You are on page 1of 1

1. There are total 38 FM 200 rooms while submitted drawings are only 31.

Please submit complete


package.
2. FM 200 equipment schedule shall be submitted mentioning cylinder details and fire alarm panel
details.
3. PDF shall be provided as a colored copy.
4. Drawing reference section to contain references to following documents along with revision
numbers
a. Designer reference drawing, 2D drawing and Schematics
b. 3D model from designer
c. Designer Calculation reports
d. NAFFCO calculation reports
e. Reference to standard detail drawing (to be produced by NAFFCO).
5. Drawing shall be submitted as Rev 0.1. Reference to submission from Unisafe shall be deleted
6. Solenoid valve is not shown at discharge of a cylinder. Please include
7. Support for vertical pipes is missing. Please update e.g. M007-RAK-FRS-DWG-UCST010-AG-00201
(Section A-A)
8. Setting out details is missing between supports e.g. M007-RAK-FRS-DWG-UCST010-AG-00201
(Section A-A)
9. Supports are missing in some drawings e.g. M007-RAK-FRS-DWG-UCST010-AG-00200
10. Mechanical Layout in all drawings shall be shown in double lines with all setting out details.
Single line layout is not acceptable.

INTERFACE WITH BACS IS MISSING

Please note that as per FRS design schematic there is interface between FM200 panel & FA as
well as FM200 panel & BACS.

Also refer attach FA design schematic and extract from BACS IO point schedule which require to
monitor 3 statuses from FM200 panel separately as stated below.

1. Fire detection alarm


2. FM 200 Gas release status
3. General fault status

Hence in view of above NAFFCO to provide 2 sets of hardwired contacts for both FA & BACS
monitoring for the above referred statuses. Please see the attach markup of your drawing RAK-
FRS-DWG-UCST010-CL-00203.