You are on page 1of 16

construction schedule

start date finish date project period


1/1/2015 1/1/2016 365 days

Activity id Activity Description orig time rem time early start early finish
1 Mobilization -
2 Excavation
3 P.c.c under footings & solid blocks
4 R.c.c for footings & strap beams -
5 Boundary wall (part 1 )sub structural work -
6 Solid blocks -
7 R.c.c for neck columns -
8 rcc tie beam /Cold bitumen 12 12 4/14/2015 4/26/2015
9 filling/compaction/Anti termite 10 10 - 4/27/2015 5/7/2015
10 Ground floor slab with A-142 steel mesh 5 5 0 5/8/2015 5/13/2015
11 Boundary wall (part 1 )sub structural work 15 15 5/14/2015 5/29/2015
12 R.c.c for Gr.F columns and staire 12 12 5/30/2015 6/11/2015
13 R.c.c for Gr.F slab 18 18 6/12/2015 6/30/2015
14 R.c.c for F.F columns 12 12 7/1/2015 7/13/2015
15 R.c.c for roof slab 18 18 7/14/2015 8/1/2015
16 R.c.c for parapet 15 15 8/2/2015 8/17/2015
17 Block work for Gr.F 20 20 8/18/2015 9/7/2015
18 Block work for F.F 20 20 9/8/2015 9/28/2015
19 Water proof for roof 14 14 9/29/2015 10/13/2015
20 Boundary wall (part 2 ) 35 35 10/14/2015 11/18/2015
21 Plumbing works for Gr.F (drainage internal) 6 6 11/19/2015 11/25/2015
22 Plumbing works Gr.F (Water supply) 6 6 11/26/2015 12/2/2015
23 Plumbing works for F.F (drainage internal) 6 6 12/3/2015 12/9/2015
24 Plumbing works F.F (Water supply) 8 8 12/10/2015 12/18/2015
25 Electrical works Gr.F (conducting) 8 8 12/19/2015 12/27/2015
26 Electrical works Fr.F (conducting) 10 10 12/28/2015 1/7/2016
27 Plaster work for Gr.F 10 10 1/8/2016 1/18/2016
28 Plaster work for Fr.F 12 12 1/19/2016 1/31/2016
29 Plaster work External 12 12 2/1/2016 2/13/2016
30 GRC work 7 7 2/14/2016 2/21/2016
31 Electrical works Gr.F (fixing D.B & wiring ) 7 7 2/22/2016 2/29/2016
32 Electrical works Fr.F (fixing D.B & wiring ) 15 15 3/1/2016 3/16/2016
33 Finishing work Gr.F (floors & wall) 15 15 3/17/2016 4/1/2016
34 Finishing work Fr.F (floors & wall) 7 7 4/2/2016 4/9/2016
35 Painting Gr.F (internal) 7 7 4/10/2016 4/17/2016
36 Painting Fr.F (internal) 12 12 4/18/2016 4/30/2016
37 Painting (external) 12 12 5/1/2016 5/13/2016
38 Aluminum windows & grills 12 12 5/14/2016 5/26/2016
39 Carpentry works(doors) 25 25 5/27/2016 6/21/2016
40 A/C works (ducting) 25 25 6/22/2016 7/17/2016
41 A/C works (fixing of units) 15 15 7/18/2016 8/2/2016
42 False ceilings & gypsum work 15 15 8/3/2016 8/18/2016
43 Plumbing works (sanitary fixing) 12 12 8/19/2016 8/31/2016
44 Electrical works (fixing switches sockets lights) 10 10 9/1/2016 9/11/2016
45 Final finishing for internal & external work 25 25 9/12/2016 10/7/2016
46 Handing over 15 15 10/8/2016 10/23/2016
-
-
-
-
-
-
46 -
project period
ys

resourses
jan 01

4/14/2015
4/15/2015
4/16/2015
4/17/2015
4/18/2015
4/19/2015
Activity id Activity description rem d

1 rcc tie beam /Cold bitumen 12 RCC TIR BEAM/COLD BITUMEN


filling/compaction/Anti termite 10
Ground floor slab with A-142 steel mesh 5
Boundary wall (part 1 )sub structural work 12
R.c.c for Gr.F columns and staire 12
R.c.c for Gr.F slab 18
R.c.c for F.F columns 12
R.c.c for roof slab 15
R.c.c for parapet 15
Block work for Gr.F 20
Block work for F.F 14
Water proof for roof 35
Boundary wall (part 2 ) 6
Plumbing works for Gr.F (drainage internal) 6
Plumbing works Gr.F (Water supply) 6
Plumbing works for F.F (drainage internal) 8
Plumbing works F.F (Water supply) 8
Electrical works Gr.F (conducting) 10
Electrical works Fr.F (conducting) 10
Plaster work for Gr.F 12
Plaster work for Fr.F 12
Plaster work External 7
GRC work 7
Electrical works Gr.F (fixing D.B & wiring ) 15
Electrical works Fr.F (fixing D.B & wiring ) 15
Finishing work Gr.F (floors & wall) 7
Finishing work Fr.F (floors & wall) 7
Painting Gr.F (internal) 12
Painting Fr.F (internal) 12
Painting (external) 12
Aluminum windows & grills 25
Carpentry works(doors) 25
A/C works (ducting) 15
A/C works (fixing of units) 15
False ceilings & gypsum work 12
Plumbing works (sanitary fixing) 10
Electrical works (fixing switches sockets lights) 25
Final finishing for internal & external work 15
Handing over
4/20/2015 jan 01
4/21/2015
4/22/2015
4/23/2015

C TIR BEAM/COLD BITUMEN


4/24/2015
4/25/2015
4/26/2015
4/27/2015
4/28/2015
4/29/2015
4/30/2015
5/1/2015
5/2/2015
5/3/2015
5/4/2015
5/5/2015
5/6/2015
FILLING/COMPACTION/ANTI TERMIT

5/7/2015
5/8/2015
5/9/2015
5/10/2015
G.f with A-142

5/11/2015
5/12/2015
5/13/2015
5/14/2015
5/15/2015
5/16/2015
5/17/2015
5/18/2015
BOUNDARY WALL SUB STRUC
5/19/2015
5/20/2015
5/21/2015
5/22/2015
5/23/2015

UNDARY WALL SUB STRUCTURE


5/24/2015
5/25/2015
5/26/2015
5/27/2015
5/28/2015
5/29/2015
5/30/2015
5/31/2015
6/1/2015
6/2/2015
6/3/2015
6/4/2015
6/5/2015
6/6/2015
6/7/2015
6/8/2015
RCC FOR GR.F COLUMN AND STAIRE CASE

6/9/2015
6/10/2015
6/11/2015
6/12/2015
6/13/2015
6/14/2015
6/15/2015
6/16/2015
GR.FLOOR SLAB
6/17/2015

GR.FLOOR SLAB
6/18/2015
6/19/2015
6/20/2015
6/21/2015
6/22/2015
6/23/2015
6/24/2015
6/25/2015
6/26/2015
6/27/2015
6/28/2015
6/29/2015
6/30/2015
7/1/2015
7/2/2015
7/3/2015
7/4/2015
7/5/2015
7/6/2015
F.F COLUMN

7/7/2015
7/8/2015
7/9/2015
7/10/2015
7/11/2015
7/12/2015
7/13/2015
7/14/2015
7/15/2015
7/16/2015
7/17/2015
7/18/2015
7/19/2015
7/20/2015
7/21/2015
7/22/2015
7/23/2015

F.F SLAB
7/24/2015
7/25/2015
7/26/2015
7/27/2015
7/28/2015
7/29/2015
7/30/2015
7/31/2015
8/1/2015
8/2/2015
8/3/2015
8/4/2015
8/5/2015
8/6/2015
8/7/2015
8/8/2015
RCC.PARAPHET

8/9/2015
8/10/2015
8/11/2015
8/12/2015
8/13/2015
8/14/2015
8/15/2015
8/16/2015
8/17/2015
8/18/2015
8/19/2015
8/20/2015
8/21/2015
8/22/2015
8/23/2015
8/24/2015
8/25/2015
8/26/2015
8/27/2015
8/28/2015
8/29/2015
8/30/2015
8/31/2015
9/1/2015
9/2/2015
9/3/2015
9/4/2015
9/5/2015
9/6/2015
9/7/2015
9/8/2015
9/9/2015
9/10/2015
9/11/2015
9/12/2015
9/13/2015
9/14/2015
9/15/2015
9/16/2015
9/17/2015
9/18/2015