (INCLUYE ACCESORIOS) PTO 4.00 9.55 38.20 4.00 4.00 38.20 38.20 100.00% -
SUMIDERO DE PISO DE 3" INCLUYE REJILLA U 2.00 18.22 36.44 - - 0.00% 2.00 2.00 36.44
TUBERA DE 50MM DE PVC TIPO B M 3.00 3.65 10.95 - - 0.00% 3.00 3.00 10.95
TUBERA DE 110 MM PVC TIPO B M 6.00 11.51 69.06 6.00 6.00 69.06 69.06 100.00% -
AGUAS LLUVIAS
BAJANTES DE TUBERA PVC TIPO B DE 110 MM M 8.00 9.52 76.16 8.00 8.00 76.16 76.16 100.00% -
CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO U 2.00 98.94 197.88 2.00 2.00 197.88 197.88 100.00% -
SUMIDERO DE CUBIERTA DE 110MM INCLUYE REJILLA CUPULA U 2.00 24.93 49.86 2.00 2.00 49.86 49.86 100.00% -
TUBERA DE 110 MM PVC TIPO B M 12.00 11.51 138.12 12.00 12.00 138.12 138.12 100.00% -
DESAGES PVC 110MM TIPO B (INCLUYE ACCESORIOS) PTO 2.00 9.55 19.10 2.00 2.00 19.10 19.10 100.00% -
APARATOS SANITARIOS
INODORO TANQUE BAJO UNA PIEZA INCLUYE ACCESORIOS U 4.00 106.95 427.80 2.00 2.00 213.90 213.90 50.00% 2.00 2.00 213.90
LAVAMANOS PARA EMPOTRAR BLANCO (508MMX445 MM) CON GRIF U 4.00 147.69 590.76 - - 0.00% 4.00 4.00 590.76
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE ZANJAS M3 6.05 6.52 39.45 - - 0.00% 6.05 6.05 39.45
BLOQUE DE LABORATORIOS DE QUMICA Y FSICA
PRELIMINARES
LIMPIEZA Y DESBROCE DEL TERRENO (MANUAL) M2 383.64 0.87 333.77 383.64 383.64 333.77 333.77 100.00% -
REPLANTEO Y NIVELACIN M2 383.64 0.99 379.80 383.64 383.64 379.80 379.80 100.00% -
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE CIMIENTOS Y PLINTOS M3 98.83 7.64 755.06 98.83 98.83 755.06 755.06 100.00% -
SUB-BASE CLASE 3 M3 17.38 16.01 278.25 17.38 17.38 278.25 278.25 100.00% -
EXCAVACIN A MQUINA M3 118.60 2.29 271.59 118.60 118.60 271.59 271.59 100.00% -
RELLENO COMPACTADO A MQUINA CON MATERIAL IMPORTADO M3 57.34 11.08 635.33 57.34 57.34 635.33 635.33 100.00% -
TRANSPORTE DE MATERIAL DE EXCAVACIN. TRANSPORTE LIBRE 1 M3-KM 1,185.96 0.25 296.49 1,185.96 1,185.96 296.49 296.49 100.00% -
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 1,494.34 0.25 373.59 1,494.34 1,494.34 373.59 373.59 100.00% -
ESTRUCTURA DE HORMIGN ARMADO
ACERO DE REFUERZO EN VARILLAS CORRUGADAS FY=4200 KG/CM2 KG 9,103.15 2.05 18,661.46 9,103.15 9,103.15 18,661.46 18,661.46 100.00% -
HORMIGN CICLPEO F'C=210 KG/CM (INCLUYE ENCOFRADO)H.S M3 21.24 121.30 2,576.41 18.86 18.86 2,287.72 2,287.72 88.79% 2.38 2.38 288.69
HORMIGN F'C= 210 KG/CM2 EN PLINTOS M3 13.03 226.59 2,952.47 13.03 13.03 2,952.47 2,952.47 100.00% -
HORMIGN F'C= 210 KG/CM2 EN CADENAS M3 11.95 184.96 2,210.27 10.62 10.62 1,964.27 1,964.27 88.87% 1.33 1.33 246.00
HORMIGN F'C= 210 KG/CM2 EN COLUMNAS M3 26.96 229.35 6,183.28 15.98 15.98 3,665.02 3,665.02 59.27% 10.98 10.98 2,518.26
HORMIGN F'C= 210 KG/CM2 EN LOSA M3 25.17 208.33 5,243.67 25.17 25.17 5,243.67 5,243.67 100.00% -
IMPERMEABILIZACIN DE TERRAZA CON LMINA ASFLTICA M2 210.00 16.13 3,387.30 210.00 210.00 3,387.30 3,387.30 100.00% -
HOJA 29 DE 546
HORMIGN F'C= 140 KG/CM2 EN REPLANTILLOS M3 4.34 108.46 470.72 4.34 4.34 470.72 470.72 100.00% -
HORMIGN F'C= 210 KG/CM2 EN VIGAS M3 19.71 233.94 4,610.96 19.71 19.71 4,610.96 4,610.96 100.00% -
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 10,707.79 0.25 2,676.95 10,707.79 10,707.79 2,676.95 2,676.95 100.00% -
MALLA ELECTROSOLDADA R-126 (4.10) M2 245.20 5.65 1,385.38 218.07 218.07 1,232.10 1,232.10 88.94% 27.13 27.13 153.28
ALIVIANAMIENTO DE BLOQUE CEMENTO DE 40CMX20CMX20CM U 1,260.00 0.58 730.80 1,260.00 1,260.00 730.80 730.80 100.00% -
GEOTEXTIL NT 2000 M2 35.00 3.95 138.25 35.00 35.00 138.25 138.25 100.00% -
GEOMALLA BIAXIAL BX1100 M2 35.00 5.40 189.00 35.00 35.00 189.00 189.00 100.00% -
CONTRAPISO HORMIGN ARMADO FC`210KG/CM2 (E=10CM, PIEDR M2 245.20 30.25 7,417.30 239.85 239.85 7,255.46 7,255.46 97.82% 5.35 5.35 161.84
OTROS
MESN DE HORMIGN ARMADO FC=210KG/CM2, A=0,60 M 28.80 49.77 1,433.38 28.00 28.00 1,393.56 1,393.56 97.22% 0.80 0.80 39.82
MAMPOSTERIA
MAMPOSTERA DE BLOQUE DE 15CM M2 273.93 17.65 4,834.86 268.06 268.06 4,731.25 4,731.25 97.86% 5.87 5.87 103.61
MAMPOSTERA DE BLOQUE DE 10CM M2 14.47 15.15 219.22 14.47 14.47 219.22 219.22 100.00% -
HORMIGN FC=210 KG/CM2 EN CONTORNO DE VENTANAS (ALFEI M3 2.74 228.43 625.90 2.74 2.74 625.90 625.90 100.00% -
HORMIGN FC=210KG/CM2 EN DINTELES Y RIOSTRAS M 16.80 15.28 256.70 16.80 16.80 256.70 256.70 100.00% -
ENLUCIDOS
ENLUCIDO VERTICAL INTERIOR. M2 377.30 6.70 2,527.91 377.30 377.30 2,527.91 2,527.91 100.00% -
ENLUCIDO VERTICAL EXTERIOR M2 333.89 9.85 3,288.82 333.89 333.89 3,288.82 3,288.82 100.00% -
EMPASTE INTERIOR DE PAREDES M2 377.30 4.18 1,577.11 377.30 377.30 1,577.11 1,577.11 100.00% -
ENLUCIDO PALETEADO FINO DE FILOS Y FAJAS M 42.00 3.37 141.54 42.00 42.00 141.54 141.54 100.00% -
PISOS
CERMICA DE PISO ALTO TRFICO ANTIDESLIZANTE M2 222.35 28.80 6,403.68 222.35 222.35 6,403.68 6,403.68 100.00% -
MASILLADO DE LOSA INCLUYE IMPERMEABILIZANTE M2 206.25 8.04 1,658.25 206.18 206.18 1,657.69 1,657.69 99.97% 0.07 0.07 0.56
BARREDERAS DE CERMICA H=10CM M 130.95 5.43 711.06 127.12 127.12 690.26 690.26 97.07% 3.83 3.83 20.80
PORCELANATO EN MESN M2 33.32 36.10 1,202.85 33.32 33.32 1,202.85 1,202.85 100.00% -
CARPINTERIA METALICA
VENTANA DE ALUMINIO Y VIDRIO 6MM CORREDIZA M2 17.98 80.28 1,443.43 - - 0.00% 17.98 17.98 1,443.43
PUERTA METLICA DE TOL, TUBO RECT. DE 50X25X2MM, Y VIDRIO M2 7.56 126.24 954.37 - - 0.00% -
PASAMANO DE ACERO INOXIDABLE M2 2.00 138.33 276.66 - - 0.00% -
RECUBRIMIENTOS
CIELO RASO FALSO DE ESTRUCTURA DE ALUMINIO PREPINTADO AL M2 195.20 21.96 4,286.59 195.20 195.20 4,286.60 4,286.60 100.00% -
PINTURA DE CAUCHO LTEX VINILO ACRLICO INTERIOR M2 377.30 5.58 2,105.33 346.07 346.07 1,931.07 1,931.07 91.72% 31.23 31.23 174.26
PINTURA ELASTOMRICA EXTERIORES M2 333.89 5.71 1,906.51 318.03 318.03 1,815.95 1,815.95 95.25% 15.86 15.86 90.56
INSTALACIONES ELECTRONICAS
SISTEMA DE CABLEADO ESTRUCTURADO DATOS Y VOZ
PUNTO SIMPLE VOZ Y/O DATOS CAT 6A CERTIFICADO PTO 3.00 109.14 327.42 - - 0.00% 1.00 1.00 109.14
PUNTO PARA SALIDA HDMI U 2.00 35.90 71.80 - - 0.00% -
PATCH CORD CAT 6A 7FT (3M) U 3.00 13.25 39.75 - - 0.00% -
PATCH CORD CAT 6A 3FT(1M) U 3.00 8.42 25.26 - - 0.00% -
BANDEJA TIPO ESCALERILLA GALVANIZADA 200X100MM INCLUYE TA M 30.00 26.53 795.90 - - 0.00% 30.00 30.00 795.90
CABLE FUTP CAT 6A BLINDADO M 30.00 2.30 69.00 - - 0.00% -
TUBERA EMT DE 3/4" Y ACCESORIOS M 15.00 5.37 80.55 - - 0.00% 15.00 15.00 80.55
TUBERA EMT DE 1" Y ACCESORIOS M 10.00 6.15 61.50 - - 0.00% 10.00 10.00 61.50
SISTEMA DE SEGURIDAD (INTRUSIN)
CONTACTOS MAGNTICOS INSTALADOS U 4.00 5.65 22.60 - - 0.00% 4.00 4.00 22.60
TECLADO ALFANUMRICO U 2.00 52.27 104.54 - - 0.00% 2.00 2.00 104.54
CENTRAL DE SEGURIDAD DE 16 ZONAS INCLUYE TECLADO LCD U 1.00 548.68 548.68 - - 0.00% 1.00 1.00 548.68
SIRENA 15W BLINDADA U 1.00 51.18 51.18 - - 0.00% 1.00 1.00 51.18
DETECTOR DE MOVIMIENTO DOBLE TECNOLOGA U 4.00 22.77 91.08 - - 0.00% 4.00 4.00 91.08
HOJA 30 DE 546
CABLE UTP CAT 5E M 150.00 0.74 111.00 - - 0.00% 150.00 150.00 111.00
CABLEADO 2X14 AWG M 12.00 2.06 24.72 - - 0.00% 12.00 12.00 24.72
TUBERA EMT 1/2" Y ACCESORIOS M 60.00 3.19 191.40 - - 0.00% 60.00 60.00 191.40
TUBERA EMT DE 3/4" Y ACCESORIOS M 25.00 5.37 134.25 - - 0.00% 25.00 25.00 134.25
PUNTO DE RED DE SEGURIDAD PTO 12.00 34.99 419.88 - - 0.00% 12.00 12.00 419.88
SISTEMA DE CCTV
CMARA IP TIPO DOMO POE, 1.3 MP U 1.00 161.41 161.41 - - 0.00% 1.00 1.00 161.41
SISTEMA DE DETECCIN TEMPRANA DE INCENDIOS
MDULO DE CONTROL U 1.00 69.35 69.35 - - 0.00% -
DETECTOR DE HUMO FOTOELCTRICO U 6.00 73.70 442.20 - - 0.00% -
ESTACIN MANUAL DE INCENDIOS U 4.00 72.56 290.24 - - 0.00% 2.00 2.00 145.12
AVISO DE SALIDA CON ILUMINACIN LED U 6.00 35.69 214.14 - - 0.00% 6.00 6.00 214.14
LUZ ESTROBOSCPICA CON SIRENA U 4.00 76.34 305.36 - - 0.00% 2.00 2.00 152.68
MDULO DE AISLAMIENTO U 1.00 92.86 92.86 - - 0.00% -
MODULO DE MONITOREO U 2.00 79.94 159.88 - - 0.00% 2.00 2.00 159.88
LUZ DE EMERGENCIA AUTNOMA U 6.00 30.74 184.44 - - 0.00% 6.00 6.00 184.44
CABLEADO ANTIFLAMA 2 X 16 AWG M 60.00 1.13 67.80 - - 0.00% -
FUENTE DE ALIMENTACIN 24 V/8A U 1.00 433.97 433.97 - - 0.00% -
TUBERA EMT DE 3/4" Y ACCESORIOS M 38.00 5.37 204.06 - - 0.00% 38.00 38.00 204.06
PUNTO DE RED DE INCENDIOS PTO 19.00 33.19 630.61 - - 0.00% 19.00 19.00 630.61
SISTEMA DE SONORIZACIN
PARLANTE PARA TECHO 8W, 8" Y 100V U 3.00 70.56 211.68 - - 0.00% 3.00 3.00 211.68
PUNTO DE SONIDO PTO 3.00 36.85 110.55 - - 0.00% 3.00 3.00 110.55
CABLEADO 2X14 AWG M 40.00 2.06 82.40 - - 0.00% 40.00 40.00 82.40
TUBERA EMT 1/2" Y ACCESORIOS M 35.00 3.19 111.65 - - 0.00% 35.00 35.00 111.65
INSTALACIONES MECANICAS
SUMINISTRO E INSTALACION SPLIT CONSOLA TIPO PISO/TECHO 36 U 2.00 1,607.97 3,215.94 - - 0.00% 2.00 2.00 3,215.94
VENTILADOR DE EXTRACCION TIPO HONGO, 1400CFM, @1,30" WG, U 1.00 1,468.71 1,468.71 - - 0.00% -
TUBERA DE DRENAJE 3/4" M 16.94 2.87 48.62 - - 0.00% 16.94 16.94 48.62
TUBERA DE COBRE ACR 5/8, INCLUYE AISLAMIENTO M 3.00 17.32 51.96 - - 0.00% 3.00 3.00 51.96
TUBERA DE COBRE ACR 3/8, INCLUYE AISLAMIENTO M 3.00 11.52 34.56 - - 0.00% 3.00 3.00 34.56
DIFUSOR DE SUMINISTRO 8" X 8" DE 4 VIAS U 4.00 27.83 111.32 - - 0.00% 4.00 4.00 111.32
VENTILADOR HELICOIDAL DE TECHO DE 48" 60 W, 110 V, 60 HZ, 1 P U 2.00 190.73 381.46 - - 0.00% -
CABLE DE CONTROL 2X#14, INCLUYE TUBERA EMT 3/4" M 13.68 4.81 65.80 - - 0.00% 13.68 13.68 65.80
CONTROL DE VENTILADOR DE TECHO DE 3 VELOCIDADES. U 2.00 18.55 37.10 - - 0.00% -
HOJA 31 DE 546
REJILLA DE EXTRACCIN DE 6"X6 INCLUYE CAJA DE ACOPLES U 8.00 30.12 240.96 - - 0.00% 8.00 8.00 240.96
DUCTO DE TOL GALVANIZADO SIN AISLAMIENTO KG 216.98 6.61 1,434.24 - - 0.00% 216.98 216.98 1,434.24
CENTRALINA DE GAS (GLP)DE DOS CILINDROS DE 45 KG U 1.00 1,018.35 1,018.35 - - 0.00% -
TUBERA DE COBRE D=1/2" TIPO L M 28.46 10.79 307.08 - - 0.00% -
RECUBRIMIENTO ELASTOMRICO CON FOIL DE ALUMINIO M2 5.00 9.30 46.50 - - 0.00% -
INSTALACIONES ELECTRICAS
PUNTO DE ILUMINACIN 120V PTO 33.00 33.84 1,116.72 33.00 33.00 1,116.72 1,116.72 100.00% -
INTERRUPTOR SIMPLE U 4.00 4.15 16.60 - - 0.00% -
CONMUTADOR SIMPLE U 6.00 5.31 31.86 - - 0.00% -
CONMUTADOR DOBLE U 2.00 11.94 23.88 - - 0.00% 2.00 2.00 23.88
LUMINARIA FLUORESCENTE 3X32W EMPOTRABLE U 20.00 69.22 1,384.40 20.00 20.00 1,384.40 1,384.40 100.00% -
OJO DE BUEY CON FLUORESCENTE COMPACTA 1X26W U 6.00 27.07 162.42 6.00 6.00 162.42 162.42 100.00% -
LUMINARIA APLIQUE DE PARED INTERIOR /EXTERIOR 1X26W U 1.00 33.87 33.87 1.00 1.00 33.87 33.87 100.00% -
PUNTO TOMACORRIENTE NORMAL DOBLE 127V PARED O TECHO PTO 33.00 40.49 1,336.17 18.00 18.00 728.82 728.82 54.55% 15.00 15.00 607.35
PUNTO TOMACORRIENTE NORMAL DOBLE 127V PISO PTO 10.00 80.75 807.50 8.00 8.00 646.00 646.00 80.00% 2.00 2.00 161.50
PUNTO TOMACORRIENTE ESPECIAL 127V PTO 8.00 100.69 805.52 5.00 5.00 503.45 503.45 62.50% 3.00 3.00 302.07
PUNTO TOMACORRIENTE ESPECIAL 220V BIFSICO PTO 6.00 92.94 557.64 - - 0.00% 6.00 6.00 557.64
PUNTO TOMACORRIENTE REGULADO DOBLE 127V PARED O TECHO PTO 4.00 42.78 171.12 - - 0.00% 4.00 4.00 171.12
PUNTO DE TOMACORRIENTE ESPECIAL REGULADO 127V PTO 4.00 40.44 161.76 - - 0.00% 4.00 4.00 161.76
CENTRO DE CARGA TRIFASICO 6 ESPACIOS U 1.00 73.53 73.53 - - 0.00% 1.00 1.00 73.53
CENTRO DE CARGA TRIFASICO 20 ESPACIOS U 2.00 171.53 343.06 - - 0.00% 2.00 2.00 343.06
BREAKER ENCHUFABLE 1P - 16 A U 12.00 6.28 75.36 - - 0.00% -
BREAKER ENCHUFABLE 1P - 20 A U 36.00 6.28 226.08 - - 0.00% -
BREAKER ENCHUFABLE 2P - 20 A U 4.00 16.08 64.32 - - 0.00% -
INTERRUPTOR TERMOMAGNETICO 3P-15-20-30-40-50-60A CAJA M U 1.00 61.37 61.37 - - 0.00% 1.00 1.00 61.37
INTERRUPTOR TERMOMAGNETICO 3P-15-20-30-40-50-60A CAJA M U 4.00 61.37 245.48 - - 0.00% 4.00 4.00 245.48
CAJA DE PASO 10X10 U 20.00 11.76 235.20 20.00 20.00 235.20 235.20 100.00% -
CONECTOR Y CLAVIJA PARA AIRES ACONDICIONADOS INTERIORES U 4.00 42.15 168.60 - - 0.00% 4.00 4.00 168.60
CAJA IP65 PARA AIRES ACONDICIONADOS EXTERIORES 20X20X15 ( U 4.00 30.21 120.84 - - 0.00% 4.00 4.00 120.84
ALIMENTADOR 1X#12(F)+1X#12(N) AWG THHN M 50.00 1.72 86.00 - - 0.00% 50.00 50.00 86.00
ALIMENTADOR 1X#12(F)+1X#12(N)+1X#14(T) AWG THHN M 50.00 2.28 114.00 - - 0.00% 50.00 50.00 114.00
ALIMENTADOR 1X#10(F)+1X#10(N)+1X#14(T) AWG THHN M 50.00 3.82 191.00 - - 0.00% -
POZO DE REVISION DE 80X80X100 CM, CON TAPA DE HORMIGN U 1.00 177.11 177.11 - - 0.00% 1.00 1.00 177.11
FUNDA BX 1" M 50.00 5.81 290.50 - - 0.00% 50.00 50.00 290.50
CABLE CONCENTRICO 2X14 AWG M 500.00 1.63 815.00 - - 0.00% 500.00 500.00 815.00
SUMNISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 2" M 50.00 11.99 599.50 - - 0.00% 50.00 50.00 599.50
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 3" M 50.00 38.41 1,920.50 - - 0.00% 50.00 50.00 1,920.50
CONDUCTOR THHN FLEX #14 AWG M 100.00 0.74 74.00 - - 0.00% 100.00 100.00 74.00
CONDUCTOR THHN FLEX #12 AWG M 100.00 1.09 109.00 - - 0.00% 100.00 100.00 109.00
CONDUCTOR THHN FLEX #10 AWG M 100.00 1.36 136.00 - - 0.00% 100.00 100.00 136.00
CABLE FLEXIBLE 6 AWG M 100.00 2.80 280.00 - - 0.00% 100.00 100.00 280.00
CABLE FLEXIBLE 4 AWG M 100.00 3.74 374.00 - - 0.00% 100.00 100.00 374.00
CABLE FLEXIBLE 2 AWG M 10.00 5.50 55.00 - - 0.00% 10.00 10.00 55.00
INSTALACIONES HIDROSANITARIAS
SISTEMA DE AGUA POTABLE
PUNTO DE AGUA PVC ROSCABLE1/2" PTO 9.00 19.92 179.28 9.00 9.00 179.28 179.28 100.00% -
TUBERA PVC ROSCABLE 1/2" M 25.66 2.64 67.74 24.54 24.54 64.79 64.79 95.64% 1.12 1.12 2.96
TUBERA PVC ROSCABLE 3/4" M 21.36 3.42 73.05 21.36 21.36 73.05 73.05 100.00% -
TUBERA PVC ROSCABLE 1" M 6.61 8.07 53.34 - - 0.00% 6.61 6.61 53.34
HOJA 32 DE 546
VLVULA DE CONTROL ROSCADA DIAM 1/2" U 9.00 8.88 79.92 4.00 4.00 35.52 35.52 44.44% 5.00 5.00 44.40
VLVULA DE CONTROL ROSCADA DIAM 3/4" U 1.00 16.89 16.89 - - 0.00% 1.00 1.00 16.89
VLVULA DECONTROL ROSCADA DIAM 1" U 1.00 22.52 22.52 - - 0.00% 1.00 1.00 22.52
SISTEMA DE AGUA RESIDUALES
CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO U 2.00 98.94 197.88 2.00 2.00 197.88 197.88 100.00% -
DESAGES PVC 75 MM. TIPO B (INCLUYE ACCESORIOS) PTO 11.00 11.58 127.38 11.00 11.00 127.38 127.38 100.00% -
SUMIDERO DE PISO DE 3" INCLUYE REJILLA U 3.00 18.22 54.66 2.00 2.00 36.44 36.44 66.67% 1.00 1.00 18.22
TUBERA DE 75 DE PVC TIPO B M 3.00 6.93 20.79 3.00 3.00 20.79 20.79 100.00% -
TUBERA DE 110 MM PVC TIPO B M 8.00 11.51 92.08 8.00 8.00 92.08 92.08 100.00% -
AGUAS LLUVIAS
BAJANTES DE TUBERA PVC TIPO B DE 110 MM M 8.00 9.52 76.16 8.00 8.00 76.16 76.16 100.00% -
CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO U 2.00 98.94 197.88 2.00 2.00 197.88 197.88 100.00% -
SUMIDERO DE CUBIERTA DE 110MM INCLUYE REJILLA CUPULA U 2.00 24.93 49.86 2.00 2.00 49.86 49.86 100.00% -
TUBERA DE 110 MM PVC TIPO B M 22.00 11.51 253.22 16.34 16.34 188.07 188.07 74.27% 5.66 5.66 65.15
DESAGES PVC 110MM TIPO B (INCLUYE ACCESORIOS) PTO 2.00 9.55 19.10 2.00 2.00 19.10 19.10 100.00% -
APARATOS SANITARIOS
FREGADERO DE ACERO INOXIDABLE 1 POZO CON ESCURRIDOR INC. U 8.00 224.20 1,793.60 8.00 8.00 1,793.60 1,793.60 100.00% -
LAVAOJOS DE EMERGENCIA ACERO INOXIDABLE U 1.00 651.74 651.74 1.00 1.00 651.74 651.74 100.00% -
EXCAVACIN MANUAL DE ZANJAS M3 7.87 6.52 51.31 - - 0.00% 7.87 7.87 51.31
BLOQUE DE LABORATORIOS DE TECNOLGA E IDIOMAS
PRELIMINARES
LIMPIEZA Y DESBROCE DEL TERRENO (MANUAL) M2 273.96 0.87 238.35 273.96 273.96 238.35 238.35 100.00% -
REPLANTEO Y NIVELACIN M2 273.96 0.99 271.22 273.96 273.96 271.22 271.22 100.00% -
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE CIMIENTOS Y PLINTOS M3 126.53 7.64 966.69 126.53 126.53 966.69 966.69 100.00% -
SUB-BASE CLASE 3 M3 24.48 16.01 391.92 24.48 24.48 391.92 391.92 100.00% -
EXCAVACIN A MQUINA M3 151.84 2.29 347.71 151.84 151.84 347.71 347.71 100.00% -
RELLENO COMPACTADO A MQUINA CON MATERIAL IMPORTADO M3 80.78 11.08 895.04 80.78 80.78 895.04 895.04 100.00% -
TRANSPORTE DE MATERIAL DE EXCAVACIN. TRANSPORTE LIBRE 1 M3-KM 1,518.37 0.25 379.59 1,518.37 1,518.37 379.59 379.59 100.00% -
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 2,105.28 0.25 526.32 2,105.28 2,105.28 526.32 526.32 100.00% -
ESTRUCTURA DE HORMIGN ARMADO
ACERO DE REFUERZO EN VARILLAS CORRUGADAS FY=4200 KG/CM2 KG 9,550.37 2.05 19,578.26 9,550.37 9,550.37 19,578.25 19,578.25 100.00% -
HORMIGN CICLPEO F'C=210 KG/CM (INCLUYE ENCOFRADO)H.S M3 7.34 121.30 890.34 7.34 7.34 890.34 890.34 100.00% -
HORMIGN F'C= 210 KG/CM2 EN VIGAS DE CIMENTACIN M3 25.65 242.51 6,220.38 25.65 25.65 6,220.38 6,220.38 100.00% -
HORMIGN F'C= 210 KG/CM2 EN CADENAS M3 4.13 184.96 763.88 4.13 4.13 763.88 763.88 100.00% -
HOJA 33 DE 546
HORMIGN F'C= 210 KG/CM2 EN COLUMNAS M3 12.15 229.35 2,786.60 10.94 10.94 2,509.09 2,509.09 90.04% 1.21 1.21 277.51
HORMIGN F'C= 210 KG/CM2 EN LOSA M3 23.04 208.33 4,799.92 23.04 23.04 4,799.92 4,799.92 100.00% -
IMPERMEABILIZACIN DE TERRAZA CON LMINA ASFLTICA M2 217.00 16.13 3,500.21 217.00 217.00 3,500.21 3,500.21 100.00% -
HORMIGN F'C= 140 KG/CM2 EN REPLANTILLOS M3 6.12 108.46 663.78 6.12 6.12 663.78 663.78 100.00% -
HORMIGN F'C= 210 KG/CM2 EN VIGAS M3 18.58 233.94 4,346.61 18.54 18.54 4,337.25 4,337.25 99.78% 0.04 0.04 9.36
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 10,104.26 0.25 2,526.07 10,104.26 10,104.26 2,526.07 2,526.07 100.00% -
MALLA ELECTROSOLDADA R-126 (4.10) M2 227.45 5.65 1,285.09 227.45 227.45 1,285.09 1,285.09 100.00% -
MALLA ELECTROSOLDADA R-131 (5.15) M2 227.45 4.53 1,030.35 - - 0.00% 227.45 227.45 1,030.35
ALIVIANAMIENTO DE BLOQUE CEMENTO DE 40CMX20CMX20CM U 1,566.00 0.58 908.28 1,362.00 1,362.00 789.96 789.96 86.97% 204.00 204.00 118.32
GEOTEXTIL NT 2000 M2 30.00 3.95 118.50 30.00 30.00 118.50 118.50 100.00% -
GEOMALLA BIAXIAL BX1100 M2 30.00 5.40 162.00 30.00 30.00 162.00 162.00 100.00% -
CONTRAPISO HORMIGN ARMADO FC`210KG/CM2 (E=10CM, PIEDR M2 227.93 30.25 6,894.88 227.93 227.93 6,894.88 6,894.88 100.00% -
MAMPOSTERIA
MAMPOSTERA DE BLOQUE DE 15CM M2 163.26 17.65 2,881.54 163.26 163.26 2,881.54 2,881.54 100.00% -
HORMIGN FC=210 KG/CM2 EN CONTORNO DE VENTANAS (ALFEI M3 1.86 228.43 424.88 1.86 1.86 424.88 424.88 100.00% -
HORMIGN FC=210KG/CM2 EN DINTELES Y RIOSTRAS M 36.70 15.28 560.78 36.70 36.70 560.78 560.78 100.00% -
ENLUCIDOS
ENLUCIDO VERTICAL INTERIOR. M2 207.14 6.70 1,387.84 207.14 207.14 1,387.84 1,387.84 100.00% -
ENLUCIDO VERTICAL EXTERIOR M2 250.00 9.85 2,462.50 250.00 250.00 2,462.50 2,462.50 100.00% -
EMPASTE INTERIOR DE PAREDES M2 207.14 4.18 865.85 207.14 207.14 865.85 865.85 100.00% -
PISOS
CERMICA DE PISO ALTO TRFICO ANTIDESLIZANTE M2 150.84 28.80 4,344.19 150.84 150.84 4,344.19 4,344.19 100.00% -
MASILLADO DE LOSA INCLUYE IMPERMEABILIZANTE M2 232.33 8.04 1,867.93 221.76 221.76 1,782.95 1,782.95 95.45% 10.57 10.57 84.98
BARREDERAS DE CERMICA H=10CM M 86.33 5.43 468.77 86.33 86.33 468.77 468.77 100.00% -
CARPINTERIA METALICA
VENTANA DE ALUMINIO Y VIDRIO 6MM CORREDIZA M2 37.26 80.28 2,991.23 - - 0.00% 37.26 37.26 2,991.23
MALLA ANTIMOSQUITO M2 9.32 11.98 111.65 - - 0.00% -
PUERTA METLICA DE TOL, TUBO RECT. DE 50X25X2MM, Y VIDRIO M2 6.30 126.24 795.31 - - 0.00% -
RECUBRIMIENTOS
CIELO RASO FALSO DE ESTRUCTURA DE ALUMINIO PREPINTADO AL M2 150.84 21.96 3,312.45 150.84 150.84 3,312.45 3,312.45 100.00% -
PINTURA DE CAUCHO LTEX VINILO ACRLICO INTERIOR M2 207.14 5.58 1,155.84 207.14 207.14 1,155.84 1,155.84 100.00% -
PINTURA ELASTOMRICA EXTERIORES M2 250.00 5.71 1,427.50 250.00 250.00 1,427.50 1,427.50 100.00% -
INSTALACIONES ELECTRONICAS
SISTEMA DE CABLEADO ESTRUCTURADO DATOS Y VOZ
PUNTO SIMPLE VOZ Y/O DATOS CAT 6A CERTIFICADO PTO 85.00 109.14 9,276.90 - - 0.00% 1.00 1.00 109.14
PUNTO PARA SALIDA HDMI U 2.00 35.90 71.80 - - 0.00% -
ADMINISTRADOR HORIZONTAL 1U U 9.00 21.88 196.92 - - 0.00% 9.00 9.00 196.92
PATCH CORD CAT 6A 7FT (3M) U 85.00 13.25 1,126.25 - - 0.00% -
PATCH CORD CAT 6A 3FT(1M) U 85.00 8.42 715.70 - - 0.00% -
PATCH PANEL 24 PUERTOS CAT 6A INCLUYE JACKS U 4.00 363.61 1,454.44 - - 0.00% -
BANDEJA TIPO ESCALERILLA GALVANIZADA 200X100MM INCLUYE TA M 60.00 26.53 1,591.80 60.00 60.00 1,591.80 1,591.80 100.00% -
SWITCH DE CAPA 2, 48 PUERTOS 10/100/1000 MBPS 4SFP U 3.00 1,881.18 5,643.54 - - 0.00% 3.00 3.00 5,643.54
SWITCH CAPA 3 10/100/1000 24 PUERTOS 2SFP U 1.00 3,456.96 3,456.96 - - 0.00% 1.00 1.00 3,456.96
PATCH CORD FIBRA PTICA 1M U 4.00 16.36 65.44 - - 0.00% -
CENTRAL TELEFNICA TELEFNICA IP 4 A 8 HBRIDA, INCLUYE TE U 1.00 688.33 688.33 - - 0.00% -
TRANSEIVER DE FIBRA A ETHERNET 1GB U 2.00 346.59 693.18 - - 0.00% -
TRANSEIVER DE FIBRA A ETHERNET 10GB U 2.00 1,077.27 2,154.54 - - 0.00% 2.00 2.00 2,154.54
RACK DE PISO 36 UR U 2.00 553.08 1,106.16 - - 0.00% -
ODF-96 PUERTOS FIBRA PTICA DISTRIBUCIN FRAME U 1.00 884.39 884.39 - - 0.00% -
HOJA 34 DE 546
CABLE CONCENTRICO 2X14 AWG M 200.00 1.63 326.00 - - 0.00% 200.00 200.00 326.00
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 1 1/ M 50.00 9.32 466.00 - - 0.00% 50.00 50.00 466.00
SUMNISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 2" M 50.00 11.99 599.50 - - 0.00% 50.00 50.00 599.50
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 3" M 50.00 38.41 1,920.50 - - 0.00% 50.00 50.00 1,920.50
CONDUCTOR THHN FLEX #14 AWG M 100.00 0.74 74.00 - - 0.00% 100.00 100.00 74.00
CONDUCTOR THHN FLEX #12 AWG M 100.00 1.09 109.00 - - 0.00% 100.00 100.00 109.00
CONDUCTOR THHN FLEX #10 AWG M 100.00 1.36 136.00 - - 0.00% 100.00 100.00 136.00
CABLE FLEXIBLE 6 AWG M 100.00 2.80 280.00 - - 0.00% 100.00 100.00 280.00
CABLE FLEXIBLE 4 AWG M 100.00 3.74 374.00 - - 0.00% 100.00 100.00 374.00
CABLE FLEXIBLE 2 AWG M 10.00 5.50 55.00 - - 0.00% 10.00 10.00 55.00
INSTALACIONES HIDROSANITARIAS
AGUAS LLUVIAS
BAJANTES DE TUBERA PVC TIPO B DE 110 MM M 8.00 9.52 76.16 8.00 8.00 76.16 76.16 100.00% -
CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO U 2.00 98.94 197.88 2.00 2.00 197.88 197.88 100.00% -
SUMIDERO DE CUBIERTA DE 110MM INCLUYE REJILLA CUPULA U 2.00 24.93 49.86 2.00 2.00 49.86 49.86 100.00% -
TUBERA DE 110 MM PVC TIPO B M 10.00 11.51 115.10 10.00 10.00 115.10 115.10 100.00% -
DESAGES PVC 110MM TIPO B (INCLUYE ACCESORIOS) PTO 2.00 9.55 19.10 2.00 2.00 19.10 19.10 100.00% -
EXCAVACIN MANUAL DE ZANJAS M3 3.64 6.52 23.73 - - 0.00% 3.64 3.64 23.73
BLOQUE ADMINISTRACIN
PRELIMINARES
LIMPIEZA Y DESBROCE DEL TERRENO (MANUAL) M2 238.70 0.87 207.67 238.70 238.70 207.67 207.67 100.00% -
REPLANTEO Y NIVELACIN M2 238.70 0.99 236.31 238.70 238.70 236.31 236.31 100.00% -
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE CIMIENTOS Y PLINTOS M3 104.36 7.64 797.31 103.49 103.49 790.66 790.66 99.17% 0.87 0.87 6.65
SUB-BASE CLASE 3 M3 20.16 16.01 322.76 20.16 20.16 322.76 322.76 100.00% -
EXCAVACIN A MQUINA M3 125.24 2.29 286.80 125.24 125.24 286.80 286.80 100.00% -
RELLENO COMPACTADO A MQUINA CON MATERIAL IMPORTADO M3 66.53 11.08 737.15 66.53 66.53 737.15 737.15 100.00% -
TRANSPORTE DE MATERIAL DE EXCAVACIN. TRANSPORTE LIBRE 1 M3-KM 1,252.37 0.25 313.09 1,252.37 1,252.37 313.09 313.09 100.00% -
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 1,733.76 0.25 433.44 1,733.76 1,733.76 433.44 433.44 100.00% -
ESTRUCTURA DE HORMIGN ARMADO
ACERO DE REFUERZO EN VARILLAS CORRUGADAS FY=4200 KG/CM2 KG 8,064.24 2.05 16,531.69 8,064.24 8,064.24 16,531.69 16,531.69 100.00% -
HORMIGN CICLPEO F'C=210 KG/CM (INCLUYE ENCOFRADO)H.S M3 6.34 121.30 769.04 6.34 6.34 769.04 769.04 100.00% -
HORMIGN F'C= 210 KG/CM2 EN VIGAS DE CIMENTACIN M3 21.20 242.51 5,141.21 21.20 21.20 5,141.21 5,141.21 100.00% -
HORMIGN F'C= 210 KG/CM2 EN CADENAS M3 3.56 184.96 658.46 3.56 3.56 658.46 658.46 100.00% -
HORMIGN F'C= 210 KG/CM2 EN COLUMNAS M3 10.13 229.35 2,323.32 9.11 9.11 2,089.38 2,089.38 89.93% 1.02 1.02 233.94
HOJA 37 DE 546
HORMIGN F'C= 210 KG/CM2 EN LOSA M3 19.22 208.33 4,004.10 19.22 19.22 4,004.10 4,004.10 100.00% -
IMPERMEABILIZACIN DE TERRAZA CON LMINA ASFLTICA M2 190.00 16.13 3,064.70 190.00 190.00 3,064.70 3,064.70 100.00% -
HORMIGN F'C= 140 KG/CM2 EN REPLANTILLOS M3 7.23 108.46 784.17 6.07 6.07 658.36 658.36 83.96% 1.16 1.16 125.81
HORMIGN F'C= 210 KG/CM2 EN VIGAS M3 16.70 233.94 3,906.80 15.83 15.83 3,703.27 3,703.27 94.79% 0.87 0.87 203.53
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 8,820.16 0.25 2,205.04 8,820.16 8,820.16 2,205.04 2,205.04 100.00% -
MALLA ELECTROSOLDADA R-126 (4.10) M2 218.90 5.65 1,236.79 200.99 200.99 1,135.60 1,135.60 91.82% 17.91 17.91 101.19
MALLA ELECTROSOLDADA R-131 (5.15) M2 218.90 4.53 991.62 - - 0.00% 218.90 218.90 991.62
ALIVIANAMIENTO DE BLOQUE CEMENTO DE 40CMX20CMX20CM U 1,728.00 0.58 1,002.24 1,302.00 1,302.00 755.16 755.16 75.35% 426.00 426.00 247.08
GEOTEXTIL NT 2000 M2 238.70 3.95 942.87 171.60 171.60 677.82 677.82 71.89% 67.10 67.10 265.05
GEOMALLA BIAXIAL BX1100 M2 238.70 5.40 1,288.98 171.60 171.60 926.64 926.64 71.89% 67.10 67.10 362.34
CONTRAPISO HORMIGN ARMADO FC`210KG/CM2 (E=10CM, PIEDR M2 196.32 30.25 5,938.68 196.32 196.32 5,938.68 5,938.68 100.00% -
MAMPOSTERA
MAMPOSTERA DE BLOQUE DE 15CM M2 257.24 17.65 4,540.29 252.51 252.51 4,456.81 4,456.81 98.16% 4.73 4.73 83.48
MAMPOSTERA DE BLOQUE DE 10CM M2 28.92 15.15 438.14 - - 0.00% 28.92 28.92 438.14
HORMIGN FC=210 KG/CM2 EN CONTORNO DE VENTANAS (ALFEI M3 1.59 228.43 363.20 1.59 1.59 363.20 363.20 100.00% -
HORMIGN FC=210KG/CM2 EN DINTELES Y RIOSTRAS M 13.60 15.28 207.81 13.60 13.60 207.81 207.81 100.00% -
ENLUCIDOS
ENLUCIDO VERTICAL INTERIOR. M2 359.26 6.70 2,407.04 352.05 352.05 2,358.73 2,358.73 97.99% 7.21 7.21 48.31
ENLUCIDO VERTICAL EXTERIOR M2 318.92 9.85 3,141.36 283.22 283.22 2,789.71 2,789.71 88.81% 35.70 35.70 351.65
EMPASTE INTERIOR DE PAREDES M2 359.26 4.18 1,501.71 352.05 352.05 1,471.57 1,471.57 97.99% 7.21 7.21 30.14
ENLUCIDO PALETEADO FINO DE FILOS Y FAJAS M 151.20 3.37 509.54 151.20 151.20 509.54 509.54 100.00% -
PISOS
CERMICA DE PISO ALTO TRFICO ANTIDESLIZANTE M2 206.38 28.80 5,943.74 191.03 191.03 5,501.66 5,501.66 92.56% 15.35 15.35 442.08
MASILLADO DE LOSA INCLUYE IMPERMEABILIZANTE M2 200.99 8.04 1,615.96 192.04 192.04 1,544.00 1,544.00 95.55% 8.95 8.95 71.96
BARREDERAS DE CERMICA H=10CM M 137.12 5.43 744.56 137.12 137.12 744.56 744.56 100.00% -
CARPINTERA METLICA
VENTANA DE ALUMINIO Y VIDRIO 6MM CORREDIZA M2 45.60 80.28 3,660.77 - - 0.00% 45.60 45.60 3,660.77
MALLA ANTIMOSQUITO M2 11.34 11.98 135.85 - - 0.00% -
PUERTA METLICA DE TOL, TUBO RECT. DE 50X25X2MM, Y VIDRIO M2 2.10 126.24 265.10 - - 0.00% -
PUERTA DE TOL 1/20", MARCO Y ESTRUCTURA DE 25*50*1,5 CON M2 19.32 128.15 2,475.86 - - 0.00% 2.10 2.10 269.12
BARRA ANTIPNICO PARA PUERTAS U 1.00 193.17 193.17 1.00 1.00 193.17 193.17 100.00% -
RECUBRIMIENTOS
CIELO RASO FALSO DE ESTRUCTURA DE ALUMINIO PREPINTADO AL M2 192.03 21.96 4,216.98 185.25 185.25 4,068.09 4,068.09 96.47% 6.78 6.78 148.89
PINTURA ELASTOMRICA EXTERIORES M2 318.92 5.71 1,821.03 243.95 243.95 1,392.95 1,392.95 76.49% 74.97 74.97 428.08
PINTURA DE CAUCHO LTEX VINILO ACRLICO INTERIOR M2 359.26 5.58 2,004.67 316.22 316.22 1,764.51 1,764.51 88.02% 43.04 43.04 240.16
CERMICA EN PAREDES M2 33.26 25.37 843.81 33.26 33.26 843.80 843.80 100.00% -
INSTALACIONES HIDROSANITARIAS
SISTEMA DE AGUA POTABLE
PUNTO DE AGUA PVC ROSCABLE1/2" PTO 9.00 19.92 179.28 9.00 9.00 179.28 179.28 100.00% -
TUBERA PVC ROSCABLE 1/2" M 6.30 2.64 16.63 - - 0.00% 6.30 6.30 16.63
TUBERA PVC ROSCABLE 1" M 18.28 8.07 147.52 18.28 18.28 147.52 147.52 100.00% -
VLVULA DE CONTROL ROSCADA DIAM 1/2" U 9.00 8.88 79.92 4.00 4.00 35.52 35.52 44.44% 5.00 5.00 44.40
VLVULA DECONTROL ROSCADA DIAM 1" U 4.00 22.52 90.08 - - 0.00% 4.00 4.00 90.08
SISTEMA DE AGUA RESIDUALES
CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO U 2.00 98.94 197.88 2.00 2.00 197.88 197.88 100.00% -
DESAGES PVC 50 MM. TIPO B(INCLUYE ACCESORIOS) PTO 5.00 8.21 41.05 5.00 5.00 41.05 41.05 100.00% -
DESAGES PVC 75 MM. TIPO B (INCLUYE ACCESORIOS) PTO 5.00 11.58 57.90 5.00 5.00 57.90 57.90 100.00% -
DESAGES PVC 110MM TIPO B (INCLUYE ACCESORIOS) PTO 4.00 9.55 38.20 4.00 4.00 38.20 38.20 100.00% -
SUMIDERO DE PISO DE 3" INCLUYE REJILLA U 5.00 18.22 91.10 5.00 5.00 91.10 91.10 100.00% -
HOJA 38 DE 546
TUBERA DE 110 MM PVC TIPO B M 3.00 11.51 34.53 3.00 3.00 34.53 34.53 100.00% -
VENTILACIN
PUNTO DE VENTILACION DE 75MM TIPO A PTO 2.00 16.51 33.02 2.00 2.00 33.02 33.02 100.00% -
TUBERA DE 75 DE PVC TIPO B M 1.00 6.93 6.93 1.00 1.00 6.93 6.93 100.00% -
TAPON REJILLA U 2.00 22.69 45.38 2.00 2.00 45.38 45.38 100.00% -
AGUAS LLUVIAS
BAJANTES DE TUBERA PVC TIPO B DE 110 MM M 8.00 9.52 76.16 8.00 8.00 76.16 76.16 100.00% -
CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO U 2.00 98.94 197.88 2.00 2.00 197.88 197.88 100.00% -
SUMIDERO DE CUBIERTA DE 110MM INCLUYE REJILLA CUPULA U 4.00 24.93 99.72 4.00 4.00 99.72 99.72 100.00% -
TUBERA DE 110 MM PVC TIPO B M 13.00 11.51 149.63 13.00 13.00 149.63 149.63 100.00% -
DESAGES PVC 110MM TIPO B (INCLUYE ACCESORIOS) PTO 4.00 9.55 38.20 4.00 4.00 38.20 38.20 100.00% -
APARATOS SANITARIOS
INODORO TANQUE BAJO UNA PIEZA INCLUYE ACCESORIOS U 4.00 106.95 427.80 4.00 4.00 427.80 427.80 100.00% -
LAVAMANOS PARA EMPOTRAR BLANCO (508MMX445 MM) CON GRIF U 5.00 147.69 738.45 - - 0.00% 5.00 5.00 738.45
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE ZANJAS M3 5.63 6.52 36.71 - - 0.00% 5.63 5.63 36.71
INSTALACIONES ELECTRICAS
PUNTO DE ILUMINACIN 120V PTO 36.00 33.84 1,218.24 36.00 36.00 1,218.24 1,218.24 100.00% -
INTERRUPTOR SIMPLE U 7.00 4.15 29.05 - - 0.00% -
INTERRUPTOR DOBLE U 6.00 4.79 28.74 - - 0.00% -
CONMUTADOR SIMPLE U 2.00 5.31 10.62 - - 0.00% -
LUMINARIA FLUORESCENTE 3X32W EMPOTRABLE U 7.00 69.22 484.54 7.00 7.00 484.54 484.54 100.00% -
OJO DE BUEY CON FLUORESCENTE COMPACTA 1X26W U 23.00 27.07 622.61 22.00 22.00 595.54 595.54 95.65% 1.00 1.00 27.07
LUMINARIA TIPO PLAFON 2X26W U 6.00 25.18 151.08 6.00 6.00 151.08 151.08 100.00% -
PUNTO TOMACORRIENTE NORMAL DOBLE 127V PARED O TECHO PTO 16.00 40.49 647.84 - - 0.00% -
PUNTO TOMACORRIENTE NORMAL DOBLE 127V PISO PTO 3.00 80.75 242.25 - - 0.00% 3.00 3.00 242.25
PUNTO TOMACORRIENTE ESPECIAL 127V PTO 8.00 100.69 805.52 3.00 3.00 302.07 302.07 37.50% 5.00 5.00 503.45
PUNTO EXTRACTOR DE BAO PTO 4.00 22.07 88.28 3.00 3.00 66.21 66.21 75.00% 1.00 1.00 22.07
PUNTO TOMACORRIENTE REGULADO DOBLE 127V PARED O TECHO PTO 9.00 42.78 385.02 - - 0.00% 9.00 9.00 385.02
PUNTO PARA TOMACORRIENTE REGULADO DOBLE 127V PISO PTO 3.00 63.39 190.17 - - 0.00% 3.00 3.00 190.17
PUNTO DE TOMACORRIENTE ESPECIAL REGULADO 127V PTO 3.00 40.44 121.32 - - 0.00% 3.00 3.00 121.32
CENTRO DE CARGA TRIFASICO 12 ESPACIOS U 3.00 116.41 349.23 - - 0.00% 3.00 3.00 349.23
BREAKER ENCHUFABLE 1P - 16 A U 3.00 6.28 18.84 - - 0.00% -
BREAKER ENCHUFABLE 1P - 20 A U 18.00 6.28 113.04 - - 0.00% 18.00 18.00 113.04
BREAKER ENCHUFABLE 2P - 20 A U 11.00 16.08 176.88 - - 0.00% 11.00 11.00 176.88
HOJA 39 DE 546
BREAKER ENCHUFABLE 3P - 30A U 2.00 33.23 66.46 - - 0.00% 2.00 2.00 66.46
BREAKER ENCHUFABLE 3P - 40 A U 2.00 33.23 66.46 - - 0.00% 2.00 2.00 66.46
INTERRUPTOR TERMOMAGNETICO 3P-15-20-30-40-50-60A CAJA M U 1.00 61.37 61.37 - - 0.00% 1.00 1.00 61.37
CAJA DE PASO 10X10 U 20.00 11.76 235.20 20.00 20.00 235.20 235.20 100.00% -
CONECTOR Y CLAVIJA PARA AIRES ACONDICIONADOS INTERIORES U 6.00 42.15 252.90 - - 0.00% -
CAJA IP65 PARA AIRES ACONDICIONADOS EXTERIORES 20X20X15 ( U 8.00 30.21 241.68 - - 0.00% -
ALIMENTADOR 1X#12(F)+1X#12(N) AWG THHN M 100.00 1.72 172.00 - - 0.00% 100.00 100.00 172.00
ALIMENTADOR 1X#12(F)+1X#12(N)+1X#14(T) AWG THHN M 100.00 2.28 228.00 - - 0.00% 100.00 100.00 228.00
ALIMENTADOR 2X#10(F)+1X#14(T) AWG THHN M 100.00 3.04 304.00 100.00 100.00 304.00 304.00 100.00% -
FUNDA BX 1" M 50.00 5.81 290.50 - - 0.00% 50.00 50.00 290.50
CABLE CONCENTRICO 2X14 AWG M 100.00 1.63 163.00 - - 0.00% -
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 1 1/ M 50.00 9.32 466.00 - - 0.00% 50.00 50.00 466.00
SUMNISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 2" M 50.00 11.99 599.50 - - 0.00% 50.00 50.00 599.50
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 3" M 50.00 38.41 1,920.50 - - 0.00% 50.00 50.00 1,920.50
CONDUCTOR THHN FLEX #14 AWG M 100.00 0.74 74.00 - - 0.00% 100.00 100.00 74.00
CONDUCTOR THHN FLEX #12 AWG M 100.00 1.09 109.00 - - 0.00% 100.00 100.00 109.00
CONDUCTOR THHN FLEX #10 AWG M 100.00 1.36 136.00 - - 0.00% 100.00 100.00 136.00
CABLE FLEXIBLE 6 AWG M 100.00 2.80 280.00 - - 0.00% 100.00 100.00 280.00
CABLE FLEXIBLE 4 AWG M 100.00 3.74 374.00 - - 0.00% 100.00 100.00 374.00
CABLE FLEXIBLE 2 AWG M 10.00 5.50 55.00 - - 0.00% 10.00 10.00 55.00
INSTALACIONES MECNICAS
SUMINISTRO E INSTALACION SPLIT CONSOLA DE PARED 12000 BT U 2.00 1,125.52 2,251.04 - - 0.00% 2.00 2.00 2,251.04
EQUIPO DE AIRE ACONDICIONADO TIPO SPLIT DECORATIVO 9000 BT U 4.00 723.13 2,892.52 - - 0.00% 4.00 4.00 2,892.52
SUMINISTRO E INSTALACION UNIDAD TIPO CASSETTE 18000 BTU/H U 1.00 1,522.30 1,522.30 - - 0.00% -
VENTILADOR DE EXTRACCIN DE TIPO PLAFON DE 100 CFM, @ 0.25 U 5.00 182.22 911.10 - - 0.00% 2.00 2.00 364.44
LOUVER DE SALIDA DE 6"X6" U 3.00 42.23 126.69 - - 0.00% -
TUBERIA DE DRENAJE DE 4" CON ACSESORIOS U 6.00 6.11 36.66 - - 0.00% -
VENTILADOR HELICOIDAL DE TECHO DE 36" U 1.00 88.66 88.66 - - 0.00% 1.00 1.00 88.66
CONTROL DE VENTILADOR DE TECHO DE 3 VELOCIDADES. U 1.00 18.55 18.55 - - 0.00% -
TERMOSTATO DIGITAL PROGRAMABLE DE UNA ETAPA U 2.00 61.50 123.00 - - 0.00% -
TUBERA DE COBRE ACR 1/2, INCLUYE AISLAMIENTO M 6.00 12.29 73.74 - - 0.00% -
TUBERA DE COBRE ACR 3/8, INCLUYE AISLAMIENTO M 18.00 11.52 207.36 - - 0.00% -
TUBERA DE COBRE ACR 1/4, INCLUYE AISLAMIENTO M 18.00 8.56 154.08 - - 0.00% -
TUBERA DE DRENAJE 3/4" M 9.00 2.87 25.83 - - 0.00% -
TUBERIA DE DRENAJE DE 1" M 23.00 3.47 79.81 - - 0.00% -
CABLE DE CONTROL 4X#12, INCLUYE CANALIZACIN EMT 3/4" M 3.00 5.80 17.40 - - 0.00% -
CABLE DE CONTROL 3X#12, INCLUYE CANALIZACIN EMT 3/4" M 18.00 5.31 95.58 - - 0.00% -
CABLE DE CONTROL 4X#16, INCLUYE TUBERA EMT 3/4" U 5.39 5.07 27.33 - - 0.00% -
CABLE DE CONTROL 2X#14, INCLUYE TUBERA EMT 3/4" M 2.90 4.81 13.95 - - 0.00% -
GAS REFRIGERANTE R-410A LB 7.00 11.18 78.26 - - 0.00% -
INSTALACIONES ELECTRONICAS
SISTEMA DE CABLEADO ESTRUCTURADO DATOS Y VOZ
PUNTO SIMPLE VOZ Y/O DATOS CAT 6A CERTIFICADO PTO 13.00 109.14 1,418.82 - - 0.00% -
ACCESS POINT 1 PUERTO GIGA U 1.00 374.63 374.63 - - 0.00% -
PUNTO PARA SALIDA HDMI U 1.00 35.90 35.90 - - 0.00% -
ADMINISTRADOR HORIZONTAL 1U U 3.00 21.88 65.64 - - 0.00% 3.00 3.00 65.64
PATCH CORD CAT 6A 7FT (3M) U 13.00 13.25 172.25 - - 0.00% -
PATCH CORD CAT 6A 3FT(1M) U 13.00 8.42 109.46 - - 0.00% -
PATCH PANEL 24 PUERTOS CAT 6A INCLUYE JACKS U 1.00 363.61 363.61 - - 0.00% -
HOJA 40 DE 546
BANDEJA TIPO ESCALERILLA GALVANIZADA 200X100MM INCLUYE TA M 39.00 26.53 1,034.67 17.00 17.00 451.01 451.01 43.59% 22.00 22.00 583.66
SWITCH CAPA 2 10/100/1000 24 PUERTOS 4SFP U 1.00 1,960.98 1,960.98 - - 0.00% -
PATCH CORD FIBRA PTICA 1M U 4.00 16.36 65.44 - - 0.00% -
TRANSEIVER DE FIBRA A ETHERNET 1GB U 2.00 346.59 693.18 - - 0.00% -
RACK DE PARED 18UR U 1.00 455.08 455.08 - - 0.00% -
TELFONO IP SIMPLES PARA ESCRITORIO U 8.00 135.01 1,080.08 - - 0.00% -
ODF-12 PUERTOS FIBRA PTICA DISTRIBUCIN FRAME U 1.00 313.19 313.19 - - 0.00% -
CABLE FUTP CAT 6A BLINDADO M 80.00 2.30 184.00 - - 0.00% -
TUBERA EMT DE 3/4" Y ACCESORIOS M 90.00 5.37 483.30 - - 0.00% 90.00 90.00 483.30
TUBERA EMT DE 1" Y ACCESORIOS M 15.00 6.15 92.25 - - 0.00% 15.00 15.00 92.25
SISTEMA DE SEGURIDAD (INTRUSIN)
CONTACTOS MAGNTICOS INSTALADOS U 2.00 5.65 11.30 - - 0.00% 2.00 2.00 11.30
TECLADO ALFANUMRICO U 1.00 52.27 52.27 - - 0.00% 1.00 1.00 52.27
CENTRAL DE SEGURIDAD DE 16 ZONAS INCLUYE TECLADO LCD U 1.00 548.68 548.68 - - 0.00% 1.00 1.00 548.68
SIRENA 15W BLINDADA U 1.00 51.18 51.18 - - 0.00% 1.00 1.00 51.18
DETECTOR DE MOVIMIENTO DOBLE TECNOLOGA U 8.00 22.77 182.16 - - 0.00% 8.00 8.00 182.16
CABLE UTP CAT 5E M 100.00 0.74 74.00 - - 0.00% 100.00 100.00 74.00
CABLEADO 2X14 AWG M 12.00 2.06 24.72 - - 0.00% 12.00 12.00 24.72
TUBERA EMT 1/2" Y ACCESORIOS M 50.00 3.19 159.50 - - 0.00% 50.00 50.00 159.50
TUBERA EMT DE 3/4" Y ACCESORIOS M 10.00 5.37 53.70 - - 0.00% 10.00 10.00 53.70
PUNTO DE RED DE SEGURIDAD PTO 13.00 34.99 454.87 - - 0.00% 13.00 13.00 454.87
SISTEMA DE CCTV
MONITOR DE 40" HD U 1.00 845.23 845.23 - - 0.00% -
CMARA IP TIPO DOMO POE, 1.3 MP U 1.00 161.41 161.41 - - 0.00% -
SISTEMA DE DETECCIN TEMPRANA DE INCENDIOS
MDULO DE CONTROL U 1.00 69.35 69.35 - - 0.00% -
DETECTOR DE HUMO FOTOELCTRICO U 7.00 73.70 515.90 - - 0.00% -
ESTACIN MANUAL DE INCENDIOS U 1.00 72.56 72.56 - - 0.00% -
AVISO DE SALIDA CON ILUMINACIN LED U 3.00 35.69 107.07 - - 0.00% 3.00 3.00 107.07
LUZ ESTROBOSCPICA CON SIRENA U 1.00 76.34 76.34 - - 0.00% -
MDULO DE AISLAMIENTO U 1.00 92.86 92.86 - - 0.00% -
MODULO DE MONITOREO U 2.00 79.94 159.88 - - 0.00% 2.00 2.00 159.88
LUZ DE EMERGENCIA AUTNOMA U 3.00 30.74 92.22 - - 0.00% 3.00 3.00 92.22
CABLEADO ANTIFLAMA 2 X 16 AWG M 90.00 1.13 101.70 - - 0.00% -
ANUNCIADOR REMOTO U 1.00 544.95 544.95 - - 0.00% 1.00 1.00 544.95
HOJA 41 DE 546
ENLUCIDO VERTICAL EXTERIOR M2 594.44 9.85 5,855.23 594.44 - 594.44 5,855.23 0.00 5,855.23 100.00% -
EMPASTE INTERIOR DE PAREDES M2 584.82 4.18 2,444.55 559.88 559.88 2,340.30 2,340.30 95.74% 24.94 24.94 104.25
ENLUCIDO PALETEADO FINO DE FILOS Y FAJAS M 46.80 3.37 157.72 46.80 46.80 157.72 157.72 100.00% -
PISOS
CERMICA DE PISO ALTO TRFICO ANTIDESLIZANTE M2 474.26 28.80 13,658.69 474.26 474.26 13,658.69 13,658.69 100.00% -
MASILLADO DE LOSA INCLUYE IMPERMEABILIZANTE M2 718.18 8.04 5,774.17 717.81 717.81 5,771.19 5,771.19 99.95% 0.37 0.37 2.97
BARREDERAS DE CERMICA H=10CM M 98.11 5.43 532.74 98.11 98.11 532.74 532.74 100.00% -
PORCELANATO EN MESN M2 2.63 36.10 94.94 2.63 2.63 94.94 94.94 100.00% -
CARPINTERIA METALICA
VENTANA DE ALUMINIO Y VIDRIO 6MM CORREDIZA M2 106.92 80.28 8,583.54 - - 0.00% 106.92 106.92 8,583.54
MALLA ANTIMOSQUITO M2 26.73 11.98 320.23 - - 0.00% -
PUERTA METLICA DE TOL, TUBO RECT. DE 50X25X2MM, Y VIDRIO M2 8.40 126.24 1,060.42 - - 0.00% -
PUERTA DE TOL 1/20", MARCO Y ESTRUCTURA DE 25*50*1,5 CON M2 43.47 128.15 5,570.68 - - 0.00% 17.64 17.64 2,260.57
PASAMANO DE ACERO INOXIDABLE M2 4.41 138.33 610.04 - - 0.00% 1.66 1.66 229.63
MESN DE ACERO INOXIDABLE A=50CM M 4.90 111.38 545.76 - - 0.00% -
CUBIERTA DE POLICARBONATO ALVEOLAR 8MM (INCLUYE ESTRUCT M2 41.46 100.17 4,153.05 41.46 - 41.46 4,153.05 0.00 4,153.05 100.00% -
RECUBRIMIENTOS
CIELO RASO FALSO DE ESTRUCTURA DE ALUMINIO PREPINTADO AL M2 319.31 21.96 7,012.05 319.31 319.31 7,012.05 7,012.05 100.00% -
CIELO RASO DE PVC M2 106.81 28.37 3,030.20 - - 0.00% -
PINTURA DE CAUCHO LTEX VINILO ACRLICO INTERIOR M2 584.82 5.58 3,263.30 584.82 584.82 3,263.30 3,263.30 100.00% -
PINTURA ELASTOMRICA EXTERIORES M2 594.44 5.71 3,394.25 594.44 594.44 3,394.25 3,394.25 100.00% -
CERMICA EN PAREDES M2 547.25 25.37 13,883.73 224.94 224.94 5,706.73 5,706.73 41.10% 322.31 322.31 8,177.00
INSTALACIONES ELECTRONICAS
SISTEMA DE CABLEADO ESTRUCTURADO DATOS Y VOZ
PUNTO SIMPLE VOZ Y/O DATOS CAT 6A CERTIFICADO PTO 5.00 109.14 545.70 - - 0.00% 1.00 1.00 109.14
ACCESS POINT 1 PUERTO GIGA U 1.00 374.63 374.63 - - 0.00% -
PUNTO PARA SALIDA HDMI U 1.00 35.90 35.90 - - 0.00% -
PATCH CORD CAT 6A 7FT (3M) U 5.00 13.25 66.25 - - 0.00% -
PATCH CORD CAT 6A 3FT(1M) U 5.00 8.42 42.10 - - 0.00% -
BANDEJA TIPO ESCALERILLA GALVANIZADA 200X100MM INCLUYE TA M 55.00 26.53 1,459.15 - - 0.00% -
TELFONO IP SIMPLES PARA ESCRITORIO U 1.00 135.01 135.01 - - 0.00% -
RACK DE PARED 24 UR CERRADO U 1.00 504.08 504.08 - - 0.00% 1.00 1.00 504.08
TUBERA EMT DE 3/4" Y ACCESORIOS M 30.00 5.37 161.10 - - 0.00% 30.00 30.00 161.10
TUBERA EMT DE 1" Y ACCESORIOS M 15.00 6.15 92.25 - - 0.00% 15.00 15.00 92.25
ADMINISTRADOR HORIZONTAL 1U U 2.00 21.88 43.76 - - 0.00% 2.00 2.00 43.76
HOJA 43 DE 546
PATCH PANEL 24 PUERTOS CAT 6A INCLUYE JACKS U 1.00 363.61 363.61 - - 0.00% -
ODF-12 PUERTOS FIBRA PTICA DISTRIBUCIN FRAME U 1.00 313.19 313.19 - - 0.00% -
SISTEMA DE SEGURIDAD (INTRUSIN)
CONTACTOS MAGNTICOS INSTALADOS U 6.00 5.65 33.90 - - 0.00% 6.00 6.00 33.90
TECLADO ALFANUMRICO U 1.00 52.27 52.27 - - 0.00% 1.00 1.00 52.27
CENTRAL DE SEGURIDAD DE 16 ZONAS INCLUYE TECLADO LCD U 1.00 548.68 548.68 - - 0.00% 1.00 1.00 548.68
SIRENA 15W BLINDADA U 1.00 51.18 51.18 - - 0.00% 1.00 1.00 51.18
DETECTOR DE MOVIMIENTO DOBLE TECNOLOGA U 5.00 22.77 113.85 - - 0.00% 5.00 5.00 113.85
CABLE UTP CAT 5E M 400.00 0.74 296.00 - - 0.00% 400.00 400.00 296.00
CABLEADO 2X14 AWG M 12.00 2.06 24.72 - - 0.00% 12.00 12.00 24.72
TUBERA EMT 1/2" Y ACCESORIOS M 150.00 3.19 478.50 - - 0.00% 150.00 150.00 478.50
TUBERA EMT DE 3/4" Y ACCESORIOS M 30.00 5.37 161.10 - - 0.00% 30.00 30.00 161.10
PUNTO DE RED DE SEGURIDAD PTO 14.00 34.99 489.86 - - 0.00% 14.00 14.00 489.86
SISTEMA DE CCTV
CMARA IP TIPO DOMO POE, 1.3 MP U 2.00 161.41 322.82 - - 0.00% 2.00 2.00 322.82
SISTEMA DE DETECCIN TEMPRANA DE INCENDIOS
MDULO DE CONTROL U 1.00 69.35 69.35 - - 0.00% -
DETECTOR DE HUMO FOTOELCTRICO U 11.00 73.70 810.70 - - 0.00% 3.00 3.00 221.10
ESTACIN MANUAL DE INCENDIOS U 5.00 72.56 362.80 - - 0.00% 1.00 1.00 72.56
AVISO DE SALIDA CON ILUMINACIN LED U 8.00 35.69 285.52 - - 0.00% 8.00 8.00 285.52
LUZ ESTROBOSCPICA CON SIRENA U 5.00 76.34 381.70 - - 0.00% 1.00 1.00 76.34
MDULO DE AISLAMIENTO U 1.00 92.86 92.86 - - 0.00% -
MODULO DE MONITOREO U 2.00 79.94 159.88 - - 0.00% 2.00 2.00 159.88
MDULO DE REL U 1.00 100.71 100.71 - - 0.00% 1.00 1.00 100.71
LUZ DE EMERGENCIA AUTNOMA U 9.00 30.74 276.66 - - 0.00% 9.00 9.00 276.66
CABLEADO ANTIFLAMA 2 X 16 AWG M 200.00 1.13 226.00 - - 0.00% -
FUENTE DE ALIMENTACIN 24 V/8A U 1.00 433.97 433.97 - - 0.00% -
DETECTOR DE CALOR TRMICO U 1.00 80.45 80.45 - - 0.00% -
DETECTOR DE GASES U 2.00 42.22 84.44 - - 0.00% 2.00 2.00 84.44
TUBERA EMT DE 3/4" Y ACCESORIOS M 100.00 5.37 537.00 - - 0.00% 100.00 100.00 537.00
PUNTO DE RED DE INCENDIOS PTO 33.00 33.19 1,095.27 - - 0.00% 33.00 33.00 1,095.27
SISTEMA DE SONORIZACIN
PARLANTE PARA TECHO 8W, 8" Y 100V U 14.00 70.56 987.84 - - 0.00% 14.00 14.00 987.84
MICRFONO CONVENCIONAL U 1.00 76.48 76.48 - - 0.00% 1.00 1.00 76.48
AMPLIFICADOR 120W U 1.00 353.85 353.85 - - 0.00% 1.00 1.00 353.85
CABLEADO 2X14 AWG M 135.00 2.06 278.10 - - 0.00% 135.00 135.00 278.10
PUNTO DE SONIDO PTO 14.00 36.85 515.90 - - 0.00% 14.00 14.00 515.90
TUBERA EMT 1/2" Y ACCESORIOS M 65.00 3.19 207.35 - - 0.00% 65.00 65.00 207.35
INSTALACIONES MECNICAS
SUMINISTRO E INSTALACIN DE UNIDAD CENTRAL TIPO PAQUETE DE U 2.00 9,250.16 18,500.32 - - 0.00% 2.00 2.00 18,500.32
VENTILADOR DE SUMINISTRO TIPO CAJA DE 1100 CFM, 3/4 HP. I U 1.00 935.97 935.97 - - 0.00% -
VENTILADOR DE EXTRACCIN TIPO HONGO DE 1200 CFM, 1/2 HP, U 1.00 1,399.50 1,399.50 - - 0.00% 1.00 1.00 1,399.50
VENTILADOR DE EXTRACCIN TIPO HONGO, 825 CFM, @ 0.5" WG, 1 U 1.00 982.25 982.25 - - 0.00% -
CAMPANA DE EXTRACCIN COMPENSADA DE ACERO INOXIDABLE 1X1 U 1.00 819.18 819.18 - - 0.00% -
DUCTO DE TOL GALVANIZADO CON AISLAMIENTO KG 818.34 8.12 6,644.92 - - 0.00% -
DUCTO DE TOL GALVANIZADO SIN AISLAMIENTO KG 575.19 6.61 3,802.01 - - 0.00% -
TERMOSTATO DIGITAL PROGRAMABLE DE DOBLE ETAPA U 2.00 61.50 123.00 - - 0.00% -
CABLE DE CONTROL 4X#16, INCLUYE TUBERA EMT 3/4" U 22.00 5.07 111.54 - - 0.00% -
MANGA FLEXIBLE DIAM. 4" CON AISLAMIENTO M 16.00 5.13 82.08 - - 0.00% -
HOJA 44 DE 546
REJILLA DE EXTRACCIN DE 6"X6 INCLUYE CAJA DE ACOPLES U 11.00 30.12 331.32 - - 0.00% -
REJILLA DE DESCARGA 8"X8" U 2.00 10.67 21.34 - - 0.00% -
LOUVER DE SALIDA DE 10" X 8" U 2.00 51.41 102.82 - - 0.00% -
TUBERA DE COBRE D=1/2" TIPO L M 8.40 10.79 90.64 - - 0.00% -
CENTRALINA DE GAS (GLP)DE CUATRO CILINDROS DE 45 KG U 1.00 1,716.60 1,716.60 - - 0.00% -
REJILLA DE RETORNO DE 24"X18" U 6.00 84.64 507.84 - - 0.00% -
DIFUSOR DE SUMINISTRO DIMETRO 12" U 24.00 59.97 1,439.28 - - 0.00% -
LOUVER DE TOMA DE 20"X18" U 2.00 69.53 139.06 - - 0.00% -
RECUBRIMIENTO ELASTOMRICO CON FOIL DE ALUMINIO M2 8.00 9.30 74.40 - - 0.00% -
GAS REFRIGERANTE R-410A LB 8.00 11.18 89.44 - - 0.00% -
INSTALACIONES ELECTRICAS
PUNTO DE ILUMINACIN 120V PTO 96.00 33.84 3,248.64 96.00 96.00 3,248.64 3,248.64 100.00% -
INTERRUPTOR SIMPLE U 11.00 4.15 45.65 - - 0.00% -
INTERRUPTOR DOBLE U 2.00 4.79 9.58 - - 0.00% 2.00 2.00 9.58
CONMUTADOR SIMPLE U 8.00 5.31 42.48 - - 0.00% -
CONMUTADOR DOBLE U 4.00 11.94 47.76 - - 0.00% 4.00 4.00 47.76
SENSOR DE MOVIMIENTO 180 U 4.00 37.22 148.88 - - 0.00% -
SENSOR DE MOVIMIENTO 360 U 6.00 37.72 226.32 - - 0.00% -
LUMINARIA FLUORESCENTE 3X32W EMPOTRABLE U 11.00 69.22 761.42 11.00 11.00 761.42 761.42 100.00% -
LUMINARIA FLUORESCENTE 2X32W SELLADA IP-65 SOBREPUESTA U 5.00 64.50 322.50 5.00 5.00 322.50 322.50 100.00% -
OJO DE BUEY CON FLUORESCENTE COMPACTA 1X26W U 58.00 27.07 1,570.06 45.00 45.00 1,218.15 1,218.15 77.59% 13.00 13.00 351.91
LUMINARIA APLIQUE DE PARED INTERIOR /EXTERIOR 1X26W U 4.00 33.87 135.48 4.00 4.00 135.48 135.48 100.00% -
LUMINARIA TIPO PLAFON 2X26W U 18.00 25.18 453.24 18.00 18.00 453.24 453.24 100.00% -
PUNTO TOMACORRIENTE NORMAL DOBLE 127V PARED O TECHO PTO 43.00 40.49 1,741.07 24.00 24.00 971.76 971.76 55.81% 19.00 19.00 769.31
PUNTO TOMACORRIENTE NORMAL DOBLE 127V PISO PTO 4.00 80.75 323.00 - - 0.00% 4.00 4.00 323.00
PUNTO TOMACORRIENTE ESPECIAL 127V PTO 6.00 100.69 604.14 4.00 4.00 402.76 402.76 66.67% 2.00 2.00 201.38
PUNTO TOMACORRIENTE ESPECIAL 220V BIFSICO PTO 9.00 92.94 836.46 9.00 9.00 836.46 836.46 100.00% -
PUNTO TOMACORRIENTE ESPECIAL 220V TRFASICO PTO 2.00 125.32 250.64 - - 0.00% 2.00 2.00 250.64
PUNTO SECADOR DE MANOS PTO 2.00 63.39 126.78 2.00 2.00 126.78 126.78 100.00% -
PUNTO TOMACORRIENTE REGULADO DOBLE 127V PARED O TECHO PTO 1.00 42.78 42.78 - - 0.00% 1.00 1.00 42.78
PUNTO DE TOMACORRIENTE ESPECIAL REGULADO 127V PTO 3.00 40.44 121.32 - - 0.00% 3.00 3.00 121.32
PUNTO EXTRACTOR DE BAO PTO 2.00 22.07 44.14 - - 0.00% 2.00 2.00 44.14
PUNTO DUCHA ELCTRICA PTO 2.00 94.68 189.36 - - 0.00% 2.00 2.00 189.36
CENTRO DE CARGA TRIFASICO 12 ESPACIOS U 1.00 116.41 116.41 1.00 1.00 116.41 116.41 100.00% -
CENTRO DE CARGA TRIFASICO 20 ESPACIOS U 1.00 171.53 171.53 1.00 1.00 171.53 171.53 100.00% -
HOJA 45 DE 546
CENTRO DE CARGA TRIFASICO 42 ESPACIOS U 1.00 299.91 299.91 1.00 1.00 299.91 299.91 100.00% -
BREAKER ENCHUFABLE 1P - 16 A U 21.00 6.28 131.88 - - 0.00% 21.00 21.00 131.88
BREAKER ENCHUFABLE 1P - 20 A U 33.00 6.28 207.24 - - 0.00% -
BREAKER ENCHUFABLE 1P - 40 A U 6.00 6.28 37.68 - - 0.00% 6.00 6.00 37.68
BREAKER ENCHUFABLE 2P - 20 A U 15.00 16.08 241.20 - - 0.00% 15.00 15.00 241.20
BREAKER ENCHUFABLE 2P - 40 A U 6.00 16.08 96.48 - - 0.00% 6.00 6.00 96.48
BREAKER ENCHUFABLE 3P - 20 A U 1.00 33.23 33.23 - - 0.00% 1.00 1.00 33.23
BREAKER ENCHUFABLE 3P - 30A U 2.00 33.23 66.46 - - 0.00% -
BREAKER ENCHUFABLE 3P - 40 A U 2.00 33.23 66.46 - - 0.00% 2.00 2.00 66.46
INTERRUPTOR TERMOMAGNETICO 3P-15-20-30-40-50-60A CAJA M U 1.00 61.37 61.37 - - 0.00% 1.00 1.00 61.37
INTERRUPTOR TERMOMAGNETICO 3P-15-20-30-40-50-60A CAJA M U 2.00 61.37 122.74 - - 0.00% 2.00 2.00 122.74
BREAKER CAJA MOLDEADA DE 3P-150A U 3.00 166.63 499.89 - - 0.00% 3.00 3.00 499.89
INTERRUPTOR TERMOMAGNETICO 3P-250A CAJA MOLDEADA MARCO U 3.00 167.71 503.13 - - 0.00% 3.00 3.00 503.13
INTERRUPTOR TERMOMAGNETICO MARCO 1000 CAJA MOLDEADA RE U 3.00 1,938.64 5,815.92 - - 0.00% 3.00 3.00 5,815.92
CAJA DE PASO 10X10 U 26.00 11.76 305.76 26.00 26.00 305.76 305.76 100.00% -
CONECTOR Y CLAVIJA PARA AIRES ACONDICIONADOS INTERIORES U 2.00 42.15 84.30 - - 0.00% -
CAJA IP65 PARA AIRES ACONDICIONADOS EXTERIORES 20X20X15 ( U 5.00 30.21 151.05 - - 0.00% -
ALIMENTADOR 1X#12(F)+1X#12(N) AWG THHN M 100.00 1.72 172.00 - - 0.00% 100.00 100.00 172.00
ALIMENTADOR 1X#12(F)+1X#12(N)+1X#14(T) AWG THHN M 100.00 2.28 228.00 - - 0.00% 100.00 100.00 228.00
ALIMENTADOR 1X#10(F)+1X#10(N)+1X#14(T) AWG THHN M 100.00 3.82 382.00 - - 0.00% -
ALIMENTADOR 1X#8(F)+1X#8(N)+1X#10(T) AWG THHN M 100.00 4.72 472.00 - - 0.00% 100.00 100.00 472.00
FUNDA BX 1" M 50.00 5.81 290.50 - - 0.00% 50.00 50.00 290.50
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 3/4" M 50.00 4.11 205.50 - - 0.00% 50.00 50.00 205.50
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 1 1/ M 50.00 9.32 466.00 - - 0.00% 50.00 50.00 466.00
SUMNISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 2" M 50.00 11.99 599.50 - - 0.00% 50.00 50.00 599.50
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 3" M 50.00 38.41 1,920.50 - - 0.00% 50.00 50.00 1,920.50
CONDUCTOR THHN FLEX #14 AWG M 100.00 0.74 74.00 - - 0.00% 100.00 100.00 74.00
CONDUCTOR THHN FLEX #12 AWG M 100.00 1.09 109.00 - - 0.00% 100.00 100.00 109.00
CONDUCTOR THHN FLEX #10 AWG M 100.00 1.36 136.00 - - 0.00% 100.00 100.00 136.00
CABLE FLEXIBLE 8 AWG M 100.00 1.98 198.00 - - 0.00% 100.00 100.00 198.00
CABLE FLEXIBLE 6 AWG M 100.00 2.80 280.00 - - 0.00% 100.00 100.00 280.00
CABLE FLEXIBLE 4 AWG M 100.00 3.74 374.00 - - 0.00% 100.00 100.00 374.00
INSTALACIONES HIDROSANITARIAS
SISTEMA DE AGUA POTABLE
PUNTO DE AGUA PVC ROSCABLE1/2" PTO 24.00 19.92 478.08 19.00 19.00 378.48 378.48 79.17% 5.00 5.00 99.60
PUNTO DE AGUA PVC ROSCABLE3/4" PTO 2.00 18.22 36.44 2.00 2.00 36.44 36.44 100.00% -
PUNTO DE AGUA PVC ROSCABLE1" PTO 7.00 38.70 270.90 6.00 6.00 232.20 232.20 85.71% 1.00 1.00 38.70
TUBERA PVC ROSCABLE 1/2" M 2.40 2.64 6.34 2.40 2.40 6.34 6.34 99.94% -
TUBERA PVC ROSCABLE 3/4" M 15.60 3.42 53.35 15.60 15.60 53.35 53.35 100.00% -
TUBERA PVC ROSCABLE 1" M 38.30 8.07 309.08 5.63 5.63 45.43 45.43 14.70% 32.67 32.67 263.65
TUBERA PVC ROSCABLE 1 1/4" M 13.10 11.68 153.01 3.96 3.96 46.25 46.25 30.23% 9.14 9.14 106.76
TUBERA PVC ROSCABLE 2" M 17.10 14.12 241.45 8.88 8.88 125.39 125.39 51.93% 8.22 8.22 116.07
VLVULA DE CONTROL ROSCADA DIAM 1/2" U 24.00 8.88 213.12 2.00 2.00 17.76 17.76 8.33% 22.00 22.00 195.36
VLVULA DE CONTROL ROSCADA DIAM 3/4" U 2.00 16.89 33.78 2.00 2.00 33.78 33.78 100.00% -
VLVULA DECONTROL ROSCADA DIAM 1" U 2.00 22.52 45.04 - - 0.00% 2.00 2.00 45.04
VLVULA DECONTROL ROSCADA DIAM 1" U 1.00 28.70 28.70 - - 0.00% 1.00 1.00 28.70
VLVULA DE CONTROL ROSCADA DIAM 2" U 2.00 44.55 89.10 1.00 1.00 44.55 44.55 50.00% 1.00 1.00 44.55
SISTEMA DE AGUA RESIDUALES
CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO U 4.00 98.94 395.76 4.00 4.00 395.76 395.76 100.00% -
HOJA 46 DE 546
DESAGES PVC 50 MM. TIPO B(INCLUYE ACCESORIOS) PTO 10.00 8.21 82.10 10.00 10.00 82.10 82.10 100.00% -
DESAGES PVC 75 MM. TIPO B (INCLUYE ACCESORIOS) PTO 10.00 11.58 115.80 10.00 10.00 115.80 115.80 100.00% -
DESAGES PVC 110MM TIPO B (INCLUYE ACCESORIOS) PTO 10.00 9.55 95.50 10.00 10.00 95.50 95.50 100.00% -
SUMIDERO DE PISO DE 3" INCLUYE REJILLA U 5.00 18.22 91.10 5.00 5.00 91.10 91.10 100.00% -
SUMIDERO DE PISO DE 4" INCLUYE REJILLA U 3.00 28.94 86.82 3.00 3.00 86.82 86.82 100.00% -
TRAMPA PARA GRASAS CRIBADO Y VLVULAS (C3-C4-C5) U 1.00 973.36 973.36 1.00 1.00 973.36 973.36 100.00% -
TUBERA DE 75 DE PVC TIPO B M 6.00 6.93 41.58 6.00 6.00 41.58 41.58 100.00% -
TUBERA DE 110 MM PVC TIPO B M 12.00 11.51 138.12 12.00 12.00 138.12 138.12 100.00% -
VENTILACIN
PUNTO DE VENTILACION DE 75MM TIPO A PTO 1.00 16.51 16.51 1.00 1.00 16.51 16.51 100.00% -
TUBERA DE 75 DE PVC TIPO B M 7.50 6.93 51.98 7.50 7.50 51.98 51.98 99.99% -
TAPON REJILLA U 1.00 22.69 22.69 1.00 1.00 22.69 22.69 100.00% -
AGUAS LLUVIAS
BAJANTES DE TUBERA PVC TIPO B DE 110 MM M 24.00 9.52 228.48 18.60 18.60 177.07 177.07 77.50% 5.40 5.40 51.41
CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO U 4.00 98.94 395.76 4.00 4.00 395.76 395.76 100.00% -
SUMIDERO DE CUBIERTA DE 110MM INCLUYE REJILLA CUPULA U 12.00 24.93 299.16 12.00 12.00 299.16 299.16 100.00% -
TUBERA DE 110 MM PVC TIPO B M 25.00 11.51 287.75 25.00 25.00 287.75 287.75 100.00% -
DESAGES PVC 110MM TIPO B (INCLUYE ACCESORIOS) PTO 12.00 9.55 114.60 12.00 12.00 114.60 114.60 100.00% -
APARATOS SANITARIOS
DUCHA CROMADA INCLUYE LLAVE Y ACCESORIOS U 2.00 20.34 40.68 2.00 2.00 40.68 40.68 100.00% -
INODORO BLANCO CON FLUXMETRO U 7.00 246.56 1,725.92 6.00 6.00 1,479.36 1,479.36 85.71% 1.00 1.00 246.56
LAVAMANOS PARA EMPOTRAR BLANCO (508MMX445 MM) CON GRIF U 6.00 147.69 886.14 6.00 6.00 886.14 886.14 100.00% -
FREGADERO DE ACERO INOXIDABLE 1 POZO CON ESCURRIDOR INC. U 3.00 224.20 672.60 2.00 2.00 448.40 448.40 66.67% 1.00 1.00 224.20
FREGADERO DE ACERO INOXIDABLE 2 POZO INC. GRIFERIA CON ES U 1.00 254.33 254.33 1.00 1.00 254.33 254.33 100.00% -
URINARIO CON LLAVE PRESSMATIC U 2.00 151.99 303.98 2.00 2.00 303.98 303.98 100.00% -
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE ZANJAS M3 20.11 6.52 131.12 - - 0.00% 20.11 20.11 131.12
BLOQUE DE BAR
PRELIMINARES
LIMPIEZA Y DESBROCE DEL TERRENO (MANUAL) M2 103.25 0.87 89.83 103.25 103.25 89.83 89.83 100.00% -
REPLANTEO Y NIVELACIN M2 103.25 0.99 102.22 103.25 103.25 102.22 102.22 100.00% -
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE CIMIENTOS Y PLINTOS M3 23.81 7.64 181.91 21.96 21.96 167.78 167.78 92.23% 0.07 1.78 1.85 0.53 13.60
SUB-BASE CLASE 3 M3 4.16 16.01 66.60 4.16 4.16 66.60 66.60 100.00% -
EXCAVACIN A MQUINA M3 28.57 2.29 65.43 28.57 28.57 65.43 65.43 100.00% -
HOJA 47 DE 546
RELLENO COMPACTADO A MQUINA CON MATERIAL IMPORTADO M3 13.73 11.08 152.13 13.73 13.73 152.13 152.13 100.00% -
TRANSPORTE DE MATERIAL DE EXCAVACIN. TRANSPORTE LIBRE 1 M3-KM 285.67 0.25 71.42 285.67 285.67 71.42 71.42 100.00% -
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 357.76 0.25 89.44 357.76 357.76 89.44 89.44 100.00% -
ESTRUCTURA DE HORMIGN ARMADO
ACERO DE REFUERZO EN VARILLAS CORRUGADAS FY=4200 KG/CM2 KG 3,721.18 2.05 7,628.42 2,895.86 2,895.86 5,936.51 5,936.51 77.82% 825.32 825.32 1,691.91
HORMIGN CICLPEO F'C=210 KG/CM (INCLUYE ENCOFRADO)H.S M3 5.34 121.30 647.74 5.34 5.34 647.74 647.74 100.00% -
HORMIGN F'C= 210 KG/CM2 EN PLINTOS M3 3.12 226.59 706.96 3.12 3.12 706.96 706.96 100.00% -
HORMIGN F'C= 210 KG/CM2 EN CADENAS M3 3.01 184.96 556.73 3.01 3.01 556.73 556.73 100.00% -
HORMIGN F'C= 210 KG/CM2 EN COLUMNAS M3 4.05 229.35 928.87 3.89 3.89 892.17 892.17 96.05% 0.16 0.16 36.70
HORMIGN F'C= 210 KG/CM2 EN LOSA M3 7.20 208.33 1,499.98 7.20 7.20 1,499.98 1,499.98 100.00% -
IMPERMEABILIZACIN DE TERRAZA CON LMINA ASFLTICA M2 60.00 16.13 967.80 60.00 60.00 967.80 967.80 100.00% -
HORMIGN F'C= 140 KG/CM2 EN REPLANTILLOS M3 1.02 108.46 110.63 1.02 1.02 110.63 110.63 100.00% -
HORMIGN F'C= 210 KG/CM2 EN VIGAS M3 5.76 233.94 1,347.49 5.18 5.18 1,211.80 1,211.80 89.93% 0.58 0.58 135.69
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 2,881.80 0.25 720.45 2,881.80 2,881.80 720.45 720.45 100.00% -
MALLA ELECTROSOLDADA R-126 (4.10) M2 65.81 5.65 371.83 64.80 64.80 366.12 366.12 98.46% 1.01 1.01 5.71
MALLA ELECTROSOLDADA R-131 (5.15) M2 65.81 4.53 298.12 - - 0.00% 65.81 65.81 298.12
ALIVIANAMIENTO DE BLOQUE CEMENTO DE 40CMX20CMX20CM U 408.00 0.58 236.64 396.00 396.00 229.68 229.68 97.06% 12.00 12.00 6.96
GEOTEXTIL NT 2000 M2 8.00 3.95 31.60 8.00 8.00 31.60 31.60 100.00% -
GEOMALLA BIAXIAL BX1100 M2 8.00 5.40 43.20 8.00 8.00 43.20 43.20 100.00% -
CONTRAPISO HORMIGN ARMADO FC`210KG/CM2 (E=10CM, PIEDR M2 65.63 30.25 1,985.31 65.63 65.63 1,985.31 1,985.31 100.00% -
MAMPOSTERIA
MAMPOSTERA DE BLOQUE DE 15CM M2 62.81 17.65 1,108.60 54.29 54.29 958.22 958.22 86.44% 8.52 8.52 150.38
HORMIGN FC=210 KG/CM2 EN CONTORNO DE VENTANAS (ALFEI M3 0.49 228.43 111.93 0.49 0.49 111.93 111.93 100.00% -
HORMIGN FC=210KG/CM2 EN DINTELES Y RIOSTRAS M 6.00 15.28 91.68 6.00 6.00 91.68 91.68 100.00% -
ENLUCIDOS
ENLUCIDO VERTICAL INTERIOR. M2 191.24 6.70 1,281.31 69.85 69.85 468.00 468.00 36.53% 121.39 121.39 813.31
EMPASTE INTERIOR DE PAREDES M2 182.64 4.18 763.44 69.85 69.85 291.97 291.97 38.24% 112.79 112.79 471.46
ENLUCIDO PALETEADO FINO DE FILOS Y FAJAS M 27.00 3.37 90.99 27.00 27.00 90.99 90.99 100.00% -
PISOS
CERMICA DE PISO ALTO TRFICO ANTIDESLIZANTE M2 31.46 28.80 906.05 31.46 31.46 906.05 906.05 100.00% -
MASILLADO DE LOSA INCLUYE IMPERMEABILIZANTE M2 31.10 8.04 250.04 31.10 31.10 250.04 250.04 100.00% -
BARREDERAS DE CERMICA H=10CM M 23.81 5.43 129.29 23.81 23.81 129.29 129.29 100.00% -
PORCELANATO EN MESN M2 6.93 36.10 250.17 6.93 6.93 250.17 250.17 100.00% -
CARPINTERIA METALICA
VENTANA DE ALUMINIO Y VIDRIO 6MM CORREDIZA M2 1.62 80.28 130.05 - - 0.00% 1.62 1.62 130.05
MALLA ANTIMOSQUITO M2 0.41 11.98 4.91 - - 0.00% -
PUERTA METLICA DE TOL, TUBO RECT. DE 50X25X2MM, Y VIDRIO M2 1.90 126.24 239.86 - - 0.00% 0.01 0.01 1.26
PASAMANO DE ACERO INOXIDABLE M2 2.40 138.33 331.99 - - 0.00% -
RECUBRIMIENTOS
CIELO RASO FALSO DE ESTRUCTURA DE ALUMINIO PREPINTADO AL M2 28.61 21.96 628.28 28.61 28.61 628.27 628.27 100.00% -
PINTURA DE CAUCHO LTEX VINILO ACRLICO INTERIOR M2 182.64 5.58 1,019.13 67.01 67.01 373.92 373.92 36.69% 115.63 115.63 645.22
CERMICA EN PAREDES M2 8.60 25.37 218.18 6.89 6.89 174.80 174.80 80.12% 1.71 1.71 43.38
INSTALACIONES ELECTRONICAS
SISTEMA DE CABLEADO ESTRUCTURADO DATOS Y VOZ
PUNTO SIMPLE VOZ Y/O DATOS CAT 6A CERTIFICADO PTO 1.00 109.14 109.14 - - 0.00% -
PATCH CORD CAT 6A 7FT (3M) U 1.00 13.25 13.25 - - 0.00% -
PATCH CORD CAT 6A 3FT(1M) U 1.00 8.42 8.42 - - 0.00% -
POZO DE REVISIN 60X60X80 CM U 1.00 137.72 137.72 - - 0.00% -
CABLE FUTP CAT 6A BLINDADO M 10.00 2.30 23.00 - - 0.00% -
HOJA 48 DE 546
TUBERA EMT DE 3/4" Y ACCESORIOS M 10.00 5.37 53.70 - - 0.00% 10.00 10.00 53.70
SISTEMA DE DETECCIN TEMPRANA DE INCENDIOS
MDULO DE CONTROL U 1.00 69.35 69.35 - - 0.00% -
DETECTOR DE HUMO FOTOELCTRICO U 2.00 73.70 147.40 - - 0.00% 1.00 1.00 73.70
ESTACIN MANUAL DE INCENDIOS U 1.00 72.56 72.56 - - 0.00% -
AVISO DE SALIDA CON ILUMINACIN LED U 1.00 35.69 35.69 - - 0.00% 1.00 1.00 35.69
LUZ ESTROBOSCPICA CON SIRENA U 1.00 76.34 76.34 - - 0.00% -
MDULO DE AISLAMIENTO U 1.00 92.86 92.86 - - 0.00% -
MODULO DE MONITOREO U 2.00 79.94 159.88 - - 0.00% 2.00 2.00 159.88
LUZ DE EMERGENCIA AUTNOMA U 1.00 30.74 30.74 - - 0.00% 1.00 1.00 30.74
CABLEADO ANTIFLAMA 2 X 16 AWG M 40.00 1.13 45.20 - - 0.00% -
FUENTE DE ALIMENTACIN 24 V/8A U 1.00 433.97 433.97 - - 0.00% -
TUBERA EMT DE 3/4" Y ACCESORIOS M 26.00 5.37 139.62 - - 0.00% 26.00 26.00 139.62
PUNTO DE RED DE INCENDIOS PTO 8.00 33.19 265.52 - - 0.00% 8.00 8.00 265.52
SISTEMA DE SONORIZACIN
PARLANTE PARA TECHO 8W, 8" Y 100V U 2.00 70.56 141.12 - - 0.00% 2.00 2.00 141.12
CABLEADO 2X14 AWG M 12.00 2.06 24.72 - - 0.00% 12.00 12.00 24.72
PUNTO DE SONIDO PTO 2.00 36.85 73.70 - - 0.00% 2.00 2.00 73.70
TUBERA EMT 1/2" Y ACCESORIOS M 10.00 3.19 31.90 - - 0.00% 10.00 10.00 31.90
INSTALACIONES MECANICAS
VENTILADOR HELICOIDAL DE TECHO DE 48" 60 W, 110 V, 60 HZ, 1 P U 4.00 190.73 762.92 - - 0.00% 2.00 2.00 381.46
CABLE DE CONTROL 2X#14, INCLUYE TUBERA EMT 3/4" M 15.00 4.81 72.15 - - 0.00% -
CONTROL DE VENTILADOR DE TECHO DE 3 VELOCIDADES. U 2.00 18.55 37.10 - - 0.00% 1.00 1.00 18.55
INSTALACIONES ELECTRICAS
PUNTO DE ILUMINACIN 120V PTO 14.00 33.84 473.76 14.00 14.00 473.76 473.76 100.00% -
INTERRUPTOR DOBLE U 10.00 4.79 47.90 - - 0.00% -
CONMUTADOR SIMPLE U 2.00 5.31 10.62 - - 0.00% 2.00 2.00 10.62
LUMINARIA FLUORESCENTE 2X32W SELLADA IP-65 SOBREPUESTA U 2.00 64.50 129.00 2.00 2.00 129.00 129.00 100.00% -
OJO DE BUEY CON FLUORESCENTE COMPACTA 1X26W U 12.00 27.07 324.84 12.00 12.00 324.84 324.84 100.00% -
PUNTO TOMACORRIENTE NORMAL DOBLE 127V PARED O TECHO PTO 11.00 40.49 445.39 5.00 5.00 202.45 202.45 45.45% 6.00 6.00 242.94
PUNTO TOMACORRIENTE NORMAL DOBLE 127V SOBRE MESON PTO 3.00 40.94 122.82 2.00 2.00 81.88 81.88 66.67% 1.00 1.00 40.94
PUNTO TOMACORRIENTE ESPECIAL 127V PTO 5.00 100.69 503.45 5.00 5.00 503.45 503.45 100.00% -
PUNTO TOMACORRIENTE REGULADO DOBLE 127V PARED O TECHO PTO 1.00 42.78 42.78 - - 0.00% 1.00 1.00 42.78
PUNTO DE TOMACORRIENTE ESPECIAL REGULADO 127V PTO 1.00 40.44 40.44 - - 0.00% 1.00 1.00 40.44
CENTRO DE CARGA TRIFASICO 6 ESPACIOS U 2.00 73.53 147.06 - - 0.00% 2.00 2.00 147.06
HOJA 49 DE 546
CENTRO DE CARGA TRIFASICO 12 ESPACIOS U 2.00 116.41 232.82 1.00 1.00 116.41 116.41 50.00% 1.00 1.00 116.41
BREAKER ENCHUFABLE 1P - 16 A U 2.00 6.28 12.56 - - 0.00% -
BREAKER ENCHUFABLE 1P - 20 A U 11.00 6.28 69.08 - - 0.00% -
INTERRUPTOR TERMOMAGNETICO 3P-15-20-30-40-50-60A CAJA M U 1.00 61.37 61.37 - - 0.00% 1.00 1.00 61.37
CAJA DE PASO 10X10 U 10.00 11.76 117.60 7.00 7.00 82.32 82.32 70.00% 3.00 3.00 35.28
CONECTOR Y CLAVIJA PARA AIRES ACONDICIONADOS INTERIORES U 2.00 42.15 84.30 - - 0.00% 2.00 2.00 84.30
ALIMENTADOR 1X#12(F)+1X#12(N) AWG THHN M 50.00 1.72 86.00 - - 0.00% 50.00 50.00 86.00
ALIMENTADOR 1X#12(F)+1X#12(N)+1X#14(T) AWG THHN M 50.00 2.28 114.00 - - 0.00% 50.00 50.00 114.00
CABLE CONCENTRICO 2X14 AWG M 200.00 1.63 326.00 - - 0.00% 200.00 200.00 326.00
SUMNISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 2" M 25.00 11.99 299.75 - - 0.00% 25.00 25.00 299.75
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 3" M 25.00 38.41 960.25 - - 0.00% 25.00 25.00 960.25
CONDUCTOR THHN FLEX #14 AWG M 50.00 0.74 37.00 - - 0.00% 50.00 50.00 37.00
CONDUCTOR THHN FLEX #12 AWG M 50.00 1.09 54.50 - - 0.00% 50.00 50.00 54.50
CONDUCTOR THHN FLEX #10 AWG M 50.00 1.36 68.00 - - 0.00% 50.00 50.00 68.00
INSTALACIONES HIDROSANITARIAS
SISTEMA DE AGUA POTABLE
PUNTO DE AGUA PVC ROSCABLE1/2" PTO 2.00 19.92 39.84 2.00 2.00 39.84 39.84 100.00% -
TUBERA PVC ROSCABLE 1/2" M 9.20 2.64 24.29 9.20 - 9.20 24.29 0.00 24.29 99.99% -
TUBERA PVC ROSCABLE 3/4" M 2.00 3.42 6.84 2.00 2.00 6.84 6.84 100.00% -
VLVULA DE CONTROL ROSCADA DIAM 3/4" U 1.00 16.89 16.89 - - 0.00% 1.00 1.00 16.89
SISTEMA DE AGUA RESIDUALES
CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO U 1.00 98.94 98.94 1.00 1.00 98.94 98.94 100.00% -
DESAGES PVC 50 MM. TIPO B(INCLUYE ACCESORIOS) PTO 2.00 8.21 16.42 2.00 2.00 16.42 16.42 100.00% -
DESAGES PVC 75 MM. TIPO B (INCLUYE ACCESORIOS) PTO 1.00 11.58 11.58 1.00 1.00 11.58 11.58 100.00% -
SUMIDERO DE PISO DE 3" INCLUYE REJILLA U 1.00 18.22 18.22 1.00 1.00 18.22 18.22 100.00% -
TUBERA DE 50MM DE PVC TIPO B M 2.00 3.65 7.30 2.00 2.00 7.30 7.30 100.00% -
AGUAS LLUVIAS
BAJANTES DE TUBERA PVC TIPO B DE 110 MM M 4.00 9.52 38.08 4.00 4.00 38.08 38.08 100.00% -
CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO U 1.00 98.94 98.94 1.00 1.00 98.94 98.94 100.00% -
SUMIDERO DE CUBIERTA DE 75MM INCLUYE REJILLA CUPULA U 2.00 20.88 41.76 2.00 2.00 41.76 41.76 100.00% -
TUBERA DE 75 DE PVC TIPO B M 16.50 6.93 114.35 8.92 8.92 61.82 61.82 54.06% 7.58 7.58 52.53
DESAGES PVC 75 MM. TIPO B (INCLUYE ACCESORIOS) PTO 2.00 11.58 23.16 2.00 2.00 23.16 23.16 100.00% -
APARATOS SANITARIOS
FREGADERO DE ACERO INOXIDABLE 1 POZO CON ESCURRIDOR INC. U 2.00 224.20 448.40 2.00 2.00 448.40 448.40 100.00% -
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE ZANJAS M3 1.99 6.52 12.97 - - 0.00% 1.99 1.99 12.97
BLOQUE VESTIDOR - BODEGA
PRELIMINARES
LIMPIEZA Y DESBROCE DEL TERRENO (MANUAL) M2 105.30 0.87 91.61 105.30 105.30 91.61 91.61 100.00% -
REPLANTEO Y NIVELACIN M2 105.30 0.99 104.25 105.30 105.30 104.25 104.25 100.00% -
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE CIMIENTOS Y PLINTOS M3 42.52 7.64 324.85 22.48 22.48 171.74 171.74 52.87% 17.59 2.45 20.04 134.39 18.72
SUB-BASE CLASE 3 M3 7.78 16.01 124.56 7.78 7.78 124.56 124.56 100.00% -
EXCAVACIN A MQUINA M3 51.02 2.29 116.84 51.02 51.02 116.84 116.84 100.00% -
RELLENO COMPACTADO A MQUINA CON MATERIAL IMPORTADO M3 25.66 11.08 284.31 25.66 25.66 284.31 284.31 100.00% -
TRANSPORTE DE MATERIAL DE EXCAVACIN. TRANSPORTE LIBRE 1 M3-KM 510.19 0.25 127.55 510.19 510.19 127.55 127.55 100.00% -
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 668.74 0.25 167.19 668.74 668.74 167.19 167.19 100.00% -
ESTRUCTURA DE HORMIGN ARMADO
ACERO DE REFUERZO EN VARILLAS CORRUGADAS FY=4200 KG/CM2 KG 3,350.99 2.05 6,869.53 3,350.99 3,350.99 6,869.53 6,869.53 100.00% -
HOJA 50 DE 546
HORMIGN CICLPEO F'C=210 KG/CM (INCLUYE ENCOFRADO)H.S M3 6.46 121.30 783.60 6.46 6.46 783.60 783.60 100.00% -
HORMIGN F'C= 210 KG/CM2 EN PLINTOS M3 5.83 226.59 1,321.02 3.72 3.72 842.92 842.92 63.81% 2.11 2.11 478.10
HORMIGN F'C= 210 KG/CM2 EN CADENAS M3 3.64 184.96 673.25 3.64 3.64 673.25 673.25 100.00% -
HORMIGN F'C= 210 KG/CM2 EN COLUMNAS M3 3.68 229.35 844.01 3.53 3.53 809.61 809.61 95.92% 0.15 0.15 34.40
HORMIGN F'C= 210 KG/CM2 EN LOSA M3 6.87 208.33 1,431.23 6.87 6.87 1,431.23 1,431.23 100.00% -
IMPERMEABILIZACIN DE TERRAZA CON LMINA ASFLTICA M2 50.00 16.13 806.50 50.00 50.00 806.50 806.50 100.00% -
HORMIGN F'C= 140 KG/CM2 EN REPLANTILLOS M3 2.63 108.46 285.25 1.61 1.61 174.62 174.62 61.22% 1.02 1.02 110.63
HORMIGN F'C= 210 KG/CM2 EN VIGAS M3 6.06 233.94 1,417.68 5.79 5.79 1,354.52 1,354.52 95.54% 0.27 0.27 63.16
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 2,657.85 0.25 664.46 2,657.85 2,657.85 664.46 664.46 100.00% -
MALLA ELECTROSOLDADA R-126 (4.10) M2 67.90 5.65 383.64 67.90 67.90 383.64 383.64 100.00% -
MALLA ELECTROSOLDADA R-131 (5.15) M2 67.90 4.53 307.59 - - 0.00% 67.90 67.90 307.59
ALIVIANAMIENTO DE BLOQUE CEMENTO DE 40CMX20CMX20CM U 442.00 0.58 256.36 441.00 441.00 255.78 255.78 99.77% 1.00 1.00 0.58
GEOTEXTIL NT 2000 M2 5.92 3.95 23.38 5.92 5.92 23.38 23.38 100.00% -
GEOMALLA BIAXIAL BX1100 M2 5.92 5.40 31.97 5.92 5.92 31.97 31.97 100.00% -
CONTRAPISO HORMIGN ARMADO FC`210KG/CM2 (E=10CM, PIEDR M2 34.25 30.25 1,036.06 34.25 34.25 1,036.06 1,036.06 100.00% -
OTROS
MESN DE HORMIGN ARMADO FC=210KG/CM2, A=0,60 M 4.58 49.77 227.95 2.80 2.80 139.36 139.36 61.14% 1.78 1.78 88.59
MAMPOSTERIA
MAMPOSTERA DE BLOQUE DE 15CM M2 144.42 17.65 2,549.01 135.26 135.26 2,387.34 2,387.34 93.66% 9.16 9.16 161.67
HORMIGN FC=210 KG/CM2 EN CONTORNO DE VENTANAS (ALFEI M3 0.29 228.43 66.24 0.29 0.29 66.24 66.24 100.00% -
HORMIGN FC=210KG/CM2 EN DINTELES Y RIOSTRAS M 10.14 15.28 154.94 10.14 10.14 154.94 154.94 100.00% -
ENLUCIDOS
ENLUCIDO VERTICAL INTERIOR. M2 330.61 6.70 2,215.09 204.91 204.91 1,372.90 1,372.90 61.98% 125.70 125.70 842.19
EMPASTE INTERIOR DE PAREDES M2 288.85 4.18 1,207.39 204.91 204.91 856.52 856.52 70.94% 83.94 83.94 350.87
ENLUCIDO PALETEADO FINO DE FILOS Y FAJAS M 102.30 3.37 344.75 102.30 102.30 344.75 344.75 100.00% -
PISOS
CERMICA DE PISO ALTO TRFICO ANTIDESLIZANTE M2 51.75 28.80 1,490.40 51.75 51.75 1,490.40 1,490.40 100.00% -
MASILLADO DE LOSA INCLUYE IMPERMEABILIZANTE M2 52.51 8.04 422.18 52.51 52.51 422.18 422.18 100.00% -
BARREDERAS DE CERMICA H=10CM M 83.56 5.43 453.73 62.30 62.30 338.29 338.29 74.56% 21.26 21.26 115.44
PORCELANATO EN MESN M2 3.21 36.10 115.88 3.21 3.21 115.88 115.88 100.00% -
CARPINTERIA METALICA
VENTANA DE ALUMINIO Y VIDRIO 6MM CORREDIZA M2 9.72 80.28 780.32 - - 0.00% 9.72 9.72 780.32
MALLA ANTIMOSQUITO M2 4.86 11.98 58.22 - - 0.00% -
PUERTA METLICA DE TOL, TUBO RECT. DE 50X25X2MM, Y VIDRIO M2 5.67 126.24 715.78 - - 0.00% -
PUERTA DE TOL 1/20", MARCO Y ESTRUCTURA DE 25*50*1,5 CON M2 5.88 128.15 753.52 - - 0.00% -
HOJA 51 DE 546
PASAMANO DE ACERO INOXIDABLE M2 2.40 138.33 331.99 - - 0.00% 0.50 0.50 69.17
RECUBRIMIENTOS
CIELO RASO FALSO DE ESTRUCTURA DE ALUMINIO PREPINTADO AL M2 39.83 21.96 874.67 39.83 39.83 874.66 874.66 100.00% -
PINTURA ELASTOMRICA EXTERIORES M2 144.32 5.71 824.07 144.32 144.32 824.07 824.07 100.00%
PINTURA DE CAUCHO LTEX VINILO ACRLICO INTERIOR M2 130.24 5.58 726.74 84.55 84.55 471.79 471.79 64.92% 45.69 45.69 254.95
CERMICA EN PAREDES M2 84.24 25.37 2,137.17 84.24 84.24 2,137.17 2,137.17 100.00% -
INSTALACIONES HIDROSANITARIAS
SISTEMA DE AGUA POTABLE
PUNTO DE AGUA PVC ROSCABLE1/2" PTO 12.00 19.92 239.04 12.00 12.00 239.04 239.04 100.00% -
PUNTO DE AGUA PVC ROSCABLE3/4" PTO 2.00 18.22 36.44 2.00 2.00 36.44 36.44 100.00% -
PUNTO DE AGUA PVC ROSCABLE1" PTO 3.00 38.70 116.10 3.00 3.00 116.10 116.10 100.00% -
TUBERA PVC ROSCABLE 1/2" M 4.00 2.64 10.56 4.00 4.00 10.56 10.56 100.00% -
TUBERA PVC ROSCABLE 3/4" M 7.20 3.42 24.62 1.60 1.60 5.47 5.47 22.23% 5.60 5.60 19.15
TUBERA PVC ROSCABLE 1" M 1.00 8.07 8.07 1.00 - 1.00 8.07 0.00 8.07 100.00% -
TUBERA PVC ROSCABLE 1 1/2" M 19.90 10.51 209.15 13.38 13.38 140.62 140.62 67.24% 6.52 6.52 68.53
TUBERA PVC ROSCABLE 2" M 5.50 14.12 77.66 2.00 2.00 28.24 28.24 36.36% 3.50 3.50 49.42
VLVULA DE CONTROL ROSCADA DIAM 1/2" U 2.00 8.88 17.76 1.00 1.00 8.88 8.88 50.00% 1.00 1.00 8.88
VLVULA DE CONTROL ROSCADA DIAM 3/4" U 4.00 16.89 67.56 1.00 1.00 16.89 16.89 25.00% 3.00 3.00 50.67
VLVULA DECONTROL ROSCADA DIAM 1" U 1.00 22.52 22.52 - - 0.00% 1.00 1.00 22.52
VLVULA DECONTROL ROSCADA DIAM 1 1/2" U 2.00 38.34 76.68 2.00 2.00 76.68 76.68 100.00% -
VLVULA DE CONTROL ROSCADA DIAM 2" U 1.00 44.55 44.55 1.00 1.00 44.55 44.55 100.00% -
SISTEMA DE AGUA RESIDUALES
CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO U 2.00 98.94 197.88 2.00 2.00 197.88 197.88 100.00% -
DESAGES PVC 50 MM. TIPO B(INCLUYE ACCESORIOS) PTO 6.00 8.21 49.26 6.00 6.00 49.26 49.26 100.00% -
DESAGES PVC 75 MM. TIPO B (INCLUYE ACCESORIOS) PTO 10.00 11.58 115.80 10.00 10.00 115.80 115.80 100.00% -
DESAGES PVC 110MM TIPO B (INCLUYE ACCESORIOS) PTO 3.00 9.55 28.65 3.00 3.00 28.65 28.65 100.00% -
SUMIDERO DE PISO DE 3" INCLUYE REJILLA U 2.00 18.22 36.44 2.00 2.00 36.44 36.44 100.00% -
SUMIDERO DE PISO DE 4" INCLUYE REJILLA U 10.00 28.94 289.40 - - 0.00% 10.00 10.00 289.40
TUBERA DE 75 DE PVC TIPO B M 3.00 6.93 20.79 3.00 3.00 20.79 20.79 100.00% -
TUBERA DE 110 MM PVC TIPO B M 20.00 11.51 230.20 19.03 19.03 219.04 219.04 95.15% 0.97 0.97 11.16
VENTILACIN
PUNTO DE VENTILACION DE 75MM TIPO A PTO 1.00 16.51 16.51 1.00 1.00 16.51 16.51 100.00% -
TUBERA DE 75 DE PVC TIPO B M 7.00 6.93 48.51 7.00 7.00 48.51 48.51 100.00% -
TAPON REJILLA U 1.00 22.69 22.69 1.00 1.00 22.69 22.69 100.00% -
AGUAS LLUVIAS
BAJANTES DE TUBERA PVC TIPO B DE 110 MM M 4.00 9.52 38.08 4.00 4.00 38.08 38.08 100.00% -
CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO U 1.00 98.94 98.94 1.00 1.00 98.94 98.94 100.00% -
SUMIDERO DE CUBIERTA DE 110MM INCLUYE REJILLA CUPULA U 1.00 24.93 24.93 1.00 1.00 24.93 24.93 100.00% -
TUBERA DE 110 MM PVC TIPO B M 9.00 11.51 103.59 4.02 4.02 46.27 46.27 44.67% 4.98 4.98 57.32
DESAGES PVC 110MM TIPO B (INCLUYE ACCESORIOS) PTO 1.00 9.55 9.55 1.00 1.00 9.55 9.55 100.00% -
APARATOS SANITARIOS
DUCHA CROMADA INCLUYE LLAVE Y ACCESORIOS U 8.00 20.34 162.72 8.00 8.00 162.72 162.72 100.00% -
INODORO BLANCO CON FLUXMETRO U 3.00 246.56 739.68 3.00 3.00 739.68 739.68 100.00% -
LAVAMANOS PARA EMPOTRAR BLANCO (508MMX445 MM) CON GRIF U 4.00 147.69 590.76 4.00 4.00 590.76 590.76 100.00% -
URINARIO CON LLAVE PRESSMATIC U 2.00 151.99 303.98 2.00 2.00 303.98 303.98 100.00% -
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE ZANJAS M3 9.00 6.52 58.68 - - 0.00% 9.00 9.00 58.68
INSTALACIONES ELECTRICAS
PUNTO DE ILUMINACIN 120V PTO 23.00 33.84 778.32 23.00 23.00 778.32 778.32 100.00% -
HOJA 52 DE 546
CERRAMIENTO PERIMETRAL DE TUBO 2" X2MM SEGN DISEO M 185.00 82.59 15,279.15 175.92 3.00 178.92 14,529.23 247.77 14,777.00 96.71% 6.08 6.08 502.15
CARPINTERIA METALICA
VENTANA DE ALUMINIO Y VIDRIO 6MM CORREDIZA M2 3.50 80.28 280.98 - - 0.00% 3.50 3.50 280.98
PUERTA DE TOL 1/20", MARCO Y ESTRUCTURA DE 25*50*1,5 CON M2 4.60 128.15 589.49 - - 0.00% 1.66 1.66 212.73
RECUBRIMIENTOS
CIELO RASO FALSO DE ESTRUCTURA DE ALUMINIO PREPINTADO AL M2 3.24 21.96 71.15 - - 0.00% 0.18 0.18 3.95
PINTURA DE CAUCHO LTEX VINILO ACRLICO INTERIOR M2 135.12 5.58 753.97 23.92 23.92 133.47 133.47 17.70% 111.20 111.20 620.50
CERMICA EN PAREDES M2 4.56 25.37 115.69 4.56 4.56 115.69 115.69 100.00% -
INSTALACIONES HIDROSANITARIAS
SISTEMA DE AGUA POTABLE
PUNTO DE AGUA PVC ROSCABLE 3/4" PTO 2.00 18.22 36.44 - - 0.00% 2.00 2.00 36.44
TUBERA PVC ROSCABLE 1/2" M 1.20 2.64 3.17 1.20 1.20 3.17 3.17 99.94% -
TUBERA PVC ROSCABLE 3/4" M 3.00 3.42 10.26 - - 0.00% 3.00 3.00 10.26
VLVULA DE CONTROL ROSCADA DIAM 1/2" U 1.00 8.88 8.88 1.00 1.00 8.88 8.88 100.00% -
SISTEMA DE AGUA RESIDUALES
CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO U 1.00 98.94 98.94 1.00 1.00 98.94 98.94 100.00% -
DESAGES PVC 50 MM. TIPO B(INCLUYE ACCESORIOS) PTO 1.00 8.21 8.21 1.00 1.00 8.21 8.21 100.00% -
DESAGES PVC 75 MM. TIPO B (INCLUYE ACCESORIOS) PTO 1.00 11.58 11.58 1.00 1.00 11.58 11.58 100.00% -
DESAGES PVC 110MM TIPO B (INCLUYE ACCESORIOS) PTO 1.00 9.55 9.55 1.00 1.00 9.55 9.55 100.00% -
SUMIDERO DE PISO DE 3" INCLUYE REJILLA U 1.00 18.22 18.22 1.00 1.00 18.22 18.22 100.00% -
TUBERA DE 110 MM PVC TIPO B M 2.00 11.51 23.02 2.00 2.00 23.02 23.02 100.00% -
AGUAS LLUVIAS
BAJANTES DE TUBERA PVC TIPO B DE 110 MM M 4.00 9.52 38.08 - - 0.00% -
CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO U 1.00 98.94 98.94 1.00 1.00 98.94 98.94 100.00% -
SUMIDERO DE CUBIERTA DE 75MM INCLUYE REJILLA CUPULA U 1.00 20.88 20.88 1.00 1.00 20.88 20.88 100.00% -
TUBERA DE 75 DE PVC TIPO B M 8.00 6.93 55.44 - - 0.00% -
DESAGES PVC 75 MM. TIPO B (INCLUYE ACCESORIOS) PTO 1.00 11.58 11.58 1.00 1.00 11.58 11.58 100.00% -
APARATOS SANITARIOS
INODORO TANQUE BAJO UNA PIEZA INCLUYE ACCESORIOS U 1.00 106.95 106.95 1.00 1.00 106.95 106.95 100.00% -
LAVAMANOS PARA EMPOTRAR BLANCO (508MMX445 MM) CON GRIF U 1.00 147.69 147.69 - - 0.00% 1.00 1.00 147.69
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE ZANJAS M3 4.23 6.52 27.58 - - 0.00% 4.23 4.23 27.58
INSTALACIONES ELECTRICAS
PUNTO DE ILUMINACIN 120V PTO 11.00 33.84 372.24 11.00 11.00 372.24 372.24 100.00% -
INTERRUPTOR SIMPLE U 2.00 4.15 8.30 - - 0.00% -
HOJA 55 DE 546
LIMPIEZA Y DESBROCE DEL TERRENO (MANUAL) M2 118.65 0.87 103.23 118.65 118.65 103.23 103.23 100.00% -
REPLANTEO Y NIVELACIN M2 118.65 0.99 117.46 118.65 118.65 117.46 117.46 100.00% -
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE CIMIENTOS Y PLINTOS M3 26.49 7.64 202.38 26.49 26.49 202.38 202.38 100.00% -
SUB-BASE CLASE 3 M3 4.70 16.01 75.25 4.70 4.70 75.25 75.25 100.00% -
EXCAVACIN A MQUINA M3 31.79 2.29 72.80 31.79 31.79 72.80 72.80 100.00% -
RELLENO COMPACTADO A MQUINA CON MATERIAL IMPORTADO M3 15.52 11.08 171.96 15.52 15.52 171.96 171.96 100.00% -
TRANSPORTE DE MATERIAL DE EXCAVACIN. TRANSPORTE LIBRE 1 M3-KM 317.88 0.25 79.47 317.88 317.88 79.47 79.47 100.00% -
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 404.54 0.25 101.14 404.54 404.54 101.14 101.14 100.00% -
ESTRUCTURA DE HORMIGN ARMADO
ACERO DE REFUERZO EN VARILLAS CORRUGADAS FY=4200 KG/CM2 KG 1,959.00 2.05 4,015.95 1,959.00 1,959.00 4,015.95 4,015.95 100.00% -
HORMIGN CICLPEO F'C=210 KG/CM (INCLUYE ENCOFRADO)H.S M3 5.28 121.30 640.46 4.79 4.79 581.02 581.02 90.72% 0.49 0.49 59.44
HORMIGN F'C= 210 KG/CM2 EN PLINTOS M3 3.53 226.59 799.86 3.53 3.53 799.86 799.86 100.00% -
HORMIGN F'C= 210 KG/CM2 EN CADENAS M3 2.97 184.96 549.33 2.69 2.69 497.54 497.54 90.57% 0.28 0.28 51.79
HORMIGN F'C= 210 KG/CM2 EN COLUMNAS M3 3.83 229.35 878.41 3.53 3.53 809.60 809.60 92.17% 0.30 0.30 68.81
HORMIGN F'C= 210 KG/CM2 EN LOSA M3 3.87 208.33 806.24 3.87 3.87 806.24 806.24 100.00% -
IMPERMEABILIZACIN DE TERRAZA CON LMINA ASFLTICA M2 10.00 16.13 161.30 10.00 10.00 161.30 161.30 100.00% -
HORMIGN F'C= 140 KG/CM2 EN REPLANTILLOS M3 1.18 108.46 127.98 1.18 1.18 127.98 127.98 100.00% -
HORMIGN F'C= 210 KG/CM2 EN VIGAS M3 2.68 233.94 626.96 2.68 2.68 626.96 626.96 100.00% -
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 1,075.29 0.25 268.82 1,075.29 1,075.29 268.82 268.82 100.00% -
MALLA ELECTROSOLDADA R-126 (4.10) M2 65.81 5.65 371.83 45.58 45.58 257.53 257.53 69.26% 20.23 20.23 114.30
MALLA ELECTROSOLDADA R-131 (5.15) M2 65.81 4.53 298.12 - - 0.00% 65.81 65.81 298.12
ALIVIANAMIENTO DE BLOQUE CEMENTO DE 40CMX20CMX20CM U 408.00 0.58 236.64 274.00 274.00 158.92 158.92 67.16% 134.00 134.00 77.72
GEOTEXTIL NT 2000 M2 10.66 3.95 42.11 10.66 10.66 42.11 42.11 100.00% -
GEOMALLA BIAXIAL BX1100 M2 10.66 5.40 57.56 10.66 10.66 57.56 57.56 100.00% -
CONTRAPISO HORMIGN ARMADO FC`210KG/CM2 (E=10CM, PIEDR M2 77.89 30.25 2,356.17 77.89 77.89 2,356.17 2,356.17 100.00% -
MAMPOSTERIA
MAMPOSTERA DE BLOQUE DE 15CM M2 175.62 17.65 3,099.69 98.71 98.71 1,742.23 1,742.23 56.21% 76.91 76.91 1,357.46
HORMIGN FC=210KG/CM2 EN DINTELES Y RIOSTRAS M 20.67 15.28 315.84 20.67 20.67 315.84 315.84 100.00% -
ENLUCIDOS
ENLUCIDO VERTICAL INTERIOR. M2 351.24 6.70 2,353.31 133.75 133.75 896.13 896.13 38.08% 217.49 217.49 1,457.18
EMPASTE INTERIOR DE PAREDES M2 351.24 4.18 1,468.18 133.75 133.75 559.08 559.08 38.08% 217.49 217.49 909.11
ENLUCIDO PALETEADO FINO DE FILOS Y FAJAS M 54.40 3.37 183.33 54.40 54.40 183.33 183.33 100.00% -
PISOS
MASILLADO DE LOSA INCLUYE IMPERMEABILIZANTE M2 47.70 8.04 383.51 47.70 47.70 383.51 383.51 100.00% -
HOJA 57 DE 546
REPLANTEO Y NIVELACIN M2 50.05 0.99 49.55 50.05 50.05 49.55 49.55 100.00% -
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE CIMIENTOS Y PLINTOS M3 58.50 7.64 446.94 58.50 58.50 446.94 446.94 100.00% -
SUB-BASE CLASE 3 M3 25.00 16.01 400.25 25.00 25.00 400.25 400.25 100.00% -
EXCAVACIN A MQUINA M3 70.20 2.29 160.76 70.20 70.20 160.76 160.76 100.00% -
TRANSPORTE DE MATERIAL DE EXCAVACIN. TRANSPORTE LIBRE 1 M3-KM 1,287.00 0.25 321.75 1,287.00 1,287.00 321.75 321.75 100.00% -
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 500.00 0.25 125.00 500.00 500.00 125.00 125.00 100.00% -
ESTRUCTURA DE HORMIGN ARMADO
ACERO DE REFUERZO EN VARILLAS CORRUGADAS FY=4200 KG/CM2 KG 2,912.26 2.05 5,970.13 2,912.26 2,912.26 5,970.13 5,970.13 100.00% -
HORMIGN FC=210KG/CM2 EN CISTERNA M3 22.99 225.67 5,188.15 22.99 22.99 5,188.15 5,188.15 100.00% -
HORMIGN F'C= 210 KG/CM2 EN COLUMNAS M3 4.54 229.35 1,041.25 2.43 2.43 557.32 557.32 53.52% 2.11 2.11 483.93
HORMIGN F'C= 210 KG/CM2 EN LOSA M3 1.45 208.33 302.08 1.45 1.45 302.08 302.08 100.00% -
IMPERMEABILIZACIN DE TERRAZA CON LMINA ASFLTICA M2 10.00 16.13 161.30 10.00 10.00 161.30 161.30 100.00% -
HORMIGN F'C= 140 KG/CM2 EN REPLANTILLOS M3 2.93 108.46 317.79 2.93 2.93 317.79 317.79 100.00% -
HORMIGN F'C= 210 KG/CM2 EN VIGAS M3 1.56 233.94 364.95 1.18 1.18 276.05 276.05 75.64% 0.38 0.38 88.90
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 1,304.10 0.25 326.03 1,304.10 1,304.10 326.03 326.03 100.00% -
MALLA ELECTROSOLDADA R-126 (4.10) M2 15.21 5.65 85.94 15.21 15.21 85.94 85.94 100.00% -
ALIVIANAMIENTO DE BLOQUE CEMENTO DE 40CMX20CMX20CM U 98.00 0.58 56.84 90.00 90.00 52.20 52.20 91.84% 8.00 8.00 4.64
GEOTEXTIL NT 2000 M2 50.05 3.95 197.70 50.05 50.05 197.70 197.70 100.00% -
GEOMALLA BIAXIAL BX1100 M2 50.05 5.40 270.27 50.05 50.05 270.27 270.27 100.00% -
MAMPOSTERIA
MAMPOSTERA DE BLOQUE DE 15CM M2 66.40 17.65 1,171.96 43.43 43.43 766.54 766.54 65.41% 22.97 22.97 405.42
HORMIGN FC=210KG/CM2 EN DINTELES Y RIOSTRAS M 8.14 15.28 124.38 8.14 8.14 124.38 124.38 100.00% -
ENLUCIDOS
ENLUCIDO VERTICAL INTERIOR. M2 122.80 6.70 822.76 43.62 43.62 292.25 292.25 35.52% 79.18 79.18 530.51
EMPASTE INTERIOR DE PAREDES M2 122.80 4.18 513.30 43.62 43.62 182.33 182.33 35.52% 79.18 79.18 330.97
ENLUCIDO PALETEADO FINO DE FILOS Y FAJAS M 29.30 3.37 98.74 29.30 29.30 98.74 98.74 100.00% -
PISOS
MASILLADO DE LOSA INCLUYE IMPERMEABILIZANTE M2 16.20 8.04 130.25 12.96 12.96 104.20 104.20 80.00% 3.24 3.24 26.05
CARPINTERIA METALICA
VENTANA CON MALLA DE CERRAMIENTO 50/10 M2 3.24 39.99 129.57 - - 0.00% 1.62 1.62 64.78
PUERTA METLICA DE TOL, TUBO RECT. DE 50X25X2MM, Y VIDRIO M2 3.84 126.24 484.76 - - 0.00% 0.24 0.24 30.30
RECUBRIMIENTOS
PINTURA DE CAUCHO LTEX VINILO ACRLICO INTERIOR M2 66.40 5.58 370.51 39.54 39.54 220.63 220.63 59.55% 26.86 26.86 149.88
PINTURA ELASTOMRICA EXTERIORES M2 66.40 5.71 379.14 65.77 65.77 375.55 375.55 99.05% 0.63 0.63 3.60
HOJA 59 DE 546
INSTALACIONES HIDROSANITARIAS
AGUAS LLUVIAS
BAJANTES DE TUBERA PVC TIPO B DE 110 MM M 4.00 9.52 38.08 4.00 4.00 38.08 38.08 100.00% -
CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO U 1.00 98.94 98.94 1.00 1.00 98.94 98.94 100.00% -
SUMIDERO DE CUBIERTA DE 75MM INCLUYE REJILLA CUPULA U 1.00 20.88 20.88 - - 0.00% 1.00 1.00 20.88
TUBERA DE 75 DE PVC TIPO B M 6.00 6.93 41.58 - - 0.00% 6.00 6.00 41.58
DESAGES PVC 75 MM. TIPO B (INCLUYE ACCESORIOS) PTO 1.00 11.58 11.58 - - 0.00% 1.00 1.00 11.58
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE ZANJAS M3 2.41 6.52 15.71 - - 0.00% 2.41 2.41 15.71
INSTALACIONES ELECTRICAS
PUNTO DE ILUMINACIN 120V PTO 1.00 33.84 33.84 1.00 1.00 33.84 33.84 100.00% -
INTERRUPTOR SIMPLE U 1.00 4.15 4.15 - - 0.00% -
LUMINARIA FLUORESCENTE 2X32W SELLADA IP-65 SOBREPUESTA U 1.00 64.50 64.50 1.00 1.00 64.50 64.50 100.00% -
PUNTO TOMACORRIENTE NORMAL DOBLE 127V PARED O TECHO PTO 4.00 40.49 161.96 2.00 2.00 80.98 80.98 50.00% 2.00 2.00 80.98
PUNTO TOMACORRIENTE ESPECIAL 127V PTO 1.00 100.69 100.69 1.00 1.00 100.69 100.69 100.00% -
PUNTO TOMACORRIENTE ESPECIAL 220V TRFASICO PTO 2.00 125.32 250.64 2.00 2.00 250.64 250.64 100.00% -
CENTRO DE CARGA TRIFASICO 20 ESPACIOS U 1.00 171.53 171.53 1.00 1.00 171.53 171.53 100.00% -
BREAKER ENCHUFABLE 1P - 16 A U 1.00 6.28 6.28 - - 0.00% -
BREAKER ENCHUFABLE 1P - 20 A U 4.00 6.28 25.12 - - 0.00% -
BREAKER ENCHUFABLE 3P - 50 A U 2.00 33.23 66.46 - - 0.00% -
BREAKER ENCHUFABLE 3P - 50 A U 2.00 33.23 66.46 - - 0.00% -
INTERRUPTOR TERMOMAGNETICO 3P-75-80-100A CAJA MOLDEADA U 1.00 66.95 66.95 - - 0.00% 1.00 1.00 66.95
INTERRUPTOR TERMOMAGNETICO 3P-75-80-100A CAJA MOLDEADA U 1.00 66.95 66.95 - - 0.00% 1.00 1.00 66.95
CAJA DE PASO 10X10 U 5.00 11.76 58.80 5.00 5.00 58.80 58.80 100.00% -
ALIMENTADOR 1X#12(F)+1X#12(N) AWG THHN M 100.00 1.72 172.00 - - 0.00% 100.00 100.00 172.00
ALIMENTADOR 1X#12(F)+1X#12(N)+1X#14(T) AWG THHN M 100.00 2.28 228.00 - - 0.00% 100.00 100.00 228.00
ALIMENTADOR 1X#8(F)+1X#8(N)+1X#10(T) AWG THHN M 100.00 4.72 472.00 - - 0.00% -
ALIMENTADOR 3X#8(F)+1X#8(N)+1X#10(T) AWG THHN M 100.00 7.50 750.00 100.00 100.00 750.00 750.00 100.00% -
CABLE CONCENTRICO 2X14 AWG M 100.00 1.63 163.00 - - 0.00% -
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 3/4" M 50.00 4.11 205.50 - - 0.00% 50.00 50.00 205.50
SUMNISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 2" M 50.00 11.99 599.50 - - 0.00% 50.00 50.00 599.50
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 3" M 50.00 38.41 1,920.50 - - 0.00% 50.00 50.00 1,920.50
CONDUCTOR THHN FLEX #14 AWG M 100.00 0.74 74.00 - - 0.00% 100.00 100.00 74.00
CONDUCTOR THHN FLEX #12 AWG M 100.00 1.09 109.00 - - 0.00% 100.00 100.00 109.00
CONDUCTOR THHN FLEX #10 AWG M 100.00 1.36 136.00 - - 0.00% 100.00 100.00 136.00
CABLE FLEXIBLE 8 AWG M 100.00 1.98 198.00 - - 0.00% 100.00 100.00 198.00
CABLE FLEXIBLE 6 AWG M 100.00 2.80 280.00 - - 0.00% 100.00 100.00 280.00
CABLE FLEXIBLE 4 AWG M 100.00 3.74 374.00 - - 0.00% 100.00 100.00 374.00
CABLE FLEXIBLE 2 AWG M 100.00 5.50 550.00 - - 0.00% 100.00 100.00 550.00
INSTALACIONES ELECTRONICAS
SISTEMA DE CABLEADO ESTRUCTURADO DATOS Y VOZ
SISTEMA DE DETECCIN TEMPRANA DE INCENDIOS
DETECTOR DE HUMO FOTOELCTRICO U 1.00 73.70 73.70 - - 0.00% -
AVISO DE SALIDA CON ILUMINACIN LED U 1.00 35.69 35.69 - - 0.00% 1.00 1.00 35.69
LUZ DE EMERGENCIA AUTNOMA U 1.00 30.74 30.74 - - 0.00% 1.00 1.00 30.74
CABLEADO ANTIFLAMA 2 X 16 AWG M 16.00 1.13 18.08 - - 0.00% -
TUBERA EMT DE 3/4" Y ACCESORIOS M 8.00 5.37 42.96 - - 0.00% 8.00 8.00 42.96
PUNTO DE RED DE INCENDIOS PTO 1.00 33.19 33.19 - - 0.00% 1.00 1.00 33.19
BLOQUE BIBLIOTECA
HOJA 60 DE 546
PRELIMINARES
LIMPIEZA Y DESBROCE DEL TERRENO (MANUAL) M2 609.60 0.87 530.35 609.60 609.60 530.35 530.35 100.00% -
REPLANTEO Y NIVELACIN M2 609.60 0.99 603.50 609.60 609.60 603.50 603.50 100.00% -
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE CIMIENTOS Y PLINTOS M3 201.82 7.64 1,541.90 182.29 182.29 1,392.69 1,392.69 90.32% 19.53 19.53 149.21
SUB-BASE CLASE 3 M3 39.06 16.01 625.35 39.06 39.06 625.35 625.35 100.00% -
EXCAVACIN A MQUINA M3 242.18 2.29 554.59 242.18 242.18 554.59 554.59 100.00% -
RELLENO COMPACTADO A MQUINA CON MATERIAL IMPORTADO M3 128.90 11.08 1,428.21 128.90 128.90 1,428.21 1,428.21 100.00% -
TRANSPORTE DE MATERIAL DE EXCAVACIN. TRANSPORTE LIBRE 1 M3-KM 2,421.79 0.25 605.45 2,421.79 2,421.79 605.45 605.45 100.00% -
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 3,359.16 0.25 839.79 3,359.16 3,359.16 839.79 839.79 100.00% -
ESTRUCTURA DE HORMIGN ARMADO
ACERO DE REFUERZO EN VARILLAS CORRUGADAS FY=4200 KG/CM2 KG 13,715.34 2.05 28,116.45 13,715.34 13,715.34 28,116.45 28,116.45 100.00% -
HORMIGN CICLPEO F'C=210 KG/CM (INCLUYE ENCOFRADO)H.S M3 11.58 121.30 1,404.65 11.58 11.58 1,404.65 1,404.65 100.00% -
HORMIGN F'C= 210 KG/CM2 EN VIGAS DE CIMENTACIN M3 38.08 242.51 9,234.78 38.08 38.08 9,234.78 9,234.78 100.00% -
HORMIGN F'C= 210 KG/CM2 EN CADENAS M3 6.52 184.96 1,205.94 6.52 6.52 1,205.94 1,205.94 100.00% -
HORMIGN F'C= 210 KG/CM2 EN COLUMNAS M3 14.18 229.35 3,252.18 13.06 13.06 2,995.31 2,995.31 92.10% 1.12 1.12 256.87
HORMIGN F'C= 210 KG/CM2 EN LOSA M3 45.02 208.33 9,379.02 45.02 45.02 9,379.02 9,379.02 100.00% -
IMPERMEABILIZACIN DE TERRAZA CON LMINA ASFLTICA M2 370.00 16.13 5,968.10 370.00 370.00 5,968.10 5,968.10 100.00% -
HORMIGN F'C= 140 KG/CM2 EN REPLANTILLOS M3 9.77 108.46 1,059.65 9.77 9.77 1,059.65 1,059.65 100.00% -
HORMIGN F'C= 210 KG/CM2 EN VIGAS M3 25.74 233.94 6,021.62 24.70 24.70 5,778.32 5,778.32 95.96% 1.04 1.04 243.30
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 16,832.36 0.25 4,208.09 16,832.36 16,832.36 4,208.09 4,208.09 100.00% -
MALLA ELECTROSOLDADA R-126 (4.10) M2 401.96 5.65 2,271.07 377.40 377.40 2,132.31 2,132.31 93.89% 24.56 24.56 138.76
ALIVIANAMIENTO DE BLOQUE CEMENTO DE 40CMX20CMX20CM U 2,388.00 0.58 1,385.04 2,388.00 2,388.00 1,385.04 1,385.04 100.00% -
GEOTEXTIL NT 2000 M2 43.47 3.95 171.71 43.47 43.47 171.71 171.71 100.00% -
GEOMALLA BIAXIAL BX1100 M2 43.47 5.40 234.74 43.47 43.47 234.74 234.74 100.00% -
CONTRAPISO HORMIGN ARMADO FC`210KG/CM2 (E=10CM, PIEDR M2 401.96 30.25 12,159.29 375.00 375.00 11,343.75 11,343.75 93.29% 26.96 26.96 815.54
OTROS
MESN DE HORMIGN ARMADO FC=210KG/CM2, A=0,60 M 2.80 49.77 139.36 2.80 2.80 139.36 139.36 100.00% -
MAMPOSTERIA
MAMPOSTERA DE BLOQUE DE 15CM M2 337.38 17.65 5,954.76 296.19 296.19 5,227.76 5,227.76 87.79% 41.19 41.19 727.00
MAMPOSTERA DE BLOQUE DE 10CM M2 168.64 15.15 2,554.90 38.10 38.10 577.22 577.22 22.59% 130.54 130.54 1,977.68
HORMIGN F'C= 210 KG/CM2 EN CADENAS M3 4.62 184.96 854.52 4.62 4.62 854.52 854.52 100.00% -
HORMIGN FC=210KG/CM2 EN DINTELES Y RIOSTRAS M 36.94 15.28 564.44 36.94 36.94 564.44 564.44 100.00% -
ENLUCIDOS
ENLUCIDO VERTICAL INTERIOR. M2 789.29 6.70 5,288.24 458.91 458.91 3,074.69 3,074.69 58.14% 330.38 330.38 2,213.55
HOJA 61 DE 546
ENLUCIDO VERTICAL EXTERIOR M2 1,100.30 9.85 10,837.96 1,100.30 1,100.30 10,837.96 10,837.96 100.00% -
EMPASTE INTERIOR DE PAREDES M2 789.29 4.18 3,299.23 458.91 458.91 1,918.24 1,918.24 58.14% 330.38 330.38 1,380.99
ENLUCIDO PALETEADO FINO DE FILOS Y FAJAS M 506.94 3.37 1,708.39 506.94 506.94 1,708.39 1,708.39 100.00% -
PISOS
CERMICA DE PISO ALTO TRFICO ANTIDESLIZANTE M2 364.53 28.80 10,498.46 364.53 364.53 10,498.46 10,498.46 100.00% -
MASILLADO DE LOSA INCLUYE IMPERMEABILIZANTE M2 365.93 8.04 2,942.08 365.11 365.11 2,935.49 2,935.49 99.78% 0.82 0.82 6.59
BARREDERAS DE CERMICA H=10CM M 157.01 5.43 852.56 126.17 126.17 685.10 685.10 80.36% 30.84 30.84 167.46
CARPINTERIA METALICA
VENTANA DE ALUMINIO Y VIDRIO 6MM CORREDIZA M2 94.45 80.28 7,582.45 - - 0.00% 94.45 94.45 7,582.45
MALLA ANTIMOSQUITO M2 33.21 11.98 397.86 - - 0.00% 10.53 10.53 126.15
PUERTA METLICA DE TOL, TUBO RECT. DE 50X25X2MM, Y VIDRIO M2 8.40 126.24 1,060.42 - - 0.00% -
PUERTA DE TOL 1/20", MARCO Y ESTRUCTURA DE 25*50*1,5 CON M2 13.98 128.15 1,791.54 - - 0.00% 2.22 2.22 284.49
PASAMANO DE ACERO INOXIDABLE PARA BAO DE DISCAPACITADO M 2.48 59.87 148.48 - - 0.00% -
PANEL DE ACERO INOXIDABLE M2 7.87 99.22 780.86 - - 0.00% -
CUBIERTA DE POLICARBONATO ALVEOLAR 8MM (INCLUYE ESTRUCT M2 64.23 100.17 6,433.92 0.00% 53.36 53.36 5,345.50
RECUBRIMIENTOS
CIELO RASO FALSO DE ESTRUCTURA DE ALUMINIO PREPINTADO AL M2 241.66 21.96 5,306.85 241.66 241.66 5,306.86 5,306.86 100.00% -
PINTURA DE CAUCHO LTEX VINILO ACRLICO INTERIOR M2 789.29 5.58 4,404.24 418.32 418.32 2,334.23 2,334.23 53.00% 370.97 370.97 2,070.01
PINTURA ELASTOMRICA EXTERIORES M2 1,100.30 5.71 6,282.71 405.31 405.31 2,314.32 2,314.32 36.84% 694.99 694.99 3,968.39
CERMICA EN PAREDES M2 38.76 25.37 983.34 38.76 38.76 983.34 983.34 100.00% -
INSTALACIONES HIDROSANITARIAS (BIBLIOTECA TIPO B)
SISTEMA DE AGUA POTABLE
PUNTO DE AGUA PVC ROSCABLE1/2" PTO 5.00 19.92 99.60 5.00 5.00 99.60 99.60 100.00% -
PUNTO DE AGUA PVC ROSCABLE3/4" PTO 2.00 18.22 36.44 2.00 2.00 36.44 36.44 100.00% -
PUNTO DE AGUA PVC ROSCABLE1" PTO 4.00 38.70 154.80 4.00 4.00 154.80 154.80 100.00% -
TUBERA PVC ROSCABLE 1/2" M 5.60 2.64 14.78 3.65 3.65 9.64 9.64 65.20% 1.95 1.95 5.15
TUBERA PVC ROSCABLE 3/4" M 1.00 3.42 3.42 - - 0.00% 1.00 1.00 3.42
TUBERA PVC ROSCABLE 1" M 1.00 8.07 8.07 - - 0.00% 1.00 1.00 8.07
TUBERA PVC ROSCABLE 1 1/4" M 6.80 11.68 79.42 1.10 1.10 12.85 12.85 16.18% 5.70 5.70 66.58
TUBERA PVC ROSCABLE 1 1/2" M 13.10 10.51 137.68 10.14 10.14 106.57 106.57 77.41% 2.96 2.96 31.11
TUBERA PVC ROSCABLE 2" M 2.00 14.12 28.24 2.00 2.00 28.24 28.24 100.00%
VLVULA DE CONTROL ROSCADA DIAM 1/2" U 5.00 8.88 44.40 1.00 1.00 8.88 8.88 20.00% 4.00 4.00 35.52
VLVULA DE CONTROL ROSCADA DIAM 3/4" U 1.00 16.89 16.89 - - 0.00% 1.00 1.00 16.89
VLVULA DECONTROL ROSCADA DIAM 1" U 1.00 22.52 22.52 - - 0.00% 1.00 1.00 22.52
VLVULA DECONTROL ROSCADA DIAM 1" U 1.00 28.70 28.70 - - 0.00% 1.00 1.00 28.70
VLVULA DE CONTROL ROSCADA DIAM 1 1/2" U 1.00 38.34 38.34 1.00 1.00 38.34 38.34 100.00% -
VLVULA DE CONTROL ROSCADA DIAM 2" U 1.00 44.55 44.55 - - 0.00% 1.00 1.00 44.55
SISTEMA DE AGUA RESIDUALES
CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO U 9.00 98.94 890.46 2.00 2.00 197.88 197.88 22.22% 7.00 7.00 692.58
DESAGES PVC 50 MM. TIPO B(INCLUYE ACCESORIOS) PTO 7.00 8.21 57.47 7.00 7.00 57.47 57.47 100.00% -
DESAGES PVC 75 MM. TIPO B (INCLUYE ACCESORIOS) PTO 3.00 11.58 34.74 3.00 3.00 34.74 34.74 100.00% -
DESAGES PVC 110MM TIPO B (INCLUYE ACCESORIOS) PTO 4.00 9.55 38.20 4.00 4.00 38.20 38.20 100.00% -
SUMIDERO DE PISO DE 3" INCLUYE REJILLA U 3.00 18.22 54.66 3.00 3.00 54.66 54.66 100.00% -
TUBERA DE 110 MM PVC TIPO B M 3.00 11.51 34.53 3.00 3.00 34.53 34.53 100.00% -
AGUAS LLUVIAS
BAJANTES DE TUBERA PVC TIPO B DE 110 MM M 12.00 9.52 114.24 12.00 12.00 114.24 114.24 100.00% -
CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO U 3.00 98.94 296.82 3.00 3.00 296.82 296.82 100.00% -
SUMIDERO DE CUBIERTA DE 110MM INCLUYE REJILLA CUPULA U 8.00 24.93 199.44 8.00 8.00 199.44 199.44 100.00% -
TUBERA DE 110 MM PVC TIPO B M 27.00 11.51 310.77 27.00 27.00 310.77 310.77 100.00% -
HOJA 62 DE 546
DESAGES PVC 110MM TIPO B (INCLUYE ACCESORIOS) PTO 8.00 9.55 76.40 8.00 8.00 76.40 76.40 100.00% -
APARATOS SANITARIOS
INODORO BLANCO CON FLUXMETRO U 4.00 246.56 986.24 4.00 4.00 986.24 986.24 100.00% -
LAVAMANOS PARA EMPOTRAR BLANCO (508MMX445 MM) CON GRIF U 5.00 147.69 738.45 4.00 4.00 590.76 590.76 80.00% 1.00 1.00 147.69
URINARIO CON LLAVE PRESSMATIC U 2.00 151.99 303.98 2.00 2.00 303.98 303.98 100.00% -
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE ZANJAS M3 17.36 6.52 113.19 - - 0.00% 17.36 17.36 113.19
INSTALACIONES ELECTRICAS (BIBLIOTECA OPCION 1)
PUNTO DE ILUMINACIN 120V PTO 56.00 33.84 1,895.04 54.00 54.00 1,827.36 1,827.36 96.43% 2.00 2.00 67.68
INTERRUPTOR SIMPLE U 2.00 4.15 8.30 - - 0.00% -
INTERRUPTOR DOBLE U 2.00 4.79 9.58 - - 0.00% -
CONMUTADOR SIMPLE U 2.00 5.31 10.62 - - 0.00% -
CONMUTADOR DOBLE U 3.00 11.94 35.82 - - 0.00% 3.00 3.00 35.82
SENSOR DE MOVIMIENTO 180 U 4.00 37.22 148.88 - - 0.00% -
SENSOR DE MOVIMIENTO 360 U 2.00 37.72 75.44 - - 0.00% -
LUMINARIA FLUORESCENTE 3X32W EMPOTRABLE U 24.00 69.22 1,661.28 24.00 24.00 1,661.28 1,661.28 100.00% -
OJO DE BUEY CON FLUORESCENTE COMPACTA 1X26W U 13.00 27.07 351.91 13.00 13.00 351.91 351.91 100.00% -
LUMINARIA APLIQUE DE PARED INTERIOR /EXTERIOR 1X26W U 19.00 33.87 643.53 16.00 16.00 541.92 541.92 84.21% 3.00 3.00 101.61
PUNTO TOMACORRIENTE NORMAL DOBLE 127V PARED O TECHO PTO 24.00 40.49 971.76 21.00 21.00 850.29 850.29 87.50% 3.00 3.00 121.47
PUNTO TOMACORRIENTE ESPECIAL 127V PTO 4.00 100.69 402.76 4.00 4.00 402.76 402.76 100.00% -
PUNTO TOMACORRIENTE ESPECIAL 220V BIFSICO PTO 5.00 92.94 464.70 3.00 3.00 278.82 278.82 60.00% 2.00 2.00 185.88
PUNTO SECADOR DE MANOS PTO 5.00 63.39 316.95 3.00 3.00 190.17 190.17 60.00% 2.00 2.00 126.78
PUNTO EXTRACTOR DE BAO PTO 3.00 22.07 66.21 - - 0.00% -
PUNTO TOMACORRIENTE REGULADO DOBLE 127V PARED O TECHO PTO 8.00 42.78 342.24 - - 0.00% 8.00 8.00 342.24
PUNTO PARA TOMACORRIENTE REGULADO DOBLE 127V PISO PTO 16.00 63.39 1,014.24 - - 0.00% 16.00 16.00 1,014.24
PUNTO DE TOMACORRIENTE ESPECIAL REGULADO 127V PTO 3.00 40.44 121.32 - - 0.00% 3.00 3.00 121.32
CENTRO DE CARGA TRIFASICO 12 ESPACIOS U 1.00 116.41 116.41 - - 0.00% 1.00 1.00 116.41
CENTRO DE CARGA TRIFASICO 20 ESPACIOS U 2.00 171.53 343.06 1.00 1.00 171.53 171.53 50.00% 1.00 1.00 171.53
BREAKER ENCHUFABLE 1P - 16 A U 8.00 6.28 50.24 - - 0.00% -
BREAKER ENCHUFABLE 1P - 20 A U 19.00 6.28 119.32 - - 0.00% -
BREAKER ENCHUFABLE 2P - 20 A U 9.00 16.08 144.72 - - 0.00% 9.00 9.00 144.72
INTERRUPTOR TERMOMAGNETICO 3P-15-20-30-40-50-60A CAJA M U 1.00 61.37 61.37 - - 0.00% 1.00 1.00 61.37
CAJA DE PASO 10X10 U 20.00 11.76 235.20 14.00 14.00 164.64 164.64 70.00% 6.00 6.00 70.56
CONECTOR Y CLAVIJA PARA AIRES ACONDICIONADOS INTERIORES U 2.00 42.15 84.30 - - 0.00% -
CAJA IP65 PARA AIRES ACONDICIONADOS EXTERIORES 20X20X15 ( U 5.00 30.21 151.05 - - 0.00% -
HOJA 63 DE 546
ALIMENTADOR 1X#12(F)+1X#12(N) AWG THHN M 100.00 1.72 172.00 - - 0.00% 100.00 100.00 172.00
ALIMENTADOR 1X#12(F)+1X#12(N)+1X#14(T) AWG THHN M 100.00 2.28 228.00 - - 0.00% 100.00 100.00 228.00
FUNDA BX 1" M 50.00 5.81 290.50 - - 0.00% 50.00 50.00 290.50
CABLE CONCENTRICO 2X14 AWG M 500.00 1.63 815.00 - - 0.00% 500.00 500.00 815.00
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 1 1/ M 50.00 9.32 466.00 - - 0.00% 50.00 50.00 466.00
SUMNISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 2" M 50.00 11.99 599.50 - - 0.00% 50.00 50.00 599.50
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 3" M 50.00 38.41 1,920.50 - - 0.00% 50.00 50.00 1,920.50
CONDUCTOR THHN FLEX #14 AWG M 100.00 0.74 74.00 - - 0.00% 100.00 100.00 74.00
CONDUCTOR THHN FLEX #12 AWG M 100.00 1.09 109.00 - - 0.00% 100.00 100.00 109.00
CONDUCTOR THHN FLEX #10 AWG M 100.00 1.36 136.00 - - 0.00% 100.00 100.00 136.00
CABLE FLEXIBLE 6 AWG M 100.00 2.80 280.00 - - 0.00% 100.00 100.00 280.00
CABLE FLEXIBLE 4 AWG M 100.00 3.74 374.00 - - 0.00% 100.00 100.00 374.00
CABLE FLEXIBLE 2 AWG M 100.00 5.50 550.00 - - 0.00% 100.00 100.00 550.00
INSTALACIONES MECNICAS
SUMINISTRO E INSTALACION UNIDAD TIPO CASSETTE 36000 BTU/H U 3.00 2,591.88 7,775.64 - - 0.00% -
VENTILADOR DE EXTRACCION TIPO HONGO 800 CFM @ 0,5" WG, 0, U 1.00 957.84 957.84 - - 0.00% -
VENTILADOR DE EXTRACCIN DE TIPO PLAFON DE 100 CFM, @ 0.25 U 2.00 182.22 364.44 - - 0.00% 1.00 1.00 182.22
VENTILADOR HELICOIDAL DE TECHO DE 36" U 2.00 88.66 177.32 - - 0.00% 2.00 2.00 177.32
CONTROL DE VENTILADOR DE TECHO DE 3 VELOCIDADES. U 1.00 18.55 18.55 - - 0.00% -
TERMOSTATO DIGITAL PROGRAMABLE DE UNA ETAPA U 2.00 61.50 123.00 - - 0.00% -
LOUVER DE SALIDA DE 6"X6" U 1.00 42.23 42.23 - - 0.00% -
TUBERIA DE DRENAJE DE 4" CON ACSESORIOS U 3.00 6.11 18.33 - - 0.00% -
REJILLA DE EXTRACCIN DE 6"X6 INCLUYE CAJA DE ACOPLES U 8.00 30.12 240.96 - - 0.00% -
DUCTO DE TOL GALVANIZADO SIN AISLAMIENTO KG 39.73 6.61 262.62 - - 0.00% -
MANGA FLEXIBLE DIAM. 4" CON AISLAMIENTO M 6.00 5.13 30.78 - - 0.00% -
TUBERA DE COBRE ACR 5/8, INCLUYE AISLAMIENTO M 7.00 17.32 121.24 - - 0.00% -
TUBERA DE COBRE ACR 3/8, INCLUYE AISLAMIENTO M 7.00 11.52 80.64 - - 0.00% -
CABLE DE CONTROL 4X#16, INCLUYE TUBERA EMT 3/4" U 17.00 5.07 86.19 - - 0.00% -
CABLE DE CONTROL 4X#12, INCLUYE CANALIZACIN EMT 3/4" M 12.00 5.80 69.60 - - 0.00% -
CABLE DE CONTROL 2X#14, INCLUYE TUBERA EMT 3/4" M 8.54 4.81 41.08 - - 0.00% -
TUBERA DE DRENAJE 3/4" M 6.00 2.87 17.22 - - 0.00% -
TUBERIA DE DRENAJE DE 1" M 18.00 3.47 62.46 - - 0.00% -
GAS REFRIGERANTE R-410A LB 3.00 11.18 33.54 - - 0.00% -
INSTALACIONES ELECTRONICAS
SISTEMA DE CABLEADO ESTRUCTURADO DATOS Y VOZ
PUNTO SIMPLE VOZ Y/O DATOS CAT 6A CERTIFICADO PTO 24.00 109.14 2,619.36 - - 0.00% 3.00 3.00 327.42
ACCESS POINT 1 PUERTO GIGA U 1.00 374.63 374.63 - - 0.00% -
ADMINISTRADOR HORIZONTAL 1U U 4.00 21.88 87.52 - - 0.00% 4.00 4.00 87.52
PATCH CORD CAT 6A 7FT (3M) U 24.00 13.25 318.00 - - 0.00% -
PATCH CORD CAT 6A 3FT(1M) U 24.00 8.42 202.08 - - 0.00% -
PATCH PANEL 24 PUERTOS CAT 6A INCLUYE JACKS U 2.00 363.61 727.22 - - 0.00% -
BANDEJA TIPO ESCALERILLA GALVANIZADA 200X100MM INCLUYE TA M 38.00 26.53 1,008.14 38.00 38.00 1,008.14 1,008.14 100.00% -
SWITCH DE CAPA 2, 48 PUERTOS 10/100/1000 MBPS 4SFP U 1.00 1,881.18 1,881.18 - - 0.00% 1.00 1.00 1,881.18
PATCH CORD FIBRA PTICA 1M U 2.00 16.36 32.72 - - 0.00% -
TRANSEIVER DE FIBRA A ETHERNET 1GB U 2.00 346.59 693.18 - - 0.00% -
TELFONO IP SIMPLES PARA ESCRITORIO U 2.00 135.01 270.02 - - 0.00% -
RACK DE PARED 24 UR CERRADO U 1.00 504.08 504.08 - - 0.00% 1.00 1.00 504.08
ODF-12 PUERTOS FIBRA PTICA DISTRIBUCIN FRAME U 1.00 313.19 313.19 - - 0.00% -
CABLE FUTP CAT 6A BLINDADO M 650.00 2.30 1,495.00 - - 0.00% -
HOJA 64 DE 546
TUBERA EMT DE 3/4" Y ACCESORIOS M 360.00 5.37 1,933.20 - - 0.00% 360.00 360.00 1,933.20
SISTEMA DE SEGURIDAD (INTRUSIN)
CONTACTOS MAGNTICOS INSTALADOS U 4.00 5.65 22.60 - - 0.00% 4.00 4.00 22.60
TECLADO ALFANUMRICO U 1.00 52.27 52.27 - - 0.00% 1.00 1.00 52.27
CENTRAL DE SEGURIDAD DE 16 ZONAS INCLUYE TECLADO LCD U 1.00 548.68 548.68 - - 0.00% 1.00 1.00 548.68
SIRENA 15W BLINDADA U 1.00 51.18 51.18 - - 0.00% 1.00 1.00 51.18
DETECTOR DE MOVIMIENTO DOBLE TECNOLOGA U 6.00 22.77 136.62 - - 0.00% 6.00 6.00 136.62
CABLE UTP CAT 5E M 243.00 0.74 179.82 - - 0.00% 243.00 243.00 179.82
CABLEADO 2X14 AWG M 12.00 2.06 24.72 - - 0.00% 12.00 12.00 24.72
TUBERA EMT 1/2" Y ACCESORIOS M 20.00 3.19 63.80 - - 0.00% 20.00 20.00 63.80
TUBERA EMT DE 3/4" Y ACCESORIOS M 20.00 5.37 107.40 - - 0.00% 20.00 20.00 107.40
PUNTO DE RED DE SEGURIDAD PTO 13.00 34.99 454.87 - - 0.00% 13.00 13.00 454.87
SISTEMA DE CCTV
CMARA IP TIPO DOMO POE, 1.3 MP U 2.00 161.41 322.82 - - 0.00% -
SISTEMA DE DETECCIN TEMPRANA DE INCENDIOS
MDULO DE CONTROL U 1.00 69.35 69.35 - - 0.00% -
DETECTOR DE HUMO FOTOELCTRICO U 5.00 73.70 368.50 - - 0.00% 1.00 1.00 73.70
ESTACIN MANUAL DE INCENDIOS U 3.00 72.56 217.68 - - 0.00% 1.00 1.00 72.56
AVISO DE SALIDA CON ILUMINACIN LED U 4.00 35.69 142.76 - - 0.00% 4.00 4.00 142.76
LUZ ESTROBOSCPICA CON SIRENA U 3.00 76.34 229.02 - - 0.00% 1.00 1.00 76.34
MDULO DE AISLAMIENTO U 1.00 92.86 92.86 - - 0.00% -
MODULO DE MONITOREO U 2.00 79.94 159.88 - - 0.00% 2.00 2.00 159.88
LUZ DE EMERGENCIA AUTNOMA U 5.00 30.74 153.70 - - 0.00% 5.00 5.00 153.70
CABLEADO ANTIFLAMA 2 X 16 AWG M 120.00 1.13 135.60 - - 0.00% -
FUENTE DE ALIMENTACIN 24 V/8A U 1.00 433.97 433.97 - - 0.00% -
TUBERA EMT DE 3/4" Y ACCESORIOS M 45.00 5.37 241.65 - - 0.00% 45.00 45.00 241.65
PUNTO DE RED DE INCENDIOS PTO 15.00 33.19 497.85 - - 0.00% 15.00 15.00 497.85
SISTEMA DE SONORIZACIN
PARLANTE PARA TECHO 8W, 8" Y 100V U 6.00 70.56 423.36 - - 0.00% 6.00 6.00 423.36
CABLEADO 2X14 AWG M 65.00 2.06 133.90 - - 0.00% 65.00 65.00 133.90
TUBERA EMT 1/2" Y ACCESORIOS M 28.00 3.19 89.32 - - 0.00% 28.00 28.00 89.32
PUNTO DE SONIDO PTO 6.00 36.85 221.10 - - 0.00% 6.00 6.00 221.10
CANCHA DE USO MLTIPLE (1 CANCHA)
PRELIMINARES
LIMPIEZA Y DESBROCE DEL TERRENO (MANUAL) M2 609.57 0.87 530.33 609.57 609.57 530.33 530.33 100.00% -
HOJA 65 DE 546
REPLANTEO Y NIVELACIN M2 604.44 0.99 598.40 604.44 604.44 598.40 598.40 100.00% -
PISOS
CONTRAPISO HORMIGN ARMADO FC`210KG/CM2 (E=10CM, PIEDR M2 604.44 30.25 18,284.31 604.44 604.44 18,284.31 18,284.31 100.00% -
CARPINTERIA METALICA
ELEMENTO DEPORTIVO PARA VOLEIBOL, POSTE METLICO 4" E=2 U 2.00 491.16 982.32 - - 0.00% 1.00 1.00 491.16
TABLERO PARA BSQUET U 2.00 400.42 800.84 - - 0.00% -
ARCO DE CANCHA DE FTBOL U 2.00 247.56 495.12 2.00 2.00 495.12 495.12 100.00% -
RECUBRIMIENTOS
PINTURA PARA SEALIZACIN M 288.16 2.61 752.10 - - 0.00% -
PINTURA DE TRAFICO ZONAS Y SEALIZACIN M2 510.00 4.61 2,351.10 - - 0.00% -
OBRAS EXTERIORES
BORDILLO H.S. F'C=180 KG/CM2 (0.15X0.35) PREFABRICADO M 101.66 16.02 1,628.59 101.66 101.66 1,628.59 1,628.59 100.00% -
INSTALACIONES ELECTRICAS
REFLECTOR HQI CUADRADO 400W-220V U 8.00 218.08 1,744.64 - - 0.00% 8.00 8.00 1,744.64
MANGUERA DE POLIETILENO REFORZADO DE 1 1/4 M 50.00 1.72 86.00 - - 0.00% -
TABLERO DE CONTROL PARA ILUMINACION EXTERIOR U 1.00 449.40 449.40 - - 0.00% -
POZO DE REVISION DE 0.60X0.60X0.60 (M) U 4.00 98.06 392.24 - - 0.00% 4.00 4.00 392.24
PROVISION E INSTALACION DE POSTE DE 12 M 500KG U 4.00 324.52 1,298.08 - - 0.00% 4.00 4.00 1,298.08
ALIMENTADOR 2X#6 TTU PARA ILUMINACIN EXTERIOR M 500.00 5.58 2,790.00 - - 0.00% 500.00 500.00 2,790.00
SUMNISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 2" M 50.00 11.99 599.50 - - 0.00% 50.00 50.00 599.50
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 3" M 4.00 38.41 153.64 - - 0.00% -
CANCHA DE FULBITO
MOVIMIENTO DE TIERRAS
REPLANTEO Y NIVELACIN M2 1,026.00 0.99 1,015.74 1,026.00 1,026.00 1,015.74 1,015.74 100.00% -
CESPED SINTTICO
CSPED ARTIFICIAL M2 1,077.30 8.06 8,683.04 1,029.00 1,029.00 8,293.74 8,293.74 95.52% 48.30 48.30 389.30
CARPINTERA METAL/MECNICA
ARCO DE CANCHA DE FTBOL U 2.00 247.56 495.12 2.00 2.00 495.12 495.12 100.00% -
CERRAMIENTO DE MALLA GALVANIZADA M2 401.40 17.67 7,092.74 401.40 401.40 7,092.74 7,092.74 100.00% -
INSTALACIONES ELECTRICAS
REFLECTOR HQI CUADRADO 400W-220V U 4.00 218.08 872.32 - - 0.00% 4.00 4.00 872.32
MANGUERA DE POLIETILENO REFORZADO DE 1 1/4 M 40.00 1.72 68.80 - - 0.00% -
TABLERO DE CONTROL PARA ILUMINACION EXTERIOR U 1.00 449.40 449.40 - - 0.00% -
ALIMENTADOR 2X#8 TTU PARA ILUMINACIN EXTERIOR M 770.00 4.01 3,087.70 - - 0.00% 770.00 770.00 3,087.70
POZO DE REVISION DE 0.60X0.60X0.60 (M) U 4.00 98.06 392.24 - - 0.00% 4.00 4.00 392.24
PROVISION E INSTALACION DE POSTE DE 12 M 500KG U 4.00 324.52 1,298.08 - - 0.00% 4.00 4.00 1,298.08
SUMNISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 2" M 4.00 11.99 47.96 - - 0.00% 4.00 4.00 47.96
SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 3" M 4.00 38.41 153.64 - - 0.00% -
AREAS EXTERIORES
CERRAMIENTO PERIMETRAL DE MAMPOSTERIA
LIMPIEZA Y DESBROCE DEL TERRENO (MANUAL) M2 582.66 0.87 506.91 582.66 582.66 506.91 506.91 100.00% -
REPLANTEO Y NIVELACIN M2 582.66 0.99 576.83 582.66 582.66 576.83 576.83 100.00% -
EXCAVACIN MANUAL DE CIMIENTOS Y PLINTOS M3 125.85 7.64 961.49 125.85 125.85 961.49 961.49 100.00% -
ACERO DE REFUERZO EN VARILLAS CORRUGADAS FY=4200 KG/CM2 KG 13.66 2.05 28.00 - - 0.00% 13.66 13.66 28.00
HORMIGN FC=210 KG/CM2 EN CONTORNO DE VENTANAS (ALFEI M3 12.76 228.43 2,914.77 - - 0.00% 12.76 12.76 2,914.77
HORMIGN CICLPEO F'C=210 KG/CM (INCLUYE ENCOFRADO)H.S M3 87.01 121.30 10,554.31 87.01 87.01 10,554.31 10,554.31 100.00% -
HORMIGN F'C= 210 KG/CM2 EN CADENAS M3 21.75 184.96 4,022.88 5.30 5.30 980.29 980.29 24.37% 16.45 16.45 3,042.59
HORMIGN F'C= 210 KG/CM2 EN COLUMNAS M3 22.53 229.35 5,167.26 7.97 7.97 1,827.92 1,827.92 35.38% 14.56 14.56 3,339.34
HORMIGN F'C= 210 KG/CM2 EN PLINTOS M3 13.98 226.59 3,167.73 6.54 6.54 1,481.90 1,481.90 46.78% 7.44 7.44 1,685.83
HOJA 66 DE 546
HORMIGN F'C= 140 KG/CM2 EN REPLANTILLOS M3 3.50 108.46 379.61 3.50 3.50 379.61 379.61 100.00% -
MAMPOSTERA DE BLOQUE DE 15CM M2 1,747.98 17.65 30,851.85 291.28 291.28 5,141.09 5,141.09 16.66% 1,456.70 1,456.70 25,710.76
ENLUCIDO VERTICAL EXTERIOR M2 1,261.65 9.85 12,427.25 1,261.65 - 1,261.65 12,427.26 0.00 12,427.26 100.00% -
PINTURA ELASTOMRICA EXTERIORES M2 1,514.92 5.71 8,650.19 1,514.92 1,514.92 8,650.20 8,650.20 100.00%
BOTAGUAS M 1,514.92 3.16 4,787.15 - - 0.00% 1,514.92 1,514.92 4,787.15
JUNTA VERTICAL EN FACHADA M 543.82 9.07 4,932.45 - - 0.00% 543.82 543.82 4,932.45
CAMINERIAS
PRELIMINARES
LIMPIEZA Y DESBROCE DEL TERRENO (MANUAL) M2 2,294.06 0.87 1,995.83 2,294.06 2,294.06 1,995.83 1,995.83 100.00% -
REPLANTEO Y NIVELACIN M2 2,294.06 0.99 2,271.12 2,294.06 2,294.06 2,271.12 2,271.12 100.00% -
ESTRUCTURA DE HORMIGN ARMADO
HORMIGN F'C= 210 KG/CM2 EN MUROS M3 1.08 201.57 217.70 1.08 1.08 217.70 217.70 100.00% -
DERROCAMIENTO A MQUINA DE CONSTRUCCIN EXISTENTE M2 1.00 9.14 9.14 1.00 1.00 9.14 9.14 100.00% -
PISOS
CAMA DE ARENA M3 344.11 16.09 5,536.73 170.98 170.98 2,751.07 2,751.07 49.69% 173.13 173.13 2,785.66
ADOQUN ORNAMENTAL FC=400 KG/CM2 M2 2,966.17 23.21 68,844.81 2,966.17 - 2,966.17 68,844.81 0.00 68,844.81 100.00% -
ADOQUN HEXAGONAL GRIS FC=400KG/CM2 M2 1.08 21.71 23.45 1.08 1.08 23.45 23.45 99.99% -
ESCALINATAS Y OBRAS EXTERIORES
BANCAS ORNAMENTALES 1,60M U 21.58 395.50 8,534.89 21.58 21.58 8,534.89 8,534.89 100.00% -
BORDILLO H.S. F'C=180 KG/CM2 (0.15X0.35) PREFABRICADO M 2,102.76 16.02 33,686.22 1,187.68 1,187.68 19,026.63 19,026.63 56.48% 915.08 915.08 14,659.58
ENCESPADO Y PLANTAS ORNAMENTALES TIPO ESCANCELA M2 8,507.00 4.66 39,642.62 3,507.00 3,507.00 16,342.62 16,342.62 41.22% 5,000.00 5,000.00 23,300.00
CONSTRUCCION CAMINERIAS Y PLAZAS
HORMIGN F`C=180KG/CM2 EN BERMAS M3 5.94 147.38 875.44 - - 0.00% 5.94 5.94 875.44
MOBILIARIO EXTERIOR
BEBEDERO DE AGUA U 4.32 1,592.50 6,879.60 - - 0.00% 0.32 0.32 509.60
BASUREROS METLICOS U 10.79 190.40 2,054.42 - - 0.00% 0.79 0.79 150.42
JARDINERIA
PLANTACION DE RBOL AUTCTONO TAMAO GRANDE (8M A 10 M U 25.90 1,751.30 45,358.67 25.00 25.00 43,782.50 43,782.50 96.53% -
PLANTACION DE RBOL AUTCTONO TAMAO MEDIO (4M A 6 M) U 51.79 453.30 23,476.41 50.00 50.00 22,665.00 22,665.00 96.54% -
PLANTACION DE RBOL AUTCTONO TAMAO PEQUEO (2M A 3 U 25.90 106.67 2,762.75 - - 0.00% -
CARPINTERIA METALICA
CERRAMIENTO PERIMETRAL DE TUBO 2" X2MM SEGN DISEO M 230.08 82.59 19,002.31 230.08 230.08 19,002.31 19,002.31 100.00% -
MOVIMENTO DE TIERRAS Y CONFORMACION DE PLATAFORMAS
MOVIMIENTO DE TIERRAS BSICO
EXCAVACIN A MQUINA 5,476.35 2.29 12,540.84 5,476.35 5,476.35 12,540.84 12,540.84 100.00%
HOJA 67 DE 546
TRANSPORTE DE MATERIAL DE EXCAVACIN. TRANSPORTE LIBRE 1 M3-KM 54,763.46 0.25 13,690.87 54,763.46 - 54,763.46 13,690.86 0.00 13,690.86 100.00% -
INSTALACIONES ELECTRONICAS
SISTEMA DE CABLEADO ESTRUCTURADO DATOS Y VOZ
CABLE FIBRA PTICA 6 HILOS OM3 MULTIMODO M 1,294.80 11.95 15,472.86 1,294.80 1,294.80 15,472.86 15,472.86 100.00% -
FUSIONADO Y CERTIFICADO DE FIBRA PTICA U 258.96 54.27 14,053.76 - - 0.00% 144.96 144.96 7,866.98
CMARA IP DE CCTV TIPO BULLET PARA EXTERIORES U 5.40 1,139.31 6,152.27 - - 0.00% 4.40 4.40 5,012.96
POSTE DE 5M DE ALTURA Y 4" DE DIMETRO U 12.95 170.35 2,206.03 - - 0.00% 12.95 12.95 2,206.03
BOCINA DE 30W 16 OHMIOS U 7.55 39.64 299.28 - - 0.00% -
TUBERA PVC 4" REFORZADA M 1,186.90 6.43 7,631.77 230.90 230.90 1,484.69 1,484.69 19.45% 956.00 956.00 6,147.08
TUBERA PVC 2" REFORZADA M 1,186.90 3.66 4,344.05 1,186.90 1,186.90 4,344.05 4,344.05 100.00% -
CAJA DE HORMIGN DE 60X60X60 [CM] CON TAPA DE HORMIGN U 26.98 166.13 4,482.19 26.00 0.98 26.98 4,319.38 162.81 4,482.19 100.00% -
CAJA DE PASO/REVISIN 15X15X9CM METLICA U 26.98 10.05 271.15 - - 0.00% -
SUMINISTRO E INSTALACIN DE MANGUERA 1" REFORZADA POLIE M 215.80 0.66 142.43 - - 0.00% 215.80 215.80 142.43
CABLEADO ANTIFLAMA 2 X 16 AWG M 1,186.90 1.13 1,341.20 - - 0.00% -
CABLE S/FTP CAT 6A M 971.10 1.66 1,612.03 - - 0.00% -
CABLE ARMADO 2X14 AWG M 1,186.90 3.95 4,688.26 - - 0.00% -
INSTALACIONES HIDROSANITARIAS
SISTEMA DE AGUA POTABLE
ACOMETIDA DE AGUA POTABLE 2" U 1.08 62.09 67.06 1.00 1.00 62.09 62.09 92.59% 0.08 0.08 4.97
LLAVES DE MANGUERA DE BRONCE D=1/2" U 1.08 13.06 14.10 - - 0.00% -
TUBERA PVC ROSCABLE 2" M 231.99 14.12 3,275.70 207.39 207.39 2,928.35 2,928.35 89.40% 2.00 22.60 24.60 28.24 319.11
TUBERA PVC ROSCABLE 3/4" M 48.56 3.42 166.08 - - 0.00% 48.56 48.56 166.08
TUBERA E/C PVC 63MM 1,25MPA M 124.09 4.44 550.96 - - 0.00% 124.09 124.09 550.96
TUBERA E/C PVC 75MM 0,63MPA M 72.29 3.59 259.52 - - 0.00% 72.29 72.29 259.52
TUBERA E/C PVC 90MM 1,25MPA M 168.32 7.61 1,280.92 168.32 168.32 1,280.92 1,280.92 100.00% -
VLVULA DE CONTROL ROSCADA DIAM 1/2" U 4.32 8.88 38.36 - - 0.00% 4.32 4.32 38.36
VLVULA COMPUERTA ROSCADA DIAM 1 1/4" U 2.16 36.05 77.87 - - 0.00% 2.16 2.16 77.87
VLVULA COMPUERTA ROSCADA DIAM 1 1/2" U 4.32 37.07 160.14 - - 0.00% -
VLVULA DE CONTROL ROSCADA DIAM 2 1/2" U 2.16 81.72 176.52 - - 0.00% 2.16 2.16 176.52
EQUIPO DE BOMBEO 12,5HP 5 TANQUES HIDRONEUMATICOS DE 11 U 1.08 9,490.66 10,249.91 - - 0.00% 1.08 1.08 10,249.91
BEBEDERO DE AGUA U 4.32 1,592.50 6,879.60 - - 0.00% 0.32 0.32 509.60
RED ALCANTARILLADO
LIMPIEZA Y DESBROCE DEL TERRENO (MANUAL) M2 1,758.05 0.87 1,529.50 1,758.05 1,758.05 1,529.50 1,529.50 100.00% -
REPLANTEO Y NIVELACIN M2 1.47 0.99 1.46 1.47 1.47 1.46 1.46 100.00% -
EXCAVACIN MANUAL DE CIMIENTOS Y PLINTOS M3 5.40 7.64 41.26 - - 0.00% 5.40 5.40 41.26
EXCAVACIN A MQUINA M3 1,136.47 2.29 2,602.52 752.12 384.35 1,136.47 1,722.35 880.17 2,602.52 100.00% -
CAMA DE ARENA M3 184.20 16.09 2,963.78 184.20 184.20 2,963.78 2,963.78 100.00% -
DESALOJO DE MATERIAL DE EXCAVACIN M3 191.63 3.54 678.37 - - 0.00% -
RELLENO COMPACTADO MANUAL CON MATERIAL DEL SITIO M3 797.94 8.98 7,165.50 797.94 797.94 7,165.50 7,165.50 100.00% -
TUBERA PARED ESTRUCTURADA SERIE 5 125MMX6M (DI 110MM) M 356.07 5.93 2,111.50 81.00 81.00 480.33 480.33 22.75% 275.07 275.07 1,631.17
TUBERA PARED ESTRUCTURADA SERIE 5 175MMX6M (DI 160MM) M 651.22 9.81 6,388.47 609.42 609.42 5,978.41 5,978.41 93.58% 21.22 21.22 208.17
TUBERA PARED ESTRUCTURADA SERIE 5 220MMX6M (DI 200MM) M 350.68 16.20 5,681.02 240.00 240.00 3,888.00 3,888.00 68.44% 110.68 110.68 1,793.02
TUBERA PARED ESTRUCTURADA SERIE 5 280MMX6M (DI 250MM) M 121.15 20.24 2,452.08 6.00 6.00 121.44 121.44 4.95% 115.15 115.15 2,330.64
TUBERA PARED ESTRUCTURADA SERIE 5 335MMX6M (DI 300MM) M 194.22 30.28 5,880.98 22.10 22.10 669.19 669.19 11.38% 172.12 172.12 5,211.79
TUBERA PARED ESTRUCTURADA SERIE 5 440MMX6M (DI 400MM) M 70.14 49.76 3,490.17 38.50 38.50 1,915.76 1,915.76 54.89% 31.64 31.64 1,574.41
SUMIDERO DE PISO DE 4" INCLUYE REJILLA U 21.58 28.94 624.53 - - 0.00% -
SUMIDERO DE CALZADA (INCLUYE REJILLA DE H:F) U 21.58 164.41 3,547.97 21.58 21.58 3,547.97 3,547.97 100.00% -
CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO U 92.79 98.94 9,180.64 28.00 28.00 2,770.32 2,770.32 30.18% 44.79 20.00 64.79 4,431.52 1,978.80
POZO DE REVISIN H=0,80-2M U 3.24 349.41 1,132.09 - - 0.00% -
HOJA 68 DE 546
ALIMENTADOR 3X#6(F)+1X#6(N)+1X#8(T) AWG TTU M 1,294.80 12.07 15,628.24 - - 0.00% 1,200.00 1,200.00 14,484.00
ALIMENTADOR 3X#4(F)+1X#4(N)+1X#6(T) AWG TTU M 539.50 16.62 8,966.49 539.50 539.50 8,966.49 8,966.49 100.00% -
ALIMENTADOR 3X#2(F)+1X#2(N)+1X#4(T) AWG TTU M 323.70 25.08 8,118.40 323.70 323.70 8,118.40 8,118.40 100.00% -
ALIMENTADOR 3X#1/0(F)+1X#1/0(N)+1X#2(T) AWG TTU M 323.70 41.46 13,420.60 - - 0.00% -
ALIMENTADOR 1X(3X2/0)(1X2/0)+1/0 TTU M 431.60 53.78 23,211.45 - - 0.00% 431.60 431.60 23,211.45
ALIMENTADOR 3X#4/0(F)+1X#4/0(N)+1X#2/0(T) AWG TTU M 431.60 81.40 35,132.24 - - 0.00% 431.60 431.60 35,132.24
ALIMENTADOR 1X(3X4/0) (1X4/0) + 2/0 TTU M 323.70 81.40 26,349.18 - - 0.00% 323.70 323.70 26,349.18
ALIMENTADOR 3X#2(F)+1X#2(N)+1X#4(T) AWG TTU M 323.70 25.08 8,118.40 - - 0.00% -
ALIMENTADOR 2X#8 TTU PARA ILUMINACIN EXTERIOR M 1,618.50 4.01 6,490.19 - - 0.00% 1,618.50 1,618.50 6,490.19
UPS TRIFSICO DE 20 KVA U 1.08 16,781.02 18,123.50 - - 0.00% 1.08 1.08 18,123.50
UPS TRIFASICA DE 30 KVA U 1.08 19,721.49 21,299.21 - - 0.00% 1.08 1.08 21,299.21
ESTRUCTURA ESV-3CR U 3.24 350.47 1,135.52 - - 0.00% 3.24 3.24 1,135.52
ESTRUCTURA ESV-3CP U 3.24 216.27 700.71 - - 0.00% 3.24 3.24 700.71
ESTRUCTURA BAJANTE EN MEDIA TENSIN U 1.08 370.47 400.11 - - 0.00% 1.08 1.08 400.11
ESTRUCTURA SPV-3S(1)E U 3.24 703.61 2,279.70 - - 0.00% 2.24 2.24 1,576.09
ESTRUCTURA SPV-3P(1)E U 3.24 318.76 1,032.78 - - 0.00% -
PUNTA TERMINAL EXTERIOR Y ACCESORIOS U 3.24 106.73 345.81 - - 0.00% -
PUNTAS TERMINALES PARA INTERIORES 13KV U 3.24 56.02 181.50 - - 0.00% 3.24 3.24 181.50
POZO DE REVISION 1.00X1.00X1.20 (M) U 4.32 286.75 1,238.76 - - 0.00% 4.32 4.32 1,238.76
POZO DE REVISION DE 80X80X100 CM, CON TAPA DE HORMIGN U 70.14 177.11 12,422.50 12.00 12.00 2,125.32 2,125.32 17.11% 58.14 58.14 10,297.18
POZO DE REVISION DE 0.60X0.60X0.60 (M) U 30.21 98.06 2,962.39 29.00 29.00 2,843.74 2,843.74 95.99% 1.21 1.21 118.65
PROVISION E INSTALACION DE POSTE DE 12 M 500KG U 1.08 324.52 350.48 - - 0.00% 1.08 1.08 350.48
POSTE METLICO GALVANIZADO DE 9M CON CANASTILLA U 21.58 379.12 8,181.41 - - 0.00% -
POSTE DE HIERRO GALVANIZADO 4M DE ALTURA U 21.58 217.56 4,694.94 - - 0.00% -
ACOMETIDA CONDUCTOR 3#2 XLP 15KV AWG + #2 CU DESN. AWG M 53.95 27.36 1,476.07 - - 0.00% 53.95 53.95 1,476.07
ALIMENTADOR TABLERO DE DISTRIBUCIN PRINCIPAL, TTA Y GENER M 53.95 326.01 17,588.24 - - 0.00% 40.00 40.00 13,040.40
ALIMENTADOR UPS 20 KVA (3X#2) (F) + 1X#2 AWG TTU (N) + 1X#4 M 107.90 25.07 2,705.05 - - 0.00% 107.90 107.90 2,705.05
ALIMENTADOR UPS 30 KVA(3X#2) (F) + 1X#2 AWG TTU (N) + 1X#4 M 107.90 25.07 2,705.05 - - 0.00% 107.90 107.90 2,705.05
LUMINARIA LED DE 7W PARA PISO U 26.98 45.54 1,228.67 - - 0.00% -
TUBERIA PVC 2 M 2,158.00 2.14 4,618.12 2,158.00 2,158.00 4,618.12 4,618.12 100.00% -
TUBERIA PVC 4" M 3,237.00 4.65 15,052.05 777.00 777.00 3,613.05 3,613.05 24.00% 2,460.00 2,460.00 11,439.00
INTERRUPTOR TERMOMAGNETICO MARCO 1000 CAJA MOLDEADA RE U 1.08 1,938.64 2,093.73 - - 0.00% 1.08 1.08 2,093.73
LUMINARIA LED DE ALUMBRADO PBLICO 90W 220V U 21.58 385.35 8,315.85 - - 0.00% -
LUMINARIA TIPO ISLA LED 40W 127V PARA CAMINERAS U 21.58 385.30 8,314.77 - - 0.00% -
ALIMENTADOR DE ALUMINIO 3X1/0 ASCR + 1X2 ASCR M 1,079.00 4.84 5,222.36 - - 0.00% 1,079.00 1,079.00 5,222.36
TRANSFORMADOR TRIFSICO 300 KVA PADMOUNTED TIPO RADIAL U 1.08 13,629.70 14,720.08 - - 0.00% 1.08 1.08 14,720.08
MALLA DE PUESTA A TIERRA ELCTRICA Y ELECTRNICA U 2.16 1,572.84 3,397.33 2.00 2.00 3,145.68 3,145.68 92.59% 0.16 0.16 251.65
MALLA DE PUESTA A TIERRA PARA PARARRAYOS U 2.16 492.67 1,064.17 2.00 2.00 985.34 985.34 92.59% 0.16 0.16 78.83
DESCARGADOR DE EQUIPOTENCIAL VIA DE CHISPAS U 2.16 435.04 939.69 2.16 2.16 939.69 939.69 100.00% -
PARARRAYOS CON MASTIL DE 5M U 2.16 2,247.45 4,854.49 2.00 2.00 4,494.90 4,494.90 92.59% 0.16 0.16 359.59
CABLE DE COBRE DESNUDO 2/0 AWG PARA INTERCONEXIN DE MA M 539.50 13.27 7,159.17 388.75 388.75 5,158.71 5,158.71 72.06% 150.75 150.75 2,000.45
TABLERO DE DISTRIBUCIN PRINCIPAL U 1.08 2,447.70 2,643.52 - - 0.00% 0.08 0.08 195.82
TABLERO DE DISTRIBUCON FUERZA REGULADA U 1.08 864.83 934.02 - - 0.00% -
TABLERO DE DISTRIBUCIN FUERZA AIRE ACONDICIONADO U 1.08 890.53 961.77 - - 0.00% -
GENERADOR TRIFSICO 300 KVA CON CABINA INSONORA U 1.08 50,413.41 54,446.48 - - 0.00% 1.08 1.08 54,446.48
TRAFO MIX PARA MEDICIN EN MEDIA TENSIN, SUMINISTRO E IN U 1.08 6,621.53 7,151.25 - - 0.00% 1.08 1.08 7,151.25
BLOQUE DE GRADAS
PRELIMINARES
LIMPIEZA Y DESBROCE DEL TERRENO (MANUAL) M2 133.24 0.87 115.92 133.24 133.24 115.92 115.92 100.00% -
HOJA 70 DE 546
REPLANTEO Y NIVELACIN M2 133.24 0.99 131.91 133.24 133.24 131.91 131.91 100.00% -
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE CIMIENTOS Y PLINTOS M3 146.70 7.64 1,120.79 112.52 112.52 859.65 859.65 76.70% 34.18 34.18 261.14
SUB-BASE CLASE 3 M3 29.34 16.01 469.73 29.34 29.34 469.73 469.73 100.00% -
EXCAVACIN A MQUINA M3 176.04 2.29 403.13 176.04 176.04 403.13 403.13 100.00% -
RELLENO COMPACTADO A MQUINA CON MATERIAL IMPORTADO M3 96.82 11.08 1,072.77 96.82 - 96.82 1,072.77 0.00 1,072.77 100.00% -
TRANSPORTE DE MATERIAL DE EXCAVACIN. TRANSPORTE LIBRE 1 M3-KM 1,760.40 0.25 440.10 1,760.40 1,760.40 440.10 440.10 100.00% -
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 2,523.24 0.25 630.81 2,523.24 2,523.24 630.81 630.81 100.00% -
ESTRUCTURA DE HORMIGN ARMADO
ACERO DE REFUERZO EN VARILLAS CORRUGADAS FY=4200 KG/CM2 KG 8,028.02 2.05 16,457.44 8,028.02 8,028.02 16,457.44 16,457.44 100.00% -
HORMIGN F'C= 210 KG/CM2 EN PLINTOS M3 29.70 226.59 6,729.72 21.72 21.72 4,921.53 4,921.53 73.13% 7.98 7.98 1,808.19
HORMIGN F'C= 210 KG/CM2 EN COLUMNAS M3 17.67 229.35 4,052.61 17.67 17.67 4,052.61 4,052.61 100.00% -
HORMIGN F'C= 210 KG/CM2 EN LOSA M3 10.20 208.33 2,124.97 10.20 10.20 2,124.97 2,124.97 100.00% -
IMPERMEABILIZACIN DE TERRAZA CON LMINA ASFLTICA M2 42.00 16.13 677.46 42.00 42.00 677.46 677.46 100.00% -
HORMIGN F'C= 140 KG/CM2 EN REPLANTILLOS M3 7.29 108.46 790.67 7.29 7.29 790.67 790.67 100.00% -
HORMIGN F'C= 210 KG/CM2 EN VIGAS M3 11.35 233.94 2,655.22 11.35 11.35 2,655.22 2,655.22 100.00% -
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 3,546.30 0.25 886.58 3,546.30 3,546.30 886.58 886.58 100.00% -
MALLA ELECTROSOLDADA R-126 (4.10) M2 101.59 5.65 573.98 101.59 101.59 573.98 573.98 100.00% -
MALLA ELECTROSOLDADA R-131 (5.15) M2 67.23 4.53 304.55 - - 0.00% 67.23 67.23 304.55
ALIVIANAMIENTO DE BLOQUE CEMENTO DE 40CMX20CMX20CM U 582.00 0.58 337.56 582.00 582.00 337.56 337.56 100.00% -
ALTAR PATRIO Y PATIO CVICO
PRELIMINARES
LIMPIEZA Y DESBROCE DEL TERRENO (MANUAL) M2 858.23 0.87 746.66 858.23 858.23 746.66 746.66 100.00% -
REPLANTEO Y NIVELACIN M2 858.23 0.99 849.65 858.23 858.23 849.65 849.65 100.00% -
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE CIMIENTOS Y PLINTOS M3 45.00 7.64 343.80 - - 0.00% 45.00 45.00 343.80
SUB-BASE CLASE 3 M3 17.59 16.01 281.62 - - 0.00% 17.59 17.59 281.62
RELLENO COMPACTADO A MQUINA CON MATERIAL IMPORTADO M3 25.00 11.08 277.00 25.00 25.00 277.00 277.00 100.00% -
TRANSPORTE DE MATERIAL DE EXCAVACIN. TRANSPORTE LIBRE 1 M3-KM 450.00 0.25 112.50 - - 0.00% -
TRNSPORTE DE MATERIALES O SOBREACARREO M3-KM 851.80 0.25 212.95 851.80 851.80 212.95 212.95 100.00% -
ESTRUCTURA DE HORMIGN ARMADO
ACERO DE REFUERZO EN VARILLAS CORRUGADAS FY=4200 KG/CM2 KG 596.59 2.05 1,223.01 - - 0.00% 596.59 596.59 1,223.01
MALLA ELECTROSOLDADA R-196 (5.10) M2 40.85 4.38 178.92 40.07 40.07 175.51 175.51 98.09% 0.78 0.78 3.42
HORMIGN F'C= 140 KG/CM2 EN REPLANTILLOS M3 2.04 108.46 221.26 2.04 2.04 221.26 221.26 100.00% -
HORMIGN FC=210KG/CM2 EN ESCALERAS M3 10.71 271.97 2,912.80 10.71 10.71 2,912.80 2,912.80 100.00% -
HOJA 71 DE 546
HORMIGN F'C= 210 KG/CM2 EN PLINTOS M3 2.12 226.59 480.37 1.26 1.26 285.50 285.50 59.43% 0.86 0.86 194.87
HORMIGN F'C= 210 KG/CM2 EN VIGAS M3 0.75 233.94 175.46 - - 0.00% 0.75 0.75 175.46
MAMPOSTERIA
MAMPOSTERA DE BLOQUE DE 15CM M2 28.50 17.65 503.03 - - 0.00% 28.50 28.50 503.03
ENLUCIDOS
ENLUCIDO VERTICAL INTERIOR. M2 124.10 6.70 831.47 124.10 124.10 831.47 831.47 100.00% -
ENLUCIDO PALETEADO FINO DE FILOS Y FAJAS M 180.00 3.37 606.60 180.00 180.00 606.60 606.60 100.00% -
REVESTIMIENTOS
PINTURA ELASTOMRICA EXTERIORES M2 124.00 5.71 708.04 42.17 42.17 240.79 240.79 34.01% 81.83 81.83 467.25
PISOS
ENLUCIDO VERTICAL INTERIOR. M2 56.29 6.70 377.14 56.29 56.29 377.14 377.14 100.00% -
CARPINTERIA METAL/METALICA
ASTA DE BANDERA CON TUBO DE HIERRO GALVANIZADO 2", 3M INC U 3.00 110.25 330.75 3.00 3.00 330.75 330.75 100.00% -
PATIO
CAMA DE ARENA M3 35.66 16.09 573.77 - - 0.00% 35.66 35.66 573.77
ADOQUN ORNAMENTAL FC=400 KG/CM2 M2 713.13 23.21 16,551.75 678.65 678.65 15,751.47 15,751.47 95.16% 34.48 34.48 800.28
BORDILLO H.S. F'C=180 KG/CM2 (0.15X0.35) PREFABRICADO M 76.42 16.02 1,224.25 76.42 76.42 1,224.25 1,224.25 100.00% -
RUBROS AMBIENTALES
AGUA PARA CONTROL DE POLVO M3 850.00 4.62 3,927.00 850.00 850.00 3,927.00 3,927.00 100.00% -
CERRAMIENTO PROVISIONAL DE YUTE M 120.00 4.24 508.80 120.00 120.00 508.80 508.80 100.00% -
BATERA SANITARIA PROVISIONAL U 4.00 1,225.00 4,900.00 4.00 4.00 4,900.00 4,900.00 100.00% -
BODEGA PROVISIONAL DE MADERA M2 1.00 68.50 68.50 1.00 1.00 68.50 68.50 100.00% -
TACHOS PLSTICOS PARA ALMACENAR DESECHOS U 4.00 52.90 211.60 4.00 4.00 211.60 211.60 100.00% -
CHARLAS DE CAPACITACIN AL PERSONAL: MANEJO AMBIENTAL Y U 4.00 291.12 1,164.48 4.00 4.00 1,164.48 1,164.48 100.00% -
CHARLAS DE SOCIALIZACIN, CONCIENCIACIN Y EDUCACIN AMB U 4.00 372.46 1,489.84 4.00 4.00 1,489.84 1,489.84 100.00% -
AFICHES INFORMATIVOS U 350.00 6.13 2,145.50 350.00 350.00 2,145.50 2,145.50 100.00% -
TRPTICOS INFORMATIVOS A4 A COLOR U 500.00 1.53 765.00 500.00 500.00 765.00 765.00 100.00% -
KIT PARA DERRAMES DE QUMICOS U 1.00 183.74 183.74 1.00 1.00 183.74 183.74 100.00% -
BUZN DE SUGERENCIAS U 1.00 61.25 61.25 - - 0.00% 1.00 1.00 61.25
BOTIQUN DE PRIMEROS AUXILIOS U 2.00 81.78 163.56 2.00 2.00 163.56 163.56 100.00% -
EXTINTOR POLVO QUIMICO ABC 10LBS(PQS) U 2.00 26.17 52.34 2.00 2.00 52.34 52.34 100.00% -
EQUIPO DE PROTECCIN PERSONAL BSICO U 5.00 66.52 332.60 5.00 5.00 332.60 332.60 100.00% -
LETREROS DE ALUMINIO, SEALES Y REGLAMENTARIAS M2 4.00 154.54 618.16 4.00 4.00 618.16 618.16 100.00% -
CINTA DE SEALIZACIN CON BARRERAS MVILES M 4.00 4.94 19.76 4.00 4.00 19.76 19.76 100.00% -
RTULOS AMBIENTALES DE 0,60X0,80 TIPO PEDESTAL U 8.00 121.47 971.76 8.00 8.00 971.76 971.76 100.00% -
MONITOREO RUIDO AMBIENTAL U 3.00 69.81 209.43 3.00 3.00 209.43 209.43 100.00% -
MONITOREO CALIDAD DE AIRE U 1.00 379.74 379.74 1.00 1.00 379.74 379.74 100.00% -
MONITOREO DE CALIDAD DE AGUA U 3.00 716.58 2,149.74 - - 0.00% 3.00 3.00 2,149.74
REA DE ALMACENAMIENTO DE COMBUSTIBLE INCLUYE CUBETO M2 4.00 62.43 249.72 4.00 4.00 249.72 249.72 100.00% -
REA PARA ALMACENAMIENTO TEMPORAL DE DESECHOS SLIDOS M2 30.00 43.40 1,302.00 30.00 30.00 1,302.00 1,302.00 100.00% -
SEALTICA INFORMATIVA (20X40 CM) ACRLICO U 1.00 27.90 27.90 1.00 1.00 27.90 27.90 100.00% -
SEALIZACIN DE SEGURIDAD TIPO PEDESTAL U 3.00 129.14 387.42 3.00 3.00 387.42 387.42 100.00% -
PARQUEADEROS
PRELIMINARES
LIMPIEZA Y DESBROCE DEL TERRENO (MANUAL) M2 170.00 0.87 147.90 170.00 170.00 147.90 147.90 100.00% -
REPLANTEO Y NIVELACIN M2 170.00 0.99 168.30 170.00 170.00 168.30 168.30 100.00% -
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE CIMIENTOS Y PLINTOS M3 29.75 7.64 227.29 - - 0.00% 29.75 29.75 227.29
EXCAVACIN A MQUINA M3 85.00 2.29 194.65 85.00 85.00 194.65 194.65 100.00% -
HOJA 72 DE 546
ING. GUIDO HERNAN SANCHEZ SANCHEZ ING. CARLOS MESTANZA CEDEO CONSTRUCTORA MIELES Y MIELES CIA. LTDA.
FISCALIZADOR ADMINISTRADOR - SECOB CONTRATISTA
HOJA 73 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
- - #DIV/0!
- 449.50 449.50 3,434.17 3,434.17 1,169.92 8,938.19 162% I
- 83.76 83.76 1,341.00 1,341.00 402.56 6,444.99 126% I
- 1,052.81 1,052.81 2,410.94 2,410.94 1,917.31 4,390.64 222% I
- 169.11 169.11 1,873.74 1,873.74 644.59 7,142.06 136% I
- - - 8,645.04 2,161.26 100% N
- 23,854.70 23,854.70 5,963.67 5,963.67 39,740.32 9,935.08 250% I
0.00 0.00 #DIV/0!
- 9,505.02 9,505.02 19,485.29 19,485.29 67,488.06 138,350.52 116% I
- 0.69 0.69 167.33 167.33 162.36 39,373.92 100% I
- 7.40 7.40 1,697.19 1,697.19 64.00 14,678.40 113% I
- 18.83 18.83 3,922.85 3,922.85 168.81 35,168.19 113% I
- 126.64 126.64 2,042.70 2,042.70 756.64 12,204.60 120% I
- 34.37 34.37 3,727.77 3,727.77 70.34 7,629.08 196% I
- 60.52 60.52 14,158.05 14,158.05 112.91 26,414.17 216% I
- 26,730.62 26,730.62 6,682.66 6,682.66 61,291.12 15,322.78 177% I
- 666.32 666.32 3,764.71 3,764.71 1,325.80 7,490.77 201% I
163.56 - - 7,850.00 4,553.00 97% D
- 608.46 608.46 2,403.42 2,403.42 798.30 3,153.29 421% I
- 608.46 608.46 3,285.68 3,285.68 798.30 4,310.82 421% I
- - - - - 0% N
- 0.74 0.74 22.39 22.39 654.90 19,810.73 100% I
0.00 0.00 #DIV/0!
1,809.30 - - 1,010.36 17,832.85 91% D
- 12.32 12.32 186.65 186.65 150.73 2,283.56 109% I
- 12.12 12.12 2,768.57 2,768.57 16.30 3,723.41 390% I
- 858.37 858.37 13,115.89 13,115.89 881.97 13,476.50 3737% I
0.00 0.00 #DIV/0!
4,186.23 - - 1,877.75 12,580.93 75% D
- 101.60 359.86 461.46 1,000.76 3,544.62 4,545.38 1,915.20 18,864.72 132% I
- 216.91 216.91 906.68 906.68 1,429.18 5,973.97 118% I
- 750.12 750.12 2,527.90 2,527.90 2,124.68 7,160.17 155% I
0.00 0.00 #DIV/0!
7,156.22 - - 1,247.77 35,935.78 83% D
2,468.69 - - 1,247.64 8,895.67 78% D
834.97 - - 544.22 2,955.11 78% D
664.24 - - 6.24 225.26 25% D
0.00 0.00 #DIV/0!
19,373.17 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
8,407.90 - - - - 0% D
67.78 - - - - 0% D
HOJA 74 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
599.50 - - - - 0% D
1,920.50 - - - - 0% D
74.00 - - - - 0% D
109.00 - - - - 0% D
136.00 - - - - 0% D
280.00 - - - - 0% D
374.00 - - - - 0% D
550.00 - - - - 0% D
0.00 0.00 #DIV/0!
3,215.94 - - - - 0% D
1,162.52 - - - - 0% D
1,869.20 - - - - 0% D
1,319.94 - - - - 0% D
1,620.90 - - - - 0% D
102.60 - - - - 0% D
229.00 - - - - 0% D
361.79 - - - - 0% D
1,461.60 - - - - 0% D
61.50 - - - - 0% D
1,084.32 - - - - 0% D
134.78 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
92.70 - - - - 0% D
1,047.86 - - - - 0% D
696.96 - - - - 0% D
420.50 - - - - 0% D
101.40 - - - - 0% D
403.41 - - - - 0% D
27.17 - - - - 0% D
81.34 - - - - 0% D
44.72 - - - - 0% D
2,071.58 - - - - 0% D
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
1,309.68 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
87.52 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
363.61 - - - - 0% D
2,069.34 - - 12.00 318.36 13% D
1,881.18 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
504.08 - - - - 0% D
- - - - - 0% N
HOJA 78 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
- - - - - 0% N
1,933.20 - - - - 0% D
307.50 - - - - 0% D
0.00 0.00 #DIV/0!
22.60 - - - - 0% D
52.27 - - - - 0% D
548.68 - - - - 0% D
51.18 - - - - 0% D
113.85 - - - - 0% D
177.60 - - - - 0% D
30.90 - - - - 0% D
574.20 - - - - 0% D
53.70 - - - - 0% D
419.88 - - - - 0% D
0.00 0.00 #DIV/0!
484.23 - - - - 0% D
0.00 0.00 #DIV/0!
138.70 - - - - 0% D
73.70 - - - - 0% D
- - - - - 0% N
927.94 - - - - 0% D
- - - - - 0% N
92.86 - - - - 0% D
319.76 - - - - 0% D
707.02 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
644.40 - - - - 0% D
1,228.03 - - - - 0% D
0.00 0.00 #DIV/0!
987.84 - - - - 0% D
1,568.96 - - - - 0% D
321.36 - - - - 0% D
446.60 - - - - 0% D
515.90 - - - - 0% D
HOJA 79 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
- - - - - 0% N
0.00 0.00 #DIV/0!
- 298.17 298.17 6,547.81 6,547.81 1,247.77 27,401.03 131% I
- 296.79 296.79 1,656.09 1,656.09 1,267.09 7,070.36 131% I
4,352.33 - - 1,439.29 8,218.35 65% D
938.59 - - 271.43 27,189.14 97% D
- 147.48 147.48 3,741.57 3,741.57 309.18 7,843.90 191% I
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
79.68 - - 15.00 298.80 79% D
- - - 10.00 182.20 100% N
- - - 19.00 735.30 100% N
38.28 - - 6.60 17.42 31% D
17.78 - - 11.60 39.67 69% D
30.67 - - 1.20 9.68 24% D
- 5.72 5.72 66.81 66.81 25.02 292.23 130% I
137.68 - - - - 0% D
245.26 - - 16.83 237.64 49% D
168.72 - - - - 0% D
135.12 - - 4.00 67.56 33% D
427.88 - - - - 0% D
- 2.00 2.00 57.40 57.40 3.00 86.10 300% I
76.68 - - - - 0% D
- - - 4.00 178.20 100% N
- - - 7.00 103.88 100% N
0.00 0.00 #DIV/0!
- - - 2.00 197.88 100% N
- - - 26.00 213.46 100% N
69.48 - - 10.00 115.80 63% D
- - - 19.00 181.45 100% N
- - - 1.00 12.64 100% N
36.44 - - 10.00 182.20 83% D
- - - 6.00 41.58 100% N
- 50.83 50.83 585.05 585.05 59.83 688.64 665% I
226.68 - - - - 0% D
HOJA 81 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
152.96 - - - - 0% D
- - - 9.00 85.68 100% N
0.00 0.00 #DIV/0!
- - - 2.00 33.02 100% N
- 3.50 3.50 24.26 24.26 12.00 83.16 141% I
- - - 2.00 45.38 100% N
0.00 0.00 #DIV/0!
- 39.50 39.50 376.04 376.04 48.00 456.96 565% I
- 2.00 2.00 197.88 197.88 6.00 593.64 150% I
- - - 6.00 125.28 100% N
- 1.00 1.00 24.93 24.93 9.00 224.37 113% I
- 27.96 27.96 193.76 193.76 45.96 318.50 255% I
- 11.43 11.43 131.56 131.56 85.43 983.30 115% I
- - - 6.00 69.48 100% N
- - - 9.00 85.95 100% N
0.00 0.00 #DIV/0!
- - - 19.00 4,684.64 100% N
- - - 14.00 2,067.66 100% N
- 6.00 6.00 710.22 710.22 7.00 828.59 700% I
896.80 - - - - 0% D
- - - 10.00 1,519.90 100% N
0.00 0.00 #DIV/0!
141.09 - - - - 0% D
0.00 0.00 #DIV/0!
101.52 - - 169.00 5,718.96 98% D
8.30 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
47.76 - - - - 0% D
74.44 - - - - 0% D
- - - - - 0% N
- - - 72.00 4,983.84 100% N
- - - 32.00 866.24 100% N
- - - 4.00 135.48 100% N
125.90 - - 61.00 1,535.98 92% D
1,579.11 - - 60.00 2,429.40 61% D
646.00 - - - - 0% D
2,617.94 - - 3.00 302.07 10% D
185.88 - - - - 0% D
- - - 8.00 507.12 100% N
- - - 4.00 88.28 100% N
941.16 - - - - 0% D
80.88 - - - - 0% D
147.06 - - - - 0% D
349.23 - - - - 0% D
514.59 - - 2.00 343.06 40% D
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
HOJA 82 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
- - - - - 0% N
166.15 - - - - 0% D
122.74 - - - - 0% D
122.74 - - - - 0% D
- - - 20.00 235.20 100% N
1,053.75 - - - - 0% D
60.42 - - - - 0% D
172.00 - - - - 0% D
228.00 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
313.12 - - - - 0% D
- - - - - 0% N
290.50 - - - - 0% D
815.00 - - - - 0% D
278.50 - - - - 0% D
466.00 - - - - 0% D
599.50 - - - - 0% D
1,920.50 - - - - 0% D
74.00 - - - - 0% D
109.00 - - - - 0% D
136.00 - - - - 0% D
280.00 - - - - 0% D
374.00 - - - - 0% D
550.00 - - - - 0% D
0.00 0.00 #DIV/0!
3,215.94 - - - - 0% D
1,964.50 - - - - 0% D
1,319.94 - - - - 0% D
1,536.43 - - - - 0% D
102.60 - - - - 0% D
229.00 - - - - 0% D
1,084.32 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
HOJA 83 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
673.75 - - - - 0% D
448.13 - - - - 0% D
498.08 - - - - 0% D
225.62 - - - - 0% D
12.53 - - - - 0% D
51.09 - - - - 0% D
55.90 - - - - 0% D
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
218.28 - - - - 0% D
- - - - - 0% N
65.64 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
2,069.34 - - 12.00 318.36 13% D
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
1,127.70 - - - - 0% D
307.50 - - - - 0% D
0.00 0.00 #DIV/0!
22.60 - - - - 0% D
52.27 - - - - 0% D
548.68 - - - - 0% D
51.18 - - - - 0% D
113.85 - - - - 0% D
162.80 - - - - 0% D
30.90 - - - - 0% D
319.00 - - - - 0% D
53.70 - - - - 0% D
419.88 - - - - 0% D
0.00 0.00 #DIV/0!
484.23 - - - - 0% D
0.00 0.00 #DIV/0!
- - - - - 0% N
73.70 - - - - 0% D
- - - - - 0% N
963.63 - - - - 0% D
- - - - - 0% N
92.86 - - - - 0% D
319.76 - - - - 0% D
707.02 - - - - 0% D
423.75 - - - - 0% D
- - - - - 0% N
751.80 - - - - 0% D
HOJA 84 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
1,161.65 - - - - 0% D
0.00 0.00 #DIV/0!
987.84 - - - - 0% D
321.36 - - - - 0% D
446.60 - - - - 0% D
515.90 - - - - 0% D
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
- 256.56 256.56 223.21 223.21 513.12 446.41 200% I
- 148.03 148.03 146.55 146.55 404.59 400.54 158% I
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
- - - - - 0% N
- - - - - 0% N
159.88 - - - - 0% D
122.96 - - - - 0% D
28.25 - - - - 0% D
- - - - - 0% N
134.25 - - - - 0% D
365.09 - - - - 0% D
0.00 0.00 #DIV/0!
211.68 - - - - 0% D
82.40 - - - - 0% D
110.55 - - - - 0% D
47.85 - - - - 0% D
0.00 0.00 #DIV/0!
- - - - - 0% N
- - - - - 0% N
0.00 0.00 #DIV/0!
67.68 - - 29.00 981.36 94% D
- 4.00 4.00 16.60 16.60 6.00 24.90 300% I
- - - 2.00 9.58 100% N
- - - 2.00 10.62 100% N
11.94 - - - - 0% D
37.22 - - - - 0% D
- - - - - 0% N
- - - 16.00 1,107.52 100% N
- - - 8.00 216.56 100% N
67.74 - - - - 0% D
- - - 5.00 125.90 100% N
202.45 - - 10.00 404.90 67% D
201.38 - - - - 0% D
371.76 - - - - 0% D
171.12 - - - - 0% D
121.32 - - - - 0% D
189.36 - - - - 0% D
171.53 - - 1.00 171.53 50% D
HOJA 87 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
- - - - - 0% N
134.25 - - - - 0% D
365.09 - - - - 0% D
0.00 0.00 #DIV/0!
211.68 - - - - 0% D
82.40 - - - - 0% D
110.55 - - - - 0% D
47.85 - - - - 0% D
0.00 0.00 #DIV/0!
- - - - - 0% N
15.89 - - - - 0% D
0.00 0.00 #DIV/0!
67.68 - - 29.00 981.36 94% D
- 4.00 4.00 16.60 16.60 6.00 24.90 300% I
- - - 2.00 9.58 100% N
- - - 2.00 10.62 100% N
11.94 - - - - 0% D
37.22 - - - - 0% D
- - - - - 0% N
- - - 16.00 1,107.52 100% N
- - - 8.00 216.56 100% N
67.74 - - - - 0% D
- - - 5.00 125.90 100% N
202.45 - - 10.00 404.90 67% D
201.38 - - 2.00 201.38 50% D
371.76 - - - - 0% D
171.12 - - - - 0% D
121.32 - - - - 0% D
189.36 - - - - 0% D
73.53 - - - - 0% D
116.41 - - - - 0% D
- - - 1.00 171.53 100% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
HOJA 91 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
64.32 - - - - 0% D
122.74 - - - - 0% D
61.37 - - - - 0% D
61.37 - - - - 0% D
- - - 20.00 235.20 100% N
168.60 - - - - 0% D
120.84 - - - - 0% D
172.00 - - - - 0% D
228.00 - - - - 0% D
- - - - - 0% N
290.50 - - - - 0% D
326.00 - - - - 0% D
205.50 - - - - 0% D
466.00 - - - - 0% D
599.50 - - - - 0% D
1,920.50 - - - - 0% D
74.00 - - - - 0% D
109.00 - - - - 0% D
136.00 - - - - 0% D
198.00 - - - - 0% D
280.00 - - - - 0% D
374.00 - - - - 0% D
55.00 - - - - 0% D
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
19.92 - - 13.00 258.96 93% D
24.74 - - 1.93 5.10 17% D
- - - 1.80 6.16 100% N
4.04 - - 6.00 48.42 92% D
5.02 - - 5.07 59.22 92% D
97.68 - - 1.00 8.88 8% D
- - - 1.00 16.89 100% N
- - - 1.00 22.52 100% N
28.70 - - 1.00 28.70 50% D
0.00 0.00 #DIV/0!
- - - 1.00 98.94 100% N
- - - 8.00 65.68 100% N
- - - 2.00 23.16 100% N
- - - 4.00 38.20 100% N
- - - 2.00 36.44 100% N
- 1.58 1.58 5.77 5.77 4.58 16.72 153% I
- 6.75 6.75 77.69 77.69 12.75 146.75 213% I
0.00 0.00 #DIV/0!
- - - 8.00 76.16 100% N
- - - 2.00 197.88 100% N
- - - 2.00 49.86 100% N
- 6.86 6.86 78.96 78.96 18.86 217.08 157% I
- - - 2.00 19.10 100% N
0.00 0.00 #DIV/0!
HOJA 92 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
107.07 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
159.88 - - - - 0% D
122.96 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
134.25 - - - - 0% D
365.09 - - - - 0% D
0.00 0.00 #DIV/0!
211.68 - - - - 0% D
82.40 - - - - 0% D
110.55 - - - - 0% D
47.85 - - - - 0% D
0.00 0.00 #DIV/0!
- - - - - 0% N
- - - - - 0% N
0.00 0.00 #DIV/0!
67.68 - - 29.00 981.36 94% D
- 4.00 4.00 16.60 16.60 6.00 24.90 300% I
- - - 2.00 9.58 100% N
- - - 2.00 10.62 100% N
11.94 - - - - 0% D
37.22 - - - - 0% D
- - - - - 0% N
- - - 16.00 1,107.52 100% N
- - - 8.00 216.56 100% N
67.74 - - - - 0% D
- - - 5.00 125.90 100% N
202.45 - - 10.00 404.90 67% D
201.38 - - 2.00 201.38 50% D
371.76 - - - - 0% D
171.12 - - - - 0% D
121.32 - - - - 0% D
189.36 - - - - 0% D
HOJA 95 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
73.53 - - - - 0% D
116.41 - - - - 0% D
- - - 1.00 171.53 100% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
64.32 - - - - 0% D
122.74 - - - - 0% D
61.37 - - - - 0% D
61.37 - - - - 0% D
- - - 20.00 235.20 100% N
168.60 - - - - 0% D
120.84 - - - - 0% D
172.00 - - - - 0% D
228.00 - - - - 0% D
- - - - - 0% N
290.50 - - - - 0% D
326.00 - - - - 0% D
205.50 - - - - 0% D
466.00 - - - - 0% D
599.50 - - - - 0% D
1,920.50 - - - - 0% D
74.00 - - - - 0% D
109.00 - - - - 0% D
136.00 - - - - 0% D
198.00 - - - - 0% D
280.00 - - - - 0% D
374.00 - - - - 0% D
55.00 - - - - 0% D
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
19.92 - - 13.00 258.96 93% D
5.99 - - 1.93 5.10 46% D
- 0.80 0.80 2.74 2.74 1.80 6.16 180% I
29.86 - - 6.00 48.42 62% D
- 2.07 2.07 24.18 24.18 5.07 59.22 169% I
- - - 1.00 8.88 100% N
- - - 1.00 16.89 100% N
- - - 1.00 22.52 100% N
28.70 - - 1.00 28.70 50% D
0.00 0.00 #DIV/0!
- - - 1.00 98.94 100% N
- - - 8.00 65.68 100% N
- - - 2.00 23.16 100% N
- - - 4.00 38.20 100% N
- - - 2.00 36.44 100% N
- 1.58 1.58 5.77 5.77 4.58 16.72 153% I
69.06 - - - - 0% D
0.00 0.00 #DIV/0!
HOJA 96 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
349.90 - - - - 0% D
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
107.07 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
159.88 - - - - 0% D
122.96 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
134.25 - - - - 0% D
365.09 - - - - 0% D
0.00 0.00 #DIV/0!
211.68 - - - - 0% D
82.40 - - - - 0% D
110.55 - - - - 0% D
47.85 - - - - 0% D
0.00 0.00 #DIV/0!
728.88 - - - - 0% D
- - - - - 0% N
0.00 0.00 #DIV/0!
- 23.00 23.00 778.32 778.32 54.00 1,827.36 174% I
- - - - - 0% N
9.58 - - - - 0% D
- - - - - 0% N
11.94 - - - - 0% D
37.22 - - - - 0% D
113.16 - - - - 0% D
- 4.00 4.00 276.88 276.88 20.00 1,384.40 125% I
- 22.00 22.00 595.54 595.54 30.00 812.10 375% I
- 2.00 2.00 67.74 67.74 4.00 135.48 200% I
- - - - - 0% N
HOJA 99 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
23.16 - - - - 0% D
- - - 4.00 38.20 100% N
36.44 - - - - 0% D
10.95 - - - - 0% D
- 1.10 1.10 12.66 12.66 7.10 81.72 118% I
0.00 0.00 #DIV/0!
- - - 8.00 76.16 100% N
- - - 2.00 197.88 100% N
- 2.00 2.00 49.86 49.86 4.00 99.72 200% I
- 10.60 10.60 122.01 122.01 22.60 260.13 188% I
- - - 2.00 19.10 100% N
0.00 0.00 #DIV/0!
213.90 - - 2.00 213.90 50% D
590.76 - - - - 0% D
0.00 0.00 #DIV/0!
39.45 - - - - 0% D
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
- 383.64 383.64 333.77 333.77 767.28 667.53 200% I
- 228.32 228.32 226.04 226.04 611.96 605.84 160% I
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
111.00 - - - - 0% D
24.72 - - - - 0% D
191.40 - - - - 0% D
134.25 - - - - 0% D
419.88 - - - - 0% D
0.00 0.00 #DIV/0!
161.41 - - - - 0% D
0.00 0.00 #DIV/0!
- - - - - 0% N
- - - - - 0% N
145.12 - - - - 0% D
214.14 - - - - 0% D
152.68 - - - - 0% D
- - - - - 0% N
159.88 - - - - 0% D
184.44 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
204.06 - - - - 0% D
630.61 - - - - 0% D
0.00 0.00 #DIV/0!
211.68 - - - - 0% D
110.55 - - - - 0% D
82.40 - - - - 0% D
111.65 - - - - 0% D
0.00 0.00 #DIV/0!
3,215.94 - - - - 0% D
- - - - - 0% N
48.62 - - - - 0% D
51.96 - - - - 0% D
34.56 - - - - 0% D
111.32 - - - - 0% D
- - - - - 0% N
65.80 - - - - 0% D
- - - - - 0% N
HOJA 103 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
240.96 - - - - 0% D
1,434.24 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
0.00 0.00 #DIV/0!
- - - 33.00 1,116.72 100% N
- - - - - 0% N
- - - - - 0% N
23.88 - - - - 0% D
- - - 20.00 1,384.40 100% N
- - - 6.00 162.42 100% N
- 6.00 6.00 203.22 203.22 7.00 237.09 700% I
607.35 - - 18.00 728.82 55% D
161.50 - - 8.00 646.00 80% D
302.07 - - 5.00 503.45 63% D
557.64 - - - - 0% D
171.12 - - - - 0% D
161.76 - - - - 0% D
73.53 - - - - 0% D
343.06 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
61.37 - - - - 0% D
245.48 - - - - 0% D
- - - 20.00 235.20 100% N
168.60 - - - - 0% D
120.84 - - - - 0% D
86.00 - - - - 0% D
114.00 - - - - 0% D
- - - - - 0% N
177.11 - - - - 0% D
290.50 - - - - 0% D
815.00 - - - - 0% D
599.50 - - - - 0% D
1,920.50 - - - - 0% D
74.00 - - - - 0% D
109.00 - - - - 0% D
136.00 - - - - 0% D
280.00 - - - - 0% D
374.00 - - - - 0% D
55.00 - - - - 0% D
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
- - - 9.00 179.28 100% N
2.96 - - 24.54 64.79 96% D
- 1.36 1.36 4.65 4.65 22.72 77.70 106% I
53.34 - - - - 0% D
HOJA 104 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
- - - - - 0% N
792.60 - - - - 0% D
537.00 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
0.00 0.00 #DIV/0!
16.95 - - - - 0% D
104.54 - - - - 0% D
548.68 - - - - 0% D
51.18 - - - - 0% D
68.31 - - - - 0% D
253.80 - - - - 0% D
111.00 - - - - 0% D
24.72 - - - - 0% D
111.65 - - - - 0% D
64.44 - - - - 0% D
2,099.84 - - - - 0% D
349.90 - - - - 0% D
0.00 0.00 #DIV/0!
484.23 - - - - 0% D
3,047.80 - - - - 0% D
- - - - - 0% N
0.00 0.00 #DIV/0!
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
107.07 - - - - 0% D
76.34 - - - - 0% D
- - - - - 0% N
185.72 - - - - 0% D
159.88 - - - - 0% D
100.71 - - - - 0% D
92.22 - - - - 0% D
- - - - - 0% N
56.99 - - - - 0% D
HOJA 107 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
- - - - - 0% N
166.47 - - - - 0% D
- - - - - 0% N
564.23 - - - - 0% D
0.00 0.00 #DIV/0!
211.68 - - - - 0% D
672.96 - - - - 0% D
72.10 - - - - 0% D
63.80 - - - - 0% D
110.55 - - - - 0% D
253.80 - - - - 0% D
0.00 0.00 #DIV/0!
6,431.88 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
0.00 0.00 #DIV/0!
236.88 - - 14.00 473.76 67% D
- - - - - 0% N
- - - - - 0% N
- 2.00 2.00 138.44 138.44 14.00 969.08 117% I
- 25.00 25.00 1,012.25 1,012.25 39.00 1,579.11 279% I
- 44.00 44.00 3,553.00 3,553.00 46.00 3,714.50 2300% I
92.94 - - 5.00 464.70 83% D
1,668.42 - - - - 0% D
202.20 - - - - 0% D
1,282.60 - - - - 0% D
116.41 - - - - 0% D
343.06 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
61.37 - - - - 0% D
61.37 - - - - 0% D
61.37 - - - - 0% D
- - - 20.00 235.20 100% N
- - - - - 0% N
86.00 - - - - 0% D
114.00 - - - - 0% D
- - - - - 0% N
16,781.02 - - - - 0% D
19,721.49 - - - - 0% D
290.50 - - - - 0% D
HOJA 108 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
326.00 - - - - 0% D
466.00 - - - - 0% D
599.50 - - - - 0% D
1,920.50 - - - - 0% D
74.00 - - - - 0% D
109.00 - - - - 0% D
136.00 - - - - 0% D
280.00 - - - - 0% D
374.00 - - - - 0% D
55.00 - - - - 0% D
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
- - - 8.00 76.16 100% N
- - - 2.00 197.88 100% N
- - - 2.00 49.86 100% N
- 3.60 3.60 41.44 41.44 13.60 156.54 136% I
- - - 2.00 19.10 100% N
23.73 - - - - 0% D
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
- 238.70 238.70 207.67 207.67 477.40 415.34 200% I
- 128.38 128.38 127.10 127.10 367.08 363.41 154% I
0.00 0.00 #DIV/0!
6.65 - - 103.49 790.66 99% D
- 12.87 12.87 206.05 206.05 33.03 528.81 164% I
- 90.80 90.80 207.93 207.93 216.04 494.73 173% I
- 121.77 121.77 1,349.21 1,349.21 188.30 2,086.36 283% I
- - - 1,252.37 313.09 100% N
- 50.13 50.13 12.53 12.53 1,783.89 445.97 103% I
0.00 0.00 #DIV/0!
- 752.62 752.62 1,542.87 1,542.87 8,816.86 18,074.57 109% I
- 4.24 4.24 514.31 514.31 10.58 1,283.35 167% I
- 1.54 1.54 373.47 373.47 22.74 5,514.68 107% I
- 2.39 2.39 442.05 442.05 5.95 1,100.51 167% I
233.94 - - 9.11 2,089.38 90% D
HOJA 109 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
66.46 - - - - 0% D
66.46 - - - - 0% D
61.37 - - - - 0% D
- - - 20.00 235.20 100% N
- - - - - 0% N
- - - - - 0% N
172.00 - - - - 0% D
228.00 - - - - 0% D
- 2,832.06 2,832.06 8,609.46 8,609.46 2,932.06 8,913.46 2932% I
290.50 - - - - 0% D
- - - - - 0% N
466.00 - - - - 0% D
599.50 - - - - 0% D
1,920.50 - - - - 0% D
74.00 - - - - 0% D
109.00 - - - - 0% D
136.00 - - - - 0% D
280.00 - - - - 0% D
374.00 - - - - 0% D
55.00 - - - - 0% D
0.00 0.00 #DIV/0!
2,251.04 - - - - 0% D
2,892.52 - - - - 0% D
- - - - - 0% N
364.44 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
88.66 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
65.64 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
HOJA 112 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
- - - - - 0% N
166.47 - - - - 0% D
464.66 - - - - 0% D
0.00 0.00 #DIV/0!
211.68 - - - - 0% D
1,568.96 - - - - 0% D
82.40 - - - - 0% D
110.55 - - - - 0% D
82.94 - - - - 0% D
0 0 #DIV/0!
0 0 #DIV/0!
- 761.79 761.79 662.76 662.76 1,523.58 1,325.51 200% I
- 650.48 650.48 643.98 643.98 1,412.27 1,398.15 185% I
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
- - - - - 0% N
- - - - - 0% N
0 0 #DIV/0!
33.90 - - - - 0% D
52.27 - - - - 0% D
548.68 - - - - 0% D
51.18 - - - - 0% D
113.85 - - - - 0% D
296.00 - - - - 0% D
24.72 - - - - 0% D
478.50 - - - - 0% D
161.10 - - - - 0% D
489.86 - - - - 0% D
0 0 #DIV/0!
322.82 - - - - 0% D
0 0 #DIV/0!
- - - - - 0% N
221.10 - - - - 0% D
72.56 - - - - 0% D
285.52 - - - - 0% D
76.34 - - - - 0% D
- - - - - 0% N
159.88 - - - - 0% D
100.71 - - - - 0% D
276.66 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
84.44 - - - - 0% D
537.00 - - - - 0% D
1,095.27 - - - - 0% D
0 0 #DIV/0!
987.84 - - - - 0% D
76.48 - - - - 0% D
353.85 - - - - 0% D
278.10 - - - - 0% D
515.90 - - - - 0% D
207.35 - - - - 0% D
0 0 #DIV/0!
18,500.32 - - - - 0% D
- - - - - 0% N
1,399.50 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
HOJA 116 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
0 0 #DIV/0!
- 14.00 14.00 473.76 473.76 110.00 3,722.40 115% I
- - - - - 0% N
9.58 - - - - 0% D
- - - - - 0% N
47.76 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
- 11.00 11.00 761.42 761.42 22.00 1,522.84 200% I
- 2.00 2.00 129.00 129.00 7.00 451.50 140% I
351.91 - - 45.00 1,218.15 78% D
- - - 4.00 135.48 100% N
- 14.00 14.00 352.52 352.52 32.00 805.76 178% I
769.31 - - 24.00 971.76 56% D
323.00 - - - - 0% D
201.38 - - 4.00 402.76 67% D
- - - 9.00 836.46 100% N
250.64 - - - - 0% D
- 2.00 2.00 126.78 126.78 4.00 253.56 200% I
42.78 - - - - 0% D
121.32 - - - - 0% D
44.14 - - - - 0% D
189.36 - - - - 0% D
- - - 1.00 116.41 100% N
- - - 1.00 171.53 100% N
HOJA 117 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
53.70 - - - - 0% D
0.00 0.00 #DIV/0!
- - - - - 0% N
73.70 - - - - 0% D
- - - - - 0% N
35.69 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
159.88 - - - - 0% D
30.74 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
139.62 - - - - 0% D
265.52 - - - - 0% D
0.00 0.00 #DIV/0!
141.12 - - - - 0% D
24.72 - - - - 0% D
73.70 - - - - 0% D
31.90 - - - - 0% D
0.00 0.00 #DIV/0!
381.46 - - - - 0% D
- - - - - 0% N
18.55 - - - - 0% D
0.00 0.00 #DIV/0!
- - - 14.00 473.76 100% N
- - - - - 0% N
10.62 - - - - 0% D
- - - 2.00 129.00 100% N
- 12.00 324.84 100% N
242.94 - - 5.00 202.45 45% D
40.94 - - 2.00 81.88 67% D
- - - 5.00 503.45 100% N
42.78 - - - - 0% D
40.44 - - - - 0% D
147.06 - - - - 0% D
HOJA 121 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
69.17 - - - - 0% D
0.00 0.00 #DIV/0!
- 20.31 20.31 446.01 446.01 60.14 1,320.67 151% I
88.37 88.37 504.59 504.59 232.69 1,328.66 161% I
254.95 - - 84.55 471.79 65% D
- 53.73 53.73 1,363.13 1,363.13 137.97 3,500.30 164% I
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
- - - 12.00 239.04 100% N
- - - 2.00 36.44 100% N
- - - 3.00 116.10 100% N
- 0.39 0.39 1.03 1.03 4.39 11.59 110% I
19.15 - - 1.60 5.47 22% D
- 44.08 44.08 355.73 355.73 45.08 363.80 4508% I
68.53 - - 13.38 140.62 67% D
49.42 - - 2.00 28.24 36% D
8.88 - - 1.00 8.88 50% D
50.67 - - 1.00 16.89 25% D
22.52 - - - - 0% D
- - - 2.00 76.68 100% N
- - - 1.00 44.55 100% N
0.00 0.00 #DIV/0!
- - - 2.00 197.88 100% N
- - - 6.00 49.26 100% N
- - - 10.00 115.80 100% N
- - - 3.00 28.65 100% N
- - - 2.00 36.44 100% N
289.40 - - - - 0% D
- 16.41 16.41 113.72 113.72 19.41 134.51 647% I
11.16 - - 19.03 219.04 95% D
0.00 0.00 #DIV/0!
- - - 1.00 16.51 100% N
- 0.60 0.60 4.16 4.16 7.60 52.67 109% I
- - - 1.00 22.69 100% N
0.00 0.00 #DIV/0!
- 0.10 0.10 0.95 0.95 4.10 39.03 103% I
- - - 1.00 98.94 100% N
- - - 1.00 24.93 100% N
57.32 - - 4.02 46.27 45% D
- - - 1.00 9.55 100% N
0.00 0.00 #DIV/0!
- - - 8.00 162.72 100% N
- - - 3.00 739.68 100% N
- - - 4.00 590.76 100% N
- - - 2.00 303.98 100% N
0.00 0.00 #DIV/0!
58.68 - - - - 0% D
0.00 0.00 #DIV/0!
- - - 23.00 778.32 100% N
HOJA 124 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
8.30 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - 23.00 622.61 100% N
- - - - - 0% N
- - - - - 0% N
- - - 2.00 126.78 100% N
40.44 - - - - 0% D
1,230.84 - - - - 0% D
147.06 - - - - 0% D
- - - 1.00 171.53 100% N
- - - - - 0% N
- - - - - 0% N
50.24 - - - - 0% D
122.74 - - - - 0% D
61.37 - - - - 0% D
- - - 11.00 129.36 100% N
168.60 - - - - 0% D
86.00 - - - - 0% D
114.00 - - - - 0% D
- - - - - 0% N
326.00 - - - - 0% D
205.50 - - - - 0% D
599.50 - - - - 0% D
1,920.50 - - - - 0% D
37.00 - - - - 0% D
109.00 - - - - 0% D
136.00 - - - - 0% D
198.00 - - - - 0% D
0.00 0.00 #DIV/0!
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
0.00 0.00 #DIV/0!
HOJA 125 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
- - - - - 0% N
- - - 2.00 54.14 100% N
- - - 5.00 125.90 100% N
587.76 - - - - 0% D
- 1.00 1.00 40.49 40.49 3.00 121.47 150% I
250.64 - - - - 0% D
42.78 - - - - 0% D
- - - 1.00 73.53 100% N
116.41 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
66.46 - - - - 0% D
122.74 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
120.84 - - - - 0% D
- - - - - 0% N
102.75 - - - - 0% D
299.75 - - - - 0% D
960.25 - - - - 0% D
37.00 - - - - 0% D
54.50 - - - - 0% D
68.00 - - - - 0% D
99.00 - - - - 0% D
140.00 - - - - 0% D
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
80.55 - - - - 0% D
0.00 0.00 #DIV/0!
845.23 - - - - 0% D
- - - - - 0% N
0.00 0.00 #DIV/0!
- - - - - 0% N
- - - - - 0% N
544.95 - - - - 0% D
16.11 - - - - 0% D
66.38 - - - - 0% D
0.00 0.00 #DIV/0!
70.56 - - - - 0% D
10.30 - - - - 0% D
36.85 - - - - 0% D
15.95 - - - - 0% D
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
HOJA 128 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
- - - - - 0% N
0.00 0.00 #DIV/0!
- - - - - 0% N
174.28 - - - - 0% D
0.00 0.00 #DIV/0!
592.32 - - 117.09 653.36 52% D
22.50 - - 124.06 708.38 97% D
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
- - - 4.00 38.08 100% N
- - - 1.00 98.94 100% N
41.76 - - - - 0% D
94.94 - - - - 0% D
75.56 - - - - 0% D
23.16 - - - - 0% D
0.00 0.00 #DIV/0!
15.71 - - - - 0% D
0.00 0.00 #DIV/0!
- - - 8.00 270.72 100% N
- - - - - 0% N
- - - - - 0% N
323.92 - - 6.00 242.94 43% D
40.44 - - - - 0% D
73.53 - - 1.00 73.53 50% D
- - - - - 0% N
- - - - - 0% N
122.74 - - - - 0% D
- - - - - 0% N
172.00 - - - - 0% D
228.00 - - - - 0% D
14,323.36 - - - - 0% D
163.00 - - - - 0% D
599.50 - - - - 0% D
1,920.50 - - - - 0% D
74.00 - - - - 0% D
280.00 - - - - 0% D
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
73.70 - - - - 0% D
107.07 - - - - 0% D
92.22 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
107.40 - - - - 0% D
99.57 - - - - 0% D
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
- 50.05 50.05 43.54 43.54 100.10 87.09 200% I
HOJA 130 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
172.00 - - - - 0% D
228.00 - - - - 0% D
290.50 - - - - 0% D
815.00 - - - - 0% D
466.00 - - - - 0% D
599.50 - - - - 0% D
1,920.50 - - - - 0% D
74.00 - - - - 0% D
109.00 - - - - 0% D
136.00 - - - - 0% D
280.00 - - - - 0% D
374.00 - - - - 0% D
550.00 - - - - 0% D
0.00 0.00 #DIV/0!
- - - - - 0% N
- - - - - 0% N
182.22 - - - - 0% D
177.32 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
327.42 - - - - 0% D
- - - - - 0% N
87.52 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
- 2.87 2.87 76.14 76.14 40.87 1,084.28 108% I
1,881.18 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
504.08 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
HOJA 136 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
1,933.20 - - - - 0% D
0.00 0.00 #DIV/0!
22.60 - - - - 0% D
52.27 - - - - 0% D
548.68 - - - - 0% D
51.18 - - - - 0% D
136.62 - - - - 0% D
179.82 - - - - 0% D
24.72 - - - - 0% D
63.80 - - - - 0% D
107.40 - - - - 0% D
454.87 - - - - 0% D
0.00 0.00 #DIV/0!
- - - - - 0% N
0.00 0.00 #DIV/0!
- - - - - 0% N
73.70 - - - - 0% D
72.56 - - - - 0% D
142.76 - - - - 0% D
76.34 - - - - 0% D
- - - - - 0% N
159.88 - - - - 0% D
153.70 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
241.65 - - - - 0% D
497.85 - - - - 0% D
0.00 0.00 #DIV/0!
423.36 - - - - 0% D
133.90 - - - - 0% D
89.32 - - - - 0% D
221.10 - - - - 0% D
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
- 609.57 609.57 530.33 530.33 1,219.14 1,060.65 200% I
HOJA 137 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
- - - - - 0% N
2,102.46 - - - - 0% D
4,899.52 - - - - 0% D
28,142.54 - - - - 0% D
0.00 0.00 #DIV/0!
3,250.69 - - - - 0% D
4,667.10 - - 124.01 1,964.32 30% D
1,771.47 - - 142.99 3,478.95 66% D
56.88 - - - - 0% D
8,344.94 - - - - 0% D
6,432.53 - - - - 0% D
637.76 - - - - 0% D
- - - - - 0% N
- 1,066.83 1,066.83 6,955.73 6,955.73 1,179.65 7,691.32 1046% I
- 624.15 624.15 5,604.87 5,604.87 723.80 6,499.72 726% I
- - - - - 0% N
0.00 0.00 #DIV/0!
- 1,374.71 1,374.71 3,148.09 3,148.09 4,008.33 9,179.08 152% I
8,855.36 - - 1,457.61 10,975.80 55% D
- - - - - 0% N
7.08 - - 145.87 2,347.05 100% D
- 13,553.07 13,553.07 13,417.54 13,417.54 16,746.91 16,579.44 524% I
- 1,495.28 1,495.28 4,650.32 4,650.32 1,496.36 4,653.68 138502% I
- 1,142.35 1,142.35 7,448.12 7,448.12 1,143.43 7,455.16 105897% I
- - - - - 0% N
3.16 - - - - 0% D
- - - - - 0% N
3.82 - - - - 0% D
- 161,134.02 169,039.42 40,283.51 42,259.86 170,534.91 42,633.73 11403% I
6.49 - - - 0% D
17.38 - - - - 0% D
8.13 - - - - 0% D
0.00 0.00 #DIV/0!
4,143.38 - - - - 0% D
5,058.67 - - - - 0% D
HOJA 141 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
14,484.00 - - - - 0% D
- 2.20 2.20 36.56 36.56 541.70 9,003.05 100% I
- 87.30 87.30 2,189.48 2,189.48 411.00 10,307.88 127% I
- - - - - 0% N
23,211.45 - - - - 0% D
35,132.24 - - - - 0% D
26,349.18 - - - - 0% D
- - - - - 0% N
6,490.19 - - - - 0% D
18,123.50 - - - - 0% D
21,299.21 - - - - 0% D
1,135.52 - - - - 0% D
700.71 - - - - 0% D
400.11 - - - - 0% D
1,576.09 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
181.50 - - - - 0% D
1,238.76 - - - - 0% D
10,297.18 - - 12.00 2,125.32 17% D
118.65 - - 29.00 2,843.74 96% D
350.48 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
1,476.07 - - - - 0% D
13,040.40 - - - - 0% D
2,705.05 - - - - 0% D
2,705.05 - - - - 0% D
- - - - - 0% N
- 802.84 802.84 1,718.08 1,718.08 2,960.84 6,336.20 137% I
11,439.00 - - 777.00 3,613.05 24% D
2,093.73 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
5,222.36 - - - - 0% D
14,720.08 - - - - 0% D
251.65 - - 2.00 3,145.68 93% D
78.83 - - 2.00 985.34 93% D
- 0.84 0.84 365.43 365.43 3.00 1,305.12 139% I
359.59 - - 2.00 4,494.90 93% D
2,000.45 - - 388.75 5,158.71 72% D
195.82 - - - - 0% D
- - - - - 0% N
- - - - - 0% N
54,446.48 - - - - 0% D
7,151.25 - - - - 0% D
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
- 133.24 133.24 115.92 115.92 266.48 231.84 200% I
HOJA 142 DE 546
INCREMENTOS
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
Acumulados Anteriores Este Periodo Acumuladas Anteriores Este Periodo Acumulados Cant Monto %
- - - - - 0% N
515.10 - - - - 0% D
- 231.68 231.68 3,523.85 3,523.85 274.18 4,170.28 645% I
0.00 0.00 #DIV/0!
474.76 - - - - 0% D
- - - 620.00 14,390.20 100% N
- 3.64 3.64 38.07 38.07 173.64 1,816.27 102% I
- - - - - 0% N
- 76.80 76.80 1,397.76 1,397.76 246.80 4,491.76 145% I
0.00 0.00 #DIV/0!
- - - - - 0% N
- - - - - 0% N
- - - - - 0% N
3,871,746.22
-0.07
CONSTRUCCIN DE LA UNIDAD EDUCATIVA ESTANDARIZADA DE
UBICADA EN LA PARROQUIA TARQUI, CANTON GU
CLCULO CON GR
RUBRO DESCRIPCION
110001 LIMPIEZA Y DESBROCE DEL TERRENO (MANUAL)
DESCRIPCIN CANTIDAD
FIGURA 1 1.00
FIGURA 2 1.00
RUBRO DESCRIPCION
110002 REPLANTEO Y NIVELACIN
DESCRIPCIN CANTIDAD
FIGURA 1 1.00
FIGURA 2 1.00
DESCRIPCIN
REPLANTEO Y NIVELACIN
RUBRO DESCRIPCION
120007 EXCAVACIN MANUAL DE CIMIENTOS Y PLINTOS
DESCRIPCIN EJES
1,2,3,4,5,6,7,8(lado
EXCAVACIN MANUAL DE CIMIENTOS Y PLINTOS derecho)
1,2,3,4,5,6,7,8(lado
EXCAVACIN MANUAL DE CIMIENTOS Y PLINTOS izquierdo)
A (2-3),(3,4),(4,5),(5-
EXCAVACIN MANUAL DE CIMIENTOS Y PLINTOS 6),(6-7),(7-8)
B (2-3),(3,4),(4,5),(5-6),
EXCAVACIN MANUAL DE CIMIENTOS Y PLINTOS (6-7),(7-8)
C (2-3),(3,4),(4,5),(5-6),
EXCAVACIN MANUAL DE CIMIENTOS Y PLINTOS (6-7),(7-8)
DESCRIPCION UBICACIN
BLOQUE DE 12 AULAS
EXCAVACIN MANUAL DE CIMIENTOS Y CODIGO A
PLINTOS (DEL MATERIAL DE EXCAVACION)
RUBRO DESCRIPCION
120011 SUB-BASE CLASE 3
CALCULO
DESCRIPCIN EJES
1,2,3,4,5,6,7,8(lado
SUB-BASE CLASE 3 derecho)
1,2,3,4,5,6,7,8(lado
SUB-BASE CLASE 3 izquierdo)
SUB-BASE CLASE 3 A(1-2)
SUB-BASE CLASE 3 B(1-2)
SUB-BASE CLASE 3 C (1-2)
SUB-BASE CLASE 3 D (1-2)
A (2-3),(3,4),(4,5),(5-
SUB-BASE CLASE 3 6),(6-7),(7-8)
B (2-3),(3,4),(4,5),(5-6),
SUB-BASE CLASE 3 (6-7),(7-8)
DESCRIPCIN EJES
1,2,3,4,5,6,7,8(lado
EXCAVACIN A MQUINA derecho)
1,2,3,4,5,6,7,8(lado
EXCAVACIN A MQUINA izquierdo)
EXCAVACIN A MQUINA A(1-2)
EXCAVACIN A MQUINA B(1-2)
EXCAVACIN A MQUINA C (1-2)
EXCAVACIN A MQUINA D (1-2)
A (2-3),(3,4),(4,5),(5-
EXCAVACIN A MQUINA 6),(6-7),(7-8)
B (2-3),(3,4),(4,5),(5-6),
EXCAVACIN A MQUINA (6-7),(7-8)
C (2-3),(3,4),(4,5),(5-6),
EXCAVACIN A MQUINA (6-7),(7-8)
D (2-3),(3,4),(4,5),(5-
EXCAVACIN A MQUINA 6),(6-7),(7-8)
DESCRIPCION UBICACIN
BLOQUE DE 12 AULAS
EXCAVACIN A MQUINA CODIGO A
(DEL MATERIAL DE EXCAVACION)
RUBRO DESCRIPCION
120005 EXCAVACIN A MQUINA
CALCULO
ZAPATAS
DESCRIPCIN EJES CANTIDAD
RUBRO DESCRIPCION
CONSTRUCTORA MIELES Y MIELES CIA. LTDA ING. GUIDO HERNN SNCHEZ
CONTRATISTA FISCALIZADOR
120005 EXCAVACIN A MQUINA
RUBRO DESCRIPCION
120009 RELLENO COMPACTADO A MQUINA CON MATERIAL IMPORTADO
DESCUENTO DE CIMIENTOS
EJES UNIDAD CANTIDAD
1 AL 8 M3 16.00
1 AL 8 M3 16.00
RUBRO DESCRIPCION
120023 TRANSPORTE DE MATERIAL DE EXCAVACIN. TRANSPORTE LIBRE 100M
DESCRIPCION UNIDAD
EXCAVACION MANUAL M3/KM
EXCAVACION A MAQUINA M3/KM
DESCRIPCION M3/KM
MATERIAL DE EXCAV.(LIBRE 100M) 8,645.04
TRNSPORTE MATERIALES O SOBREACARREO 15,885.62
TRNSPORTE MATERIALES O SOBREACARREO 34,560.50
TOTAL 59,091.16
RUBRO DESCRIPCION
120048 TRNSPORTE DE MATERIALES O SOBREACARREO
CALCULO
DESCRIPCION UBICACIN
RUBRO DESCRIPCION
130001 ACERO DE REFUERZO EN VARILLAS CORRUGADAS FY=4200 KG/CM2 (PROVISIN, CONF Y COLOCACIN)
RUBRO DESCRIPCION
130050 HORMIGN F'C= 210 KG/CM2 EN VIGAS DE CIMENTACIN
RUBRO DESCRIPCION
130017 HORMIGN F'C= 210 KG/CM2 EN COLUMNAS
RUBRO DESCRIPCION
130021 HORMIGN F'C= 210 KG/CM2 EN LOSA
NIVEL 7,85
LOSAS EJE CANT
LADO NORTE 2,3,4,5,6,7,8 1
LADO NORTE AB: 1 Y 2 1
LADO SUR 2,3,4,5,6,7,8 1
LADO SUR CD: 1 Y 2 1
TOTAL NIVEL 7,85
DESCUENTOS
VIGAS LADO NORTE Y SUR NIVEL 4,00
EJE VIGA UND
AB V5 M3
1Y2 V1 M3
1,2,3,4,5,6,7,8 V1,V2,V3,V4 M3
1,2,3,4,5,6,7,8 V1,V2,V3,V4 M3
A FALDON M3
C FALDON M3
TOTAL NIVEL 4,00
BLOQUES DE ALIVIAMIENTO
NIVEL UND
4.00 M3
7.85 M3
SUMA
DESCRIPCION
LAMINA ASFALTICA SOBRE SUPERFICIE DE LOSA
LAMINA ASFALTICA SOBRE SUPERFICIE DE LOSA
LAMINA ASFALTICA (INTERIOR ANTEPECHO SOBRE LOSA)
RUBRO DESCRIPCION
130025 HORMIGN F'C= 140 KG/CM2 EN REPLANTILLOS
1,2,3,4,5,6,7,8(lado
HORMIGN FC=140 KG/CM2 EN REPLANTILLOS izquierdo)
A (2-3),(3,4),(4,5),(5-
HORMIGN FC=140 KG/CM2 EN REPLANTILLOS 6),(6-7),(7-8)
B (2-3),(3,4),(4,5),(5-6),
HORMIGN FC=140 KG/CM2 EN REPLANTILLOS (6-7),(7-8)
C (2-3),(3,4),(4,5),(5-6),
HORMIGN FC=140 KG/CM2 EN REPLANTILLOS (6-7),(7-8)
D (2-3),(3,4),(4,5),(5-
HORMIGN FC=140 KG/CM2 EN REPLANTILLOS 6),(6-7),(7-8)
DESCRIPCION UBICACIN
BLOQUE DE 12 AULAS
HORMIGN FC=140 KG/CM2 EN REPLANTILLOS CODIGO A
(DEL MATERIAL DE EXCAVACIO
REPLANTILLOS
EJES UNIDAD CANTIDAD
A,D M3 2.00
B,C M3 2.00
1,2,3,4,5,6,7,8 M3 8.00
CONSTRUCTORA MIELES Y MIELES CIA. LTDA ING. GUIDO HERNN SNCHEZ
CONTRATISTA FISCALIZADOR
1,2,3,4,5,6,7,8 M3 8.00
1,2,3,4,5,6,7,8 M3 8.00
1,2,3,4,5,6,7,8 M3 8.00
RUBRO DESCRIPCION
130027 HORMIGN F'C= 210 KG/CM2 EN VIGAS
RUBRO DESCRIPCION
120048 TRNSPORTE DE MATERIALES O SOBREACARREO
RUBRO DESCRIPCION
130095 MALLA ELECTROSOLDADA R-126 (4.10)
TOTAL
RUBRO DESCRIPCION
130007 ALIVIANAMIENTO DE BLOQUE CEMENTO DE 40CMX20CMX20CM
NIVEL 4,00
EJES UNIDAD
A y B entre 1 - 2 U
A y B entre 1 - 2 U
B y Bentre 1 - 2 U
CONSTRUCTORA MIELES Y MIELES CIA. LTDA ING. GUIDO HERNN SNCHEZ
CONTRATISTA FISCALIZADOR
A - D (2-3 ; 4-5) U
A - B (6 - 7) U
A - D (3-4 ; 4-5 ; 5-6 ; 6-7 ; 7-8) U
B y B (2-3 ; 3-4 ; 4-5 ; 5-6 ; 6-7 ; 7-8) U
TOTAL BLOQUES (NIVEL + 4.00)
NIVEL 7,85
EJES UNIDAD
A y B entre 1 - 2 U
A y B entre 1 - 2 U
B y Bentre 1 - 2 U
A - D (2-3 ; 3-4 ; 4-5 ; 5-6 ; 6-7 ; 7-8) U
B y B (2-3 ; 3-4 ; 4-5 ; 5-6 ; 6-7 ; 7-8) U
TOTAL BLOQUES (NIVEL + 7,85)
RUBRO DESCRIPCION
180079 GEOTEXTIL NT 2000
RUBRO DESCRIPCION
130223 GEOMALLA BIAXIAL BX1100
CALCULO SENTIDO
1,2,3,4,5,6,7,8(ala
GEOMALLA BIAXIAL BX 1100 derecha)
1,2,3,4,5,6,7,8(ala
GEOMALLA BIAXIAL BX 1100 izquierda)
TRASLAPE
DESCRIPCIN EJES
RUBRO DESCRIPCION
160404 CONTRAPISO HORMIGN ARMADO FC`210KG/CM2 (E=10CM, PIEDRA BOLA=15CM, MALLA 5X10X10)
DESCUENTOS
EJES UNID.
COLUMNAS (0,50x0,50) M2
RESUMEN
DESC
CONTRAPISO
DESCUENTO
TOTAL HORM
RUBRO DESCRIPCION
140002 MAMPOSTERA DE BLOQUE DE 15CM
VIGUETAS -2
VIGUETAS -8
A 1
SOBRE LOSA PILARETES -11
VIGUETAS -1
8 1
1
1
LATERAL DERECHA VIGUETAS -4
P. BAJA Y P.
ALTA PILARETES -1
-1
COLUMNAS -2
COLUMNAS -2
8 1
SOBRE LOSA PILARETES -4
VIGUETAS -1
6 1
1
1
PARED INTERIOR 1
PLANTA BAJA Y VIGUETAS -4
PLANTA ALTA PILARETES -1
PILARETES -1
COLUMNAS -2
COLUMNAS -2
5 1
COLUMNAS -2
PARED INTERIOR
P. BAJA PUERTAS -1
PILARETES -2
PILARETES -2
4 1
1
PARED INTERIOR
P. ALTA COLUMNAS -2
VIGUETA -2
PILARETES -1
2 1
1
1
PARED INTERIOR 1
P. BAJA Y P. VIGUETAS -4
ALTA PILARETES -1
PILARETES -1
CONSTRUCTORA MIELES Y MIELES CIA. LTDA ING. GUIDO HERNN SNCHEZ
CONTRATISTA FISCALIZADOR
PARED INTERIOR
P. BAJA Y P.
ALTA
COLUMNAS -2
COLUMNAS -2
2 1
SOBRE LOSA PILARETES -2
VIGUETAS -1
1 1
1
LATERAL VIGUETAS -4
IZQUIERDA P. PILARETES -1
BAJA Y P. ALTA PILARETES -1
COLUMNAS -2
COLUMNAS -2
1 1
SOBRE LOSA PILARETES -5
VIGUETAS -1
PARED INTERIOR 2" 2
P. BAJA Y P.
ALTA 2
PARED INTERIOR 6" 2
P. BAJA Y P.
ALTA 2
TOTAL MA
4 1
1
1
PARED INTERIOR 1
P. BAJA Y PLANTA VIGUETAS -4
ALTA PILARETES -1
PILARETES -1
COLUMNAS -2
COLUMNAS -2
2 1
1
1
PARED INTERIOR
CONSTRUCTORA MIELES Y MIELES CIA. LTDA ING. GUIDO HERNN SNCHEZ
P. BAJA Y
CONTRATISTA P. FISCALIZADOR
ALTA
PARED INTERIOR 1
P. BAJA Y P. VIGUETAS -4
ALTA PILARETES -1
PILARETES -1
COLUMNAS -2
COLUMNAS -2
2 1
SOBRE LOSA PILARETES -2
VIGUETAS -1
1 1
1
LATERAL VIGUETAS -4
IZQUIERDA P. PILARETES -1
BAJA Y P. ALTA PILARETES -1
COLUMNAS -2
COLUMNAS -2
1 1
SOBRE LOSA PILARETES -5
VIGUETAS -1
PARED INTERIOR 6" 2
P. BAJA Y P.
ALTA 2
PARED INTERIOR 4" 2
P. BAJA Y P.
ALTA 2
PARED INTERIOR 6"CORTE F,F 2
P. BAJA Y P.
ALTA 2
TOTAL MAM
RESUMEN
TOTAL MAMPOSTERIA ALA DERECHA E IZQUIERDA
TOTAL MAMPOSTERIA ALA DERECHA
TOTAL MAMPOSTERIA ALA IZQUIERDA
TOTAL MAMPOSTERIA 15 CM 12 AULAS A
RUBRO DESCRIPCION
DESCRIPCION
TOTAL MAMPOSTERIA ALA DERECHA
TOTAL MAMPOSTERIA ALA IZQUIERDA
TOTAL MAMPOSTERIA 10 CM 12 AULAS A
RUBRO DESCRIPCION
130191 HORMIGN FC=210 KG/CM2 EN CONTORNO DE VENTANAS (ALFEIZAR)
BLOQUE 12 AULAS A
CONSTRUCTORA MIELES Y MIELES CIA. LTDA ING. GUIDO HERNN SNCHEZ
CONTRATISTA FISCALIZADOR
CANT L A
10 4.45 0.15
Alfeizar Inferior
10 4.00 0.20
10 4.45 0.15
Alfeizar Superior
10 4.00 0.20
20 1.80 0.15
Alfeizar Lateral
20 1.80 0.20
4 4.45 0.15
Alfeizar Inferior
2 8.95 0.20
4 4.45 0.15
Alfeizar Superior
2 8.95 0.20
4 1.80 0.15
Alfeizar Lateral
4 1.80 0.20
4 3.55 0.15
Alfeizar Inferior
4 2.20 0.20
4 3.55 0.15
Alfeizar Superior
4 2.20 0.20
8 0.90 0.15
Alfeizar Lateral
8 0.90 0.20
TOTAL HORMIGON
RUBRO DESCRIPCION
130064 HORMIGN FC=210KG/CM2 EN DINTELES Y RIOSTRAS
RUBRO DESCRIPCION
150004 ENLUCIDO VERTICAL INTERIOR.
RUBRO DESCRIPCION
150006 ENLUCIDO VERTICAL EXTERIOR
RUBRO DESCRIPCION
150002 EMPASTE INTERIOR DE PAREDES
RUBRO DESCRIPCION
150035 ENLUCIDO PALETEADO FINO DE FILOS Y FAJAS
CLCULOS
DESCRIPCION
FACHADA FRONTAL IZQUIERDA
BOQUETE
BOQUETE
FACHADA FRONTAL DERECHA
BOQUETE
BOQUETE
FACHADA POSTERIOR IZQUIERDA
BOQUETE
BOQUETE
FACHADA POSTERIOR DERECHA
BOQUETE
BOQUETE
FACHADALATERAL DERECHA
VENTANAS
VENTANAS
FACHADALATERAL IZQUIERDA
VENTANAS
VENTANAS
VENTANAS
VENTANAS
VENTANAS
PUERTAS
PUERTAS
VENTANAS
CONSTRUCTORA MIELES Y MIELES CIA. LTDA ING. GUIDO HERNN SNCHEZ
CONTRATISTA FISCALIZADOR
VENTANAS
VENTANAS
PUERTAS
PUERTAS
FACHADA INTERIOR PANTALLA DERECHA
VENTANA
ANTEPECHO BALCON
ANTEPECHO BALCON
ANTEPECHO BALCON
ANTEPECHO BALCON
FACHADA INTERIOR PANTALLA IZQUIERDA
VENTANA
ANTEPECHO BALCON
ANTEPECHO BALCON
ANTEPECHO BALCON
ANTEPECHO BALCON
RUBRO DESCRIPCION
160004 CERMICA DE PISO ALTO TRFICO ANTIDESLIZANTE
CONSTRUCTORA MIELES Y MIELES CIA. LTDA ING. GUIDO HERNN SNCHEZ
CONTRATISTA FISCALIZADOR
CONSTRUCCIN DE LA UNIDAD EDUCATIVA ESTANDARIZADA DE
UBICADA EN LA PARROQUIA TARQUI, CANTON GU
CLCULO CON GR
RUBRO DESCRIPCION
160012 MASILLADO Y ALISADO DE PISOS
RESUMEN
TOTAL MASILLADO PLANTA
TOTAL DESCUENTO MASILLADO P
TOTAL MASILLADO PLANTA
RUBRO DESCRIPCION
160026 BARREDERAS DE CERMICA H=10CM
RUBRO DESCRIPCION
180093 PORCELANATO EN MESN
RUBRO DESCRIPCION
170068 VENTANA DE ALUMINIO Y VIDRIO 6MM CORREDIZA
RUBRO DESCRIPCION
170193 MALLA ANTIMOSQUITO
RUBRO DESCRIPCION
170107 PUERTA METLICA DE TOL, TUBO RECT. DE 50X25X2MM, Y VIDRIO TEMPLADO 6MM, INC. CERRADURA
RUBRO DESCRIPCION
170370 PUERTA DE TOL 1/20", MARCO Y ESTRUCTURA DE 25*50*1,5 CON CERRADURA
RUBRO DESCRIPCION
170029 PANEL DE ACERO INOXIDABLE
RUBRO DESCRIPCION
170032 PASAMANO DE ACERO INOXIDABLE
RUBRO DESCRIPCION
170031 PASAMANO DE ACERO INOXIDABLE PARA BAO DE DISCAPACITADOS
RUBRO DESCRIPCION
180113 CIELO RASO FALSO DE ESTRUCTURA DE ALUMINIO PREPINTADO AL HORNO COLOR BLANCO CON PLANCHAS DE G
RUBRO DESCRIPCION
RUBRO DESCRIPCION
180080 PINTURA ELASTOMRICA EXTERIORES
RUBRO DESCRIPCION
190027 CUBIERTA DE POLICARBONATO ALVEOLAR 8MM (INCLUYE ESTRUCTURA METLICA)
RUBRO DESCRIPCION
180006 CERMICA EN PAREDES
RUBRO DESCRIPCION
200031 PUNTO DE AGUA PVC ROSCABLE1/2"
RUBRO DESCRIPCION
200032 PUNTO DE AGUA PVC ROSCABLE3/4"
RUBRO DESCRIPCION
200030 PUNTO DE AGUA PVC ROSCABLE1"
RUBRO DESCRIPCION
200150 TUBERA PVC ROSCABLE 1/2"
RUBRO DESCRIPCION
200151 TUBERA PVC ROSCABLE 3/4"
RUBRO DESCRIPCION
200149 TUBERA PVC ROSCABLE 1"
RUBRO DESCRIPCION
200148 TUBERA PVC ROSCABLE 1 1/4"
RUBRO DESCRIPCION
200146 TUBERA PVC ROSCABLE 1 1/2"
RUBRO DESCRIPCION
200147 TUBERA PVC ROSCABLE 2"
RUBRO DESCRIPCION
200226 VLVULA DE CONTROL ROSCADA DIAM 1/2"
RUBRO DESCRIPCION
200227 VLVULA DE CONTROL ROSCADA DIAM 3/4"
RUBRO DESCRIPCION
200228 VLVULA DECONTROL ROSCADA DIAM 1"
RUBRO DESCRIPCION
200229 VLVULA DECONTROL ROSCADA DIAM 1"
RUBRO DESCRIPCION
200230 VLVULA DE CONTROL ROSCADA DIAM 1 1/2"
RUBRO DESCRIPCION
200231 VLVULA DE CONTROL ROSCADA DIAM 2"
RUBRO DESCRIPCION
200007 COLUMNA DE PVC DE 2"
RUBRO DESCRIPCION
220005 CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO
RUBRO DESCRIPCION
220018 DESAGES PVC 50 MM. TIPO B(INCLUYE ACCESORIOS)
RUBRO DESCRIPCION
220016 DESAGES PVC 110MM TIPO B (INCLUYE ACCESORIOS)
RUBRO DESCRIPCION
220031 SUMIDERO DE PISO DE 2" INCLUYE REJILLA
RUBRO DESCRIPCION
220032 SUMIDERO DE PISO DE 3" INCLUYE REJILLA
RUBRO DESCRIPCION
220053 TUBERA DE 75 DE PVC TIPO B
RUBRO DESCRIPCION
220049 TUBERA DE 110 MM PVC TIPO B
RUBRO DESCRIPCION
220050 TUBERA DE 160 DE PVC TIPO B
RUBRO DESCRIPCION
220209 REGISTRO INSPECCIN Y LIMPIEZA PVC, 160MM
RUBRO DESCRIPCION
220001 BAJANTES DE TUBERA PVC TIPO B DE 110 MM
RUBRO DESCRIPCION
200317 PUNTO DE VENTILACION DE 75MM TIPO A
RUBRO DESCRIPCION
220053 TUBERA DE 75 DE PVC TIPO B
RUBRO DESCRIPCION
220111 TAPON REJILLA
RUBRO DESCRIPCION
220001 BAJANTES DE TUBERA PVC TIPO B DE 110 MM
RUBRO DESCRIPCION
220005 CAJA DE REVISIN DE 60 X 60 CON TAPA CERCO METLICO
RUBRO DESCRIPCION
220204 SUMIDERO DE CUBIERTA DE 75MM INCLUYE REJILLA CUPULA
RUBRO DESCRIPCION
220205 SUMIDERO DE CUBIERTA DE 110MM INCLUYE REJILLA CUPULA
RUBRO DESCRIPCION
220053 TUBERA DE 75 DE PVC TIPO B
RUBRO DESCRIPCION
220049 TUBERA DE 110 MM PVC TIPO B
RUBRO DESCRIPCION
220019 DESAGES PVC 75 MM. TIPO B (INCLUYE ACCESORIOS)
RUBRO DESCRIPCION
220016 DESAGES PVC 110MM TIPO B (INCLUYE ACCESORIOS)
RUBRO DESCRIPCION
210013 INODORO BLANCO CON FLUXMETRO
RUBRO DESCRIPCION
210027 LAVAMANOS PARA EMPOTRAR BLANCO (508MMX445 MM) CON GRIFERA DE 4" CR
RUBRO DESCRIPCION
210025 LAVAMANOS DE PEDESTAL CORTO CON LLAVE TEMPORIZADA
RUBRO DESCRIPCION
210042 URINARIO CON LLAVE PRESSMATIC
RUBRO DESCRIPCION
RUBRO DESCRIPCION
300303 PUNTO DE ILUMINACIN 120V
RUBRO DESCRIPCION
301761 INTERRUPTOR SIMPLE
RUBRO DESCRIPCION
301762 INTERRUPTOR DOBLE
RUBRO DESCRIPCION
301097 CONMUTADOR SIMPLE
RUBRO DESCRIPCION
301098 CONMUTADOR DOBLE
RUBRO DESCRIPCION
302511 SENSOR DE MOVIMIENTO 180
RUBRO DESCRIPCION
301403 SENSOR DE MOVIMIENTO 360
RUBRO DESCRIPCION
300165 LUMINARIA FLUORESCENTE 3X32W EMPOTRABLE
RUBRO DESCRIPCION
301895 OJO DE BUEY CON FLUORESCENTE COMPACTA 1X26W
RUBRO DESCRIPCION
302398 LUMINARIA APLIQUE DE PARED INTERIOR /EXTERIOR 1X26W
RUBRO DESCRIPCION
301893 LUMINARIA TIPO PLAFON 2X26W
RUBRO DESCRIPCION
301898 PUNTO TOMACORRIENTE NORMAL DOBLE 127V PARED O TECHO
RUBRO DESCRIPCION
301899 PUNTO TOMACORRIENTE NORMAL DOBLE 127V PISO
RUBRO DESCRIPCION
300314 PUNTO TOMACORRIENTE ESPECIAL 127V
RUBRO DESCRIPCION
300313 PUNTO TOMACORRIENTE ESPECIAL 220V BIFSICO
RUBRO DESCRIPCION
300876 PUNTO SECADOR DE MANOS
RUBRO DESCRIPCION
300877 PUNTO EXTRACTOR DE BAO
RUBRO DESCRIPCION
300315 PUNTO TOMACORRIENTE REGULADO DOBLE 127V PARED O TECHO
RUBRO DESCRIPCION
300317 PUNTO PARA TOMACORRIENTE REGULADO DOBLE 127V PISO
RUBRO DESCRIPCION
300318 PUNTO DE TOMACORRIENTE ESPECIAL REGULADO 127V
RUBRO DESCRIPCION
301909 CENTRO DE CARGA TRIFASICO 6 ESPACIOS
RUBRO DESCRIPCION
301911 CENTRO DE CARGA TRIFASICO 20 ESPACIOS
RUBRO DESCRIPCION
301912 CENTRO DE CARGA TRIFASICO 30 ESPACIOS
RUBRO DESCRIPCION
301917 BREAKER ENCHUFABLE 1P - 16 A
RUBRO DESCRIPCION
301918 BREAKER ENCHUFABLE 1P - 20 A
RUBRO DESCRIPCION
301921 BREAKER ENCHUFABLE 2P - 20 A
RUBRO DESCRIPCION
301727 BREAKER ENCHUFABLE 3P - 20 A
RUBRO DESCRIPCION
302540 BREAKER ENCHUFABLE 3P - 30A
RUBRO DESCRIPCION
301173 INTERRUPTOR TERMOMAGNETICO 3P-15-20-30-40-50-60A CAJA MOLDEADA MARCO 100 TIPO N
RUBRO DESCRIPCION
302513 CAJA DE PASO 10X10
RUBRO DESCRIPCION
302538 CONECTOR Y CLAVIJA PARA AIRES ACONDICIONADOS INTERIORES
RUBRO DESCRIPCION
302539 CAJA IP65 PARA AIRES ACONDICIONADOS EXTERIORES 20X20X15 (CM)
RUBRO DESCRIPCION
301999 ALIMENTADOR 1X#12(F)+1X#12(N) AWG THHN
RUBRO DESCRIPCION
302007 ALIMENTADOR 1X#12(F)+1X#12(N)+1X#14(T) AWG THHN
RUBRO DESCRIPCION
301080 ALIMENTADOR 1X#10(F)+1X#10(N)+1X#14(T) AWG THHN
RUBRO DESCRIPCION
302668 ALIMENTADOR 2X#12(F)+1X#14(T) AWG THHN
RUBRO DESCRIPCION
302669 ALIMENTADOR 2X#10(F)+1X#14(T) AWG THHN
RUBRO DESCRIPCION
302527 ALIMENTADOR 3X#8(F)+1X#8(N)+1X#10(T) AWG TTU
RUBRO DESCRIPCION
301004 FUNDA BX 1"
RUBRO DESCRIPCION
302444 CABLE CONCENTRICO 2X14 AWG
RUBRO DESCRIPCION
300484 SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 1/2"
RUBRO DESCRIPCION
300486 SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 1"
RUBRO DESCRIPCION
300489 SUMNISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 2"
RUBRO DESCRIPCION
300482 SUMINISTRO E INSTALACIN DE TUBERA CONDUIT GALV EMT 3"
RUBRO DESCRIPCION
RUBRO DESCRIPCION
301561 CONDUCTOR THHN FLEX #12 AWG
RUBRO DESCRIPCION
301562 CONDUCTOR THHN FLEX #10 AWG
RUBRO DESCRIPCION
302441 CABLE FLEXIBLE 6 AWG
RUBRO DESCRIPCION
302442 CABLE FLEXIBLE 4 AWG
RUBRO DESCRIPCION
302443 CABLE FLEXIBLE 2 AWG
RUBRO DESCRIPCION
400717 SUMINISTRO E INSTALACION SPLIT CONSOLA TIPO PISO/TECHO 36000 BTU, R410 A. INCLUYE CONSOLAS DECORA
RUBRO DESCRIPCION
402010 SUMINISTRO E INSTALACIN UNIDAD TIPO FAN COIL 36000 BTU/H, R410A, 208-220V/2PH/60HZ. INCLUYE ARRAN
RUBRO DESCRIPCION
400005 VENTILADOR DE EXTRACCIN EN LNEA, 825 CFM, @ 0.5" WG, 1/3HP, 1725 RPM, 2/220/60. INCLUYE ARRANQUE
RUBRO DESCRIPCION
402480 VENTILADOR DE EXTRACCIN CUADRADO IN-LINE, 525 CFM @ 0.35" CA, 1725 RPM, 1/4HP, 115/1/60
RUBRO DESCRIPCION
400632 DUCTO DE TOL GALVANIZADO SIN AISLAMIENTO
RUBRO DESCRIPCION
401373 MANGA FLEXIBLE DIAM. 4" CON AISLAMIENTO
RUBRO DESCRIPCION
401156 LOUVER DE SALIDA DE 12"X8"
RUBRO DESCRIPCION
400616 DIFUSOR DE SUMINISTRO 8" X 8" DE 4 VIAS
RUBRO DESCRIPCION
400631 DUCTO DE TOL GALVANIZADO CON AISLAMIENTO
RUBRO DESCRIPCION
402024 TERMOSTATO DIGITAL PROGRAMABLE DE UNA ETAPA
RUBRO DESCRIPCION
400702 REJILLA DE EXTRACCIN DE 6"X6 INCLUYE CAJA DE ACOPLES
RUBRO DESCRIPCION
400706 REJILLA DE RETORNO 18"X12" INCLUYE CAJA DE ACOPLES
RUBRO DESCRIPCION
400831 VENTILADOR HELICOIDAL DE TECHO DE 48" 60 W, 110 V, 60 HZ, 1 PH
RUBRO DESCRIPCION
402481 CONTROL DE VENTILADOR DE TECHO DE 3 VELOCIDADES.
RUBRO DESCRIPCION
400670 MANGA FLEXIBLE DIAM. 8" CON AISLAMIENTO
RUBRO DESCRIPCION
401347 TUBERA DE COBRE ACR 5/8, INCLUYE AISLAMIENTO
RUBRO DESCRIPCION
401395 CABLE DE CONTROL 4X#12, INCLUYE CANALIZACIN EMT 3/4"
RUBRO DESCRIPCION
402026 CABLE DE CONTROL 4X#16, INCLUYE TUBERA EMT 3/4"
RUBRO DESCRIPCION
402025 CABLE DE CONTROL 2X#14, INCLUYE TUBERA EMT 3/4"
RUBRO DESCRIPCION
402427 TUBERIA DE DRENAJE DE 1"
RUBRO DESCRIPCION
401329 TUBERA DE DRENAJE 3/4"
RUBRO DESCRIPCION
400655 GAS REFRIGERANTE R-410A
RUBRO DESCRIPCION
402011 SUMINISTRO E INSTALACIN UNIDAD TIPO FAN COIL 48000 BTU/H, R410A, 208-220V/2PH/60HZ. INCLUYE ARRAN
RUBRO DESCRIPCION
500082 PUNTO SIMPLE VOZ Y/O DATOS CAT 6A CERTIFICADO
RUBRO DESCRIPCION
500797 ACCESS POINT 1 PUERTO GIGA
RUBRO DESCRIPCION
500798 PUNTO PARA SALIDA HDMI
RUBRO DESCRIPCION
500751 ADMINISTRADOR HORIZONTAL 1U
RUBRO DESCRIPCION
500289 PATCH CORD CAT 6A 7FT (3M)
RUBRO DESCRIPCION
500077 PATCH CORD CAT 6A 3FT(1M)
RUBRO DESCRIPCION
500136 PATCH PANEL 24 PUERTOS CAT 6A INCLUYE JACKS
RUBRO DESCRIPCION
500426 BANDEJA TIPO ESCALERILLA GALVANIZADA 200X100MM INCLUYE TAPA Y ACCESORIOS
RUBRO DESCRIPCION
500521 SWITCH DE CAPA 2, 48 PUERTOS 10/100/1000 MBPS 4SFP
RUBRO DESCRIPCION
500801 PATCH CORD FIBRA PTICA 1M
RUBRO DESCRIPCION
500449 TRANSEIVER DE FIBRA A ETHERNET 1GB
RUBRO DESCRIPCION
500124 TELFONO IP SIMPLES PARA ESCRITORIO
RUBRO DESCRIPCION
500828 RACK DE PARED 24 UR CERRADO
RUBRO DESCRIPCION
500608 ODF-12 PUERTOS FIBRA PTICA DISTRIBUCIN FRAME
RUBRO DESCRIPCION
500215 TUBERA EMT DE 3/4" Y ACCESORIOS
RUBRO DESCRIPCION
500211 TUBERA EMT DE 1" Y ACCESORIOS
RUBRO DESCRIPCION
RUBRO DESCRIPCION
500648 TECLADO ALFANUMRICO
RUBRO DESCRIPCION
500157 CENTRAL DE SEGURIDAD DE 16 ZONAS INCLUYE TECLADO LCD
RUBRO DESCRIPCION
500836 SIRENA 15W BLINDADA
RUBRO DESCRIPCION
500130 DETECTOR DE MOVIMIENTO DOBLE TECNOLOGA
RUBRO DESCRIPCION
500256 CABLE UTP CAT 5E
RUBRO DESCRIPCION
500814 CABLEADO 2X14 AWG
RUBRO DESCRIPCION
500210 TUBERA EMT 1/2" Y ACCESORIOS
RUBRO DESCRIPCION
500215 TUBERA EMT DE 3/4" Y ACCESORIOS
RUBRO DESCRIPCION
500720 PUNTO DE RED DE SEGURIDAD
RUBRO DESCRIPCION
500877 CMARA IP TIPO BULLET POE, 1.3 MP
RUBRO DESCRIPCION
500183 MDULO DE CONTROL
RUBRO DESCRIPCION
500752 DETECTOR DE HUMO FOTOELCTRICO
RUBRO DESCRIPCION
500758 ESTACIN MANUAL DE INCENDIOS
RUBRO DESCRIPCION
500610 AVISO DE SALIDA CON ILUMINACIN LED
RUBRO DESCRIPCION
500760 LUZ ESTROBOSCPICA CON SIRENA
RUBRO DESCRIPCION
500679 MDULO DE AISLAMIENTO
RUBRO DESCRIPCION
500682 MODULO DE MONITOREO
RUBRO DESCRIPCION
500058 LUZ DE EMERGENCIA AUTNOMA
RUBRO DESCRIPCION
500035 CABLEADO ANTIFLAMA 2 X 16 AWG
RUBRO DESCRIPCION
500355 FUENTE DE ALIMENTACIN 24 V/8A
RUBRO DESCRIPCION
500215 TUBERA EMT DE 3/4" Y ACCESORIOS
RUBRO DESCRIPCION
500875 PARLANTE PARA TECHO 8W, 8" Y 100V
RUBRO DESCRIPCION
500878 MICRFONO POE PARA ESCRITORIO
RUBRO DESCRIPCION
500814 CABLEADO 2X14 AWG
RUBRO DESCRIPCION
500210 TUBERA EMT 1/2" Y ACCESORIOS
RUBRO DESCRIPCION
500300 PUNTO DE SONIDO
TOTAL 437.82
CALCULO
CANTIDAD LARGO ANCHO ALTURA VOLUMEN
TOTAL 175.12
TOTAL 437.82
ALTURA VOLUMEN
AREA UNIDAD
PROMEDIO M3
437.82 1.55 678.62 M3
TOTAL 678.62 M3
CALCULO
ZAPATAS
b B h LONGITUD VOLUMEN
TOTAL 891.56
PLATAFORMA
ANCHO h VOLUMEN
27.05 1.04 1012.75
1 1.04 6.50
1 1.04 6.50
TOTAL 1025.75
RESUMEN
TOTAL EJES 1-8 91.22 M3
TOTAL EJES A 32.59 M3
TOTAL EJES B 38.52 M3
TOTAL CIMENTACION 162.34 M3
COORDENADAS
DESCRIPCIN ESTE NORTE
CAMPAMENTO
CALLE MIGUEL HDEALCIVAR
OBRA Y 622950 9759760
FCO DE ORELLANA 622724 9761506
JUAN TANCA MARENGO 622270 9762362
VIADUCTO LA PROSPERINA 618609 9763413
PERIMETRAL 616987 9761729
VIA A LA COSTA 616011 9758363
VIA A LA COSTA- COSTALMAR 610514 9758480
PTO HONDO
ENTRADA RECINTO CASAS 607525 9757998
VIEJAS 603352 9755983
BOTADERO 603013 9756592
OBSERVACIONES
ESTA PLANILLA
LIMPIEZA Y
DESBROCE DEL
TERRENO 0.00 M2
(MANUAL),
h=0,4 m
EXCAVACIN
MANUAL DE 328.37 M3
CIMIENTOS Y
PLINTOS
EXCAVACIN A 891.56 M3
MQUINA
TOTAL 1219.93 M3
CULO
RESUMEN
TOTAL EJES 1-8 91.22 M3
TOTAL EJES A 32.59 M3
TOTAL EJES B 38.52 M3
TOTAL CIMENTACION 162.34 M3
7,85 344.71
DESCRIPCION M3
HORMIGON EN LOSAS NIVEL 4,00 Y + 7,85 344.71
TOTAL 344.71
DESCUENTOS
DESCRIPCION M3
VIGAS -49.73
BLOQUES DE ALIVIMIENTO -125.60
DUCTOS -0.57
SUMAN -175.90
RESUMEN
TOTAL CALCULOS
TOTAL LOSA NIVEL 4 + 7,85 344.71
TOTAL DESCUENTOS -175.90
TOTAL HORMIGON EN LOSA 168.81
TOTAL 307.14
ALTURA VOLUMEN
UBICACIN AREA UNIDAD
PROMEDIO M3
BLOQUE DE 12 AULAS
CODIGO A 307.14 0.10 30.71 M3
L MATERIAL DE EXCAVACION)
TOTAL 30.71 M3
Altura Caras
LARGO (9,65) + H Laterales,
ANCHO AREA
geotextil H geotextil
(0,6+0,6)
LAPE
Altura Caras
Laterales,
CANTIDAD DE TRASLAPE ANCHO AREA
H geotextil
(0,6+0,6)
Altura Caras
LARGO ANCHO Laterales, AREA
H geotextil
(0,6+0,6)
1.60 1.80 1.20 4.80
1.60 2.10 1.20 5.28
1.60 2.10 1.20 5.28
1.60 1.80 1.20 4.80
TOTAL 798.30
CALCULO SENTIDO Y
TRASLAPE
Altura Caras
CANTIDAD DE Laterales, H
TRASLAPE ANCHO AREA
TRASLAPE geomalla
(0,6+0,6)
Altura Caras
Laterales, H
CANTIDAD LARGO ANCHO AREA
geomalla
(0,6+0,6)
TOTAL 798.30
DESCRIPCION LARGO
O 662.90
-8.00
TOTAL HORMIGON EN LOSA 654.90
498.52
511.84
1,010.36
M2
86.42
64.31
150.73
ANTA BAJA
ALTURA TOTAL
3.38 6.76
3.38 16.90
CONSTRUCTORA MIELES Y MIELES CIA. LTDA ING. GUIDO HERNN SNCHEZ
CONTRATISTA FISCALIZADOR
2.10 8.40
2.10 4.20
3.38 6.76
2.10 2.10
2.10 4.20
3.38 6.76
3.38 6.76
62.84
ANTA BAJA
ALTURA TOTAL
3.38 6.76
3.38 16.90
2.10 4.20
2.10 4.20
3.38 6.76
2.10 4.20
3.38 3.38
2.10 4.20
3.38 6.76
3.38 6.76
64.12
ANTA ALTA
ALTURA TOTAL
3.38 6.76
3.38 16.90
2.10 4.20
2.10 4.20
3.38 6.76
2.10 4.20
3.38 6.76
2.10 4.20
3.38 6.76
3.38 6.76
67.50
ANTA ALTA
ALTURA TOTAL
3.38 6.76
3.38 16.90
2.10 4.20
2.10 6.30
3.38 3.38
2.10 4.20
3.38 6.76
2.10 4.20
3.38 6.76
3.38 6.76
66.22
CONSTRUCTORA MIELES Y MIELES CIA. LTDA ING. GUIDO HERNN SNCHEZ
CONTRATISTA FISCALIZADOR
A
ALTURA TOTAL
0.40 11.20
0.40 11.20
22.40
LANTA BAJA
ALTURA TOTAL
4.45 17.80
4.40 8.80
1.87 1.87
2.95 2.95
1.85 1.85
2.96 11.84
4.45 26.70
1.64 1.64
4.40 8.80
2.90 26.10
2.38 2.38
1.42 1.42
1.74 1.74
113.89
LANTA BAJA
ALTURA TOTAL
4.45 17.80
4.40 8.80
2.95 2.95
1.85 1.85
2.96 17.76
1.75 1.75
4.45 17.80
4.40 8.80
1.64 1.64
2.90 29.00
108.15
LANTA BAJA
ALTURA TOTAL
4.45 17.80
2.95 2.95
1.85 1.85
2.96 17.76
1.85 3.70
4.45 17.80
4.40 8.80
1.64 1.64
CONSTRUCTORA MIELES Y MIELES CIA. LTDA ING. GUIDO HERNN SNCHEZ
CONTRATISTA FISCALIZADOR
2.90 29.00
101.30
LANTA BAJA
ALTURA TOTAL
4.45 17.80
2.95 2.95
1.85 1.85
2.96 17.76
1.75 1.75
4.45 17.80
4.40 8.80
1.64 1.64
2.90 29.00
99.35
OSA
ALTURA TOTAL
33.60 67.20
10.45 10.45
9.45 9.45
1.00 1.00
88.10
ALES
283.08
510.79
793.87
ALTURA TOTAL
9.00 96.83
3.00 -15.90
9.00 96.83
3.00 -15.90
9.00 87.83
9.00 9.04
3.00 -15.90
9.00 87.83
9.00 9.04
3.00 -15.90
9.00 302.57
0.90 -3.24
1.80 -77.76
9.00 302.57
0.90 -3.24
1.80 -77.76
3.35 112.71
3.35 112.71
0.90 -1.62
0.90 -14.58
0.90 -19.44
2.10 -12.60
2.10 -3.78
3.35 112.71
3.35 112.71
0.90 -1.62
0.90 -14.58
0.90 -19.44
2.10 -12.60
2.10 -3.78
9.00 302.57
1.60 -50.88
CONSTRUCTORA MIELES Y MIELES CIA. LTDA ING. GUIDO HERNN SNCHEZ
CONTRATISTA FISCALIZADOR
3.00 -95.40
0.90 -1.62
0.90 -12.78
0.90 -1.24
9.00 302.57
1.60 -50.88
3.00 -95.40 LONG. TOTAL (9,00 m.)
0.90 -1.62
0.90 -12.78
0.90 -1.24
7.20 242.08
1.60 -50.88
3.00 -95.40
0.90 -1.62
0.90 -12.78
0.90 -1.24
7.20 242.08
1.60 -50.88
3.00 -95.40
0.90 -1.62
0.90 -12.78
0.90 -1.24
1555.34
CLCULOS
PAG
PAG
CONSTRUCTORA MIELES Y MIELES CIA. LTDA ING. GUIDO HERNN SNCHEZ
CONTRATISTA FISCALIZADOR
PLANILLA
1
2
11
12
PAG
PAG
PLANILLA
5
6
11
12
PAG
PAG
PAG
PLANILLA
9
12
PAG
PAG
PLANILLA
5
12
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PAG
PLANILLA
1 1038.72 PRIMERA LIMPIEZA
12 1007.13 SEGUNDA LIMPIEZA
31.59 2045.85
31.59 POR COBRAR
PLANILLA
1 1038.72 PRIMER REPLANTEO
12 799.37 SEGUNDO REPLANTEO
31.59 1,838.090
PLANILLA
25150.80
32832.24
3747.68 61730.72
5757.34
67488.06 9505.02
PLANILLA
149.98
18.83
168.81 18.83
PLANILLA
PLANILLA
34560.5
26730.62
61291.12 26730.62
PLANILLA
14 6.4
0.40
PLANILLA
6 654.16 654.9
11 0.74 0.74
654.9
PLANILLA
9 23.6 793.87
11 770.27
793.87 770.27 INCREMENTO REAL
PLANILLA
12 1429.18 REVISAR CUADROS,PLANILLAN DOS VECES PLANTA BAJA
216.91
PLANILLA
12 544.22
-153.77
PLANILLA
12 6.24
-18.40
PLANILLA
14 72.09
11.76
PLANILLA
14 25.2
12.00
PLANILLA
14 22.68
13.62
PLANILLA
14 6
-84.74
PLANILLA
14 54.13
-0.49
PLANILLA
14 12
1.00
PLANILLA
14 1.6
0.00
PLANILLA
12 1247.77
389.19
PLANILLA
13 1212.66 1267.09
14 154.91 GRADAS - HOMOLAGADO
1367.57 154.91
PLANILLA
13 1247.77
-205.97
PLANILLA
12 243.10
13 28.33
14 62.00 HOMOLOGADO
333.43 67.82
PLANILLA
13 17
-2.00
PLANILLA
13 10
0.00
PLANILLA
13 19
PLANILLA
13 6.6
-11.80
PLANILLA
13 11.6
-5.10
PLANILLA
13 1.2
-0.80
PLANILLA
13 25.02
14 89.95 HOMOLOGADO
114.97 95.67
PLANILLA
13 16.83
-16.37
PLANILLA
13 4
-6.00
PLANILLA
13 10
0.00
PLANILLA
12 169.00 1602.90
-5.00
PLANILLA
14 5
-2.00
PLANILLA
14 10
2.00
PLANILLA
13 61
-5.00
PLANILLA
12 60
-47.00
PLANILLA
12 7 HOMOLOGADO SALA DE PROFESORES
-1.00
PLANILLA
12 3
-22.00
PLANILLA
12 8
0.00
PLANILLA
12 16
12.00 HOMOLOGADO
PLANILLA
12 2
-2.00
PLANILLA
12 2
1.00
PLANILLA
12 20
0.00
PLANILLA
14 24
7.00
PLANILLA
14 12
3.00
PLANILLA
14 12
-12.00
PLANILLA
14 12
2.00
PLANILLA
14 1
-1.00
PLANILLA
12 12
-78.00
PLANILLA
14 12
-1.00
PLANILLA
14 4
1.00
PLANILLA
14 12
1.00
PLANILLA
14 1
-1.00
PLANILLA
14 2
0.00