Professional Documents
Culture Documents
5 Success Stories
1
Shipment for Chinese market in 2013Q4~2014Q3 Shipment for global market in 2013Q4~2014Q3
356,902 2,380,290
296,958 293,957 1,947,138
215.258
201,942 187,536
707,204
359,258
297,362 293,957
Dell Huawei Inspur Lenovo HP IBM HP Dell IBM Huawei Lenovo Inspur
2
Transaction Processing
Performance Council
TPC
Shattered 281 world records for performance spec
VMmark
Source: www.spec.org
3
100,000+ 100,000+
100,000+ 5,000+
According to the statistics from above key customers, Huawei servers have a
fault rate 15% lower than other vendors' servers.
4
Xian Hangzhou
The only global server vendor with independent R&D, production and delivery in one
5
Continuous Innovation RH5885H V3
9032
The key business
application server
RH8100 V3
The key business 2015
application server
X8000
The high density server 2014
E9000 with whole cabinet
The industry's leading
converge architecture
X6000 blade server 2013
The innovative high
density server for
RH2285 datacenter 2012
The first large capacity
ES3000 storage 2U rack server 2010
The worlds first
published PCIe
2008
T8000 SSD card
The ATCA architecture
server for telecom
2007
2002
6
Servers & Solutions Family
Web Analytics Virtualization HPC RISC Migration SAP HANA SQL Server Cache Acceleration
Solution
8U 8S 4U 4S 2U 4S 2U 2S 1U 2S
Rack
RH5885H V3 RH2288 V3 RH2285 V3 RH1288 V3
Server
RH8100 V3
RH5885 V3 RH2485 V2 RH2288H V2 RH2285H V2 RH1288 V2
Blade
Server
12U8/16/32 blades CH242 V3 CH240 CH140 CH222 V3 CH220 V3 CH121 V3
7
Product Strategy
4P/8P/16P+ Server
Converged Infrastructure
Converged OLAP class
Computing, storage,
network integration
8
Support Steady Business Development
9
Total Quality Control to Ensure the Lowest Failure Rate
Components derating design IPD development process Strict production test process
The design of the using stress is lower IPD process is the core Supplier certification and quality
than the nominal stress to improve competitiveness of Huawei control
reliability Quality Management System and Stricter reliability test than the
Strictly selected components to Integrated Product Development international standard
ensure the reliability of equipment Huawei server from the module to Pressure test for 30 consecutive
under extreme conditions the system to strictly abide by the days
IPD process
Time
10
Professional, System-Level Expertise Service
Shenzhen headquarters Mainstream reference architecture Troubleshooting software BIOS, driver, and management
11
Contents
1 Server Sales Strategy Overview
5 Success Stories
12
Huawei Rack Server Family
High scalability
1 U and 2 sockets 2 U and 2 sockets 4-socket server 8-socket server
13
Rack Server Sales Opportunities & Strategy
IT Infrastructure Application Service Application
Enterprise office application ERP SCM CRM
Distributed application
Opportunity Internet Web 2.0
HPC
Searching / Instant Messenger / Electronic
Cluster HPC / Modeling and simulation
Business / Community / Video
Business intelligence
Adopt the following product sales principles with the consideration of price, supply, and configurations:
RH1288 V2 / RH1288 V3: applies to offices of small and medium-sized enterprises or large enterprises' data centers
analysis, and ERP. It has competitive advantages in services and technologies for high-end customers and industries
and helps raise recognition of Huawei servers.
14
Rack Server Key Selling Points
New Technologies and High Performance
Super capacitor for RAID protection solution
Application acceleration solution, high I/O performance with PCIe SSD
Trusted Platform Module (TPM) for Server Security
Top performance in the TPC-E test and SPEC, 53 RAS Features Ensure
High Reliability
15
Rack Server Competitive Strategy
CPU platform HP IBM Dell CISCO Huawei
16
Contents
1 Server Sales Strategy Overview
5 Success Stories
17
E9000 Blade Server Product Overview
Compute Node
CH220 V3 CH222 V3
CH121 V3 IO Expansion Storage
2P Compute 2P Compute Expansion
Node Node 2P Node
Switch Module
Converged Flexible Green and
architecture deployment energy saving C317
CX110 CX116 CX310 10GE /
GE pass through FCoE converged 10GE pass
GE switch module
through module
Support Intel three future generations module switch module
18
E9000 Blade Server Sales Opportunities & Strategy
High-end enterprise applications Private cloud infrastructure
Database / ERP / CRM Physical and virtual machines
Opportunity
Large-memory database HPC (High Performance Computing)
SAP HANA High density and High performance
Converged architecture: Adopts the modular design for compute nodes, storage nodes, switch modules, fan modules,
and power supply modules, and provides various switch modules (such as GE, 10GE, FC, FCoE, and InfiniBand) that
are flexibly configured based on service requirements
Strategy Superb performance: Supports 4-socket compute nodes and up to 1.5 TB of highly cost-effective memory capacity;
supports 40GE/56GE and InfiniBand FDR (56G) and 100GE and evolution towards 16G/32G FC and InfiniBand EDR.
Green and Reliable: Adopts a passive mid-plane to prevent single point of failures, and supports dynamic
management on PSMs in hibernation state, optimizes system air ducts to ensure best heat dissipation.
19
E9000 Blade Server Key Selling Points
No. 1 Reliability
Independent air-duct, improving system heat dissipation
Passive backplanes avoid single points of failure
The most stringent standards of reliability testing for components
Quality control throughout the whole process
20
E9000 Blade Server Competitive Strategy
Huawei E9000 IBM PureFlex HP C7000 Cisco UCS 5108 Dell M1000e
E9000 Competitiveness
Highest Computing Density, Single-frame support 32*2P notes, 64* Grantly EP 135W CPU; Maximum floating point performance 16.5TFlops; Every
node support 8 memory channels, leading memory bandwidth;
Highest Storage Density, CH222 support 15*2.5 inch HDDs, and single-frame support 120T storage capacity
Passive Backplane Ensure Security and Reliability, IBM/HP/DELL/Cisco blade server chassis have active components, with more invalidation risk.
21
Contents
1 Server Sales Strategy Overview
5 Success Stories
22
ES3000 V2 PCIe SSD Card: Break Through the
Storage I/O Bottleneck
Up to 750,000 IOPS
OLTP performance improved 30x vs. SAS HDD
Certified by VMware & FusionSphere
23
Oracle Database Improve 30X
Using two ES3000 as the main storage of the database server, to
store the database contents and log data, the performance of
Oracle database improved almost 30 times.
Oracle ASM
Volume Manager
Oracle Database OLTP Acceleration (bigger is better)
(Transaction Per Second, TPS)
ASM Disk1 ASM Disk2
ES3000
Solution 7484
(3000 users)
ES3000-1 ES3000-2
Array
272 Improve 30X
Solution
(100 users)
24
VDI System Boot Time Saving 96%
Using one ES3000 as the caching device of the VDI server, to solve the boot
storm problem, 50 VDIs in one server simultaneously boot time is shortened
to 20 seconds, saving 96%.
VDI Clients
ES3000
Internet Solution
20 s
(50 VDIs) Saving 96%
Array
Solution 480 s
ES3000 (30 VDIs)
VDI Servers 25
Meeting Speedy Expansion of Internet Services
Large space
X6000 2U, 4 nodes
required
New
Energy saving
High energy Space saving
consumption Rapid deployment
X6800 4U, 8 nodes
(To be released Q414)
Slow deployment
40
consumption
10%
1U rack
80 50% server
Huawei 4 8 300
X nodes servers
20 2U rack server persons hours
4
2U rack
75% server 8 1200
X6000 persons hours servers
27
High-Density Rack Server X8000
X8000
28
Contents
1 Server Sales Strategy Overview
5 Success Stories
29
Huawei Servers Widely Applying to Various Industries
Around the World
Government Finance Energy Telecom Media Others
5000+
customers worldwide China Railway
China State Grid USA Digital
Corporation Domain
Solutions
HUAWEI RH2285 V2 servers act as standalone video surveillance
servers, especially configured and deployed in each branch, and collect
and retransmit data to the headquarters in real time for centralized
management.
Customer Benefits
Unified remote management is supported, which makes daily
management and maintenance more convenient and efficient.
Fully redundant architecture and comprehensive after-sales services
ensure the reliability of the entire system.
Constructing Russian Social Security Fund
Insurance Platform by Using Huawei Blade Servers
Customer Requirements
The Russian social security fund company needs to deploy 82 blade
servers in its 82 branches in a unified manner.
The Russian social security fund company wants to choose a brand-
new IT solution provider who helps the company create values by
providing various and reliable products.
Solutions
Huawei provides a high-performance and high-reliable blade server
platform and deploys servers in 58 of the 82 branches of the Russian
social security fund company.
Customer Benefits
Acquires a brand-new valuable IT solution provider with comprehensive
solutions.
Provides high-efficient IT insurance services, enhances the service
competitive strength, and reduces the procurement cost for customers.
Application Server Integration Project for the
Madrid Hospital
Customer Requirements
The integrated application servers seamlessly interconnect with the
Virtual machines
digital hospital patient information management system and office
systems such as SAP and OA. These systems are frequently accessed
and process a large amount of data, which imposes high performance
requirements on physical servers.
VMware virtualization
As data is increasing, flexible server capacity expansion solutions are
Solutions
needed for on-demand deployment.
The RH2285 V2 servers provide superior multithreaded concurrent
processing to ensure high-availability system performance and
effectively process massive user access requests.
Each RH2285 V2 server provides up to 38 TB of local storage space
Customer Benefits
and sufficient I/O expansion capability.
After the core service systems of the six branches were configured and
integrated by using HUAWEI RH2285 V2 rack servers and VMware
virtualization technology, the entire IT system architecture of Madrid
Hospital was simplified, and witnessed instant results in increased resource
usage, reduced management complexity, and improved system efficiency.
Help Tencent Build an Efficient IT System
Customer Requirements
Lower TCO: Over 200,000 servers in use in Tencent, which charges 1
billion RMB for electricity each year. Reducing operation costs and
cabinet rents are in demand.
Rapid deployment: To address waves of Internet service requirements,
Tencent requires rapid delivery of the infrastructure.
Stable operation: Servers are regarded as product lines in Tencent, so
stable operation of servers is of utmost importance. Batch faults are not
allowed for scale deployment of servers.
Solutions
The 2 U 4-node high-density X6000 servers increase space utilization,
and reduce power consumption and operating costs.
Various node servers are provided to fit in different classifications of Single-socket/Low
cost/2 U 4 SV
Customer Benefits
Lower TCO: Reduces space occupation by 50%, lowers power Dual-socket/
Large-capacity
memory/2 U 4 SV
consumption by 15%, and decreases TCO by 30%.
Improve deployment efficiency greatly: Deploying a chassis of 20
server nodes takes only 10 minutes compared with 5 hours in the past.
DB application/
Reduce faults: Solves the problem of batch faults; Huawei servers are High reliability
Solutions
The Huawei intelligent emulation system with E6000 blade servers provides
industry-leading computing and network throughput capabilities.
The energy scheduling system for State Grid uses the 4-socket servers
RH2488 and RH5485. They provide high performance, reliability, and
scalability. Their specifications are much better than what customers expect
and they are the best choices for implementing core enterprise services.
Customer Benefits
The scheduling system for State Grid has four security levels, which
are lower than only the army security levels. Huawei servers help State
Grid improve the security performance and implement production
strategies in China.
The green and energy-efficient solutions with Huawei servers help
customers slash the operating expense (OPEX) and TCO.
HUAWEI ENTERPRISE ICT SOLUTIONS A BETTER WAY