SUBJECT:
A. GENERAL REQUIREMENTS
1.00 Mobilization/Demobilization lot
2.00 Temporary Facilities
a. Field office (to include seperate office for PM and lot
Owner, conference room with internet access
b. Temporary warehouse lot
c. Temporary toilet (seperate from the workers) lot
d. Temporary enclosure lot
3.00 Materials handling lot
4.00 Transport handling lot
5.00 Tools and equipment lot
6.00 Water/power facilities
a. Temporary power connection lot
b. Temporary water connection lot
7.00 Permits and licenses
a. Building permits lot
b. Occupancy permits/ CEI lot
8.00 Bonds and Insurance
a. Surety bond lot
b. Performance bond lot
c. Guarantee bond lot
d. Contractor's all risk insurance lot
B. PHASE 1
I. EARTHWORKS
1.00 Site clearing lot
2.00 Layout and staking lot
3.00 Excavation
a. Column footings cu.m.
b. Cistern tank cu.m.
c. Septic tank cu.m.
d. Retaining walls cu.m.
e. Sump pit cu.m.
f. Wall footings
4.00 Backfilling and compaction cu.m.
5.00 Disposal of excess soil/ debris lot
6.00 Gravel Bedding cu.m.
7.00 Soil Poisoning sq.m.
8.00 Others
a. Protection of adjacent structure
Sub-total
Sub-total
C. PHASE 2
I. MASONRY WORKS
1.00 Plastering sq.m.
2.00 Concrete topping sq.m.
3.00 Others
a. Rebars kgs
b. Tie wire kgs
Sub-total
V. CARPENTRY WORKS
1.00 Ceiling cornice bd.-ft
2.00 Baseboards bd.-ft
3.00 Door casings, wood moldings bd.-ft
4.00 Wood treatment lot
5.00 Others
Sub-total
GRAND TOTAL
UNIT COST TOTAL AMOUNT
Materials Labor Materials Labor TOTAL