You are on page 1of 5

Sheet1

PROJECT TITLE RELEAVANCE


(TOTAL POINT 5)

1. I- SHIRT (IOT BASED) 3.5

2. 3D PRINTING OF BONES 4

3. SWIM MONITORING AND DRAWING SYSTEM(IOT BASED) 3.5

4. VEHICLE COLUMN AIR QUALITY MEASUREMENT 4.5


FOR IMPROVED SAFETY

5. INFLATABLE MOTORCYCLE JACKET FOR TWO WHEELER 3.5


SAFETY

6. MULTI TASKING VOICE CONTROLLED ROBOT 4

7. IOT BASED COFFEE MACHINE 3

8. FOOT STEP GENERATION 5

9. ROBOTIC SURGEON 3.5

10. 3D PRINTER WHICH CAN HANDLE ABS MATERIALS 5

Page 1
Sheet1

FUTURE READY MARKET PULL OR TECHNOLOGY PUSH


(TOTAL POINT 5) (M.P. /T.P.)

4 T.P.

5 M.P.

4 T.P.

4.5 T.P.

3.5 T.P.

5 M.P.

3.5 M.P.

3.5 M.P.

4.5 T.P.

5 T.P.

Page 2
Sheet1

COST EFFECTIVENESS SAFETY TOTAL POINTS


(TOTAL POINT 5) (TOTAL POINT 5) OUT OF 20 /M.P. OR T.P.

3 4 14.5/T.P.

3 5 17/M.P.

3 5 14.5/T.P.

3 4 16/T.P.

2.5 5 14.5/T.P.

4 4 17/M.P.

4 5 15.5/M.P.

3 5 16.5/M.P.

2 4 14/T.P.

3 5 18/T.P.

Page 3
Sheet1

REMARKS

UR FIRST CHOICE BUT REJECTED BY THE TEAM LEADER DUE TO UNAVAILABLE INFORMATION OF MATERIAL

HIRD CHOICE BUT REJECTED BY THE TEAM LEADER DUE TO UNAVAILABLE INFORMATION OF SPECIFIED T

OUR SECOND CHOICE BUT REJECTED BY TEAM LEADER DUE TO RETURN OF INVESTMENT.

THE IMPROVISATION OF OUR FIRST CHOICE WHICH IS SUGGESTED BY OUR TEAM LEADER.IT IS GOING FOR E

Page 4
Sheet1

ERIAL.

IED TASK.

FOR EVALUATION.

Page 5

You might also like